OK ENGINEERING ESTIMATE - SR ADABANG Ok

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 137

HARGA SATUAN UPAH DAN BAHAN

PROGRAM PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI D
PEKERJAAN PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (
LOKASI KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A 2023

NO URAIAN SATUAN

1 Mandor OH
2 Kepala Tukang Batu OH
3 Tukang Batu Kasar OH
4 Tukang Batu Halus OH
5 Kepala Tukang Kayu OH
6 Tukang Kayu Kasar OH
7 Tukang Kayu Halus OH
8 Kepala Tukang Besi OH
9 Tukang Besi Konstruksi OH
10 Tukang Besi Tulangan OH
11 Kepala Tukang Cat OH
12 Tukang Cat Biasa OH
13 Kepala Tukang Listrik OH
14 Tukang Listrik OH
15 Kepala Tukang Pipa OH
16 Tukang Pipa OH
17 Pekerja OH
18 Operator OH
19 Pembantu Operator OH

B BAHAN
B.1 PIPA
1 Pipa HDPE Ø 63 mm ( 2 inch ) Pn 16 Sdr 11 m'
2 Pipa HDPE Ø 50 mm ( 1 1/2 inch ) Pn 16 Sdr 11 m'
3 Pipa HDPE Ø 32 mm ( 1 inch ) Pn 16 Sdr 11 m'
4 Pipa HDPE Ø 25 mm ( 3/4 inch ) Pn 16 Sdr 11 m'
5 Pipa HDPE Ø 20 mm ( 1/2 inch ) Pn 16 Sdr 11 m'
6 Pipa Galvanis 2" Medium A m'
7 Pipa Galvanis 1 1/2" Medium A m'
8 Pipa Galvanis 1 1/4" Medium A m'
9 Pipa Galvanis 1" Medium A m'
10 Pipa Galvanis 3/4" Medium A m'
11 Pipa Galvanis 1/2" Medium A m'

B.2 AKSESORIS PIPA

1 Straigh Coupler (PN 16) Ø 20 mm Bh


2 Straigh Coupler (PN 16) Ø 25 mm Bh
3 Straigh Coupler (PN 16) Ø 32 mm Bh
4 Straigh Coupler (PN 16) Ø 40 mm Bh
5 Straigh Coupler (PN 16) Ø 50 mm Bh
6 Straigh Coupler (PN 16) Ø 63 mm Bh
7 Straigh Coupler (PN 16) Ø 75 mm Bh
8 Straigh Coupler (PN 16) Ø 90 mm Bh
9 Straigh Coupler (PN 16) Ø 110 mm Bh

1 Male Thread Adaptor (MTA) Ø 20 mm x 1/2" Bh


2 Male Thread Adaptor (MTA) Ø 20 mm x 3/4" Bh
3 Male Thread Adaptor (MTA) Ø 25 mm x 1/2" Bh
4 Male Thread Adaptor (MTA) Ø 25 mm x 3/4" Bh
5 Male Thread Adaptor (MTA) Ø 25 mm x 1" Bh
6 Male Thread Adaptor (MTA) Ø 32 mm x 3/4" Bh
7 Male Thread Adaptor (MTA) Ø 32 mm x 1" Bh
8 Male Thread Adaptor (MTA) Ø 32 mm x 1 1/4" Bh
9 Male Thread Adaptor (MTA) Ø 40 mm x 3/4" Bh
10 Male Thread Adaptor (MTA) Ø 40 mm x 1" Bh
11 Male Thread Adaptor (MTA) Ø 40 mm x 1 1/4" Bh
12 Male Thread Adaptor (MTA) Ø 40 mm x 1 1/2" Bh
13 Male Thread Adaptor (MTA) Ø 50 mm x 1 1/4" Bh
14 Male Thread Adaptor (MTA) Ø 50 mm x 1 1/2" Bh
15 Male Thread Adaptor (MTA) Ø 50 mm x 1 1/2" Bh
16 Male Thread Adaptor (MTA) Ø 63 mm x 1 1/2" Bh
17 Male Thread Adaptor (MTA) Ø 63 mm x 2" Bh
18 Male Thread Adaptor (MTA) Ø 75 mm x 2 " Bh
19 Male Thread Adaptor (MTA) Ø 75 mm x 2 1/2" Bh
20 Male Thread Adaptor (MTA) Ø 90 mm x 3" Bh
21 Male Thread Adaptor (MTA) Ø 110 mm x 4" Bh

1 Female Thread Adaptor (FTA) Ø 20 mm x 1/2" Bh


2 Female Thread Adaptor (FTA) Ø 20 mm x 3/4" Bh
3 Female Thread Adaptor (FTA) Ø 25 mm x 1/2" Bh
4 Female Thread Adaptor (FTA) Ø 25 mm x 3/4" Bh
5 Female Thread Adaptor (FTA) Ø 25 mm x 1" Bh
6 Female Thread Adaptor (FTA) Ø 32 mm x 3/4" Bh
7 Female Thread Adaptor (FTA) Ø 32 mm x 1" Bh
8 Female Thread Adaptor (FTA) Ø 40 mm x 1" Bh
9 Female Thread Adaptor (FTA) Ø 40 mm x 1 1/4" Bh
10 Female Thread Adaptor (FTA) Ø 40 mm x 1 1/2" Bh
11 Female Thread Adaptor (FTA) Ø 50 mm x 1 1/2" Bh
12 Female Thread Adaptor (FTA) Ø 63 mm x 2" Bh
13 Female Thread Adaptor (FTA) Ø 75 mm x 2" Bh
14 Female Thread Adaptor (FTA) Ø 75 mm x 2 1/2" Bh
15 Female Thread Adaptor (FTA) Ø 90 mm x 3" Bh
16 Female Thread Adaptor (FTA) Ø 110 mm x 4" Bh

1 Male Threaded Elbow 90⁰ Ø 20 mm x 1/2" Bh


2 Male Threaded Elbow 90⁰ Ø 20 mm x 3/4" Bh
3 Male Threaded Elbow 90⁰ Ø 25 mm x 1/2" Bh
4 Male Threaded Elbow 90⁰ Ø 25 mm x 3/4 Bh
5 Male Threaded Elbow 90⁰ Ø 25 mm x 1" Bh
6 Male Threaded Elbow 90⁰ Ø 32 mm x 1/2" Bh
7 Male Threaded Elbow 90⁰ Ø 32 mm x 3/4" Bh
8 Male Threaded Elbow 90⁰ Ø 32 mm x 1" Bh
9 Male Threaded Elbow 90⁰ Ø 40 mm x 1" Bh
10 Male Threaded Elbow 90⁰ Ø 40 mm x 1 1/4" Bh
11 Male Threaded Elbow 90⁰ Ø 50 mm x 1 1/2" Bh
12 Male Threaded Elbow 90⁰ Ø 63 mm x 2" Bh
13 Male Threaded Elbow 90⁰ Ø 75 mm x 2 1/2" Bh
14 Male Threaded Elbow 90⁰ Ø 90 mm x 3" Bh
15 Male Threaded Elbow 90⁰ Ø 110 mm x 4" Bh

1 Female Threaded Elbow 90⁰ Ø 20 mm x 1/2" Bh


2 Female Threaded Elbow 90⁰ Ø 20 mm x 3/4" Bh
3 Female Threaded Elbow 90⁰ Ø 25 mm x 1/2" Bh
4 Female Threaded Elbow 90⁰ Ø 25 mm x 3/4 Bh
5 Female Threaded Elbow 90⁰ Ø 25 mm x 1" Bh
6 Female Threaded Elbow 90⁰ Ø 32 mm x 1/2" Bh
7 Female Threaded Elbow 90⁰ Ø 32 mm x 3/4" Bh
8 Female Threaded Elbow 90⁰ Ø 32 mm x 1" Bh
9 Female Threaded Elbow 90⁰ Ø 40 mm x 1" Bh
10 Female Threaded Elbow 90⁰ Ø 40 mm x 1 1/4" Bh
11 Female Threaded Elbow 90⁰ Ø 50 mm x 1 1/2" Bh
12 Female Threaded Elbow 90⁰ Ø 63 mm x 2" Bh
13 Female Threaded Elbow 90⁰ Ø 75 mm x 2 1/2" Bh
14 Female Threaded Elbow 90⁰ Ø 90 mm x 3" Bh
15 Female Threaded Elbow 90⁰ Ø 110 mm x 4" Bh

1 Tee Equal 90⁰ Ø 20 mm Bh


2 Tee Equal 90⁰ Ø 25 mm Bh
3 Tee Equal 90⁰ Ø 32 mm Bh
4 Tee Equal 90⁰ Ø 40 mm Bh
5 Tee Equal 90⁰ Ø 50 mm Bh
6 Tee Equal 90⁰ Ø 63 mm Bh
7 Tee Equal 90⁰ Ø 75 mm Bh
8 Tee Equal 90⁰ Ø 90 mm Bh
9 Tee Equal 90⁰ Ø 110 mm Bh

1 Reducing Tee 90⁰ Ø 25 mm x Ø 20 mm Bh


2 Reducing Tee 90⁰ Ø 32 mm x Ø 20 mm Bh
3 Reducing Tee 90⁰ Ø 32 mm x Ø 25 mm Bh
4 Reducing Tee 90⁰ Ø 40 mm x Ø 25 mm Bh
5 Reducing Tee 90⁰ Ø 40 mm x Ø 32 mm Bh
6 Reducing Tee 90⁰ Ø 50 mm x Ø 25 mm Bh
7 Reducing Tee 90⁰ Ø 50 mm x Ø 32 mm Bh
8 Reducing Tee 90⁰ Ø 50 mm x Ø 40 mm Bh
9 Reducing Tee 90⁰ Ø 63 mm x Ø 32 mm Bh
10 Reducing Tee 90⁰ Ø 63 mm x Ø 40 mm Bh
11 Reducing Tee 90⁰ Ø 63 mm x Ø 50 mm Bh
12 Reducing Tee 90⁰ Ø 75 mm x Ø 40 mm Bh
13 Reducing Tee 90⁰ Ø 75 mm x Ø 63 mm Bh
14 Reducing Tee 90⁰ Ø 90 mm x Ø 63 mm Bh
15 Reducing Tee 90⁰ Ø 90 mm x Ø 75 mm Bh
16 Reducing Tee 90⁰ Ø 110 mm x Ø 90 mm Bh

1 Reducing Coupler Ø 25 mm x Ø 20 mm Bh
2 Reducing Coupler Ø 32 mm x Ø 20 mm Bh
3 Reducing Coupler Ø 32 mm x Ø 25 mm Bh
4 Reducing Coupler Ø 40 mm x Ø 20 mm Bh
5 Reducing Coupler Ø 40 mm x Ø 25 mm Bh
6 Reducing Coupler Ø 40 mm x Ø 32 mm Bh
7 Reducing Coupler Ø 50 mm x Ø 20 mm Bh
8 Reducing Coupler Ø 50 mm x Ø 25 mm Bh
9 Reducing Coupler Ø 50 mm x Ø 32 mm Bh
10 Reducing Coupler Ø 50 mm x Ø 40 mm Bh
11 Reducing Coupler Ø 63 mm x Ø 25 mm Bh
12 Reducing Coupler Ø 63 mm x Ø 32 mm Bh
13 Reducing Coupler Ø 63 mm x Ø 40 mm Bh
14 Reducing Coupler Ø 63 mm x Ø 50 mm Bh
15 Reducing Coupler Ø 75 mm x Ø 40 mm Bh
16 Reducing Coupler Ø 75 mm x Ø 50 mm Bh
17 Reducing Coupler Ø 75 mm x Ø 63 mm Bh
18 Reducing Coupler Ø 90 mm x Ø 63 mm Bh
19 Reducing Coupler Ø 90 mm x Ø 75 mm Bh
20 Reducing Coupler Ø 110 mm x Ø 90 mm Bh

1 Elbow 90⁰ Ø 20 mm Bh
2 Elbow 90⁰ Ø 25 mm Bh
3 Elbow 90⁰ Ø 32 mm Bh
4 Elbow 90⁰ Ø 40 mm Bh
5 Elbow 90⁰ Ø 50 mm Bh
6 Elbow 90⁰ Ø 63 mm Bh
7 Elbow 90⁰ Ø 75 mm Bh
8 Elbow 90⁰ Ø 90 mm Bh
9 Elbow 90⁰ Ø 110 mm Bh

1 Male Threaded Tee 90⁰ Ø 20 mm x 20 mm" Bh


2 Male Threaded Tee 90⁰ Ø 20 mm x 25 mm" Bh
3 Male Threaded Tee 90⁰ Ø 25 mm x 20 mm" Bh
4 Male Threaded Tee 90⁰ Ø 25 mm x 25 mm" Bh
5 Male Threaded tee 90⁰ Ø 25 mm x 32 mm" Bh
7 Male Threaded tee 90⁰ Ø 32 mm x 25 mm" Bh
8 Male Threaded Tee 90⁰ Ø 32 mm x 32 mm" Bh
9 Male Threaded Tee 90⁰ Ø 40 mm x 32 mm" Bh
10 Male Threaded Tee 90⁰ Ø 40 mm x 40 mm" Bh
11 Male Threaded Tee 90⁰ Ø 50 mm x 40 mm" Bh
12 Male Threaded Tee 90⁰ Ø 50 mm x 50 mm" Bh
13 Male Threaded Tee 90⁰ Ø 63 mm x 63 mm" Bh
14 Male Threaded Tee 90⁰ Ø 75 mm x 63 mm" Bh
15 Male Threaded Tee 90⁰ Ø 75 mm x 75 mm" Bh
16 Male Threaded Tee 90⁰ Ø 90 mm x 90 mm" Bh
17 Male Threaded Tee 90⁰ Ø 110 mm x 90 mm" Bh
18 Male Threaded Tee 90⁰ Ø 110 mm x 110 mm" Bh

1 Famale ThreadedTee 90⁰ Ø 20 mm x 20 mm" Bh


2 Famale Threaded Tee 90⁰ Ø 20 mm x 25 mm" Bh
3 Famale Threaded Tee 90⁰ Ø 25 mm x 20 mm" Bh
4 Famale Threaded Tee 90⁰ Ø 25 mm x 25 mm" Bh
5 Famale Threaded Tee 90⁰ Ø 25 mm x 32 mm" Bh
6 Famale Threaded Tee 90⁰ Ø 32 mm x 25 mm" Bh
7 Famale Threaded Tee 90⁰ Ø 32 mm x 32 mm" Bh
8 Famale Threaded Tee 90⁰ Ø 40 mm x 32 mm" Bh
9 Famale Threaded Tee 90⁰ Ø 40 mm x 40 mm" Bh
10 Famale Threaded tee 90⁰ Ø 50 mm x 40 mm" Bh
11 Famale Threaded Tee 90⁰ Ø 50 mm x 50 mm" Bh
12 Famale Threaded Tee 90⁰ Ø 63 mm x 63 mm" Bh
13 Famale Threaded Tee 90⁰ Ø 75 mm x 63 mm" Bh
14 Famale Threaded Tee 90⁰ Ø 75 mm x 75 mm" Bh
15 Famale Threaded Tee 90⁰ Ø 90 mm x 90 mm" Bh
16 Famale Threaded Tee 90⁰ Ø 110 mm x 90 mm" Bh
17 Famale Threaded Tee 90⁰ Ø 110 mm x 110 mm" Bh

1 Ferruler Thread Connection Ø 32 mm x 20 mm Bh


2 Ferruler Thread Connection Ø 32 mm x 25 mm Bh
3 Ferruler Thread Connection Ø 32 mm x 25 mm Bh
4 Ferruler Thread Connection Ø 40 mm x 20 mm Bh
5 Ferruler Thread Connection Ø 40 mm x 25 mm Bh
6 Ferruler Thread Connection Ø 40 mm x 32 mm Bh

1 Ferruler Compresion Joint Ø 32 mm x 20 mm Bh


2 Ferruler Compresion Joint Ø 32 mm x 25 mm Bh
3 Ferruler Compresion Joint Ø 32 mm x 32 mm Bh
4 Ferruler Compresion Joint Ø 40 mm x 20 mm Bh
5 Ferruler Compresion Joint Ø 40 mm x 25 mm Bh
6 Ferruler Compresion Joint Ø 40 mm x 32 mm Bh

1 End Cap Ø 20 mm Bh
2 End Cap Ø 25 mm Bh
3 End Cap Ø 32 mm Bh
4 End Cap Ø 40 mm Bh
5 End Cap Ø 50 mm Bh
6 End Cap Ø 63 mm Bh
7 End Cap Ø 75 mm Bh
8 End Cap Ø 90 mm Bh
9 End Cap Ø 110 mm Bh

1 Flanged Joint Ø 50 mm x 1 1/2" Bh


2 Flanged Joint Ø 63 mm x 2" Bh
3 Flanged Joint Ø 75 mm x 2 1/2" Bh
4 Flanged Joint Ø 90 mm x 3" Bh
5 Flanged Joint Ø 110 mm x 4" Bh

1 Clamp Sadle Ø 25 mm x 20 mm" Bh


2 Clamp Sadle Ø 32 mm x 20 mm" Bh
3 Clamp Sadle Ø 32 mm x 25 mm" Bh
4 Clamp Sadle Ø 32 mm x 32 mm" Bh
5 Clamp Sadle Ø 40 mm x 20 mm" Bh
6 Clamp Sadle Ø 40 mm x 25 mm" Bh
7 Clamp Sadle Ø 40 mm x 32 mm" Bh
8 Clamp Sadle Ø 50 mm x 20 mm" Bh
9 Clamp Sadle Ø 50 mm x 25 mm" Bh
10 Clamp Sadle Ø 50 mm x 32 mm" Bh
11 Clamp Sadle Ø 63 mm x 20 mm" Bh
12 Clamp Sadle Ø 63 mm x 25 mm" Bh
13 Clamp Sadle Ø 63 mm x 32 mm" Bh
14 Clamp Sadle Ø 63 mm x 40 mm" Bh
15 Clamp Sadle Ø 75 mm x 20 mm" Bh
16 Clamp Sadle Ø 75 mm x 25 mm" Bh
17 Clamp Sadle Ø 75 mm x 32 mm" Bh
18 Clamp Sadle Ø 75 mm x 40 mm" Bh
19 Clamp Sadle Ø 75 mm x 50 mm" Bh
20 Clamp Sadle Ø 75 mm x 63 mm" Bh
21 Clamp Sadle Ø 90 mm x 20 mm" Bh
22 Clamp Sadle Ø 90 mm x 25 mm" Bh
23 Clamp Sadle Ø 90 mm x 32 mm" Bh
24 Clamp Sadle Ø 90 mm x 40 mm" Bh
25 Clamp Sadle Ø 90 mm x 50 mm" Bh
26 Clamp Sadle Ø 90 mm x 63 mm" Bh
27 Clamp Sadle Ø 110 mm x 20 mm" Bh
28 Clamp Sadle Ø 110 mm x 25 mm" Bh
29 Clamp Sadle Ø 110 mm x 32 mm" Bh
30 Clamp Sadle Ø 110 mm x 40 mm" Bh
31 Clamp Sadle Ø 110 mm x 50 mm" Bh
32 Clamp Sadle Ø 110 mm x 63 mm" Bh

1 Knee 90ᴼ GIP Ø 1/2" Bh


2 Knee 90ᴼ GIP Ø 3/4" Bh
3 Knee 90ᴼ GIP Ø 1" Bh
4 Knee 90ᴼ GIP Ø 1 1/4" Bh
5 Knee 90ᴼ GIP Ø 1 1/2" Bh
6 Knee 90ᴼ GIP Ø 2" Bh
7 Knee 90ᴼ GIP Ø 2 1/2" Bh

1 Tee GIP Ø 1/2" Bh


2 Tee GIP Ø 3/4" Bh
3 Tee GIP Ø 1" Bh
4 Tee GIP Ø 1 1/4" Bh
5 Tee GIP Ø 1 1/2" Bh
6 Tee GIP Ø 2" Bh
7 Tee GIP Ø 2 1/2" Bh

1 Socket GIP Ø 1/2" Bh


2 Socket GIP Ø 3/4" Bh
3 Socket GIP Ø 1" Bh
4 Socket GIP Ø 1 1/4" Bh
5 Socket GIP Ø 1 1/2" Bh
6 Socket GIP Ø 2" Bh
7 Socket GIP Ø 2 1/2" Bh

1 Double Niple GIP Ø 1/2" Bh


2 Double Niple GIP Ø 3/4" Bh
3 Double Niple GIP Ø 1" Bh
4 Double Niple GIP Ø 1 1/4" Bh
5 Double Niple GIP Ø 1 1/2" Bh
6 Double Niple GIP Ø 2" Bh
7 Double Niple GIP Ø 2 1/2" Bh

1 Watermour GIP Ø 1/2" Bh


2 Watermour GIP Ø 3/4" Bh
3 Watermour GIP Ø 1" Bh
4 Watermour GIP Ø 1 1/4" Bh
5 Watermour GIP Ø 1 1/2" Bh
6 Watermour GIP Ø 2" Bh
7 Watermour GIP Ø 2 1/2" Bh

1 Plug GIP Ø 1/2" Bh


2 Plug GIP Ø 3/4" Bh
3 Plug GIP Ø 1" Bh
4 Plug GIP Ø 1 1/4" Bh
5 Plug GIP Ø 1 1/2" Bh
6 Plug GIP Ø 2" Bh
7 Plug GIP Ø 2 1/2" Bh

1 Dop GIP Ø 1/2" Bh


2 Dop GIP Ø 3/4" Bh
3 Dop GIP Ø 1" Bh
4 Dop GIP Ø 1 1/4" Bh
5 Dop GIP Ø 1 1/2" Bh
6 Dop GIP Ø 2" Bh
7 Dop GIP Ø 2 1/2" Bh

1 V. Socket GIP Ø 1/2" Bh


2 V. Socket GIP Ø 3/4" Bh
3 V. Socket GIP Ø 1" Bh
4 V. Socket GIP Ø 1 1/4" Bh
5 V. Socket GIP Ø 1 1/2" Bh
6 V. Socket GIP Ø 2" Bh
7 V. Socket GIP Ø 2 1/2" Bh

1 V. Tee GIP Ø 1/2" Bh


2 V. Tee GIP Ø 3/4" Bh
3 V. Tee GIP Ø 1" Bh
4 V. Tee GIP Ø 1 1/4" Bh
5 V. Tee GIP Ø 1 1/2" Bh
6 V. Tee GIP Ø 2" Bh
7 V. Tee GIP Ø 2 1/2" Bh

1 V. Ring GIP Ø 1/2" Bh


2 V. Ring GIP Ø 3/4" Bh
3 V. Ring GIP Ø 1" Bh
4 V. Ring GIP Ø 1 1/4" Bh
5 V. Ring GIP Ø 1 1/2" Bh
6 V. Ring GIP Ø 2" Bh
7 V. Ring GIP Ø 2 1/2" Bh

1 Flange Drat GIP Ø 1/2" Bh


2 Flange Drat GIP Ø 3/4" Bh
3 Flange Drat GIP Ø 1" Bh
4 Flange Drat GIP Ø 1 1/4" Bh
5 Flange Drat GIP Ø 1 1/2" Bh
6 Flange Drat GIP Ø 2" Bh
7 Flange Drat GIP Ø 2 1/2" Bh
8 Flange Drat GIP Ø 3" Bh
9 Flange Drat GIP Ø 4" Bh

1 V. Knee GIP Ø 3/4" Bh


2 V. Knee GIP Ø 1" Bh
3 V. Knee GIP Ø 1 1/4" Bh
4 Clamp Saddle Ø 1" - Black Malliable Iron Bh
5 Clamp Saddle Ø 1 1/2" - Black Malliable Iron Bh
6 Clamp Saddle Ø 2" - Black Malliable Iron Bh
7 Clamp Saddle Ø 3" - Black Malliable Iron Bh
8 Clamp Saddle Ø 4" - Black Malliable Iron Bh

1 Packing Karet 1,5" Bh


2 Packing Karet 2" Bh
3 Packing Karet 3" Bh
4 Plug Valve 1/2" - Kuningan Bh
5 Plug Kran 1/2" - Kuningan Bh
6 Check Valve 1/2" - Kuningan Bh
7 Water Meter Ø 15 mm ( 1/2" ) - SNI Bh
8 Katup Searah Ǿ 15 mm Bh
9 Kran Air GIP Ø 15 mm ( 1/2" ) Bh
10 Kran Air GIP Ø 20 mm ( 3/4" ) Bh
11 Kran Air GIP Ø 25 mm ( 1" ) Bh
12 Box Meter Bh
13 Wall Pipa 1,5 Bh
14 Stop kran 1/2" - Kuningan Bh

1 Gate Valve 1/2" Bh


2 Gate Valve 3/4" Bh
3 Gate Valve 1" Bh
4 Gate Valve 1 1/2" Bh
5 Gate Valve 1 1/2" Bh
6 Gate Valve 2" Bh
7 Gate Valve 2 1/2" Bh
8 Gate Valve 3" Bh
9 Gate Valve 4" Bh

HARGA SATUAN SK BUPATI 2023


HARGA BAHAN BANGUNAN LARANTUKA
KODE URAIAN SATUAN
Air Liter
1.1.7.01.01.01.002 Semen Bosowa 40 Kg sak
1.1.7.01.01.01.002 Semen warna (super grow) Kg
1.1.7.01.01.01.015 Besi beton 6 mm Banci Batang
1.1.7.01.01.01.015 Besi Beton 6 mm (SNI) Batang
1.1.7.01.01.01.015 Besi beton 8 mm Banci Batang
1.1.7.01.01.01.015 Besi Beton 8 mm (SNI) Batang
1.1.7.01.01.01.015 Besi beton 10 mm Banci Batang
1.1.7.01.01.01.015 Besi Beton 10 mm (SNI) Batang
1.1.7.01.01.01.015 Beesi beton 12 mm Banci Batang
1.1.7.01.01.01.015 Besi Beton 12 mm (SNI) Batang
1.1.7.01.01.01.015 Besi Beton 16 mm (SNI) Batang
1.1.7.01.01.05.001 Kawat ikat Kg
1.1.7.01.01.01.022 Paku biasa 10 cm Kg
1.1.7.01.01.01.022 Paku biasa 7 cm Kg
1.1.7.01.01.01.022 Paku biasa 5 cm Kg
1.1.7.01.01.01.022 Paku biasa 6 cm Kg
1.1.7.01.01.01.022 Paku biasa 2 cm Kg
1.1.7.01.01.01.022 Paku biasa 3 cm Kg
1.1.7.01.01.01.022 Paku biasa 4 cm Kg
1.1.7.01.01.01.022 Paku seng biasa Kg
1.1.7.01.01.01.022 Taekwood 3 mm Lembar
1.1.7.01.01.01.022 Tripleks 3 mm Lembar
1.1.7.01.01.01.022 Tripleks 6 mm Lembar
1.1.7.01.01.01.022 Tripleks 9 mm Lembar
1.1.7.02.02.06.001 Saringan kamar mandi Buah
1.1.7.02.02.06.001 Sumbat Bak Besi Buah
1.1.7.02.02.06.001 Sumbat Bak Plastik Buah
1.1.7.01.03.07.005 Talang PVC 8 Dim Batang
1.1.7.01.01.01.006 Lem PVC Tube
1.1.7.01.03.07.005 Seal tape Buah
1.1.7.01.03.07.005 Kran kuningan 1/2 Buah
1.1.7.01.03.07.005 Kran kuningan 3/4 Buah
1.1.7.01.03.07.005 Stop kran 1/2 Buah
1.1.7.01.03.07.005 Stop kran 3/4 Buah
1.1.7.01.03.07.005 Stop kran 1 dim Buah

KODE URAIAN SATUAN


1.1.7.01.01.01.006 Cat tembok matex 20 kg Vitex Kaleng Besar
1.1.7.01.01.01.006 Cat tembok matex 5 kg VITEX Kaleng
1.1.7.01.01.01.006 Meni besi altex 1 kg bintang Kaleng
1.1.7.01.01.01.006 Cat emco 1 kg Kaleng
1.1.7.01.03.07.005 Kwas cat 2 Buah
1.1.7.01.03.07.005 Kwas cat 4 Buah
1.1.7.01.03.07.005 Kwas roll Buah
1.1.7.01.03.07.005 Kertas amplas Lembar
1.1.7.01.01.01.006 Politur 1 kg Kaleng
1.1.7.01.01.01.006 Cat kayu miha tex Avian Kaleng
1.1.7.01.01.01.002 Semen putih (port land) Kg
1.1.7.01.01.05.001 Kawat ram Meter
1.1.7.01.01.05.002 Lis plank kayu 4 meter 3 Cm Batang
1.1.7.01.01.05.002 Lis plank kayu 4 meter 4 Cm Batang
1.1.7.01.01.05.002 Lis plank kayu 4 meter 5 Cm Batang
1.1.7.01.01.05.002 Lis plank kayu 4 meter 6 Cm Batang
1.1.7.02.02.06.001 Pipa galvanis 1 Batang
1.1.7.02.02.06.001 Pipa galvanis 3/4 Ukuran Besar Batang
1.1.7.02.02.06.001 Pipa galvanis 1/2 Batang
1.1.7.02.02.06.001 Sock galvanis 1/2 Buah
1.1.7.01.01.01.005 Kerikil sungai ayak tanpa pasir ( Split Kreser ) Kubik
1.1.7.01.01.01.005 Kerikil alam galian bukit Kubik
1.1.7.01.01.01.005 Kerikil pecah bersaring Kubik
1.1.7.01.01.01.005 Kerikil sungai / Sekop Kubik
1.1.7.01.01.01.005 Batu kali Kubik
1.1.7.01.01.01.005 Batu gunung/kali/hutan Kubik
1.1.7.01.01.01.005 Batu belah 10 - 15 cm Kubik
1.1.7.01.01.01.005 Batu belah 7 - 10 cm Kubik
1.1.7.01.01.01.005 Batu belah 5 - 7 cm Kubik
1.1.7.01.01.01.005 Batu belah 3 - 5 cm Kubik
1.1.7.01.01.01.005 Batu belah 2-3 cm (Stone cruser) Kubik
1.1.7.01.01.01.005 Batu belah 1 - 2 cm (Stone cruser) Kubik
1.1.7.01.01.01.005 Batu belah 05 - 1 cm (Stone cruser) Kubik
1.1.7.01.01.01.005 Batu bata Buah
1.1.7.01.01.01.004 Pasir pasang Kubik
1.1.7.01.01.01.004 Pasir urungan timbunan Kubik
1.1.7.01.01.01.004 Pasir ayak untuk beton (pasir cor) Kubik
1.1.7.01.01.01.004 Tanah urug Kubik
1.1.7.01.01.01.004 Sirtu (tidak ayak) Kubik
1.1.7.01.01.01.004 Timbunan pilihan Kubik
1.1.7.01.01.05.002 Balok Kayu kelas I Kubik
1.1.7.01.01.05.002 Balok Kayu kelas II Kubik
1.1.7.01.01.05.002 Papan kayu kelas I Kubik
1.1.7.01.01.05.002 Papan kayu kelas II Kubik
1.1.7.01.01.05.002 Balok Usuk 5/7 Kubik
1.1.7.01.01.01.004 Papan Cor Kubik
1.1.7.01.01.01.004 Amplas Lembar
1.1.7.01.01.01.008 Besi Strip Buah
1.1.7.01.03.07.005 Kwas Biasa 4' Buah
1.1.7.01.01.01.006 Minyak begesting Ltr

KODE URAIAN SATUAN


1.1.7.01.01.01.006 Plamur Dinding 5 kg Kaleng
1.1.7.01.01.01.006 Politur Merk irdian Kaleng
1.1.7.01.03.08.003 Saklar tunggal Buah
1.1.7.01.03.08.003 Saklar ganda Buah
1.1.7.01.03.08.003 Stop kontak Ganda Buah
1.1.7.01.03.08.003 Stop kontak Tunggal Buah
1.1.7.01.05.01.009 Socket T PVC ø 4' Buah
1.1.7.01.05.01.009 Wastafel Komplit Buah
1.1.7.02.02.01.002 Pipa Gip medium A 2 dim Batang
1.1.7.02.02.01.002 Pipa Gip medium B 1 dim Batang
1.1.7.02.02.01.002 Pipa Gip medium B 11/2 dim Batang
1.1.7.01.05.01.009 Soket gip 3 dim Buah
1.1.7.01.05.01.009 Soket gip 2 dim Buah
1.1.7.01.05.01.009 Soket gip 1/2 dim Buah
1.1.7.01.05.01.009 Soket 1gip 1 dim Buah
1.1.7.01.05.01.009 Soket 1/2 dim Buah
1.1.7.01.05.01.009 Water moor 3 dim Buah
1.1.7.01.05.01.009 Water moor 2 dim Buah
1.1.7.01.05.01.009 Water moor 1 1/2 dim Buah
1.1.7.01.05.01.009 Water moor 1 dim Buah
1.1.7.01.05.01.009 Water moor 1/2 dim Buah
1.1.7.01.03.07.005 Nipel 3 dim Buah
1.1.7.01.03.07.005 Nipel 2 dim Buah
1.1.7.01.03.07.005 Nipel 1 dim Buah
1.1.7.01.03.07.005 Nipel 1/2 dim Buah
1.1.7.01.03.07.005 Nipel 1 1/2 dim Buah
1.1.7.01.05.01.009 Water moor 1 1/2 dim besi Buah
1.1.7.01.05.01.009 Water moor 1 dim besi Buah
1.1.7.01.05.01.009 Water moor 1/2 dim besi Buah
1.1.7.01.03.07.005 Nipel 3 dim besi Buah
1.1.7.01.03.07.005 Nipel 2 dim besi Buah
1.1.7.01.03.07.005 Nipel 1 dim besi Buah
1.1.7.01.03.07.005 Nipel 1/2 dim besi Buah
1.1.7.02.02.07.001 Tee stuk 3 x 3 dim Buah
1.1.7.02.02.07.001 Tee stuk 3 x 2 dim Buah
1.1.7.02.02.07.001 Tee stuk 2 x 2 dim Buah
1.1.7.02.02.07.001 Tee stuk 2 x 1 dim Buah
1.1.7.02.02.07.001 Tee stuk 2 x 1/2 dim Buah
1.1.7.02.02.07.001 Tee stuk 11/2 x 11/2 dim Buah
1.1.7.02.02.07.001 Tee stuk 1 x 1 dim Buah
1.1.7.02.02.07.001 Tee stuk 1/2 x 1/2 dim Buah
1.1.7.01.05.01.009 Reduser 3 x 2 dim Buah
1.1.7.01.05.01.009 Reduser 2 x 1 dim Buah
1.1.7.01.05.01.009 Reduser 1 x 3/4 dim Buah
1.1.7.01.05.01.009 Reduser 1 x 1/2 dim Buah
1.1.7.01.05.01.009 Reduser 3/4 x 1/2 dim Buah
1.1.7.01.03.07.005 Knie 2 dim Buah
1.1.7.01.03.07.005 Knie 1 1/2 dim Buah
1.1.7.01.03.07.005 Knie 1 dim Buah
1.1.7.01.03.07.005 Stop kran kitz 1/2 dim Buah
1.1.7.01.03.07.005 Water meter 1/2 dim Buah
1.1.7.01.03.07.005 Plug kran 1/2 dim Buah
1.1.7.01.03.07.005 Kran 1/2 dim Buah
1.1.7.01.03.01.004 Lem besi Buah
1.1.7.01.03.01.004 Solatip Buah
1.1.7.01.01.01.002 Semen Bcian/Scimcoat Sak
EM PENYEDIAAN AIR MINUM
EM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
N DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
ES TIMUR - PROVINSI NTT

SK BUPATI TAHUN
2023
Rp 123,420.00
Rp 112,530.00
Rp 101,640.00
Rp 101,640.00
Rp 112,530.00
Rp 101,640.00
Rp 101,640.00
Rp 112,530.00
Rp 101,640.00
Rp 101,640.00
Rp 112,530.00
Rp 101,640.00
Rp 112,530.00
Rp 101,640.00
Rp 112,530.00
Rp 101,640.00
Rp 81,070.00
Rp 128,575.00
Rp 102,578.00

Price List Harga


Harga Terpakai
Surabaya 2022
SUPRALON RUCIKA
73,314.00 84,311.10 15% 77,330.00 69,500.00
47,500.00 54,625.00 15% 48,670.00 44,000.00
17,776.00 20,442.40 15% 20,330.00 17,900.00
11,454.00 13,172.10 15% 12,340.00 11,200.00
7,718.00 8,875.70 15% 8,230.00 7,400.00
1,434,308.70 239,051.45 10% 1,303,917.00 130,391.70
1,051,158.90 175,193.15 10% 955,599.00 95,559.90
915,139.50 152,523.25 10% 831,945.00 83,194.50
693,283.80 115,547.30 10% 630,258.00 63,025.80
459,950.70 76,658.45 10% 418,137.00 41,813.70
357,875.10 59,645.85 10% 325,341.00 32,534.10

Harga Survey

20,400.00 24,480.00 20%


26,600.00 31,920.00
36,200.00 43,440.00
67,400.00 80,880.00
94,800.00 113,760.00
150,200.00 180,240.00
302,000.00 362,400.00
311,400.00 373,680.00
698,400.00 838,080.00
-
10,800.00 12,960.00
10,600.00 12,720.00
14,400.00 17,280.00
14,800.00 17,760.00
15,800.00 18,960.00
19,400.00 23,280.00
20,400.00 24,480.00
23,600.00 28,320.00
38,800.00 46,560.00
39,600.00 47,520.00
39,600.00 47,520.00
40,800.00 48,960.00
56,600.00 67,920.00
58,800.00 70,560.00
58,800.00 70,560.00
82,600.00 99,120.00
82,600.00 99,120.00
178,600.00 214,320.00
178,600.00 214,320.00
184,000.00 220,800.00
411,600.00 493,920.00

12,400.00 14,880.00
12,800.00 15,360.00
16,400.00 19,680.00
16,600.00 19,920.00
18,400.00 22,080.00
22,000.00 26,400.00
23,400.00 28,080.00
43,000.00 51,600.00
43,000.00 51,600.00
43,000.00 51,600.00
70,200.00 84,240.00
108,400.00 130,080.00
219,000.00 262,800.00
219,000.00 262,800.00
225,800.00 270,960.00
493,800.00 592,560.00

14,400.00 17,280.00
15,000.00 18,000.00
18,400.00 22,080.00
18,400.00 22,080.00
20,200.00 24,240.00
26,600.00 31,920.00
26,600.00 31,920.00
28,000.00 33,600.00
47,800.00 57,360.00
47,800.00 57,360.00
79,400.00 95,280.00
129,000.00 154,800.00
241,600.00 289,920.00
249,200.00 299,040.00
459,400.00 551,280.00

14,400.00 17,280.00
15,000.00 18,000.00
18,400.00 22,080.00
18,400.00 22,080.00
20,200.00 24,240.00
26,600.00 31,920.00
26,600.00 31,920.00
28,000.00 33,600.00
47,800.00 57,360.00
47,800.00 57,360.00
79,400.00 95,280.00
129,000.00 154,800.00
241,600.00 289,920.00
249,200.00 299,040.00
459,400.00 551,280.00

29,900.00 35,880.00
40,400.00 48,480.00
55,800.00 66,960.00
107,400.00 128,880.00
154,000.00 184,800.00
253,000.00 303,600.00
486,400.00 583,680.00
500,000.00 600,000.00
1,114,200.00 1,337,040.00

37,400.00 44,880.00
49,800.00 59,760.00
54,200.00 65,040.00
18,400.00 22,080.00
20,200.00 24,240.00
26,600.00 31,920.00
26,600.00 31,920.00
28,000.00 33,600.00
47,800.00 57,360.00
47,800.00 57,360.00
79,400.00 95,280.00
129,000.00 154,800.00
241,600.00 289,920.00
249,200.00 299,040.00
459,400.00 551,280.00
459,401.00 551,281.20

23,800.00 28,560.00
27,800.00 33,360.00
30,600.00 36,720.00
46,600.00 55,920.00
49,600.00 59,520.00
53,600.00 64,320.00
68,800.00 82,560.00
68,800.00 82,560.00
72,600.00 87,120.00
86,200.00 103,440.00
113,000.00 135,600.00
113,000.00 135,600.00
114,800.00 137,760.00
127,600.00 153,120.00
245,200.00 294,240.00
245,200.00 294,240.00
245,200.00 294,240.00
245,200.00 294,240.00
288,400.00 346,080.00
698,400.00 838,080.00

20,800.00 24,960.00
28,200.00 33,840.00
40,800.00 48,960.00
75,400.00 90,480.00
107,400.00 128,880.00
170,400.00 204,480.00
335,600.00 402,720.00
364,000.00 436,800.00
781,000.00 937,200.00
-
12,400.00 14,880.00
12,800.00 15,360.00
16,400.00 19,680.00
16,600.00 19,920.00
18,400.00 22,080.00
23,400.00 28,080.00
43,000.00 51,600.00
43,000.00 51,600.00
43,000.00 51,600.00
-
70,200.00 84,240.00
219,000.00 262,800.00
-
219,000.00 262,800.00
225,800.00 270,960.00
493,800.00 592,560.00
-

19,250.00 23,100.00
15,000.00 18,000.00
18,400.00 22,080.00
19,250.00 23,100.00
20,200.00 24,240.00
26,600.00 31,920.00
38,300.00 45,960.00
28,000.00 33,600.00
47,800.00 57,360.00
47,800.00 57,360.00
109,150.00 130,980.00
173,950.00 208,740.00
-
-
-
-
-

132,500.00 159,000.00
132,500.00 159,000.00
132,500.00 159,000.00
132,500.00 159,000.00
132,500.00 159,000.00
132,500.00 159,000.00

132,500.00 159,000.00
132,500.00 159,000.00
132,500.00 159,000.00
132,500.00 159,000.00
132,500.00 159,000.00
132,500.00 159,000.00

9,400.00 11,280.00
12,400.00 14,880.00
17,200.00 20,640.00
40,400.00 48,480.00
51,800.00 62,160.00
74,000.00 88,800.00
178,000.00 213,600.00
208,000.00 249,600.00
440,000.00 528,000.00
-
616,800.00 740,160.00
660,800.00 792,960.00
822,200.00 986,640.00
904,400.00 1,085,280.00
1,541,600.00 1,849,920.00

23,800.00 28,560.00
41,400.00 49,680.00
41,400.00 49,680.00
43,200.00 51,840.00
44,200.00 53,040.00
44,200.00 53,040.00
46,600.00 55,920.00
46,600.00 55,920.00
46,600.00 55,920.00
43,800.00 52,560.00
67,000.00 80,400.00
67,000.00 80,400.00
68,200.00 81,840.00
75,200.00 90,240.00
104,800.00 125,760.00
104,800.00 125,760.00
108,400.00 130,080.00
108,400.00 130,080.00
112,400.00 134,880.00
116,400.00 139,680.00
116,400.00 139,680.00
116,400.00 139,680.00
121,800.00 146,160.00
133,200.00 159,840.00
138,200.00 165,840.00
139,000.00 166,800.00
158,000.00 189,600.00
158,000.00 189,600.00
162,800.00 195,360.00
170,400.00 204,480.00
179,800.00 215,760.00
179,800.00 215,760.00

26,900.00 32,280.00
35,300.00 42,360.00
57,900.00 69,480.00
69,000.00 82,800.00
88,700.00 106,440.00
137,300.00 164,760.00
241,700.00 290,040.00

32,300.00 38,760.00
42,800.00 51,360.00
76,800.00 92,160.00
85,600.00 102,720.00
110,000.00 132,000.00
201,900.00 242,280.00
322,800.00 387,360.00

25,600.00 30,720.00
29,400.00 35,280.00
41,900.00 50,280.00
55,300.00 66,360.00
64,900.00 77,880.00
106,750.00 128,100.00
167,400.00 200,880.00

16,133 19,359.60
29,800.00 35,760.00
38,000.00 45,600.00
53,600.00 64,320.00
65,400.00 78,480.00
97,200.00 116,640.00
147,300.00 176,760.00

38,500.00 46,200.00
87,500.00 105,000.00
112,900.00 135,480.00
128,800.00 154,560.00
194,000.00 232,800.00
244,600.00 293,520.00
433,700.00 520,440.00

19,000.00 22,800.00
24,700.00 29,640.00
29,900.00 35,880.00
40,500.00 48,600.00
49,300.00 59,160.00
68,000.00 81,600.00
126,700.00 152,040.00

23,600.00 28,320.00
26,500.00 31,800.00
33,200.00 39,840.00
44,800.00 53,760.00
55,300.00 66,360.00
81,800.00 98,160.00
145,200.00 174,240.00

26,500.00 31,800.00
33,700.00 40,440.00
41,900.00 50,280.00
63,900.00 76,680.00
74,000.00 88,800.00
96,600.00 115,920.00
204,600.00 245,520.00

44,900.00 53,880.00
50,900.00 61,080.00
71,700.00 86,040.00
113,700.00 136,440.00
189,900.00 227,880.00
203,800.00 244,560.00
365,700.00 438,840.00

24,500.00 29,400.00
26,900.00 32,280.00
37,400.00 44,880.00
49,800.00 59,760.00
73,800.00 88,560.00
82,200.00 98,640.00
128,500.00 154,200.00
-
20,600.00 24,720.00
28,500.00 34,200.00
33,250.00 39,900.00
47,500.00 57,000.00
55,350.00 66,420.00
67,200.00 80,640.00
110,700.00 132,840.00
142,300.00 170,760.00
217,400.00 260,880.00

11,500.00 13,800.00
17,400.00 20,880.00
28,100.00 33,720.00
17,400.00 20,880.00
22,500.00 27,000.00
25,600.00 30,720.00
41,900.00 50,280.00
55,500.00 66,600.00

7,750.00 9,300.00
10,900.00 13,080.00
15,500.00 18,600.00
76,000.00 91,200.00
60,000.00 72,000.00
74,850.00 89,820.00
600,000.00 720,000.00 400,000 370,000
61,800.00 74,160.00
60,000.00 72,000.00
95,000.00 114,000.00
141,000.00 169,200.00
95,000.00 114,000.00
98,500.00 118,200.00
70,800.00 84,960.00

213,400.00 256,080.00
257,400.00 308,880.00
363,000.00 435,600.00
299,000.00 358,800.00
768,852.00 922,622.40
936,100.00 1,123,320.00
1,989,900.00 2,387,880.00
2,989,900.00 3,587,880.00
4,501,400.00 5,401,680.00

AN LARANTUKA
HARGA 2023 CONFER
100
77,000.00 1,925
33,000.00
33,000.00
52,800.00
45,650.00
66,000.00
55,000.00
104,500.00 8708.33
132,000.00
247,500.00 20,625
283,250.00
38,500.00
29,700.00
29,700.00
29,700.00
29,700.00
38,500.00
38,500.00
38,500.00
44,000.00
134,200.00
77,000.00
110,000.00
161,700.00
58,300.00
35,200.00
19,250.00
183,750.00
38,500.00
38,500.00
60,500.00
82,500.00
110,000.00
121,000.00
161,700.00

HARGA 2023
404,250.00
99,000.00
47,250.00
101,750.00
27,500.00
19,250.00
33,000.00
8,250.00
88,000.00
82,500.00
73,700.00
71,500.00
93,500.00
88,000.00
115,500.00
139,125.00
302,500.00
195,000.00
165,000.00
22,000.00
21,000.00
1,155,000.00
357,000.00
409,500.00
446,250.00
267,750.00
267,750.00
661,500.00
661,500.00
661,500.00
1,155,000.00 600,000
1,333,500.00
1,753,500.00
2,100.00
250,950.00
199,500.00
294,000.00 1400 Kg/m3
157,500.00
157,500.00
157,500.00
14,700,000.00
4,200,000.00
12,600,000.00
4,200,000.00 3,200,000
4,042,500.00
2,100,000.00
11,000.00
16,500.00
22,000.00
26,250.00

HARGA 2023
69,960.00
82,500.00
27,500.00
33,000.00
34,375.00
22,000.00
33,000.00
770,000.00
472,500.00
275,000.00
467,500.00
110,000.00
46,750.00
19,250.00
27,500.00
32,120.00
247,500.00
121,000.00
99,000.00
60,500.00
38,500.00
93,500.00
55,000.00
27,500.00
22,000.00
38,500.00
107,250.00
58,667.00
40,333.00
110,000.00
52,250.00
24,750.00
16,133.00
154,000.00
183,750.00
93,500.00
68,200.00
52,500.00
44,000.00
35,750.00
19,250.00
110,000.00
60,500.00
30,250.00
27,500.00
27,500.00
66,000.00
44,000.00
30,250.00
88,000.00
26,250.00
77,000.00
60,500.00
27,500.00
22,000.00
110,000.00
VINILON LANGGENG TRILIUN Rata Rata
65,500.00 84,860.00 69,380.00 366,570.00 73,314.00
41,300.00 59,870.00 43,660.00 237,500.00 47,500.00
16,700.00 15,700.00 18,250.00 88,880.00 17,776.00
10,500.00 12,150.00 11,080.00 57,270.00 11,454.00
7,500.00 8,070.00 7,390.00 38,590.00 7,718.00
ANALISA MATERIAL ON SITE

PIPA HDPE DIA. 63 MM


* HARGA SATUAN PIPA dia 2" DI LOKASI PEKERJAAN Rp Rp 80,609.70

NO URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA

1. Lokasi Pipa HDPE dia 63 mm m1 1 79,625.94 Rp 79,625.94

2. Biaya Angkut ( Trasportasi truk ) a m1 1 827.48 Rp 827.48

3. ongkos Angkut trip m1 1 156.28 Rp 156.28


(dengan Tenaga Manusia) b

Total harga onsite m1 Rp 80,609.70

PIPA HDPE DIA. 50 MM


* HARGA SATUAN PIPA dia 1,5" DI LOKASI PEKERJAAN Rp Rp 51,032.27162

NO URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA

1. Lokasi Pipa HDPE dia 50 mm m1 1 50,354.78 Rp 50,354.78

2. Biaya Angkut ( Trasportasi truk ) a m1 1 521.22 Rp 521.22

3. ongkos Angkut trip m1 1 156.28 Rp 156.28


(dengan Tenaga Manusia) b

Total harga onsite m1 Rp 51,032.27

PIPA HDPE DIA. 32 MM


* HARGA SATUAN PIPA dia 1" DI LOKASI PEKERJAAN Rp Rp 22,925.42159

NO URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA

1. Lokasi Pipa HDPE dia 32 mm m1 1 22,649.42 Rp 22,649.42

2. Biaya Angkut ( Trasportasi truk ) a m1 1 213.49 Rp 213.49

3. ongkos Angkut trip m1 1 62.51 Rp 62.51


(dengan Tenaga Manusia) b

Total harga onsite m1 Rp 22,925.42

PIPA HDPE DIA. 25 MM


* HARGA SATUAN PIPA dia 3/4" DI LOKASI PEKERJAAN Rp 13,106.05

NO URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA

1. Lokasi Pipa HDPE dia 25 mm m1 1 12,913.23 Rp 12,913.23

2. Biaya Angkut ( Trasportasi truk ) a m1 1 130.30 Rp 130.30

3. ongkos Angkut trip m1 1 62.51 Rp 62.51


(dengan Tenaga Manusia) b

Total harga onsite m1 Rp 13,106.05

PIPA HDPE DIA. 20 MM


* HARGA SATUAN PIPA dia 1/2" DI LOKASI PEKERJAAN Rp 8,793.89

NO URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA

1. Lokasi Pipa HDPE dia 20 mm m1 1 8,647.99 Rp 8,647.99

2. Biaya Angkut ( Trasportasi truk ) a m1 1 83.39 Rp 83.39

3. ongkos Angkut trip m1 1 62.51 Rp 62.51


(dengan Tenaga Manusia) b

Total harga onsite m1 Rp 8,793.89


PIPA GIP DIA. 50 MM
* HARGA SATUAN PIPA dia 1,5" DI LOKASI PEKERJAAN Rp 154,277.71

NO URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA

1. Lokasi Pipa GIP dia 50 mm m1 1 153,277.71 Rp 153,277.71

2. Biaya Angkut ( Trasportasi truk ) a m1 1 750.00 Rp 750.00

3. ongkos Angkut trip m1 1 250.00 Rp 250.00


(dengan Tenaga Manusia) b

Total harga onsite m1 Rp 154,277.71

PIPA GIP DIA. 40 MM


* HARGA SATUAN PIPA dia 1,5" DI LOKASI PEKERJAAN Rp 114,913.40

NO URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA

1. Lokasi Pipa GIP dia 40 mm m1 1 113,813.40 Rp 113,813.40

2. Biaya Angkut ( Trasportasi truk ) a m1 1 700.00 Rp 700.00

3. ongkos Angkut trip m1 1 400.00 Rp 400.00


(dengan Tenaga Manusia) b

Total harga onsite m1 Rp 114,913.40

PIPA GIP DIA. 32 MM


* HARGA SATUAN PIPA dia 1" DI LOKASI PEKERJAAN Rp 63,984.52

NO URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA

1. Lokasi Pipa GIP dia 32 mm m1 1 62,551.88 Rp 62,551.88

2. Biaya Angkut ( Trasportasi truk ) a m1 1 130.30 Rp 130.30

3. ongkos Angkut trip m1 1 1,302.33 Rp 1,302.33


(dengan Tenaga Manusia) b

Total harga onsite m1 Rp 63,984.52

PIPA GIP DIA. 25 MM


* HARGA SATUAN PIPA dia 1" DI LOKASI PEKERJAAN Rp 52,211.02

NO URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA

1. Lokasi Pipa GIP dia 25 mm m1 1 51,311.02 Rp 51,311.02

2. Biaya Angkut ( Trasportasi truk ) a m1 1 600.00 Rp 600.00

3. ongkos Angkut trip m1 1 300.00 Rp 300.00


(dengan Tenaga Manusia) b

Total harga onsite m1 Rp 52,211.02

PIPA GIP DIA. 20 MM


* HARGA SATUAN PIPA dia 1/2" DI LOKASI PEKERJAAN Rp 33,657.96

NO URAIAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA

1. Lokasi Pipa GIP dia 20 mm m1 1 32,742.83 Rp 32,742.83

2. Biaya Angkut ( Trasportasi truk ) a m1 1 46.91 Rp 46.91

3. ongkos Angkut trip m1 1 868.22 Rp 868.22


(dengan Tenaga Manusia) b

Total harga onsite m1 Rp 33,657.96


BACK UP VOLUME

PEKERJAAN REHAB PIPA EKSISTING

DAFTAR PIPA HDPE Ø 32 MM RENCANA


NO JENIS PIPA Panjang Sat.
DUSUN TANAH ME'A
1 Pipa Polyethelene (HDPE) Ø 32 mm 143.0 M'
2 Pipa Polyethelene (HDPE) Ø 32 mm 308.98 M'
3 Pipa Polyethelene (HDPE) Ø 32 mm 72.38 M'
4 Pipa Polyethelene (HDPE) Ø 32 mm 76.48 M'
5 Pipa Polyethelene (HDPE) Ø 32 mm 138.66 M'
6 Pipa Polyethelene (HDPE) Ø 32 mm 65.09 M'
7 Pipa Polyethelene (HDPE) Ø 32 mm 71.71 M'
8 Pipa Polyethelene (HDPE) Ø 32 mm 27.30 M'
9 Pipa Polyethelene (HDPE) Ø 32 mm 98.62 M'
10 Pipa Polyethelene (HDPE) Ø 32 mm 30.68 M'
11 Pipa Polyethelene (HDPE) Ø 32 mm 89.17 M'
12 Pipa Polyethelene (HDPE) Ø 32 mm 40.91 M'
13 Pipa Polyethelene (HDPE) Ø 32 mm 188.67 M'
14 Pipa Polyethelene (HDPE) Ø 32 mm 156.58 M'
15 Pipa Polyethelene (HDPE) Ø 32 mm 30.41 M'
16 Pipa Polyethelene (HDPE) Ø 32 mm 71.73 M'
17 Pipa Polyethelene (HDPE) Ø 32 mm 27.70 M'
18 Pipa Polyethelene (HDPE) Ø 32 mm 97.41 M'
19 Pipa Polyethelene (HDPE) Ø 32 mm 50.58 M'
20 Pipa Polyethelene (HDPE) Ø 32 mm 63.09 M'
21 Pipa Polyethelene (HDPE) Ø 32 mm 69.08 M'
22 Pipa Polyethelene (HDPE) Ø 32 mm 215.24 M'
23 Pipa Polyethelene (HDPE) Ø 32 mm 329.99 M'
24 Pipa Polyethelene (HDPE) Ø 32 mm 97.97 M'
25 Pipa Polyethelene (HDPE) Ø 32 mm 8.37 M'
Panjang 2,426.8 M'

DAFTAR PIPA HDPE Ø 50 MM RENCANA


NO JENIS PIPA Panjang Sat.
DUSUN ADABANG
R3.PA Pipa Polyethelene (HDPE) Ø 32 mm 455.83 M'
Panjang 455.83 M'

DAFTAR PIPA HDPE Ø 32 MM RENCANA


DUSUN 1 [ R1 ]
NO JENIS PIPA Panjang Sat.
RA.1 Pipa Polyethelene (HDPE) Ø 32 mm 555.89 M'
Panjang 555.89 M'
DAFTAR PIPA HDPE Ø 25 MM RENCANA
DUSUN 1 [ R1 ] 3,438.49
NO JENIS PIPA Panjang Sat.
A.1 Pipa Polyethelene (HDPE) Ø 25 mm 99.14 M'
A.2 Pipa Polyethelene (HDPE) Ø 25 mm 49.05 M'
A.3 Pipa Polyethelene (HDPE) Ø 25 mm 44.01 M'
A.4 Pipa Polyethelene (HDPE) Ø 25 mm 29.68 M'
A.5 Pipa Polyethelene (HDPE) Ø 25 mm 15.52 M'
A.6 Pipa Polyethelene (HDPE) Ø 25 mm 36.90 M'
A.7 Pipa Polyethelene (HDPE) Ø 25 mm 34.05 M'
A.8 Pipa Polyethelene (HDPE) Ø 25 mm 42.37 M'
A.9 Pipa Polyethelene (HDPE) Ø 25 mm 23.51 M'
A.10 Pipa Polyethelene (HDPE) Ø 25 mm 34.98 M'
Panjang 409.22 M'

DAFTAR PIPA HDPE Ø 32 MM RENCANA


DUSUN 2 [ R2 ]
NO JENIS PIPA Panjang Sat.
B.1 Pipa Polyethelene (HDPE) Ø 32 mm 46.94 M'
B.2 Pipa Polyethelene (HDPE) Ø 32 mm 37.25 M'
B.3 Pipa Polyethelene (HDPE) Ø 32 mm 26.72 M'
B.4 Pipa Polyethelene (HDPE) Ø 32 mm 85.61 M'
B.5 Pipa Polyethelene (HDPE) Ø 32 mm 28.79 M'
B.6 Pipa Polyethelene (HDPE) Ø 32 mm 73.18 M'
B.7 Pipa Polyethelene (HDPE) Ø 32 mm 31.89 M'
B.8 Pipa Polyethelene (HDPE) Ø 32 mm 51.61 M'
B.9 Pipa Polyethelene (HDPE) Ø 32 mm 28.79 M'
B.10 Pipa Polyethelene (HDPE) Ø 32 mm 77.23 M'
B.11 Pipa Polyethelene (HDPE) Ø 32 mm 90.24 M'
B.12 Pipa Polyethelene (HDPE) Ø 32 mm 32.69 M'
B.13 Pipa Polyethelene (HDPE) Ø 32 mm 21.61 M'
B.14 Pipa Polyethelene (HDPE) Ø 32 mm 45.24 M'
B.15 Pipa Polyethelene (HDPE) Ø 32 mm 41.42 M'
B.16 Pipa Polyethelene (HDPE) Ø 32 mm 52.94 M'
Panjang 772.15 M'
DAFTAR PIPA HDPE Ø 32 MM RENCANA
DUSUN 3 [ 3 ]
NO JENIS PIPA Panjang Sat.
C.1 Pipa Polyethelene (HDPE) Ø 32 mm 12.23 M'
C.2 Pipa Polyethelene (HDPE) Ø 32 mm 27.04 M'
C.3 Pipa Polyethelene (HDPE) Ø 32 mm 14.88 M'
C.4 Pipa Polyethelene (HDPE) Ø 32 mm 16.83 M'
C.5 Pipa Polyethelene (HDPE) Ø 32 mm 22.19 M'
C.6 Pipa Polyethelene (HDPE) Ø 32 mm 24.90 M'
C.7 Pipa Polyethelene (HDPE) Ø 32 mm 48.32 M'
C.8 Pipa Polyethelene (HDPE) Ø 32 mm 12.41 M'
C.9 Pipa Polyethelene (HDPE) Ø 32 mm 35.00 M'
C.10 Pipa Polyethelene (HDPE) Ø 32 mm 23.66 M'
C.11 Pipa Polyethelene (HDPE) Ø 32 mm 17.60 M'
Panjang 255.05 M'

#REF! 6948
DAFTAR AKSESORIS PIPA HDPE Ø 32 MM RENCANA
NO JENIS PIPA Volume Sat.
DUSUN 1 [ R1 ]
1 Straight Coupler HDPE Ø 32 mm 2.0 Bh
2 Tee HDPE. ∅ 32 x 32 x 32 mm 1.0 Bh
3 Elbow HDPE. ∅ 32 mm - 90 1.0 Bh
4 Dop HDPE. ∅ 32 mm 3.0 Bh

DAFTAR AKSESORIS PIPA HDPE Ø 25 MM RENCANA


NO JENIS PIPA Volume Sat.
DUSUN 1 [ R1 ]
1 Tee HDPE. ∅ 32 x 32 x 25 mm 10.0 Bh
2 Elbow HDPE. ∅ 25 mm - 90 8.0 Bh
3 Dop HDPE. ∅ 25 mm 10.0 Bh

DAFTAR AKSESORIS PIPA HDPE Ø 50 MM RENCANA


NO JENIS PIPA Volume Sat.
DUSUN 2 [ R2 ]
1 Female Adaptor Ø 50 mm x 1 1/2" 3 Bh
2 Straight Coupler HDPE Ø 50 7.0 Bh
3 Tee Equal HDPE Ø 50 X 50 X 50 1.0 Bh
4 Tee Equal HDPE Ø 50 X 50 X 32 15.0 Bh
5 Elbow Ø 50 mm - 90 11.0 Bh
6 Reduces Hdpe. ∅ 50 x 50 mm 3.0 Bh
7 Dop HDPE. ∅ 50 mm 1.0 Bh

DAFTAR AKSESORIS PIPA HDPE Ø 32 MM RENCANA


NO JENIS PIPA Volume Sat.
DUSUN 2 [ R2 ]
1 Tee Equal HDPE Ø 32 X 32 X 32 2.0 Bh
2 Elbow HDPE. ∅ 32 mm - 90 9.0 Bh
3 Dop HDPE. ∅ 32 mm 15.0 Bh

DAFTAR AKSESORIS PIPA HDPE Ø 50 MM RENCANA


NO JENIS PIPA Volume Sat.
DUSUN 3 [ 3 ]
1 Female Adaptor Ø 50 mm x 1 1/2" 2.0 Bh
2 Straight Coupler HDPE Ø 50 9.0 Bh
3 Tee Equal HDPE Ø 50 X 50 X 32 12.0 Bh
4 Elbow Ø 50 mm - 90 2.0 Bh
5 Dop HDPE. ∅ 50 mm 2.0 Bh

DAFTAR AKSESORIS PIPA HDPE Ø 32 MM RENCANA


NO JENIS PIPA Volume Sat.
DUSUN 3 [ 3 ]
1 Tee Equal HDPE Ø 32 X 32 X 32 1.0 Bh
2 Elbow HDPE. ∅ 32 mm - 90 11.0 Bh
3 Dop HDPE. ∅ 32 mm 13.0 Bh
452.45
2.0
128.4 1.06
Panjang 136.2

65.77 1.97 67.74 7.8 71.03


357.61 10.73 368.33

423.37 436 13

458.12 13.74 471.86


458.12 472

460,994
Panjang
173.79 5.21 179.01
174 5.21 179.01 382

Panjang
96.25 2.89 99.14 97,006
47.63 1.43 49.05 31,853
42.73 1.28 44.01 90,658
28.81 0.86 29.68 67,147
15.07 0.45 15.52
35.83 1.07 36.90
33.06 0.99 34.05
41.14 1.23 42.37
22.83 0.68 23.51
33.96 1.02 34.98
397.30 409.22 9.45 286,664

Panjang
45.58 1.37 46.94 97,006
36.17 1.09 37.25 31,853
25.94 0.78 26.72 90,658
83.12 2.49 85.61 67,147
27.95 0.84 28.79 26,875
71.05 2.13 73.18
30.96 0.93 31.89
50.10 1.50 51.61
27.95 0.84 28.79
74.98 2.25 77.23
87.61 2.63 90.24
31.74 0.95 32.69
20.98 0.63 21.61
43.93 1.32 45.24
40.22 1.21 41.42
51.40 1.54 52.94
749.66 772.15 22 313,539
Panjang
11.87 0.36 12.23
26.25 0.79 27.04
14.44 0.43 14.88
16.34 0.49 16.83
21.55 0.65 22.19
24.17 0.73 24.90
46.91 1.41 48.32
12.05 0.36 12.41
33.98 1.02 35.00
22.97 0.69 23.66
17.09 0.51 17.60
247.62 255.05 7 -

2801.0129

VOL CROSING JALAN BELO TEBANG


GALIAN TANAH 0.3 0.15 4 0.18 1
SIRTU 0.2 0.15 4 0.12 1
BETON FC 0.1 0.15 4 0.06 1
VOL CROSING JALAN TANAH MEA
GALIAN TANAH 0.3 0.15 4 0.18 6
SIRTU 0.2 0.15 4 0.12 6
BETON FC 0.1 0.15 4 0.06 6
VOL CROSING JALAN ADABANG
GALIAN TANAH 0.3 0.15 4 0.18 4
SIRTU 0.2 0.15 4 0.12 4
BETON FC 0.1 0.15 4 0.06 4

PIPA GALVANIS 2" MEDIUM =A 4 11 44

TOTAL CROSING 50 MM 11 TITIK


VOL CROSING JALAN BELO TEBANG
GALIAN TANAH 0.3 0.15 4
SIRTU 0.2 0.15 4
#REF! BETON FC 0.1 0.15 4
VOL CROSING JALAN TANAH MEA
GALIAN TANAH 0.3 0.15 4
SIRTU 0.2 0.15 4
BETON FC 0.1 0.15 4
VOL CROSING JALAN ADABANG
GALIAN TANAH 0.3 0.15 4
04.1 SIRTU 0.2 0.15 4
BETON FC 0.1 0.15 4

PIPA GALVANIS 2" MEDIUM=A 4 11

TOTAL CROSING 50 MM 11 TITIK


136.20
0.18
0.12
0.06

1.08
0.72
0.36

0.72
0.48
0.24

1.98
1.32
0.66
0.18 4 0.72
0.12 4 0.48
0.06 4 0.24

0.18 29 5.22
0.12 29 3.48
0.06 29 1.74

0.18 10 1.8
0.12 10 1.2
0.06 10 0.6

44 7.74
5.16
2.58
BACK UP VOLUME

PEKERJAAN REHAB PIPA EKSISTING

DAFTAR PIPA HDPE Ø 50 MM RENCANA


NO JENIS PIPA Panjang Sat.
BELOTEBANG ( BT )
BT.A Pipa Polyethelene (HDPE) Ø 50 mm 466.0 M'
Panjang 466.0 M'

DAFTAR PIPA HDPE Ø 50 MM RENCANA


NO JENIS PIPA Panjang Sat.
DUSUN ADABANG ( PG & LL )
PG.A Pipa Polyethelene (HDPE) Ø 50 mm 455.83 M'
Panjang 455.83 M'

DAFTAR PIPA HDPE Ø 50 MM RENCANA


DUSUN TANAH MERAH
NO JENIS PIPA Panjang Sat.
TM.A Pipa Polyethelene (HDPE) Ø 32 mm 431.987 M'
TM.B Pipa Polyethelene (HDPE) Ø 50 mm 467.051 M'
TM.C Pipa Polyethelene (HDPE) Ø 50 mm 340.653 M'
TM.D Pipa Polyethelene (HDPE) Ø 50 mm 446.355 M'
Panjang 1,686.046 M' 1,254.059
DAFTAR PIPA HDPE Ø 32 MM RENCANA 1,254.059
DUSUN TANAH MERAH
NO JENIS PIPA Panjang Sat.
A.1 Pipa Polyethelene (HDPE) Ø 32 mm 55.950 M'
A.2 Pipa Polyethelene (HDPE) Ø 32 mm 28.526 M'
A.3 Pipa Polyethelene (HDPE) Ø 32 mm 38.933 M'
A.4 Pipa Polyethelene (HDPE) Ø 32 mm 165.614 M'
A.5 Pipa Polyethelene (HDPE) Ø 32 mm 75.790 M'
A.6 Pipa Polyethelene (HDPE) Ø 32 mm 31.320 M'

B.1 Pipa Polyethelene (HDPE) Ø 32 mm 67.991 M'


B.2 Pipa Polyethelene (HDPE) Ø 32 mm 103.385 M'
B.3 Pipa Polyethelene (HDPE) Ø 32 mm 70.885 M'
B.4 Pipa Polyethelene (HDPE) Ø 32 mm 99.926 M'
B.5 Pipa Polyethelene (HDPE) Ø 32 mm 111.108 M'
B.6 Pipa Polyethelene (HDPE) Ø 32 mm 37.662 M'
B.7 Pipa Polyethelene (HDPE) Ø 32 mm 58.441 M'
B.8 Pipa Polyethelene (HDPE) Ø 32 mm 31.324 M'
B.9 Pipa Polyethelene (HDPE) Ø 32 mm 5.869 M'

C.1 Pipa Polyethelene (HDPE) Ø 32 mm 118.930 M'


C.2 Pipa Polyethelene (HDPE) Ø 32 mm 84.236 M'
C.3 Pipa Polyethelene (HDPE) Ø 32 mm 91.837 M'

D.1 Pipa Polyethelene (HDPE) Ø 32 mm 119.356 M'


D.2 Pipa Polyethelene (HDPE) Ø 32 mm 53.804 M'
D.3 Pipa Polyethelene (HDPE) Ø 32 mm 96.912 M'
D.4 Pipa Polyethelene (HDPE) Ø 32 mm 70.084
D.5 Pipa Polyethelene (HDPE) Ø 32 mm 49.454 M'
Panjang 1,667.34 M'

DAFTAR PIPA HDPE Ø 32 MM RENCANA


BELOTEBANG ( BT )
NO JENIS PIPA Panjang Sat.
BT.1 Pipa Polyethelene (HDPE) Ø 32 mm 92.81 M'
BT.2 Pipa Polyethelene (HDPE) Ø 32 mm 194.78 M'
BT.3 Pipa Polyethelene (HDPE) Ø 32 mm 68.21 M'
BT.4 Pipa Polyethelene (HDPE) Ø 32 mm 59.63 M'
BT.5 Pipa Polyethelene (HDPE) Ø 32 mm 94.58 M'
BT.6 Pipa Polyethelene (HDPE) Ø 32 mm 45.87 M'
Panjang 555.89 M'

DAFTAR PIPA HDPE Ø 32 MM RENCANA


DUSUN ADABANG ( PG & LL )
NO JENIS PIPA Panjang Sat.
PG.A1 Pipa Polyethelene (HDPE) Ø 32 mm 23.674 M'
PG.A2 Pipa Polyethelene (HDPE) Ø 32 mm 99.229 M'
PG.A3 Pipa Polyethelene (HDPE) Ø 32 mm 32.809 M'
PG.A4 Pipa Polyethelene (HDPE) Ø 32 mm 93.378 M'
PG.A5 Pipa Polyethelene (HDPE) Ø 32 mm 79.584 M'
PG.A6 Pipa Polyethelene (HDPE) Ø 32 mm 28.714 M' 346.98
PG.B1 Pipa Polyethelene (HDPE) Ø 32 mm 277.577 M'
LL.A1 Pipa Polyethelene (HDPE) Ø 32 mm 40.240 M'
LL.A2 Pipa Polyethelene (HDPE) Ø 32 mm 50.145 M'
LL.A3 Pipa Polyethelene (HDPE) Ø 32 mm 41.781 M'
LL.A4 Pipa Polyethelene (HDPE) Ø 32 mm 44.945 M'
LL.A5 Pipa Polyethelene (HDPE) Ø 32 mm 44.732 M' 215.38
LL.B1 Pipa Polyethelene (HDPE) Ø 32 mm 135.469 M' 346.90
Panjang 992.275 M'

#REF! 6948
DAFTAR AKSESORIS PIPA HDPE Ø 32 MM RENCANA
NO JENIS PIPA Volume Sat.
BELOTEBANG ( BT )
1 Straight Coupler HDPE Ø 32 mm 2.0 Bh
2 Tee HDPE. ∅ 32 x 32 x 32 mm 1.0 Bh
3 Elbow HDPE. ∅ 32 mm - 90 1.0 Bh
4 Dop HDPE. ∅ 32 mm 3.0 Bh

DAFTAR AKSESORIS PIPA HDPE Ø 25 MM RENCANA


NO JENIS PIPA Volume Sat.
BELOTEBANG ( BT )
1 Tee HDPE. ∅ 32 x 32 x 25 mm 10.0 Bh
2 Elbow HDPE. ∅ 25 mm - 90 8.0 Bh
3 Dop HDPE. ∅ 25 mm 10.0 Bh

DAFTAR AKSESORIS PIPA HDPE Ø 50 MM RENCANA


NO JENIS PIPA Volume Sat.
BELOTEBANG ( BT )
1 Male Thread Elbow 90⁰ Ø 50 mm x 1 1/2" 1 Bh
2 Pipa HDPE ∅ 50 mm 1 M
3 Straight Coupler HDPE Ø 50 mm 4.0 Bh
4 Reducing Tee 90⁰ Ø 50 x Ø 50 x Ø 32 mm 5.0 Bh
5 Elbow HDPE. ∅ 50 mm - 90 2.0 Bh
6 Reduces Hdpe. ∅ 50 x 32 mm 1.0 Bh

DAFTAR AKSESORIS PIPA HDPE Ø 32 MM RENCANA


NO JENIS PIPA Volume Sat.
BELOTEBANG ( BT )
1 Tee Equal HDPE Ø 32 X 32 X 32 1.0 Bh
2 Elbow HDPE. ∅ 32 mm - 90 4.0 Bh
3 Dop HDPE. ∅ 32 mm 5.0 Bh

DAFTAR AKSESORIS PIPA HDPE Ø 50 MM RENCANA


NO JENIS PIPA Volume Sat.
DUSUN ADABANG ( PG & LL )
1 Female Thread Ø 50 mm x 1 1/2" 1.0 Bh
2 Straight Coupler HDPE Ø 50 mm 4.0 Bh
3 Tee Reducing HDPE. ∅ 50 x 50 x 32 mm 5.0 M
4 Elbow HDPE. ∅ 50 mm - 90 2.0 Bh
5 End Cap HDPE. ∅ 32 mm 1.0 Bh

DAFTAR AKSESORIS PIPA HDPE Ø 32 MM RENCANA


NO JENIS PIPA Volume Sat.
DUSUN ADABANG ( PG & LL )
1 Elbow HDPE. ∅ 32 mm - 90 4.0 Bh total
2 Tee HDPE. ∅ 32 x 32 x 32 mm 1.0 Bh
3 End Cap HDPE. ∅ 32 mm 6.0 Bh

1 GATE VALVE Ǿ 32 1.0


2 Male Threaded Elbow 90⁰ Ø 32 mm x 1" 1 Bh
3 Pipa HDPE ∅ 32 mm ( Pasang Siku ) 2 bh
4 Elbow HDPE. ∅ 32 mm - 90 4 bh
5 Straight Coupler HDPE Ø 32 mm 1 Bh

1 GATE VALVE Ǿ 32 3 Bh 4.0


2 'Pipa Galvanis 1" Medium A ( bagi 3 ) 1.5 m 1.5
3 Straight Coupler HDPE Ø 32 mm (BAK RES) 3 Bh
4 Equal Tee HDPE. ∅ 32 x 32 x 32 mm 5 Bh 6.0
5 Elbow HDPE. ∅ 32 mm - 90 5 Bh 13.0
6 Straight Coupler HDPE Ø 32 mm ( LL.B1 ) 1 Bh 5
7 End Cup HDPE. ∅ 32 mm 6 Bh 12.0

DAFTAR AKSESORIS PIPA HDPE Ø 50 MM RENCANA


NO JENIS PIPA Volume Sat.
DUSUN TANAH MERAH
TM.A
1 Male Threaded Join 90⁰ Ø 50 mm x 1 1/5" 1.0 Bh
2 Reduces Hdpe. ∅ 50 x 32 mm 1.0 Bh
3 Straight Coupler HDPE Ø 32 mm 4.0 Bh
4 Elbow HDPE. ∅ 50 mm - 90 2.0 Bh

TM.B
1 Male Threaded Join 90⁰ Ø 50 mm x 1 1/5" 1.0 Bh
2 Straight Coupler HDPE Ø 32 mm 4.0 Bh
3 Tee HDPE. ∅ 50 x 50 x 32 mm 5.0 Bh
4 Tee HDPE. ∅ 50 x 32 x 32 mm 1.0 Bh

TM.C
1 Male Threaded Join 90⁰ Ø 50 mm x 1 1/2" 1.0 Bh
2 Straight Coupler HDPE Ø 32 mm 4.0 Bh
3 Tee HDPE. ∅ 50 x 50 x 32 mm 3.0 Bh
4 End Cup HDPE. ∅ 50 mm 1.0 Bh

TM.D
1 Male Threaded Join 90⁰ Ø 50 mm x 1 1/2" 1.0 Bh
2 Straight Coupler HDPE Ø 32 mm 4.0 Bh
3 Tee HDPE. ∅ 50 x 50 x 32 mm 5.0 Bh
4 End Cup HDPE. ∅ 50 mm 1.0 Bh

DAFTAR AKSESORIS PIPA HDPE Ø 32 MM RENCANA


NO JENIS PIPA Volume Sat.
TM.A
1 GATE VALVE Ǿ 32 4.0 Bh
2 Male Threaded Elbow 90⁰ Ø 32 mm x 1" 8.0 Bh
3 Straight Coupler HDPE Ø 32 mm 4.0 Bh
4 Elbow HDPE. ∅ 32 mm - 90 6.0 Bh
5 End Cup HDPE. ∅ 32 mm 6.0 Bh

TM.B
1 Tee HDPE. ∅ 32 x 32 x 32 mm 2.0 Bh
2 Elbow HDPE. ∅ 32 mm - 90 5 Bh
3 End Cup HDPE. ∅ 32 mm 7 bh

TM.C
1 Elbow HDPE. ∅ 32 mm - 90 3 Bh
2 End Cup HDPE. ∅ 32 mm 3 Bh

TM.D

1 Elbow HDPE. ∅ 32 mm - 90 4 Bh
2 End Cup HDPE. ∅ 32 mm 5 Bh

Reduces Hdpe. ∅ 50 x 32 mm 1.0


Straight Coupler HDPE Ø 32 mm 4.0
Elbow HDPE. ∅ 50 mm - 90 2.0
452.45
13.6
128.4 1.06
Panjang 136.2

452.450 13.57 466.02 7.8 488.65


452.450 466 14

442.55 13.28 455.83


442.55 456 13

2,123.17 460,994

Panjang
419.41 12.58 431.99
453.45 13.60 467.05
330.73 9.92 340.65
433.35 13.00 446.35
1,637 49.11 1,686.05 49

Panjang
54.32 1.63 55.95 97,006
27.70 0.83 28.53 31,853
37.80 1.13 38.93 90,658
160.79 4.82 165.61 67,147
73.58 2.21 75.79
30.41 0.91 31.32
384.595 11.54 396.133 11.538
66.01 1.98 67.99
100.37 3.01 103.39 0
68.82 2.06 70.88
97.02 2.91 99.93
107.87 3.24 111.11
36.57 1.10 37.66
56.74 1.70 58.44
30.41 0.91 31.32
5.698 0.17 5.87 0
569.507 586.592 17.085
115.466 3.46 118.93
81.783 2.45 84.24
89.162 2.67 91.84
286.41 295.003 8.59
115.88 3.48 119.36
52.24 1.57 53.80
94.09 2.82 96.91
68.04 2.04 70.08
48.01 1.44 49.45
378.26 389.611 11.35 286,664
1,667.34

Panjang
90.109 2.70 92.81 97,006
189.108 5.67 194.78 31,853
66.223 1.99 68.21 90,658
57.894 1.74 59.63 67,147
91.824 2.75 94.58 26,875
44.537 1.34 45.87
539.70 555.89 16 313,539

Panjang
22.98 0.69 23.67
96.34 2.89 99.23
31.85 0.96 32.81
90.66 2.72 93.38
77.27 2.32 79.58
27.88 0.84 28.71 357.387 10
269.49 8.08 277.58 8
39.07 1.17 40.24
48.68 1.46 50.14
40.56 1.22 41.78
43.64 1.31 44.95
43.43 1.30 44.73 221.84 6
131.52 3.95 135.47 357.311 10
963.37 992.28 29

0 1 0.2 0.01
2801.0129

VOL CROSING JALAN DUSUN 1 50MM titik


GALIAN TANAH 0.3 0.15 4 0.18 7
SIRTU 0.2 0.15 4 0.12 7
BETON FC 0.1 0.15 4 0.06 7
VOL CROSING JALAN DUSUN 32 MM
GALIAN TANAH 0.3 0.15 4 0.18 16
SIRTU 0.2 0.15 4 0.12 16
BETON FC 0.1 0.15 4 0.06 16
VOL CROSING JALAN DUSUN 25 MM
GALIAN TANAH 0.3 0.15 4 0.18 11
SIRTU 0.2 0.15 4 0.12 11
BETON FC 0.1 0.15 4 0.06 11

PIPA GALVANIS 2" MEDIUM =A 4 11 44

TOTAL CROSING 50 MM 11 TITIK


28 4.666666667 34
64 10.66666667

VOL CROSING JALAN BELO TEBANG


GALIAN TANAH 0.3 0.15 4
SIRTU 0.2 0.15 4
#REF! BETON FC 0.1 0.15 4
VOL CROSING JALAN ADABANG
GALIAN TANAH 0.3 0.15 4
SIRTU 0.2 0.15 4
BETON FC 0.1 0.15 4
VOL CROSING JALAN BELOTEBANG
GALIAN TANAH 0.3 0.15 4
16.7 SIRTU 0.2 0.15 4
BETON FC 0.1 0.15 4

PIPA GALVANIS 2" MEDIUM=A 3 11

TOTAL CROSING 50 MM 46
184
30.666667
15 19
45 57

VOLUME ACIAN BAK RES 1 DUSUN 1


D= 4.4 L= 2 ᴫ r
T= 2.4 = 2 3.14 2.2
R= 2.2 = 6.29 2.2 2.4
= 13.83 2.4
L = 33.19
136.20
1.2

1.26 21.6
0.84
0.42

2.88
1.92
0.96

1.98
1.32
0.66

6.12
4.08
2.04

0.18 15 2.7
0.12 15 1.8
0.06 15 0.9

0.18 5 0.9
0.12 5 0.6
0.06 5 0.3

0.18 26 4.68
0.12 26 3.12
0.06 26 1.56

33 8.28
5.52
TITIK 2.76

t
2.4
REKAPITULASI
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
TA. : 2023

NO. URAIAN PEKERJAAN JUMLAH HARGA

A PEKERJAAN PERSIAPAN Rp 6,350,000.00


B PEKERJAAN PEMBANGUNAN RESERVOIR TANGKAPAN DAN KELENGKAPANNYA Rp 72,551,050.21
C PENANGANAN PIPA TRANSMISI, DISTRIBUSI DAN AKSESORIS LAMA Rp 15,256,796.51
D PENGADAAN DAN PEMASANGAN PIPA DISTRIBUSI DAN PELAYANAN Rp 148,945,124.22
E PEKERJAAN PEMASANGAN PIPA TRANSMISI DAN PIPA RING Rp 78,267,739.97
F PEKERJAAN SAMBUNGAN RUMAH Rp 172,964,467.25
G PEKERJAAN AKHIR Rp 4,074,732.50

1. JUMLAH TOTAL Rp 498,409,910.66


2. PPn 11 % ( 1 x 11% ) Rp 54,825,090.17
3. TOTAL JUMLAH ( 1 + 2 ) Rp 553,235,000.83
DIBULATKAN Rp 553,235,000.00

LIMA RATUS LIMA PULUH TIGA JUTA DUA RATUS TIGA PULUH LIMA RIBU RUPIAH

Larantuka, April 2023


DIPERIKSA OLEH : DIBUAT OLEH :
Teknik Bangunan dan Perumahan Konsultan Perencana
Ahli Muda PT.DIPTA PERKASA KONSULTAN
DPU PENRU Kabupaten Flores Timur

ISIDORUS ANIS, A. Md. HENDRIKUS HURAT HURINT.SST


NIP. 19670404 200212 1 005 Kuasa Direktur

DISETUJUI OLEH : MENGETAHUI :


Pejabat Pembuat Komitmen Kepala Dinas Pekerjaan Umum dan Penataan Ruang
Bidang Penataan Ruang dan Cipta Karya Kabupaten Flores Timur
Dinas Pekerjaan Umum dan Penataan Ruang Kab. Flores Timur

ADE MARYANI AFEN PAH, ST JOHANES BRECHMANS SUBAN TUKAN, ST., MT


Nip. 198110911 200803 2 002 NIP. 19720413 199903 1 005
DAFTAR KUANTITAS DAN HARGA
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
TA. : 2023

HARGA
JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME HARGA
SATUAN
( Rp. )
1 2 3 4 5 6=4x5
A PEKERJAAN PERSIAPAN
- Pengukuran Dan Pembersihan Lokasi Ls 1.00 Rp 1,500,000.00 Rp 1,500,000.00
- Papan Nama Proyek Ls 1.00 Rp 350,000.00 Rp 350,000.00
- Mobilisasi dan Demobilisasi Ls 1.00 Rp 1,500,000.00 Rp 1,500,000.00
- Penerapan Keselamatan dan Kesehatan Kerja (K3) Set 1.00 Rp 3,000,000.00 Rp 3,000,000.00
Pengadaan Helm Proyek, Rompi, Sarung Tangan dan sepatu
(6 Manpower)
Sub Jumlah Rp 6,350,000.00
TOTAL PEKERJAAN A Rp 6,350,000.00

B PEKERJAAN PEMBANGUNAN RESERVOIR TANGKAPAN DAN KELENGKAPANNYA


1 Pembangunan Reservoir 5 M3
DUSUN TANAH ME'A
a Pekerjaan Tanah dan Pondasi
- Galian Tanah M³ 2.730 Rp 70,276.80 Rp 191,855.66
- Urugan Pasir (dibawah Pondasi dan Peninggi Lantai) M³ 1.301 Rp 51,376.60 Rp 66,840.96
- Aanstamping M³ 0.819 Rp 810,480.76 Rp 663,783.75
- Pas. Batu Pondasi 1Pc : 4 Psr M³ 2.340 Rp 1,315,634.98 Rp 3,078,585.84
- Urugan Tanah Kembali Bekas Galian M³ 0.683 Rp 51,376.60 Rp 35,064.53
b Pekerjaan Beton
- Lantai Kerja K-125 M³ 0.515 Rp 1,347,988.12 Rp 694,483.48
- Sloof/Dek Bawah ( 1,7 x 2,2 x 0,2 m )
o Beton K-175 M³ 1.288 Rp 1,596,456.42 Rp 2,056,235.87
o Pembesian (TU : 4 Ø 12; Sengkang Ø10 - 15 Cm) Kg 88.800 Rp 153,035.85 Rp 13,589,583.71
- Kolom/Dinding Keliling ( 1,7 + 1,7 + 2,2 + 2,2 m )
o Beton K-175 M³ 2.340 Rp 1,596,456.42 Rp 3,735,708.02
o Pembesian (TU : 4 Ø 12; Sengkang Ø10 - 15 Cm) Kg 148.000 Rp 153,035.85 Rp 22,649,306.18
- Ringbalk/Dek/Plat Atas ( 1,7 x 2,2 x 0,10 m )
o Beton K-175 M³ 0.456 Rp 1,596,456.42 Rp 727,984.13
o Pembesian (TU : 4 Ø 12; Sengkang Ø10 - 15 Cm) Kg 66.600 Rp 153,035.85 Rp 10,192,187.78
- Bekisting M² 23.180 Rp 371,314.63 Rp 8,607,073.01
c Pekerjaan Plesteran dan Pengecetan
- Acian M² 23.180 Rp 39,124.81 Rp 906,912.99
- Pengecetan Dinding Reservoir ( Warna Biru ) M² 14.670 Rp 51,154.31 Rp 750,433.74
Sub Jumlah Rp 67,946,039.64

2 Penambahan Aksesoris Reservoar


- Pipa Pembuangan Pipa Galvanis 1/12" Medium A M¹ 1.000 Rp 101,931.88 Rp 101,931.88
- Pipa Penguras Pipa Galvanis 1 1/2" Medium A M¹ 1.000 Rp 101,931.88 Rp 101,931.88
- Pipa Outlet Pipa Galvanis 1 1/2" Medium A M¹ 8.000 Rp 101,931.88 Rp 815,455.02
- Pipa Inlet Pipa Galvanis 1 " Medium A M¹ 4.000 Rp 63,997.95 Rp 255,991.80
- Gate Valve 1 1/2" Bh 4.000 Rp 299,000.00 Rp 1,196,000.00
- Knee 90ᴼ GIP Ø 1 1/2" Bh 8.000 Rp 88,700.00 Rp 709,600.00
- Knee 90ᴼ GIP Ø 1 " Bh 4.000 Rp 57,900.00 Rp 231,600.00
- Plat Baja Penutup Menhole Ls 1.000 Rp 1,000,000.00 Rp 1,000,000.00
- Sealtape Bh 5.000 Rp 38,500.00 Rp 192,500.00
Sub Jumlah Rp 4,605,010.57
TOTAL PEKERJAAN B Rp 72,551,050.21

C PENANGANAN PIPA TRANSMISI, DISTRIBUSI DAN AKSESORIS LAMA


1 Pembongkaran Pipa Transmisi dan Distribusi HDPE Ø 32 mm ( 1" )
DUSUN TANAH ME'A
- Pembongkaran Pipa Distribusi HDPE Ø 32 mm ( 1" ) M¹ 2,426.772 Rp 5,292.72 Rp 12,844,228.34
Sub Jumlah Rp 12,844,228.34
2 Pembongkaran Pipa Distribusi HDPE Ø 32 mm ( 1" )
DUSUN ADABANG ( PAGONG - LOSELAYU )
- Pembongkaran Pipa Distribusi HDPE Ø 32 mm ( 1" ) M¹ 455.828 Rp 5,292.72 Rp 2,412,568.17
Sub Jumlah Rp 2,412,568.17
TOTAL PEKERJAAN C Rp 15,256,796.51
HARGA
JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME HARGA
SATUAN
( Rp. )
1 2 3 4 5 6=4x5
D PENGADAAN DAN PEMASANGAN PIPA DISTRIBUSI DAN PELAYANAN
1 Pengadaan dan Pemasangan Pipa Distribusi HDPE Ø 50 mm ( 1 1/2" ) - PN 16 SDR 11
DUSUN TANAH ME'A
- Pipa Polyethelene (HDPE) Ø 50 mm M' 1,254.06 Rp 61,623.76 Rp 77,279,826.57
- Male Threaded Join 90⁰ Ø 50 mm x 1 1/5" Bh 4.00 Rp 58,800.00 Rp 235,200.00
- Straight Coupler HDPE Ø 50 mm Bh 12.00 Rp 101,040.00 Rp 1,212,480.00
- Reducing Tee 90⁰ Ø 50 x Ø 50 x Ø 32 mm Bh 13.00 Rp 163,080.00 Rp 2,120,040.00
- Reducing Tee 90⁰ Ø 50 x Ø 32 x Ø 32 Bh 1.00 Rp 163,080.00 Rp 163,080.00
End Cup HDPE. ∅ 50 mm Bh 2.00 Rp 58,080.00 Rp 116,160.00
Sub Jumlah Rp 81,126,786.57

2 Pengadaan dan Pemasangan Pipa Distribusi HDPE Ø 50 mm ( 1 1/2" ) - PN 16 SDR 11


DUSUN ADABANG ( PAGONG - LOSELAYU )
- Pipa Polyethelene (HDPE) Ø 50 mm M¹ 455.828 Rp 61,623.76 Rp 28,089,804.98
- Female Thread Ø 50 mm x 1 1/2" Bh 1.000 Rp 78,600.00 Rp 78,600.00
- Straight Coupler HDPE Ø 50 mm Bh 4.000 Rp 101,040.00 Rp 404,160.00
- Tee Reducing HDPE. ∅ 50 x 50 x 32 mm Bh 5.000 Rp 163,080.00 Rp 815,400.00
- Elbow HDPE. ∅ 50 mm - 90 Bh 2.000 Rp 114,960.00 Rp 229,920.00
- End Cap HDPE. ∅ 50 mm Bh 1.000 Rp 58,080.00 Rp 58,080.00
Sub Jumlah Rp 29,675,964.98

3 Pengadaan dan Pemasangan Pipa Distribusi HDPE Ø 50 mm ( 1 1/2" ) - PN 16 SDR 11


DUSUN BELOTEBANG ( BT )
- Pipa Polyethelene (HDPE) Ø 50 mm M¹ 466.024 Rp 61,623.76 Rp 28,718,118.96
- Male Thread Elbow 90⁰ Ø 50 mm x 1 1/2" Bh 1.000 Rp 84,480.00 Rp 84,480.00
- Pipa HDPE ∅ 50 mm M¹ 1.000 Rp 51,086.01 Rp 51,086.01
- Straight Coupler HDPE Ø 50 mm Bh 4.000 Rp 101,040.00 Rp 404,160.00
- Reducing Tee 90⁰ Ø 50 x Ø 50 x Ø 32 mm Bh 5.000 Rp 163,080.00 Rp 815,400.00
- Elbow HDPE. ∅ 50 mm - 90 Bh 2.000 Rp 114,960.00 Rp 229,920.00
- Reduces Hdpe. ∅ 50 x 32 mm Bh 1.000 Rp 72,600.00 Rp 72,600.00
Sub Jumlah Rp 30,375,764.97

4 Pekerjaan Crossing Jalan


Pekerjaan Crossing Jalan Perkerasan (4 Titik)
- Galian Tanah Cadas/Aspal/Beton M3 2.565 Rp 141,911.22 Rp 364,002.28
- Beton mutu f’= 9,8 MPa (K 125) M3 0.855 Rp 1,347,988.12 Rp 1,152,529.84
- Urugan Sirtu M3 1.71 Rp 160,110.72 Rp 273,789.33
- Pipa Gip Pelindung ( Penyebrangan Jalan Beraspal ) 2" M¹ 25.00 Rp 239,051.45 Rp 5,976,286.25
Sub Jumlah Rp 7,766,607.70
TOTAL PEKERJAAN D Rp 148,945,124.22

E PEKERJAAN PEMASANGAN PIPA TRANSMISI DAN PIPA RING


1 Pengadaan dan Pemasangan Pipa Polyethelene (HDPE) Ø 32 mm ( Panjang Pipa 1667,33 m' )
DUSUN TANAH ME'A ( TM )
- Pipa Polyethelene (HDPE) Ø 32 mm ( Pipa Ring ) Bahan Baru M¹ 583.670 Rp 30,671.32 Rp 17,901,920.59
- Pipa Polyethelene (HDPE) Ø 32 mm ( Pipa Ring ) Bahan Exs. M¹ 1,083.670 Rp 5,429.15 Rp 5,883,403.94
- GATE VALVE Ǿ 32 Bh 4.000 Rp 200,000.00 Rp 800,000.00
- Male Threaded Elbow 90⁰ Ø 32 mm x 1" Bh 8.000 Rp 27,120.00 Rp 216,960.00
- Straight Coupler HDPE Ø 32 mm Bh 8.000 Rp 36,960.00 Rp 295,680.00
- Elbow HDPE. ∅ 32 mm - 90 Bh 20.000 Rp 40,920.00 Rp 818,400.00
- Tee HDPE. ∅ 32 x 32 x 32 mm Bh 2.000 Rp 59,400.00 Rp 118,800.00
- End Cup HDPE. ∅ 32 mm Bh 21.000 Rp 17,160.00 Rp 360,360.00
Reduces Hdpe. ∅ 50 x 32 mm Bh 1.000 Rp 72,600.00 Rp 72,600.00
Sub Jumlah Rp 26,468,124.53

2 Pengadaan dan Pemasangan Pipa Polyethelene (HDPE) Ø 32 mm ( Panjamg Pipa 992,28 m )


DUSUN ADABANG ( PAGONG - LOSELAYU )
- Pipa Polyethelene (HDPE) Ø 32 mm ( Pipa Ring ) Bahan Baru M¹ 992.275 Rp 30,671.32 Rp 30,434,394.68
- GATE VALVE Ǿ 32 M¹ 4.000 Rp 200,000.00 Rp 800,000.00
- Male Threaded Elbow 90⁰ Ø 32 mm x 1" Bh 1.000 Rp 32,400.00 Rp 32,400.00
- Pipa Galvanis 1" Medium A ( bagi 3 ) M' 1.500 Rp 63,997.95 Rp 95,996.93
- Pipa HDPE ∅ 32 mm ( Pasang Siku ) M' 2.000 Rp 22,947.43 Rp 45,894.86
- Straight Coupler HDPE Ø 32 mm Bh 5.000 Rp 36,960.00 Rp 184,800.00
- Equal Tee HDPE. ∅ 32 x 32 x 32 mm Bh 6.000 Rp 59,400.00 Rp 356,400.00
- Elbow HDPE. ∅ 32 mm - 90 Bh 13.000 Rp 40,920.00 Rp 531,960.00
- End Cup HDPE. ∅ 32 mm Bh 12.000 Rp 17,160.00 Rp 205,920.00
Sub Jumlah Rp 32,687,766.47
HARGA
JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME HARGA
SATUAN
( Rp. )
1 2 3 4 5 6=4x5
3 Pengadaan dan Pemasangan Pipa Polyethelene (HDPE) Ø 32 mm
DUDUN BELOTEBANG ( BT )
- Pipa Polyethelene (HDPE) Ø 32 mm ( Pipa Ring ) Bahan Baru M¹ 555.886 Rp 30,671.32 Rp 17,049,754.96
- Tee Equal HDPE Ø 32 X 32 X 32 Bh 1.000 Rp 66,960.00 Rp 66,960.00
- Elbow HDPE. ∅ 32 mm - 90 Bh 4.000 Rp 48,960.00 Rp 195,840.00
- Dop HDPE. ∅ 32 mm Bh 5.000 Rp 20,640.00 Rp 103,200.00
Sub Jumlah Rp 17,415,754.96

4 Pekerjaan Crossing Jalan


Pekerjaan Crossing Jalan Perkerasan (18 Titik)
- Galian Tanah Cadas/Aspal/Beton M3 2.43 Rp 141,911.22 Rp 344,844.26
- Beton mutu f’= 9,8 MPa (K 125) M3 0.81 Rp 1,347,988.12 Rp 1,091,870.37
- Urugan Sirtu M3 1.62 Rp 160,110.72 Rp 259,379.37
Sub Jumlah Rp 1,696,094.01
TOTAL PEKERJAAN E Rp 78,267,739.97

F PEKERJAAN SAMBUNGAN RUMAH


PEKERJAAN PEMASANGAN PIPA SR
1 Pengadaan Aksesoies
Pengadaan Pipa & Aksesoies
- Clamp Sadle Ø 32 X 20 mm Bh 1.00 Rp 35,400.00 Rp 35,400.00
- Male Thread Joint Ǿ 20 x 20 mm Bh 1.00 Rp 7,680.00 Rp 7,680.00
- Pipa HDPE Ø 20 mm M' 10.00 Rp 15,111.89 Rp 151,118.89
- Female Thread Elbow Ø 20 mm 90° Bh 1.00 Rp 13,560.00 Rp 13,560.00
- Pipa GIP Ø 1/2 " M' 2.00 Rp 77,052.61 Rp 154,105.22
- Knie GIP Ø 1/2 " Bh 5.00 Rp 26,900.00 Rp 134,500.00
- Double Nipple GIP Ø 1/2 " Bh 3.00 Rp 16,133.00 Rp 48,399.00
- Plugh Kran GIP Ø 1/2 " Bh 1.00 Rp 19,000.00 Rp 19,000.00
- Water Moor GIP (Khusus untuk water meter) Bh 2.00 Rp 38,500.00 Rp 77,000.00
- Water Meter Bh 1.00 Rp 450,000.00 Rp 450,000.00
- Katup Searah Ǿ 15 mm Bh 1.00 Rp 61,800.00 Rp 61,800.00
- Stop Kran 1/2" - Kuningan Bh 1.00 Rp 70,800.00 Rp 70,800.00
- Kran Air 1/2 " Bh 1.00 Rp 60,000.00 Rp 60,000.00
- Baut Moor 10 mm Bh 4.00 Rp 1,500.00 Rp 6,000.00
- Box Penutup Bh 1.00 Rp 95,000.00 Rp 95,000.00
Sub Jumlah Rp 1,384,363.11
JUMLAH SR : 120 UNIT Rp 166,123,573.14

2 Konstruksi Pemasangan Pipa (Sambungan Rumah)


- Galian Tanah M3 32.40 Rp 70,276.80 Rp 2,276,968.32
- Urugan Tanah Bekas Galian M3 32.16 Rp 51,376.60 Rp 1,652,271.46
- Pembuatan Dudukan Box Water Meter dan Perkuatan Tap Kran dari
Beton Tumbuk 1pc : 3ps :5k + Bekesting, sesuai spesifikasi Teknik M3 2.16 Rp 1,347,988.12 Rp 2,911,654.33
dan gambar
Sub Jumlah Rp 6,840,894.11
TOTAL PEKERJAAN F Rp 172,964,467.25

G PEKERJAAN AKHIR
1 Uji Coba Pengaliran Ls 1.000 Rp 2,574,733 Rp 2,574,732.50
2 Pembersihan Akhir Lokasi Ls 1.000 Rp 1,500,000 Rp 1,500,000.00
Sub Jumlah Rp 4,074,732.50
TOTAL PEKERJAAN G Rp 4,074,732.50
HARGA DASAR

HARGA SATUAN
NO. U R A I A N SAT. SK Bupati Tahun Harga Survey
2021 Terpakai
A UPAH

1 Mandor OH 123,420.00 123,420.00


2 Kepala Tukang Batu OH 112,530.00 112,530.00
3 Tukang Batu Kasar OH 101,640.00 101,640.00
4 Tukang Batu Halus OH 101,640.00 101,640.00
5 Kepala Tukang Kayu OH 112,530.00 112,530.00
6 Tukang Kayu Kasar OH 101,640.00 101,640.00
7 Tukang Kayu Halus OH 101,640.00 101,640.00
8 Kepala Tukang Besi OH 112,530.00 112,530.00
9 Tukang Besi Konstruksi OH 101,640.00 101,640.00
10 Tukang Besi Tulangan OH 101,640.00 101,640.00
11 Kepala Tukang Cat OH 112,530.00 112,530.00
12 Tukang Cat Biasa OH 101,640.00 101,640.00
13 Kepala Tukang Listrik OH 112,530.00 112,530.00
14 Tukang Listrik OH 101,640.00 101,640.00
15 Kepala Tukang Pipa OH 112,530.00 112,530.00
16 Tukang Pipa OH 101,640.00 101,640.00
17 Pekerja OH 81,070.00 81,070.00
18 Operator OH 101,640.00 101,640.00
19 Pembantu Operator OH 81,070.00 81,070.00

B BAHAN
Price List Harga
B.1 PIPA Harga Terpakai
Surabaya 2022

1 Pipa HDPE Ø 90 mm ( 3 inch ) Pn 16 Sdr 11 m' 135,070.00 149,927.70


2 Pipa HDPE Ø 75 mm ( 2 1/2 inch ) Pn 16 Sdr 11 m' 93,318.00 103,582.98
3 Pipa HDPE Ø 63 mm ( 2 inch ) Pn 16 Sdr 11 m' 66,880.00 74,236.80
4 Pipa HDPE Ø 50 mm ( 1 1/2 inch ) Pn 16 Sdr 11 m' 42,306.00 46,959.66
5 Pipa HDPE Ø 40 mm ( 1 1/4 inch ) Pn 16 Sdr 11 m' 27,230.00 30,225.30
6 Pipa HDPE Ø 32 mm ( 1 inch ) Pn 16 Sdr 11 m' 17,406.00 19,320.66
7 Pipa HDPE Ø 25 mm ( 3/4 inch ) Pn 16 Sdr 11 m' 10,868.00 12,063.48
8 Pipa HDPE Ø 20 mm ( 1/2 inch ) Pn 16 Sdr 11 m' 7,300.00 8,103.00
9 Pipa Galvanis 2" Medium A m' 118,529.50 131,567.75
10 Pipa Galvanis 1 1/2" Medium A m' 88,184.88 97,885.21
11 Pipa Galvanis 1 1/4" Medium A m' 73,061.13 81,097.85
12 Pipa Galvanis 1" Medium A m' 55,453.75 61,553.66
13 Pipa Galvanis 3/4" Medium A m' 38,419.88 42,646.06
14 Pipa Galvanis 1/2" Medium A m' 29,146.75 32,352.89

B.2 AKSESORIS PIPA Harga Survey

1 Straigh Coupler (PN 16) Ø 20 mm Bh 14,300 17,160.00


2 Straigh Coupler (PN 16) Ø 25 mm Bh 21,500 25,800.00
3 Straigh Coupler (PN 16) Ø 32 mm Bh 30,800 36,960.00
4 Straigh Coupler (PN 16) Ø 40 mm Bh 70,400 84,480.00
5 Straigh Coupler (PN 16) Ø 50 mm Bh 84,200 101,040.00
6 Straigh Coupler (PN 16) Ø 63 mm Bh 123,800 148,560.00
7 Straigh Coupler (PN 16) Ø 75 mm Bh 248,800 298,560.00
8 Straigh Coupler (PN 16) Ø 90 mm Bh 313,700 376,440.00
9 Straigh Coupler (PN 16) Ø 110 mm Bh 695,100 834,120.00

1 Male Thread Adaptor (MTA) Ø 20 mm x 1/2" Bh 6,400 7,680.00


2 Male Thread Adaptor (MTA) Ø 20 mm x 3/4" Bh 8,400 10,080.00
3 Male Thread Adaptor (MTA) Ø 25 mm x 1/2" Bh 10,300 12,360.00
4 Male Thread Adaptor (MTA) Ø 25 mm x 3/4" Bh 10,300 12,360.00
5 Male Thread Adaptor (MTA) Ø 25 mm x 1" Bh 10,800 12,960.00
Male Thread Adaptor (MTA) Ø 32 mm x 1/2" 15,200 18,240.00
6 Male Thread Adaptor (MTA) Ø 32 mm x 3/4" Bh 15,200 18,240.00
7 Male Thread Adaptor (MTA) Ø 32 mm x 1" Bh 15,200 18,240.00
8 Male Thread Adaptor (MTA) Ø 32 mm x 1 1/4" Bh 15,200 18,240.00
9 Male Thread Adaptor (MTA) Ø 40 mm x 1" Bh 42,400 50,880.00
10 Male Thread Adaptor (MTA) Ø 40 mm x 1 1/4" Bh 42,400 50,880.00
11 Male Thread Adaptor (MTA) Ø 40 mm x 1 1/2" Bh 42,400 50,880.00
12 Male Thread Adaptor (MTA) Ø 50 mm x 1 1/4" Bh 49,000 58,800.00
13 Male Thread Adaptor (MTA) Ø 50 mm x 1 1/2" Bh 49,000 58,800.00
14 Male Thread Adaptor (MTA) Ø 50 mm x 1 1/2" Bh 49,000 58,800.00
15 Male Thread Adaptor (MTA) Ø 63 mm x 1 1/2" Bh 67,100 80,520.00
16 Male Thread Adaptor (MTA) Ø 63 mm x 2" Bh 69,300 83,160.00

1 Female Thread Adaptor (FTA) Ø 20 mm x 1/2" Bh 9,800 11,760.00


2 Female Thread Adaptor (FTA) Ø 20 mm x 3/4" Bh 9,800 11,760.00
3 Female Thread Adaptor (FTA) Ø 25 mm x 1/2" Bh 11,800 14,160.00
4 Female Thread Adaptor (FTA) Ø 25 mm x 3/4" Bh 11,800 14,160.00
5 Female Thread Adaptor (FTA) Ø 25 mm x 1" Bh 12,300 14,760.00
6 Female Thread Adaptor (FTA) Ø 32 mm x 3/4" Bh 19,800 23,760.00
7 Female Thread Adaptor (FTA) Ø 32 mm x 1" Bh 19,800 23,760.00
8 Female Thread Adaptor (FTA) Ø 40 mm x 1" Bh 46,800 56,160.00
9 Female Thread Adaptor (FTA) Ø 40 mm x 1 1/4" Bh 46,800 56,160.00
10 Female Thread Adaptor (FTA) Ø 40 mm x 1 1/2" Bh 46,800 56,160.00
11 Female Thread Adaptor (FTA) Ø 50 mm x 1 1/2" Bh 65,500 78,600.00
12 Female Thread Adaptor (FTA) Ø 63 mm x 2" Bh 112,800 135,360.00
13 Female Thread Adaptor (FTA) Ø 75 mm x 2" Bh 178,300 213,960.00
14 Female Thread Adaptor (FTA) Ø 75 mm x 2 1/2" Bh 189,300 227,160.00
15 Female Thread Adaptor (FTA) Ø 90 mm x 3" Bh 241,100 289,320.00
16 Female Thread Adaptor (FTA) Ø 110 mm x 4" Bh 486,000 583,200.00

1 Male Threaded Elbow 90⁰ Ø 20 mm x 1/2" Bh 11,300 13,560.00


2 Male Threaded Elbow 90⁰ Ø 20 mm x 3/4" Bh 11,300 13,560.00
3 Male Threaded Elbow 90⁰ Ø 25 mm x 1/2" Bh 14,300 17,160.00
4 Male Threaded Elbow 90⁰ Ø 25 mm x 3/4 Bh 14,300 17,160.00
5 Male Threaded Elbow 90⁰ Ø 25 mm x 1" Bh 14,300 17,160.00
7 Male Threaded Elbow 90⁰ Ø 32 mm x 3/4" Bh 22,600 27,120.00
8 Male Threaded Elbow 90⁰ Ø 32 mm x 1" Bh 22,600 27,120.00
9 Male Threaded Elbow 90⁰ Ø 40 mm x 1" Bh 56,700 68,040.00
10 Male Threaded Elbow 90⁰ Ø 40 mm x 1 1/4" Bh 56,700 68,040.00
11 Male Threaded Elbow 90⁰ Ø 50 mm x 1 1/2" Bh 70,400 84,480.00
12 Male Threaded Elbow 90⁰ Ø 63 mm x 2" Bh 122,200 146,640.00
13 Male Threaded Elbow 90⁰ Ø 75 mm x 2 1/2" Bh 203,100 243,720.00
14 Male Threaded Elbow 90⁰ Ø 90 mm x 3" Bh 276,800 332,160.00
15 Male Threaded Elbow 90⁰ Ø 110 mm x 4" Bh 561,900 674,280.00

1 Female Threaded Elbow 90⁰ Ø 20 mm x 1/2" Bh 11,300 13,560.00


2 Female Threaded Elbow 90⁰ Ø 20 mm x 3/4" Bh 11,300 13,560.00
3 Female Threaded Elbow 90⁰ Ø 25 mm x 1/2" Bh 15,200 18,240.00
4 Female Threaded Elbow 90⁰ Ø 25 mm x 3/4 Bh 15,200 18,240.00
5 Female Threaded Elbow 90⁰ Ø 25 mm x 1" Bh 15,200 18,240.00
6 Female Threaded Elbow 90⁰ Ø 32 mm x 3/4" Bh 27,000 32,400.00
7 Female Threaded Elbow 90⁰ Ø 32 mm x 1" Bh 27,000 32,400.00
8 Female Threaded Elbow 90⁰ Ø 40 mm x 1" Bh 56,700 68,040.00
9 Female Threaded Elbow 90⁰ Ø 40 mm x 1 1/4" Bh 56,700 68,040.00
10 Female Threaded Elbow 90⁰ Ø 50 mm x 1 1/4" Bh 79,800 95,760.00
11 Female Threaded Elbow 90⁰ Ø 50 mm x 1 1/2" Bh 79,800 95,760.00
12 Female Threaded Elbow 90⁰ Ø 63 mm x 2" Bh 126,600 151,920.00
13 Female Threaded Elbow 90⁰ Ø 75 mm x 2 " 224,000 268,800.00
14 Female Threaded Elbow 90⁰ Ø 75 mm x 2 1/2" Bh 232,300 278,760.00
15 Female Threaded Elbow 90⁰ Ø 90 mm x 3" Bh 315,400 378,480.00

1 Tee Equal 90⁰ Ø 20 mm Bh 23,700 28,440.00


2 Tee Equal 90⁰ Ø 25 mm Bh 31,400 37,680.00
3 Tee Equal 90⁰ Ø 32 mm Bh 49,500 59,400.00
4 Tee Equal 90⁰ Ø 40 mm Bh 122,700 147,240.00
5 Tee Equal 90⁰ Ø 50 mm Bh 135,900 163,080.00
6 Tee Equal 90⁰ Ø 63 mm Bh 221,800 266,160.00
7 Tee Equal 90⁰ Ø 75 mm Bh 426,500 511,800.00
8 Tee Equal 90⁰ Ø 90 mm Bh 526,100 631,320.00
9 Tee Equal 90⁰ Ø 110 mm Bh 1,235,000 1,482,000.00

1 Reducing Tee 90⁰ Ø 25 mm x Ø 20 mm Bh 32,500 39,000.00


2 Reducing Tee 90⁰ Ø 32 mm x Ø 20 mm Bh 44,600 53,520.00
3 Reducing Tee 90⁰ Ø 32 mm x Ø 25 mm Bh 46,200 55,440.00
4 Reducing Tee 90⁰ Ø 40 mm x Ø 25 mm Bh 121,600 145,920.00
5 Reducing Tee 90⁰ Ø 40 mm x Ø 32 mm Bh 121,600 145,920.00
6 Reducing Tee 90⁰ Ø 50 mm x Ø 20 mm Bh 135,900 163,080.00
7 Reducing Tee 90⁰ Ø 50 mm x Ø 25 mm Bh 135,900 163,080.00
8 Reducing Tee 90⁰ Ø 50 mm x Ø 32 mm Bh 135,900 163,080.00
9 Reducing Tee 90⁰ Ø 50 mm x Ø 40 mm Bh 135,900 163,080.00
Reducing Tee 90⁰ Ø 63 mm x Ø 25 mm Bh 198,100 237,720.00
10 Reducing Tee 90⁰ Ø 63 mm x Ø 32 mm Bh 198,100 237,720.00
11 Reducing Tee 90⁰ Ø 63 mm x Ø 40 mm Bh 198,100 237,720.00
12 Reducing Tee 90⁰ Ø 63 mm x Ø 50 mm Bh 206,900 248,280.00
13 Reducing Tee 90⁰ Ø 75 mm x Ø 50 mm Bh 417,700 501,240.00
14 Reducing Tee 90⁰ Ø 75 mm x Ø 63 mm Bh 538,200 645,840.00
15 Reducing Tee 90⁰ Ø 90 mm x Ø 63 mm Bh 515,100 618,120.00
16 Reducing Tee 90⁰ Ø 90 mm x Ø 75 mm Bh 540,400 648,480.00
17 Reducing Tee 90⁰ Ø 110 mm x Ø 90 mm Bh 1,067,700 1,281,240.00

1 Reducing Coupler Ø 25 mm x Ø 20 mm Bh 16,700 20,040.00


2 Reducing Coupler Ø 32 mm x Ø 20 mm Bh 25,900 31,080.00
3 Reducing Coupler Ø 32 mm x Ø 25 mm Bh 27,000 32,400.00
4 Reducing Coupler Ø 40 mm x Ø 20 mm Bh 51,700 62,040.00
5 Reducing Coupler Ø 40 mm x Ø 25 mm Bh 51,700 62,040.00
6 Reducing Coupler Ø 40 mm x Ø 32 mm Bh 51,700 62,040.00
7 Reducing Coupler Ø 50 mm x Ø 20 mm Bh 60,500 72,600.00
8 Reducing Coupler Ø 50 mm x Ø 25 mm Bh 60,500 72,600.00
9 Reducing Coupler Ø 50 mm x Ø 32 mm Bh 60,500 72,600.00
10 Reducing Coupler Ø 50 mm x Ø 40 mm Bh 77,000 92,400.00
11 Reducing Coupler Ø 63 mm x Ø 25 mm Bh 84,800 101,760.00
12 Reducing Coupler Ø 63 mm x Ø 32 mm Bh 93,600 112,320.00
13 Reducing Coupler Ø 63 mm x Ø 40 mm Bh 108,400 130,080.00
14 Reducing Coupler Ø 63 mm x Ø 50 mm Bh 112,800 135,360.00
15 Reducing Coupler Ø 75 mm x Ø 50 mm Bh 193,700 232,440.00
16 Reducing Coupler Ø 75 mm x Ø 63 mm Bh 220,100 264,120.00
17 Reducing Coupler Ø 90 mm x Ø 63 mm Bh 240,500 288,600.00
18 Reducing Coupler Ø 90 mm x Ø 75 mm Bh 296,600 355,920.00
19 Reducing Coupler Ø 110 mm x Ø 90 mm Bh 548,700 658,440.00

1 Reducing Elbow Ø 25 mm x Ø 20 mm Bh 25,900 31,080.00


2 Reducing Elbow Ø 32 mm x Ø 20 mm Bh 79,300 79,300.00
3 Reducing Elbow Ø 32 mm x Ø 25 mm Bh 79,300 79,300.00
4 Reducing Elbow Ø 50 mm x Ø 25 mm Bh 151,900 151,900.00
5 Reducing Elbow Ø 50 mm x Ø 32 mm Bh 151,900 151,900.00

1 Elbow 90⁰ Ø 20 mm Bh 15,700 18,840.00


2 Elbow 90⁰ Ø 25 mm Bh 18,700 22,440.00
3 Elbow 90⁰ Ø 32 mm Bh 34,100 40,920.00
4 Elbow 90⁰ Ø 40 mm Bh 85,300 102,360.00
5 Elbow 90⁰ Ø 50 mm Bh 95,800 114,960.00
6 Elbow 90⁰ Ø 63 mm Bh 143,100 171,720.00
7 Elbow 90⁰ Ø 75 mm Bh 295,000 354,000.00
8 Elbow 90⁰ Ø 90 mm Bh 383,600 460,320.00
9 Elbow 90⁰ Ø 110 mm Bh 864,600 1,037,520.00

1 Male Threaded Tee 90⁰ Ø 20 mm x 20 mm" Bh 20,400 20,400.00


2 Male Threaded Tee 90⁰ Ø 20 mm x 25 mm" Bh 20,400 20,400.00
3 Male Threaded Tee 90⁰ Ø 25 mm x 20 mm" Bh 26,400 26,400.00
4 Male Threaded Tee 90⁰ Ø 25 mm x 25 mm" Bh 26,400 26,400.00
5 Male Threaded tee 90⁰ Ø 25 mm x 32 mm" Bh 26,400 26,400.00
7 Male Threaded tee 90⁰ Ø 32 mm x 25 mm" Bh 40,200 40,200.00
8 Male Threaded Tee 90⁰ Ø 32 mm x 32 mm" Bh 40,200 40,200.00
9 Male Threaded Tee 90⁰ Ø 40 mm x 32 mm" Bh 93,600 93,600.00
10 Male Threaded Tee 90⁰ Ø 40 mm x 40 mm" Bh 93,600 93,600.00
11 Male Threaded Tee 90⁰ Ø 50 mm x 40 mm" Bh 103,500 103,500.00
12 Male Threaded Tee 90⁰ Ø 50 mm x 50 mm" Bh 103,500 103,500.00
13 Male Threaded Tee 90⁰ Ø 63 mm x 63 mm" Bh 195,400 195,400.00
14 Male Threaded Tee 90⁰ Ø 75 mm x 63 mm" Bh 326,400 326,400.00
15 Male Threaded Tee 90⁰ Ø 75 mm x 75 mm" Bh 328,600 328,600.00
16 Male Threaded Tee 90⁰ Ø 90 mm x 90 mm" Bh 477,700 477,700.00
17 Male Threaded Tee 90⁰ Ø 110 mm x 90 mm" Bh 951,600 951,600.00
18 Male Threaded Tee 90⁰ Ø 110 mm x 110 mm" Bh 954,900 954,900.00

1 Famale ThreadedTee 90⁰ Ø 20 mm x 20 mm" Bh 20,400 24,480.00


2 Famale Threaded Tee 90⁰ Ø 20 mm x 25 mm" Bh 20,400 24,480.00
3 Famale Threaded Tee 90⁰ Ø 25 mm x 20 mm" Bh 26,400 31,680.00
4 Famale Threaded Tee 90⁰ Ø 25 mm x 25 mm" Bh 26,400 31,680.00
5 Famale Threaded Tee 90⁰ Ø 25 mm x 32 mm" Bh 26,400 31,680.00
6 Famale Threaded Tee 90⁰ Ø 32 mm x 25 mm" Bh 40,200 48,240.00
7 Famale Threaded Tee 90⁰ Ø 32 mm x 32 mm" Bh 40,700 48,840.00
8 Famale Threaded Tee 90⁰ Ø 40 mm x 32 mm" Bh 103,500 124,200.00
9 Famale Threaded Tee 90⁰ Ø 40 mm x 40 mm" Bh 103,500 124,200.00
10 Famale Threaded tee 90⁰ Ø 50 mm x 40 mm" Bh 121,600 145,920.00
11 Famale Threaded Tee 90⁰ Ø 50 mm x 50 mm" Bh 121,600 145,920.00
12 Famale Threaded Tee 90⁰ Ø 63 mm x 63 mm" Bh 183,300 219,960.00
13 Famale Threaded Tee 90⁰ Ø 75 mm x 63 mm" Bh 353,900 424,680.00
14 Famale Threaded Tee 90⁰ Ø 75 mm x 75 mm" Bh 362,100 434,520.00
15 Famale Threaded Tee 90⁰ Ø 90 mm x 90 mm" Bh 484,900 581,880.00
16 Famale Threaded Tee 90⁰ Ø 110 mm x 90 mm" Bh 1,019,300 1,223,160.00
17 Famale Threaded Tee 90⁰ Ø 110 mm x 110 mm" Bh 1,019,300 1,223,160.00

1 End Cap Ø 20 mm Bh 7,900 9,480.00


2 End Cap Ø 25 mm Bh 10,300 12,360.00
3 End Cap Ø 32 mm Bh 14,300 17,160.00
4 End Cap Ø 40 mm Bh 37,400 44,880.00
5 End Cap Ø 50 mm Bh 48,400 58,080.00
6 End Cap Ø 63 mm Bh 69,300 83,160.00
7 End Cap Ø 75 mm Bh 150,200 180,240.00
8 End Cap Ø 90 mm Bh 175,000 210,000.00
9 End Cap Ø 110 mm Bh 372,000 446,400.00

1 Clamp Sadle Ø 25 mm x 20 mm" Bh 26,500 31,800.00


2 Clamp Sadle Ø 32 mm x 20 mm" Bh 29,500 35,400.00
3 Clamp Sadle Ø 32 mm x 25 mm" Bh 29,500 35,400.00
4 Clamp Sadle Ø 32 mm x 32 mm" Bh 30,000 36,000.00
5 Clamp Sadle Ø 40 mm x 20 mm" Bh 34,400 41,280.00
6 Clamp Sadle Ø 40 mm x 25 mm" Bh 34,900 41,880.00
7 Clamp Sadle Ø 40 mm x 32 mm" Bh 37,300 44,760.00
8 Clamp Sadle Ø 50 mm x 20 mm" Bh 36,400 43,680.00
9 Clamp Sadle Ø 50 mm x 25 mm" Bh 37,800 45,360.00
10 Clamp Sadle Ø 50 mm x 32 mm" Bh 40,800 48,960.00
11 Clamp Sadle Ø 63 mm x 20 mm" Bh 48,600 58,320.00
12 Clamp Sadle Ø 63 mm x 25 mm" Bh 49,100 58,920.00
13 Clamp Sadle Ø 63 mm x 32 mm" Bh 52,100 62,520.00
14 Clamp Sadle Ø 63 mm x 40 mm" Bh 54,500 65,400.00
15 Clamp Sadle Ø 75 mm x 20 mm" Bh 75,700 90,840.00
16 Clamp Sadle Ø 75 mm x 25 mm" Bh 76,200 91,440.00
17 Clamp Sadle Ø 75 mm x 32 mm" Bh 79,100 94,920.00
18 Clamp Sadle Ø 75 mm x 40 mm" Bh 81,600 97,920.00
19 Clamp Sadle Ø 75 mm x 50 mm" Bh 82,600 99,120.00

1 Knee 90ᴼ GIP Ø 1/2" Bh 26,900.00 30,935.00


2 Knee 90ᴼ GIP Ø 3/4" Bh 35,300.00 40,595.00
3 Knee 90ᴼ GIP Ø 1" Bh 57,900.00 66,585.00
4 Knee 90ᴼ GIP Ø 1 1/4" Bh 69,000.00 79,350.00
5 Knee 90ᴼ GIP Ø 1 1/2" Bh 88,700.00 102,005.00
6 Knee 90ᴼ GIP Ø 2" Bh 137,300.00 157,895.00
7 Knee 90ᴼ GIP Ø 2 1/2" Bh 241,700.00 277,955.00

8 Tee GIP Ø 1/2" Bh 32,300.00 37,145.00


9 Tee GIP Ø 3/4" Bh 42,800.00 49,220.00
10 Tee GIP Ø 1" Bh 76,800.00 88,320.00
11 Tee GIP Ø 1 1/4" Bh 85,600.00 98,440.00
12 Tee GIP Ø 1 1/2" Bh 110,000.00 126,500.00
13 Tee GIP Ø 2" Bh 201,900.00 232,185.00
14 Tee GIP Ø 2 1/2" Bh 322,800.00 371,220.00

15 Socket GIP Ø 1/2" Bh 25,600.00 29,440.00


16 Socket GIP Ø 3/4" Bh 29,400.00 33,810.00
17 Socket GIP Ø 1" Bh 41,900.00 48,185.00
18 Socket GIP Ø 1 1/4" Bh 55,300.00 63,595.00
19 Socket GIP Ø 1 1/2" Bh 64,900.00 74,635.00
20 Socket GIP Ø 2" Bh 106,750.00 122,762.50
21 Socket GIP Ø 2 1/2" Bh 167,400.00 192,510.00

22 Double Niple GIP Ø 1/2" Bh 16,133 18,552.95


23 Double Niple GIP Ø 3/4" Bh 29,800.00 34,270.00
24 Double Niple GIP Ø 1" Bh 38,000.00 43,700.00
25 Double Niple GIP Ø 1 1/4" Bh 53,600.00 61,640.00
26 Double Niple GIP Ø 1 1/2" Bh 65,400.00 75,210.00
27 Double Niple GIP Ø 2" Bh 97,200.00 111,780.00
28 Double Niple GIP Ø 2 1/2" Bh 147,300.00 169,395.00

29 Watermour GIP Ø 1/2" Bh 38,500.00 44,275.00


30 Watermour GIP Ø 3/4" Bh 87,500.00 100,625.00
31 Watermour GIP Ø 1" Bh 112,900.00 129,835.00
32 Watermour GIP Ø 1 1/4" Bh 128,800.00 148,120.00
33 Watermour GIP Ø 1 1/2" Bh 194,000.00 223,100.00
34 Watermour GIP Ø 2" Bh 244,600.00 281,290.00
35 Watermour GIP Ø 2 1/2" Bh 433,700.00 498,755.00

36 Plug GIP Ø 1/2" Bh 19,000.00 21,850.00


37 Plug GIP Ø 3/4" Bh 24,700.00 28,405.00
38 Plug GIP Ø 1" Bh 29,900.00 34,385.00
39 Plug GIP Ø 1 1/4" Bh 40,500.00 46,575.00
40 Plug GIP Ø 1 1/2" Bh 49,300.00 56,695.00
41 Plug GIP Ø 2" Bh 68,000.00 78,200.00
42 Plug GIP Ø 2 1/2" Bh 126,700.00 145,705.00

43 Dop GIP Ø 1/2" Bh 23,600.00 27,140.00


44 Dop GIP Ø 3/4" Bh 26,500.00 30,475.00
45 Dop GIP Ø 1" Bh 33,200.00 38,180.00
46 Dop GIP Ø 1 1/4" Bh 44,800.00 51,520.00
47 Dop GIP Ø 1 1/2" Bh 55,300.00 63,595.00
48 Dop GIP Ø 2" Bh 81,800.00 94,070.00
49 Dop GIP Ø 2 1/2" Bh 145,200.00 166,980.00

50 V. Socket GIP Ø 1/2" Bh 26,500.00 30,475.00


51 V. Socket GIP Ø 3/4" Bh 33,700.00 38,755.00
52 V. Socket GIP Ø 1" Bh 41,900.00 48,185.00
53 V. Socket GIP Ø 1 1/4" Bh 63,900.00 73,485.00
54 V. Socket GIP Ø 1 1/2" Bh 74,000.00 85,100.00
55 V. Socket GIP Ø 2" Bh 96,600.00 111,090.00
56 V. Socket GIP Ø 2 1/2" Bh 204,600.00 235,290.00

57 V. Tee GIP Ø 1/2" Bh 44,900.00 51,635.00


58 V. Tee GIP Ø 3/4" Bh 50,900.00 58,535.00
59 V. Tee GIP Ø 1" Bh 71,700.00 82,455.00
60 V. Tee GIP Ø 1 1/4" Bh 113,700.00 130,755.00
61 V. Tee GIP Ø 1 1/2" Bh 189,900.00 218,385.00
62 V. Tee GIP Ø 2" Bh 203,800.00 234,370.00
63 V. Tee GIP Ø 2 1/2" Bh 365,700.00 420,555.00

64 V. Ring GIP Ø 1/2" Bh 24,500.00 28,175.00


65 V. Ring GIP Ø 3/4" Bh 26,900.00 30,935.00
66 V. Ring GIP Ø 1" Bh 37,400.00 43,010.00
67 V. Ring GIP Ø 1 1/4" Bh 49,800.00 57,270.00
68 V. Ring GIP Ø 1 1/2" Bh 73,800.00 84,870.00
69 V. Ring GIP Ø 2" Bh 82,200.00 94,530.00
70 V. Ring GIP Ø 2 1/2" Bh 128,500.00 147,775.00

71 Flange Drat GIP Ø 1/2" Bh 20,600.00 23,690.00


72 Flange Drat GIP Ø 3/4" Bh 28,500.00 32,775.00
73 Flange Drat GIP Ø 1" Bh 33,250.00 38,237.50
74 Flange Drat GIP Ø 1 1/4" Bh 47,500.00 54,625.00
75 Flange Drat GIP Ø 1 1/2" Bh 55,350.00 63,652.50
76 Flange Drat GIP Ø 2" Bh 67,200.00 77,280.00
77 Flange Drat GIP Ø 2 1/2" Bh 110,700.00 127,305.00
78 Flange Drat GIP Ø 3" Bh 142,300.00 163,645.00
79 Flange Drat GIP Ø 4" Bh 217,400.00 250,010.00

80 V. Knee GIP Ø 3/4" Bh 11,500.00 13,225.00


81 V. Knee GIP Ø 1" Bh 17,400.00 20,010.00
82 V. Knee GIP Ø 1 1/4" Bh 28,100.00 32,315.00

83 Clamp Saddle Ø 1" - Black Malliable Iron Bh 17,400.00 20,010.00


84 Clamp Saddle Ø 1 1/2" - Black Malliable Iron Bh 22,500.00 25,875.00
85 Clamp Saddle Ø 2" - Black Malliable Iron Bh 25,600.00 29,440.00
86 Clamp Saddle Ø 3" - Black Malliable Iron Bh 41,900.00 48,185.00
87 Clamp Saddle Ø 4" - Black Malliable Iron Bh 55,500.00 63,825.00

88 Packing Karet 1,5" Bh 7,750.00 8,912.50


89 Packing Karet 2" Bh 10,900.00 12,535.00
90 Packing Karet 3" Bh 15,500.00 17,825.00
91 Plug Valve 1/2" - Kuningan Bh 76,000.00 87,400.00
92 Plug Kran 1/2" - Kuningan Bh 60,000.00 69,000.00
93 Check Valve 1/2" - Kuningan Bh 74,850.00 86,077.50
94 Water Meter Ø 15 mm ( 1/2" ) - SNI Bh 325,000.00 373,750.00
95 Katup Searah Ǿ 15 mm Bh 61,800.00 71,070.00
96 Kran Air GIP Ø 15 mm ( 1/2" ) Bh 60,000.00 69,000.00
97 Kran Air GIP Ø 20 mm ( 3/4" ) Bh 95,000.00 109,250.00
98 Kran Air GIP Ø 25 mm ( 1" ) Bh 141,000.00 162,150.00
99 Box Meter Bh 95,000.00 109,250.00
100 Wall Pipa 1,5 Bh 98,500.00 113,275.00
101 Stop Kran 1/2" - Kuningan Bh 70,800.00 81,420.00
-
102 Gate Valve 1/2" Bh 200,000.00 230,000.00
103 Gate Valve 3/4" Bh 257,400.00 296,010.00
104 Gate Valve 1" Bh 200,000.00 230,000.00
105 Gate Valve 1 1/2" Bh 299,000.00 343,850.00
106 Gate Valve 1 1/2" Bh 768,852.00 884,179.80
107 Gate Valve 2" Bh 936,100.00 1,076,515.00
108 Gate Valve 2 1/2" Bh 1,989,900.00 2,288,385.00
109 Gate Valve 3" Bh 2,989,900.00 3,438,385.00
110 Gate Valve 4" Bh 4,501,400.00 5,176,610.00
111 Seal tape Bh 38,500.00 44,275.00

B.3 BAHAN LAIN Harga Di Quary

1 Air ltr 100.00


2 Batu Kali / Karang / Gunung m3 267,750.00 150,000.00
3 Batu Bata Merah Bh 2,100.00
4 Batu Pecah m3 1,155,000.00 400,000.00
5 Pasir Pasang / Cor m3 294,000.00 150,000.00
6 Pasir urungan timbunan m4 199,500.00 120,000.00
7 Tanah urug m3 157,500.00 100,000.00
8 Semen Bosowa 40 Kg Kg 1,250.00
9 Besi Beton Polos Ø 10 Kg 8,708.333
10 Kawat Ikat Kg 35,500.00
9 Papan Kayu Begesting ( Kelas II ) m3 4,200,000.00
10 Balok Kayu ( Kelas II ) m3 4,200,000.00
11 Balok Kayu ( Kelas III ) m3 2,500,000.00
12 Tripleks Tebal 9 mm lbr 161,700.00
13 Minyak Begesting ltr 26,250.00
14 Cat Tembok ( 5 Kg ) Anti Air Kg 99,000.00
15 Plamuur Kg 17,600.00
16 Cat Dasar Kg 30,800.00
17 Kunci Gembok Bh 20,000.00
18 Plat Nama Stainless / Kuningan Bh 40,000.00
19 Solar Industri ltr 12,500.00
20 Bensin Industri ltr 10,000.00
21 Plat Strip m2 47,500.00
22 Baut Φ10 Bh 12,000.00
23 Oli ltr 32,000.00
24 Kawat Las btg 17,500.00
25 Paku 7- 10 cm kg 29,700.00
26 Besi H Beam Kg 20,000.00

C ALAT Harga Sewa

1 Dump Truck Rp. 350,000,000.00


2 Exavator Rp. 1,200,000,000.00
3 Mesin Las HDPE Rp. 8,600,000.00
4 Mesin Las Listrik Jam 200,000.00
5 Pompa Tes Tekan Jam 200,000.00
6 Stamper Jam 200,000.00
7 Concrete Mixer Rp. 10,000,000.00
8 Concrete Vibrator Jam 200,000.00
9 Jack Hammer Jam 200,000.00
10 Genset Jam 200,000.00
11 Tripod/ Tackle & Handle Crane 2T Jam 200,000.00

D JASA PENGIRIMAN Tol Laut Expedisi


HARGA SATUAN UPAH DAN BAHAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

HARGA SATUAN
NO. U R A I A N SAT. SK Bupati Tahun Harga Survey
Harga Dasar Harga Analisa Onsite Harga Terpakai
2023 Konsultan
A UPAH

1 Mandor OH 123,420.00 123,420.00


2 Kepala Tukang Batu OH 112,530.00 112,530.00
3 Tukang Batu Kasar OH 101,640.00 101,640.00
4 Tukang Batu Halus OH 101,640.00 101,640.00
5 Kepala Tukang Kayu OH 112,530.00 112,530.00
6 Tukang Kayu Kasar OH 101,640.00 101,640.00
7 Tukang Kayu Halus OH 101,640.00 101,640.00
8 Kepala Tukang Besi OH 112,530.00 112,530.00
9 Tukang Besi Konstruksi OH 101,640.00 101,640.00
10 Tukang Besi Tulangan OH 101,640.00 101,640.00
11 Kepala Tukang Cat OH 112,530.00 112,530.00
12 Tukang Cat Biasa OH 101,640.00 101,640.00
13 Kepala Tukang Listrik OH 112,530.00 112,530.00
14 Tukang Listrik OH 101,640.00 101,640.00
15 Kepala Tukang Pipa OH 112,530.00 112,530.00
16 Tukang Pipa OH 101,640.00 101,640.00
17 Pekerja OH 81,070.00 81,070.00
18 Operator OH 101,640.00 ` 101,640.00
19 Pembantu Operator OH 81,070.00 81,070.00

B BAHAN
Price List Harga Harga Sampai Pel. Harga Analisa
B.1 PIPA Harga Bongkar Harga Terpakai
Surabaya Larantuka Onsite

1 Pipa HDPE Ø 63 mm ( 2 inch ) Pn 16 Sdr 11 m' 74,236.80 79,625.94 80,695.01 80,695.01


2 Pipa HDPE Ø 50 mm ( 1 1/2 inch ) Pn 16 Sdr 11 m' 46,959.66 50,354.78 51,086.01 51,086.01
3 Pipa HDPE Ø 32 mm ( 1 inch ) Pn 16 Sdr 11 m' 19,320.66 22,649.42 22,947.43 22,947.43
4 Pipa HDPE Ø 25 mm ( 3/4 inch ) Pn 16 Sdr 11 m' 12,063.48 12,913.23 13,119.48 13,119.48
5 Pipa HDPE Ø 20 mm ( 1/2 inch ) Pn 16 Sdr 11 m' 8,103.00 8,647.99 8,802.49 8,802.49
5 Pipa HDPE Ø 50 mm ( 1 1/2 inch ) Pn 16 Sdr 11 m' 5,292.72 - - 6,288.33 6,288.33
6 Pipa HDPE Ø 32 mm ( 1 inch ) Pn 16 Sdr 11 m' 5,292.72 - - 5,344.11 5,344.11
7 Pipa Galvanis 2" Medium A m' 131,567.75 135,216.68 137,093.97 137,093.97
8 Pipa Galvanis 1 1/2" Medium A m' 97,885.21 100,261.58 101,931.88 101,931.88
9 Pipa Galvanis 1" Medium A m' 61,553.66 62,551.88 63,997.95 63,997.95
10 Pipa Galvanis 3/4" Medium A m' 42,646.06 43,294.68 44,254.89 44,254.89
11 Pipa Galvanis 1/2" Medium A m' 32,352.89 32,742.83 33,662.80 33,662.80

B.2 AKSESORIS PIPA Harga Survey Harga Terpakai

● Straigh Coupler (PN 16)


1 Straigh Coupler (PN 16) Ø 20 mm Bh 17,160.00 17,160.00
2 Straigh Coupler (PN 16) Ø 25 mm Bh 25,800.00 25,800.00
3 Straigh Coupler (PN 16) Ø 32 mm Bh 36,960.00 36,960.00
4 Straigh Coupler (PN 16) Ø 40 mm Bh 84,480.00 84,480.00
5 Straigh Coupler (PN 16) Ø 50 mm Bh 101,040.00 101,040.00
6 Straigh Coupler (PN 16) Ø 63 mm Bh 148,560.00 148,560.00
7 Straigh Coupler (PN 16) Ø 75 mm Bh 298,560.00 298,560.00
8 Straigh Coupler (PN 16) Ø 90 mm Bh 376,440.00 376,440.00
9 Straigh Coupler (PN 16) Ø 110 mm Bh 834,120.00 834,120.00
● Male Thread Adaptor (MTA)
1 Male Thread Adaptor (MTA) Ø 20 mm x 1/2" Bh 7,680.00 7,680.00
2 Male Thread Adaptor (MTA) Ø 20 mm x 3/4" Bh 10,080.00 10,080.00
3 Male Thread Adaptor (MTA) Ø 25 mm x 1/2" Bh 12,360.00 12,360.00
4 Male Thread Adaptor (MTA) Ø 25 mm x 3/4" Bh 12,360.00 12,360.00
5 Male Thread Adaptor (MTA) Ø 25 mm x 1" Bh 12,960.00 12,960.00
6 Male Thread Adaptor (MTA) Ø 32 mm x 1/2" 18,240.00 18,240.00
7 Male Thread Adaptor (MTA) Ø 32 mm x 3/4" Bh 18,240.00 18,240.00
8 Male Thread Adaptor (MTA) Ø 32 mm x 1" Bh 18,240.00 18,240.00
9 Male Thread Adaptor (MTA) Ø 32 mm x 1 1/4" Bh 18,240.00 18,240.00
9 Male Thread Adaptor (MTA) Ø 40 mm x 1" Bh 50,880.00 50,880.00
10 Male Thread Adaptor (MTA) Ø 40 mm x 1 1/4" Bh 50,880.00 50,880.00
11 Male Thread Adaptor (MTA) Ø 40 mm x 1 1/2" Bh 50,880.00 50,880.00
12 Male Thread Adaptor (MTA) Ø 50 mm x 1 1/4" Bh 58,800.00 58,800.00
13 Male Thread Adaptor (MTA) Ø 50 mm x 1 1/2" Bh 58,800.00 58,800.00
14 Male Thread Adaptor (MTA) Ø 50 mm x 1 1/2" Bh 58,800.00 58,800.00
15 Male Thread Adaptor (MTA) Ø 63 mm x 1 1/2" Bh 80,520.00 80,520.00
16 Male Thread Adaptor (MTA) Ø 63 mm x 2" Bh 83,160.00 83,160.00
● Female Thread Adaptor (FTA)
1 Female Thread Adaptor (FTA) Ø 20 mm x 1/2" Bh 11,760.00 11,760.00
2 Female Thread Adaptor (FTA) Ø 20 mm x 3/4" Bh 11,760.00 11,760.00
3 Female Thread Adaptor (FTA) Ø 25 mm x 1/2" Bh 14,160.00 14,160.00
4 Female Thread Adaptor (FTA) Ø 25 mm x 3/4" Bh 14,160.00 14,160.00
5 Female Thread Adaptor (FTA) Ø 25 mm x 1" Bh 14,760.00 14,760.00
6 Female Thread Adaptor (FTA) Ø 32 mm x 3/4" Bh 23,760.00 23,760.00
7 Female Thread Adaptor (FTA) Ø 32 mm x 1" Bh 23,760.00 23,760.00
8 Female Thread Adaptor (FTA) Ø 40 mm x 1" Bh 56,160.00 56,160.00
9 Female Thread Adaptor (FTA) Ø 40 mm x 1 1/4" Bh 56,160.00 56,160.00
10 Female Thread Adaptor (FTA) Ø 40 mm x 1 1/2" Bh 56,160.00 56,160.00
11 Female Thread Adaptor (FTA) Ø 50 mm x 1 1/2" Bh 78,600.00 78,600.00
12 Female Thread Adaptor (FTA) Ø 63 mm x 2" Bh 135,360.00 135,360.00
13 Female Thread Adaptor (FTA) Ø 75 mm x 2" Bh 213,960.00 213,960.00
14 Female Thread Adaptor (FTA) Ø 75 mm x 2 1/2" Bh 227,160.00 227,160.00
15 Female Thread Adaptor (FTA) Ø 90 mm x 3" Bh 289,320.00 289,320.00
16 Female Thread Adaptor (FTA) Ø 110 mm x 4" Bh 583,200.00 583,200.00
● Male Threaded Elbow 90⁰
1 Male Threaded Elbow 90⁰ Ø 20 mm x 1/2" Bh 13,560.00 13,560.00
2 Male Threaded Elbow 90⁰ Ø 20 mm x 3/4" Bh 13,560.00 13,560.00
3 Male Threaded Elbow 90⁰ Ø 25 mm x 1/2" Bh 17,160.00 17,160.00
4 Male Threaded Elbow 90⁰ Ø 25 mm x 3/4 Bh 17,160.00 17,160.00
5 Male Threaded Elbow 90⁰ Ø 25 mm x 1" Bh 17,160.00 17,160.00
7 Male Threaded Elbow 90⁰ Ø 32 mm x 3/4" Bh 27,120.00 27,120.00
8 Male Threaded Elbow 90⁰ Ø 32 mm x 1" Bh 27,120.00 27,120.00
9 Male Threaded Elbow 90⁰ Ø 40 mm x 1" Bh 68,040.00 68,040.00
10 Male Threaded Elbow 90⁰ Ø 40 mm x 1 1/4" Bh 68,040.00 68,040.00
11 Male Threaded Elbow 90⁰ Ø 50 mm x 1 1/2" Bh 84,480.00 84,480.00
12 Male Threaded Elbow 90⁰ Ø 63 mm x 2" Bh 146,640.00 146,640.00
13 Male Threaded Elbow 90⁰ Ø 75 mm x 2 1/2" Bh 243,720.00 243,720.00
14 Male Threaded Elbow 90⁰ Ø 90 mm x 3" Bh 332,160.00 332,160.00
15 Male Threaded Elbow 90⁰ Ø 110 mm x 4" Bh 674,280.00 674,280.00
● Female Threaded Elbow 90⁰
1 Female Threaded Elbow 90⁰ Ø 20 mm x 1/2" Bh 13,560.00 13,560.00
2 Female Threaded Elbow 90⁰ Ø 20 mm x 3/4" Bh 13,560.00 13,560.00
3 Female Threaded Elbow 90⁰ Ø 25 mm x 1/2" Bh 18,240.00 18,240.00
4 Female Threaded Elbow 90⁰ Ø 25 mm x 3/4 Bh 18,240.00 18,240.00
5 Female Threaded Elbow 90⁰ Ø 25 mm x 1" Bh 18,240.00 18,240.00
6 Female Threaded Elbow 90⁰ Ø 32 mm x 3/4" Bh 32,400.00 32,400.00
7 Female Threaded Elbow 90⁰ Ø 32 mm x 1" Bh 32,400.00 32,400.00
8 Female Threaded Elbow 90⁰ Ø 40 mm x 1" Bh 68,040.00 68,040.00
9 Female Threaded Elbow 90⁰ Ø 40 mm x 1 1/4" Bh 68,040.00 68,040.00
10 Female Threaded Elbow 90⁰ Ø 50 mm x 1 1/4" Bh 95,760.00 95,760.00
11 Female Threaded Elbow 90⁰ Ø 50 mm x 1 1/2" Bh 95,760.00 95,760.00
12 Female Threaded Elbow 90⁰ Ø 63 mm x 2" Bh 151,920.00 151,920.00
13 Female Threaded Elbow 90⁰ Ø 75 mm x 2 " 268,800.00 268,800.00
14 Female Threaded Elbow 90⁰ Ø 75 mm x 2 1/2" Bh 278,760.00 278,760.00
15 Female Threaded Elbow 90⁰ Ø 90 mm x 3" Bh 378,480.00 378,480.00
● Tee Equal 90⁰
1 Tee Equal 90⁰ Ø 20 mm Bh 28,440.00 28,440.00
2 Tee Equal 90⁰ Ø 25 mm Bh 37,680.00 37,680.00
3 Tee Equal 90⁰ Ø 32 mm Bh 59,400.00 59,400.00
4 Tee Equal 90⁰ Ø 40 mm Bh 147,240.00 147,240.00
5 Tee Equal 90⁰ Ø 50 mm Bh 163,080.00 163,080.00
6 Tee Equal 90⁰ Ø 63 mm Bh 266,160.00 266,160.00
7 Tee Equal 90⁰ Ø 75 mm Bh 511,800.00 511,800.00
8 Tee Equal 90⁰ Ø 90 mm Bh 631,320.00 631,320.00
9 Tee Equal 90⁰ Ø 110 mm Bh 1,482,000.00 1,482,000.00
● Reducing Tee 90⁰
1 Reducing Tee 90⁰ Ø 25 mm x Ø 20 mm Bh 39,000.00 39,000.00
2 Reducing Tee 90⁰ Ø 32 mm x Ø 20 mm Bh 53,520.00 53,520.00
3 Reducing Tee 90⁰ Ø 32 mm x Ø 25 mm Bh 55,440.00 55,440.00
4 Reducing Tee 90⁰ Ø 40 mm x Ø 25 mm Bh 145,920.00 145,920.00
5 Reducing Tee 90⁰ Ø 40 mm x Ø 32 mm Bh 145,920.00 145,920.00
6 Reducing Tee 90⁰ Ø 50 mm x Ø 20 mm Bh 163,080.00 163,080.00
7 Reducing Tee 90⁰ Ø 50 mm x Ø 25 mm Bh 163,080.00 163,080.00
8 Reducing Tee 90⁰ Ø 50 mm x Ø 32 mm Bh 163,080.00 163,080.00
9 Reducing Tee 90⁰ Ø 50 mm x Ø 40 mm Bh 163,080.00 163,080.00
10 Reducing Tee 90⁰ Ø 63 mm x Ø 25 mm Bh 237,720.00 237,720.00
11 Reducing Tee 90⁰ Ø 63 mm x Ø 32 mm Bh 237,720.00 237,720.00
12 Reducing Tee 90⁰ Ø 63 mm x Ø 40 mm Bh 237,720.00 237,720.00
13 Reducing Tee 90⁰ Ø 63 mm x Ø 50 mm Bh 248,280.00 248,280.00
14 Reducing Tee 90⁰ Ø 75 mm x Ø 50 mm Bh 501,240.00 501,240.00
15 Reducing Tee 90⁰ Ø 75 mm x Ø 63 mm Bh 645,840.00 645,840.00
16 Reducing Tee 90⁰ Ø 90 mm x Ø 63 mm Bh 618,120.00 618,120.00
17 Reducing Tee 90⁰ Ø 90 mm x Ø 75 mm Bh 648,480.00 648,480.00
18 Reducing Tee 90⁰ Ø 110 mm x Ø 90 mm Bh 1,281,240.00 1,281,240.00
● Reducing Coupler
1 Reducing Coupler Ø 25 mm x Ø 20 mm Bh 20,040.00 20,040.00
2 Reducing Coupler Ø 32 mm x Ø 20 mm Bh 31,080.00 31,080.00
3 Reducing Coupler Ø 32 mm x Ø 25 mm Bh 32,400.00 32,400.00
4 Reducing Coupler Ø 40 mm x Ø 20 mm Bh 62,040.00 62,040.00
5 Reducing Coupler Ø 40 mm x Ø 25 mm Bh 62,040.00 62,040.00
6 Reducing Coupler Ø 40 mm x Ø 32 mm Bh 62,040.00 62,040.00
7 Reducing Coupler Ø 50 mm x Ø 20 mm Bh 72,600.00 72,600.00
8 Reducing Coupler Ø 50 mm x Ø 25 mm Bh 72,600.00 72,600.00
9 Reducing Coupler Ø 50 mm x Ø 32 mm Bh 72,600.00 72,600.00
10 Reducing Coupler Ø 50 mm x Ø 40 mm Bh 92,400.00 92,400.00
11 Reducing Coupler Ø 63 mm x Ø 25 mm Bh 101,760.00 101,760.00
12 Reducing Coupler Ø 63 mm x Ø 32 mm Bh 112,320.00 112,320.00
13 Reducing Coupler Ø 63 mm x Ø 40 mm Bh 130,080.00 130,080.00
14 Reducing Coupler Ø 63 mm x Ø 50 mm Bh 135,360.00 135,360.00
15 Reducing Coupler Ø 75 mm x Ø 50 mm Bh 232,440.00 232,440.00
16 Reducing Coupler Ø 75 mm x Ø 63 mm Bh 264,120.00 264,120.00
17 Reducing Coupler Ø 90 mm x Ø 63 mm Bh 288,600.00 288,600.00
18 Reducing Coupler Ø 90 mm x Ø 75 mm Bh 355,920.00 355,920.00
19 Reducing Coupler Ø 110 mm x Ø 90 mm Bh 658,440.00 658,440.00
● Reducing Elbow
1 Reducing Elbow Ø 25 mm x Ø 20 mm Bh 31,080.00 31,080.00
2 Reducing Elbow Ø 32 mm x Ø 20 mm Bh 79,300.00 79,300.00
3 Reducing Elbow Ø 32 mm x Ø 25 mm Bh 79,300.00 79,300.00
4 Reducing Elbow Ø 50 mm x Ø 25 mm Bh 151,900.00 151,900.00
5 Reducing Elbow Ø 50 mm x Ø 32 mm Bh 151,900.00 151,900.00
● Elbow 90⁰
1 Elbow 90⁰ Ø 20 mm Bh 18,840.00 18,840.00
2 Elbow 90⁰ Ø 25 mm Bh 22,440.00 22,440.00
3 Elbow 90⁰ Ø 32 mm Bh 40,920.00 40,920.00
4 Elbow 90⁰ Ø 40 mm Bh 102,360.00 102,360.00
5 Elbow 90⁰ Ø 50 mm Bh 114,960.00 114,960.00
6 Elbow 90⁰ Ø 63 mm Bh 171,720.00 171,720.00
7 Elbow 90⁰ Ø 75 mm Bh 354,000.00 354,000.00
8 Elbow 90⁰ Ø 90 mm Bh 460,320.00 460,320.00
9 Elbow 90⁰ Ø 110 mm Bh 1,037,520.00 1,037,520.00
● Male Threaded Tee 90⁰
1 Male Threaded Tee 90⁰ Ø 20 mm x 20 mm" Bh 20,400.00 20,400.00
2 Male Threaded Tee 90⁰ Ø 20 mm x 25 mm" Bh 20,400.00 20,400.00
3 Male Threaded Tee 90⁰ Ø 25 mm x 20 mm" Bh 26,400.00 26,400.00
4 Male Threaded Tee 90⁰ Ø 25 mm x 25 mm" Bh 26,400.00 26,400.00
5 Male Threaded tee 90⁰ Ø 25 mm x 32 mm" Bh 26,400.00 26,400.00
7 Male Threaded tee 90⁰ Ø 32 mm x 25 mm" Bh 40,200.00 40,200.00
8 Male Threaded Tee 90⁰ Ø 32 mm x 32 mm" Bh 40,200.00 40,200.00
9 Male Threaded Tee 90⁰ Ø 40 mm x 32 mm" Bh 93,600.00 93,600.00
10 Male Threaded Tee 90⁰ Ø 40 mm x 40 mm" Bh 93,600.00 93,600.00
11 Male Threaded Tee 90⁰ Ø 50 mm x 40 mm" Bh 103,500.00 103,500.00
12 Male Threaded Tee 90⁰ Ø 50 mm x 50 mm" Bh 103,500.00 103,500.00
13 Male Threaded Tee 90⁰ Ø 63 mm x 63 mm" Bh 195,400.00 195,400.00
14 Male Threaded Tee 90⁰ Ø 75 mm x 63 mm" Bh 326,400.00 326,400.00
15 Male Threaded Tee 90⁰ Ø 75 mm x 75 mm" Bh 328,600.00 328,600.00
16 Male Threaded Tee 90⁰ Ø 90 mm x 90 mm" Bh 477,700.00 477,700.00
17 Male Threaded Tee 90⁰ Ø 110 mm x 90 mm" Bh 951,600.00 951,600.00
18 Male Threaded Tee 90⁰ Ø 110 mm x 110 mm" Bh 954,900.00 954,900.00
● Famale ThreadedTee 90⁰
1 Famale ThreadedTee 90⁰ Ø 20 mm x 20 mm" Bh 24,480.00 24,480.00
2 Famale Threaded Tee 90⁰ Ø 20 mm x 25 mm" Bh 24,480.00 24,480.00
3 Famale Threaded Tee 90⁰ Ø 25 mm x 20 mm" Bh 31,680.00 31,680.00
4 Famale Threaded Tee 90⁰ Ø 25 mm x 25 mm" Bh 31,680.00 31,680.00
5 Famale Threaded Tee 90⁰ Ø 25 mm x 32 mm" Bh 31,680.00 31,680.00
6 Famale Threaded Tee 90⁰ Ø 32 mm x 25 mm" Bh 48,240.00 48,240.00
7 Famale Threaded Tee 90⁰ Ø 32 mm x 32 mm" Bh 48,840.00 48,840.00
8 Famale Threaded Tee 90⁰ Ø 40 mm x 32 mm" Bh 124,200.00 124,200.00
9 Famale Threaded Tee 90⁰ Ø 40 mm x 40 mm" Bh 124,200.00 124,200.00
10 Famale Threaded tee 90⁰ Ø 50 mm x 40 mm" Bh 145,920.00 145,920.00
11 Famale Threaded Tee 90⁰ Ø 50 mm x 50 mm" Bh 145,920.00 145,920.00
12 Famale Threaded Tee 90⁰ Ø 63 mm x 63 mm" Bh 219,960.00 219,960.00
13 Famale Threaded Tee 90⁰ Ø 75 mm x 63 mm" Bh 424,680.00 424,680.00
14 Famale Threaded Tee 90⁰ Ø 75 mm x 75 mm" Bh 434,520.00 434,520.00
15 Famale Threaded Tee 90⁰ Ø 90 mm x 90 mm" Bh 581,880.00 581,880.00
16 Famale Threaded Tee 90⁰ Ø 110 mm x 90 mm" Bh 1,223,160.00 1,223,160.00
17 Famale Threaded Tee 90⁰ Ø 110 mm x 110 mm" Bh 1,223,160.00 1,223,160.00
● End Cap
1 End Cap Ø 20 mm Bh 9,480.00 9,480.00
2 End Cap Ø 25 mm Bh 12,360.00 12,360.00
3 End Cap Ø 32 mm Bh 17,160.00 17,160.00
4 End Cap Ø 40 mm Bh 44,880.00 44,880.00
5 End Cap Ø 50 mm Bh 58,080.00 58,080.00
6 End Cap Ø 63 mm Bh 83,160.00 83,160.00
7 End Cap Ø 75 mm Bh 180,240.00 180,240.00
8 End Cap Ø 90 mm Bh 210,000.00 210,000.00
9 End Cap Ø 110 mm Bh 446,400.00 446,400.00
● Clamp Sadle
1 Clamp Sadle Ø 25 mm x 20 mm" Bh 31,800.00 31,800.00
2 Clamp Sadle Ø 32 mm x 20 mm" Bh 35,400.00 35,400.00
3 Clamp Sadle Ø 32 mm x 25 mm" Bh 35,400.00 35,400.00
4 Clamp Sadle Ø 32 mm x 32 mm" Bh 36,000.00 36,000.00
5 Clamp Sadle Ø 40 mm x 20 mm" Bh 41,280.00 41,280.00
6 Clamp Sadle Ø 40 mm x 25 mm" Bh 41,880.00 41,880.00
7 Clamp Sadle Ø 40 mm x 32 mm" Bh 44,760.00 44,760.00
8 Clamp Sadle Ø 50 mm x 20 mm" Bh 43,680.00 43,680.00
9 Clamp Sadle Ø 50 mm x 25 mm" Bh 45,360.00 45,360.00
10 Clamp Sadle Ø 50 mm x 32 mm" Bh 48,960.00 48,960.00
11 Clamp Sadle Ø 63 mm x 20 mm" Bh 58,320.00 58,320.00
12 Clamp Sadle Ø 63 mm x 25 mm" Bh 58,920.00 58,920.00
13 Clamp Sadle Ø 63 mm x 32 mm" Bh 62,520.00 62,520.00
14 Clamp Sadle Ø 63 mm x 40 mm" Bh 65,400.00 65,400.00
15 Clamp Sadle Ø 75 mm x 20 mm" Bh 90,840.00 90,840.00
16 Clamp Sadle Ø 75 mm x 25 mm" Bh 91,440.00 91,440.00
17 Clamp Sadle Ø 75 mm x 32 mm" Bh 94,920.00 94,920.00
18 Clamp Sadle Ø 75 mm x 40 mm" Bh 97,920.00 97,920.00
19 Clamp Sadle Ø 75 mm x 50 mm" Bh 99,120.00 99,120.00
● Knee 90ᴼ GIP
1 Knee 90ᴼ GIP Ø 1/2" Bh 26,900.00 26,900.00
2 Knee 90ᴼ GIP Ø 3/4" Bh 35,300.00 35,300.00
3 Knee 90ᴼ GIP Ø 1" Bh 57,900.00 57,900.00
4 Knee 90ᴼ GIP Ø 1 1/4" Bh 69,000.00 69,000.00
5 Knee 90ᴼ GIP Ø 1 1/2" Bh 88,700.00 88,700.00
6 Knee 90ᴼ GIP Ø 2" Bh 137,300.00 137,300.00
7 Knee 90ᴼ GIP Ø 2 1/2" Bh 241,700.00 241,700.00
● Tee GIP
1 Tee GIP Ø 1/2" Bh 32,300.00 32,300.00
2 Tee GIP Ø 3/4" Bh 42,800.00 42,800.00
3 Tee GIP Ø 1" Bh 76,800.00 76,800.00
4 Tee GIP Ø 1 1/4" Bh 85,600.00 85,600.00
5 Tee GIP Ø 1 1/2" Bh 110,000.00 110,000.00
6 Tee GIP Ø 2" Bh 201,900.00 201,900.00
7 Tee GIP Ø 2 1/2" Bh 322,800.00 322,800.00
● Socket GIP
1 Socket GIP Ø 1/2" Bh 25,600.00 25,600.00
2 Socket GIP Ø 3/4" Bh 29,400.00 29,400.00
3 Socket GIP Ø 1" Bh 41,900.00 41,900.00
4 Socket GIP Ø 1 1/4" Bh 55,300.00 55,300.00
5 Socket GIP Ø 1 1/2" Bh 64,900.00 64,900.00
6 Socket GIP Ø 2" Bh 106,750.00 106,750.00
7 Socket GIP Ø 2 1/2" Bh 167,400.00 167,400.00
● Double Niple GIP
1 Double Niple GIP Ø 1/2" Bh 16,133.00 16,133.00
2 Double Niple GIP Ø 3/4" Bh 29,800.00 29,800.00
3 Double Niple GIP Ø 1" Bh 38,000.00 38,000.00
4 Double Niple GIP Ø 1 1/4" Bh 53,600.00 53,600.00
5 Double Niple GIP Ø 1 1/2" Bh 65,400.00 65,400.00
6 Double Niple GIP Ø 2" Bh 97,200.00 97,200.00
7 Double Niple GIP Ø 2 1/2" Bh 147,300.00 147,300.00
● Watermour GIP
1 Watermour GIP Ø 1/2" Bh 38,500.00 38,500.00
2 Watermour GIP Ø 3/4" Bh 87,500.00 87,500.00
3 Watermour GIP Ø 1" Bh 112,900.00 112,900.00
4 Watermour GIP Ø 1 1/4" Bh 128,800.00 128,800.00
5 Watermour GIP Ø 1 1/2" Bh 194,000.00 194,000.00
6 Watermour GIP Ø 2" Bh 244,600.00 244,600.00
7 Watermour GIP Ø 2 1/2" Bh 433,700.00 433,700.00
● Plug GIP
1 Plug GIP Ø 1/2" Bh 19,000.00 19,000.00
2 Plug GIP Ø 3/4" Bh 24,700.00 24,700.00
3 Plug GIP Ø 1" Bh 29,900.00 29,900.00
4 Plug GIP Ø 1 1/4" Bh 40,500.00 40,500.00
5 Plug GIP Ø 1 1/2" Bh 49,300.00 49,300.00
6 Plug GIP Ø 2" Bh 68,000.00 68,000.00
7 Plug GIP Ø 2 1/2" Bh 126,700.00 126,700.00
● Dop GIP
1 Dop GIP Ø 1/2" Bh 23,600.00 23,600.00
2 Dop GIP Ø 3/4" Bh 26,500.00 26,500.00
3 Dop GIP Ø 1" Bh 33,200.00 33,200.00
4 Dop GIP Ø 1 1/4" Bh 44,800.00 44,800.00
5 Dop GIP Ø 1 1/2" Bh 55,300.00 55,300.00
6 Dop GIP Ø 2" Bh 81,800.00 81,800.00
7 Dop GIP Ø 2 1/2" Bh 145,200.00 145,200.00
● V. Socket GIP
1 V. Socket GIP Ø 1/2" Bh 26,500.00 26,500.00
2 V. Socket GIP Ø 3/4" Bh 33,700.00 33,700.00
3 V. Socket GIP Ø 1" Bh 41,900.00 41,900.00
4 V. Socket GIP Ø 1 1/4" Bh 63,900.00 63,900.00
5 V. Socket GIP Ø 1 1/2" Bh 74,000.00 74,000.00
6 V. Socket GIP Ø 2" Bh 96,600.00 96,600.00
7 V. Socket GIP Ø 2 1/2" Bh 204,600.00 204,600.00
● V. Tee GIP
1 V. Tee GIP Ø 1/2" Bh 44,900.00 44,900.00
2 V. Tee GIP Ø 3/4" Bh 50,900.00 50,900.00
3 V. Tee GIP Ø 1" Bh 71,700.00 71,700.00
4 V. Tee GIP Ø 1 1/4" Bh 113,700.00 113,700.00
5 V. Tee GIP Ø 1 1/2" Bh 189,900.00 189,900.00
6 V. Tee GIP Ø 2" Bh 203,800.00 203,800.00
7 V. Tee GIP Ø 2 1/2" Bh 365,700.00 365,700.00
● V. Ring GIP
1 V. Ring GIP Ø 1/2" Bh 24,500.00 24,500.00
2 V. Ring GIP Ø 3/4" Bh 26,900.00 26,900.00
3 V. Ring GIP Ø 1" Bh 37,400.00 37,400.00
4 V. Ring GIP Ø 1 1/4" Bh 49,800.00 49,800.00
5 V. Ring GIP Ø 1 1/2" Bh 73,800.00 73,800.00
6 V. Ring GIP Ø 2" Bh 82,200.00 82,200.00
7 V. Ring GIP Ø 2 1/2" Bh 128,500.00 128,500.00
● Flange Drat GIP
1 Flange Drat GIP Ø 1/2" Bh 20,600.00 20,600.00
2 Flange Drat GIP Ø 3/4" Bh 28,500.00 28,500.00
3 Flange Drat GIP Ø 1" Bh 33,250.00 33,250.00
4 Flange Drat GIP Ø 1 1/4" Bh 47,500.00 47,500.00
5 Flange Drat GIP Ø 1 1/2" Bh 55,350.00 55,350.00
6 Flange Drat GIP Ø 2" Bh 67,200.00 67,200.00
7 Flange Drat GIP Ø 2 1/2" Bh 110,700.00 110,700.00
8 Flange Drat GIP Ø 3" Bh 142,300.00 142,300.00
9 Flange Drat GIP Ø 4" Bh 217,400.00 217,400.00
● V. Knee GIP
1 V. Knee GIP Ø 3/4" Bh 11,500.00 11,500.00
2 V. Knee GIP Ø 1" Bh 17,400.00 17,400.00
3 V. Knee GIP Ø 1 1/4" Bh 28,100.00 28,100.00
● Clamp Saddle - Black Malliable Iron
1 Clamp Saddle Ø 1" - Black Malliable Iron Bh 17,400.00 17,400.00
2 Clamp Saddle Ø 1 1/2" - Black Malliable Iron Bh 22,500.00 22,500.00
3 Clamp Saddle Ø 2" - Black Malliable Iron Bh 25,600.00 25,600.00
4 Clamp Saddle Ø 3" - Black Malliable Iron Bh 41,900.00 41,900.00
5 Clamp Saddle Ø 4" - Black Malliable Iron Bh 55,500.00 55,500.00
● Aksesoris Lainya
1 Packing Karet 1,5" Bh 7,750.00 7,750.00
2 Packing Karet 2" Bh 10,900.00 10,900.00
3 Packing Karet 3" Bh 15,500.00 15,500.00
4 Plug Valve 1/2" - Kuningan Bh 76,000.00 76,000.00
5 Plug Kran 1/2" - Kuningan Bh 60,000.00 60,000.00
6 Check Valve 1/2" - Kuningan Bh 74,850.00 74,850.00
7 Water Meter Ø 15 mm ( 1/2" ) - SNI Bh 325,000.00 370,000.00
8 Katup Searah Ǿ 15 mm Bh 61,800.00 61,800.00
9 Kran Air GIP Ø 15 mm ( 1/2" ) Bh 60,000.00 60,000.00
10 Kran Air GIP Ø 20 mm ( 3/4" ) Bh 95,000.00 95,000.00
11 Kran Air GIP Ø 25 mm ( 1" ) Bh 141,000.00 141,000.00
12 Box Meter Bh 95,000.00 95,000.00
13 Wall Pipa 1,5 Bh 98,500.00 98,500.00
14 Stop Kran 1/2" - Kuningan Bh 70,800.00 70,800.00
● Gate Valve
1 Gate Valve 1/2" Bh 200,000.00 200,000.00
2 Gate Valve 3/4" Bh 257,400.00 257,400.00
3 Gate Valve 1" Bh 200,000.00 200,000.00
4 Gate Valve 1 1/2" Bh 299,000.00 299,000.00
5 Gate Valve 1 1/2" Bh 768,852.00 768,852.00
6 Gate Valve 2" Bh 936,100.00 936,100.00
7 Gate Valve 2 1/2" Bh 1,989,900.00 1,989,900.00
8 Gate Valve 3" Bh 2,989,900.00 2,989,900.00
9 Gate Valve 4" Bh 4,501,400.00 4,501,400.00
10 Seal tape Bh 38,500.00 38,500.00
Harga Analisa
B.3 BAHAN LAIN Harga Di Quary Harga Terpakai
Onsite

1 Air ltr 100.00 - 100.00


2 Batu Kali / Karang / Gunung m3 267,750.00 150,000.00 466,603.70 466,603.70
3 Batu Bata Merah Bh 2,100.00 - 2,100.00
4 Batu Pecah m3 1,155,000.00 200,000.00 640,406.47 640,406.47
5 Pasir Pasang / Cor m3 294,000.00 150,000.00 635,275.56 635,275.56
6 Pasir urungan timbunan m4 199,500.00 120,000.00 120,000.00
7 Tanah urug m3 157,500.00 100,000.00 100,000.00
8 Semen Bosowa 40 Kg Kg 1,250.00 - 2,101.69 2,101.69
9 Besi Beton Polos Ø 10 Kg 8,708.33 - 9,277.47 9,277.47
10 Kawat Ikat Kg 35,500.00 - 35,500.00
9 Papan Kayu Begesting ( Kelas II ) m3 4,200,000.00 - -
10 Balok Kayu ( Kelas II ) m3 4,200,000.00 - 4,200,000.00
11 Balok Kayu ( Kelas III ) m3 2,500,000.00 - 2,500,000.00
12 Tripleks Tebal 9 mm lbr 161,700.00 - 161,700.00
13 Minyak Begesting ltr 26,250.00 - 26,250.00
14 Cat Tembok ( 5 Kg ) Anti Air Kg 99,000.00 - 99,000.00
15 Plamuur Kg 17,600.00 - 17,600.00
16 Cat Dasar Kg 30,800.00 - 30,800.00
17 Kunci Gembok Bh 20,000.00 - 20,000.00
18 Plat Nama Stainless / Kuningan Bh 40,000.00 - 40,000.00
19 Solar Industri ltr 12,500.00 - 12,500.00
20 Bensin Industri ltr 10,000.00 - 10,000.00
21 Plat Strip m2 47,500.00 - 47,500.00
22 Baut Φ10 Bh 12,000.00 - 12,000.00
23 Oli ltr 32,000.00 - 32,000.00
24 Kawat Las btg 17,500.00 - 17,500.00
25 Paku 7- 10 cm kg 29,700.00 - 29,700.00
26 Besi H Beam Kg - 20,000.00

C ALAT Harga Terpakai

1 Dump Truck Jam 449,342.07


2 Exavator Jam 698,160.64
3 Mesin Las HDPE Jam 193,592.00
4 Mesin Las Listrik Jam 200,000.00
5 Pompa Tes Tekan Jam 200,000.00
6 Stamper Jam 200,000.00
7 Concrete Mixer Jam 199,732.09
8 Concrete Vibrator Jam 200,000.00
9 Jack Hammer Jam 200,000.00
10 Genset Jam 200,000.00
11 Tripod/ Tackle & Handle Crane 2T Jam 200,000.00
3,395.12

131,567.75
97,885.21
61,553.66
42,646.06
32,352.89 201,976.79
299,040.00
- 350,000.00
3 M3 3,5 M3 4 M3 / ZAK

1,399,811.11 1,633,112.96 1,866,414.81

1,921,219.41 2,241,422.64 2,561,625.87


1,905,826.69 2,223,464.47 2,541,102.25
360,000.00 420,000.00 480,000.00
ANALISA HARGA SATUAN PEKERJAAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH
KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA
ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

Jenis Pekerjaan : A.2.3.1.1. Penggalian 1 m3 tanah Cadas/Aspal/Beton


Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 141,911.22
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 1.500 81,070.00 121,605.00
2 Mandor OH 0.060 123,420.00 7,405.20

2 Material :
1 -

3 Peralatan :
1 -

Jumlah Harga Satuan 129,010.20


Keuntungan dan Biaya Overhead 10 % 12,901.02
Harga Satuan Pekerjaan 141,911.22

Jenis Pekerjaan : A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m


Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 70,276.80
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.750 81,070.00 60,802.50
2 Mandor OH 0.025 123,420.00 3,085.50

2 Material :
1 -

3 Peralatan :
1 -

Jumlah Harga Satuan 63,888.00


Keuntungan dan Biaya Overhead 10 % 6,388.80
Harga Satuan Pekerjaan 70,276.80

Jenis Pekerjaan : A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah


Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 51,376.60
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.500 81,070.00 40,535.00
2 Mandor OH 0.050 123,420.00 6,171.00

2 Material :
1

3 Peralatan :
1 -

Jumlah Harga Satuan 46,706.00


Keuntungan dan Biaya Overhead 10 % 4,670.60
Harga Satuan Pekerjaan 51,376.60
Jenis Pekerjaan : A.2.3.1.11. Pengurugan 1 m3 dengan Sirtu
Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 160,110.72
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.300 81,070.00 24,321.00
2 Mandor OH 0.010 123,420.00 1,234.20

2 Material :
1 Pasir Urug m3 1.200 100,000.00 120,000.00

3 Peralatan :
1 -

Jumlah Harga Satuan 145,555.20


Keuntungan dan Biaya Overhead 10 % 14,555.52
Harga Satuan Pekerjaan 160,110.72

Jenis Pekerjaan : A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP
Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 1,315,634.98
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 1.500 81,070.00 121,605.00
2 Tukang batu OH 0.750 101,640.00 76,230.00
3 Kepala tukang OH 0.075 112,530.00 8,439.75
4 Mandor OH 0.075 123,420.00 9,256.50

2 Material :
1 Batu belah m3 1.200 466,603.70 559,924.44
2 Semen Portland Kg 163.000 2,101.69 342,576.10
3 Pasir pasang m3 0.520 150,000.00 78,000.00

3 Peralatan :
1 -

Jumlah Harga Satuan 1,196,031.80


Keuntungan dan Biaya Overhead 10 % 119,603.18
Harga Satuan Pekerjaan 1,315,634.98

Jenis Pekerjaan : A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping)


Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 810,480.76
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.780 81,070.00 63,234.60
2 Tukang batu OH 0.390 101,640.00 39,639.60
3 Kepala tukang OH 0.039 112,530.00 4,388.67
4 Mandor OH 0.039 123,420.00 4,813.38

2 Material :
1 Batu belah m3 1.200 466,603.70 559,924.44
2 Pasir urug m3 0.432 150,000.00 64,800.00

3 Peralatan :
1 -

Jumlah Harga Satuan 736,800.69


Keuntungan dan Biaya Overhead 10 % 73,680.07
Harga Satuan Pekerjaan 810,480.76
Jenis Pekerjaan : 1 m³ beton untuk lantai kerja (bedding) Beton fc' = 7,4 s.d. 9,8 MPa (K-100 s.d. K-125)
Satuan Mata Pembayaran : Rp./M3
3
Kuantitas Pekerjaan M
Harga Satuan : Rp. 1,190,360.63
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 1.200 81,070.00 97,284.00
2 Tukang batu OH 0.200 101,640.00 20,328.00
3 Kepala tukang OH 0.020 112,530.00 2,250.60
4 Mandor OH 0.120 123,420.00 14,810.40

2 Material :
1 Semen Portland Kg 227.000 2,101.69 477,084.51
2 Pasir Beton Kg 0.621 150,000.00 93,107.14
3 Kerikil Kg 0.556 640,406.47 355,781.37
4 Air Liter 215.000 100.00 21,500.00

3 Peralatan :
1 -

Jumlah Harga Satuan 1,082,146.02


Keuntungan dan Biaya Overhead 10 % 108,214.60
Harga Satuan Pekerjaan 1,190,360.63

Jenis Pekerjaan : A.4.1.1.2. Membuat 1 m3 Beton Mutu f’c = 9,8 Mpa (K125)
Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 1,347,988.12
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 1.650 81,070.00 133,765.50
2 Tukang batu OH 0.275 101,640.00 27,951.00
3 Kepala tukang OH 0.028 112,530.00 3,150.84
4 Mandor OH 0.083 123,420.00 10,243.86

2 Material :
1 Semen Portland Kg 276.000 2,101.69 580,067.51
2 Pasir Beton Kg 0.591 150,000.00 88,714.29
3 Kerikil Kg 0.562 640,406.47 360,050.75
4 Air Liter 215.000 100.00 21,500.00

3 Peralatan :
1 -
Jumlah Harga Satuan 1,225,443.74
Keuntungan dan Biaya Overhead 10 % 122,544.37
Harga Satuan Pekerjaan 1,347,988.12

Jenis Pekerjaan : A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175)
Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 1,596,456.42
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 1.650 81,070.00 133,765.50
2 Tukang batu OH 0.275 101,640.00 27,951.00
3 Kepala tukang OH 0.028 112,530.00 3,150.84
4 Mandor OH 0.083 123,420.00 10,243.86

2 Material :
1 Semen Portland Kg 326.000 2,101.69 685,152.20
2 Pasir Beton Kg 0.543 150,000.00 81,428.57
3 Kerikil Kg 0.762 640,406.47 488,132.04
4 Air Liter 215.000 100.00 21,500.00

3 Peralatan :
1 -
Jumlah Harga Satuan 1,451,324.02
Keuntungan dan Biaya Overhead 10 % 145,132.40
Harga Satuan Pekerjaan 1,596,456.42
Jenis Pekerjaan : A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 Mpa (K250)
Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 1,727,748.33
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 1.650 81,070.00 133,765.50
2 Tukang batu OH 0.275 101,640.00 27,951.00
3 Kepala tukang OH 0.028 112,530.00 3,150.84
4 Mandor OH 0.083 123,420.00 10,243.86

2 Material :
1 Semen Portland Kg 384.000 2,101.69 807,050.45
2 Pasir Beton Kg 0.494 150,000.00 74,142.86
3 Kerikil Kg 0.770 640,406.47 492,875.79
4 Air Liter 215.000 100.00 21,500.00

3 Peralatan :
1 -

Jumlah Harga Satuan 1,570,680.30


Keuntungan dan Biaya Overhead 10 % 157,068.03
Harga Satuan Pekerjaan 1,727,748.33

Jenis Pekerjaan : A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
Satuan Mata Pembayaran : Rp./Kg
Kuantitas Pekerjaan Kg
Harga Satuan : Rp. 153,035.85
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.700 81,070.00 56,749.00
2 Tukang Besi OH 0.070 101,640.00 7,114.80
3 Kepala tukang OH 0.007 112,530.00 787.71
4 Mandor OH 0.004 123,420.00 493.68

2 Material :
1 Besi Beton Kg 7.400 9277.47 68,653.31
2 Kawat Beton Kg 0.150 35,500.00 5,325.00

3 Peralatan :
1 -

Jumlah Harga Satuan 139,123.50


Keuntungan dan Biaya Overhead 10 % 13,912.35
Harga Satuan Pekerjaan 153,035.85
Jenis Pekerjaan : A.4.1.1.23 Pemasangan 1 m2 Bekisting untuk Dinding Sheerwall
Satuan Mata Pembayaran : Rp./M²
Kuantitas Pekerjaan M²
Harga Satuan : Rp. 371,314.63
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.660 81,070.00 53,506.20
2 Tukang Kayu OH 0.330 101,640.00 33,541.20
3 Kepala tukang OH 0.033 112,530.00 3,713.49
4 Mandor OH 0.033 123,420.00 4,072.86

2 Material :
1 Kayu kelas III M³ 0.030 2,500,000.00 75,000.00
2 Paku 5 – 12 cm Kg 0.400 29,700.00 11,880.00
3 Minyak bekisting Liter 0.200 26,250.00 5,250.00
4 Balok kayu kelas II M³ 0.020 3,200,000.00 64,000.00
5 Tripleks tebal 9 mm Lbr 0.350 161,700.00 56,595.00
6 Dolken kayu ɸ (8-10) cm - panjang 4 m Batang 3.000 10,000.00 30,000.00

3 Peralatan :
1 -

Jumlah Harga Satuan 337,558.75


Keuntungan dan Biaya Overhead 10 % 33,755.88
Harga Satuan Pekerjaan 371,314.63

Jenis Pekerjaan : A.4.4.2.27 Pemasangan 1 m2 acian


Satuan Mata Pembayaran : Rp./M²
Kuantitas Pekerjaan M²
Harga Satuan : Rp. 39,124.81
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.200 81,070.00 16,214.00
2 Tukang Batu OH 0.100 101,640.00 10,164.00
3 Kepala tukang OH 0.010 112,530.00 1,125.30
4 Mandor OH 0.010 123,420.00 1,234.20

2 Material :
1 Semen portland Kg 3.250 2,101.69 6,830.51

3 Peralatan :
1 -
Jumlah Harga Satuan 35,568.01
Keuntungan dan Biaya Overhead 10 % 3,556.80
Harga Satuan Pekerjaan 39,124.81

Jenis Pekerjaan : A.4.7.1.10 Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Satuan Mata Pembayaran : Rp./M²
Kuantitas Pekerjaan M²
Harga Satuan : Rp. 51,154.31
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.020 81,070.00 1,621.40
2 Tukang Batu OH 0.063 101,640.00 6,403.32
3 Kepala tukang OH 0.006 112,530.00 708.94
4 Mandor OH 0.003 123,420.00 370.26

2 Material :
1 Plamuur Kg 0.100 17,600.00 1,760.00
2 Cat dasar Kg 0.100 99,000.00 9,900.00
3 Cat penutup Kg 0.260 99,000.00 25,740.00

3 Peralatan :
1 -
Jumlah Harga Satuan 46,503.92
Keuntungan dan Biaya Overhead 10 % 4,650.39
Harga Satuan Pekerjaan 51,154.31
Jenis Pekerjaan : A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½”
Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 77,052.61
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.054 81,070.00 4,377.78
2 Tukang Pipa OH 0.090 101,640.00 9,147.60
3 Kepala tukang OH 0.009 112,530.00 1,012.77
4 Mandor OH 0.027 123,420.00 3,332.34

2 Material :
1 Pipa Galvanize 1/2" m' 1.200 33,662.80 40,395.36
2 Perlengkapan Ls 35% x Hrg Pipa 11,781.98

3 Peralatan :
1 -

Jumlah Harga Satuan 70,047.83


Keuntungan dan Biaya Overhead 10 % 7,004.78
Harga Satuan Pekerjaan 77,052.61

Jenis Pekerjaan : A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter ¾"


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 95,112.13
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.054 81,070.00 4,377.78
2 Tukang Pipa OH 0.090 101,640.00 9,147.60
3 Kepala tukang OH 0.009 112,530.00 1,012.77
4 Mandor OH 0.027 123,420.00 3,332.34

2 Material :
1 Pipa Galvanize 3/4" m' 1.200 44,254.89 53,105.87
2 Perlengkapan Ls 35% x Hrg Pipa 15,489.21

3 Peralatan :
1 -

Jumlah Harga Satuan 86,465.57


Keuntungan dan Biaya Overhead 10 % 8,646.56
Harga Satuan Pekerjaan 95,112.13

Jenis Pekerjaan : A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1”


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 141,779.24
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.108 81,070.00 8,755.56
2 Tukang Pipa OH 0.180 101,640.00 18,295.20
3 Kepala tukang OH 0.018 112,530.00 2,025.54
4 Mandor OH 0.005 123,420.00 617.10

2 Material :
1 Pipa Galvanize 1" m' 1.200 63,997.95 76,797.54
2 Perlengkapan Ls 35% x Hrg Pipa 22,399.28

3 Peralatan :
1 -

Jumlah Harga Satuan 128,890.22


Keuntungan dan Biaya Overhead 10 % 12,889.02
Harga Satuan Pekerjaan 141,779.24
Jenis Pekerjaan : A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1 1/4"
Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 292,714.88
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.108 81,070.00 8,755.56
2 Tukang Pipa OH 0.180 101,640.00 18,295.20
3 Kepala tukang OH 0.018 112,530.00 2,025.54
4 Mandor OH 0.005 123,420.00 617.10

2 Material :
1 Pipa Galvanize 1 1/4" m' 1.200 152,523.25 183,027.90
2 Perlengkapan Ls 35% x Hrg Pipa 53,383.14

3 Peralatan :
1 -

Jumlah Harga Satuan 266,104.44


Keuntungan dan Biaya Overhead 10 % 26,610.44
Harga Satuan Pekerjaan 292,714.88

Jenis Pekerjaan : A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 1 ½"


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 206,456.59
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.108 81,070.00 8,755.56
2 Tukang Pipa OH 0.180 101,640.00 18,295.20
3 Kepala tukang OH 0.018 112,530.00 2,025.54
4 Mandor OH 0.005 123,420.00 617.10

2 Material :
1 Pipa Galvanize 1 1/2" m' 1.200 101,931.88 122,318.25
2 Perlengkapan Ls 35% x Hrg Pipa 35,676.16

3 Peralatan :
1 -

Jumlah Harga Satuan 187,687.81


Keuntungan dan Biaya Overhead 10 % 18,768.78
Harga Satuan Pekerjaan 206,456.59

Jenis Pekerjaan : A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 2"


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 266,407.95
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.108 81,070.00 8,755.56
2 Tukang Pipa OH 0.180 101,640.00 18,295.20
3 Kepala tukang OH 0.018 112,530.00 2,025.54
4 Mandor OH 0.005 123,420.00 617.10

2 Material :
1 Pipa Galvanize 2" m' 1.200 137,093.97 164,512.76
2 Perlengkapan Ls 35% x Hrg Pipa 47,982.89

3 Peralatan :
1 -

Jumlah Harga Satuan 242,189.05


Keuntungan dan Biaya Overhead 10 % 24,218.90
Harga Satuan Pekerjaan 266,407.95

Jenis Pekerjaan : A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 2 1/2"


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. #REF!
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.108 81,070.00 8,755.56
2 Tukang Pipa OH 0.180 101,640.00 18,295.20
3 Kepala tukang OH 0.018 112,530.00 2,025.54
4 Mandor OH 0.005 123,420.00 617.10

2 Material :
1 Pipa Galvanize 2 1/2" m' 1.200 #REF! #REF!
2 Perlengkapan Ls 35% x Hrg Pipa #REF!

3 Peralatan :
1 -

Jumlah Harga Satuan #REF!


Keuntungan dan Biaya Overhead 10 % #REF!
Harga Satuan Pekerjaan #REF!

Jenis Pekerjaan : A.5.1.1 23. Pemasangan 1 m’ pipa galvanis diameter 3"


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. #REF!
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.108 81,070.00 8,755.56
2 Tukang Pipa OH 0.180 101,640.00 18,295.20
3 Kepala tukang OH 0.018 112,530.00 2,025.54
4 Mandor OH 0.005 123,420.00 617.10

2 Material :
1 Pipa Galvanize 3" m' 1.200 #REF! #REF!
2 Perlengkapan Ls 35% x Hrg Pipa #REF!

3 Peralatan :
1 -

Jumlah Harga Satuan #REF!


Keuntungan dan Biaya Overhead 10 % #REF!
Harga Satuan Pekerjaan #REF!

Jenis Pekerjaan : A.5.1.1 24. Pemasangan 1 m’ pipa galvanis diameter 4"


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. #REF!
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.108 81,070.00 8,755.56
2 Tukang Pipa OH 0.180 101,640.00 18,295.20
3 Kepala tukang OH 0.018 112,530.00 2,025.54
4 Mandor OH 0.005 123,420.00 617.10

2 Material :
1 Pipa Galvanize 4" m' 1.200 #REF! #REF!
2 Perlengkapan Ls 35% x Hrg Pipa #REF!

3 Peralatan :
1 -

Jumlah Harga Satuan #REF!


Keuntungan dan Biaya Overhead 10 % #REF!
Harga Satuan Pekerjaan #REF!

Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 90 mm


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. #REF!
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.035 81,070.00 2,837.45
2 Tukang Pipa OH 0.017 101,640.00 1,727.88
3 Mandor OH 0.003 123,420.00 370.26

2 Material :
1 Pipa HDPE dia 90 mm m' 1.000 #REF! #REF!

3 Peralatan :
1 Sewa Tripot/Tackel & handle crane 2 T Jam 0.0190 200,000.00 3,800.00

Jumlah Harga Satuan #REF!


Keuntungan dan Biaya Overhead 10 % #REF!
Harga Satuan Pekerjaan #REF!

Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 75 mm


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. #REF!
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.035 81,070.00 2,837.45
2 Tukang Pipa OH 0.017 101,640.00 1,727.88
3 Mandor OH 0.003 123,420.00 370.26

2 Material :
1 Pipa HDPE dia 75 mm m' 1.000 #REF! #REF!

3 Peralatan :
1 Sewa Tripot/Tackel & handle crane 2 T Jam 0.0190 200,000.00 3,800.00

Jumlah Harga Satuan #REF!


Keuntungan dan Biaya Overhead 10 % #REF!
Harga Satuan Pekerjaan #REF!
Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 63 mm
Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 94,193.66
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.035 81,070.00 2,837.45
2 Tukang Pipa OH 0.017 101,640.00 1,727.88
3 Mandor OH 0.003 123,420.00 370.26

2 Material :
1 Pipa HDPE dia 63 mm m' 1.000 80,695.01 80,695.01

3 Peralatan :
-

Jumlah Harga Satuan 85,630.60


Keuntungan dan Biaya Overhead 10 % 8,563.06
Harga Satuan Pekerjaan 94,193.66

Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 50 mm


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 61,623.76
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.035 81,070.00 2,837.45
2 Tukang Pipa OH 0.017 101,640.00 1,727.88
3 Mandor OH 0.003 123,420.00 370.26

2 Material :
1 Pipa HDPE dia 50 mm m' 1.000 51,086.01 51,086.01

2 Peralatan :

Jumlah Harga Satuan 56,021.60


Keuntungan dan Biaya Overhead 10 % 5,602.16
Harga Satuan Pekerjaan 61,623.76

Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 40 mm


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. #REF!
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.035 81,070.00 2,837.45
2 Tukang Pipa OH 0.017 101,640.00 1,727.88
3 Mandor OH 0.003 123,420.00 370.26

2 Material :
1 Pipa HDPE dia 40 mm m' 1.000 #REF! #REF!

3 Peralatan :

Jumlah Harga Satuan #REF!


Keuntungan dan Biaya Overhead 10 % #REF!
Harga Satuan Pekerjaan #REF!
Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 32 mm
Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 30,671.32
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.035 81,070.00 2,837.45
2 Tukang Pipa OH 0.017 101,640.00 1,727.88
3 Mandor OH 0.003 123,420.00 370.26
2 Material :
1 Pipa HDPE dia 32 mm m' 1.000 22,947.43 22,947.43

3 Peralatan :

Jumlah Harga Satuan 27,883.02


Keuntungan dan Biaya Overhead 10 % 2,788.30
Harga Satuan Pekerjaan 30,671.32

Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 25 mm


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 19,860.58
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.035 81,070.00 2,837.45
2 Tukang Pipa OH 0.017 101,640.00 1,727.88
3 Mandor OH 0.003 123,420.00 370.26

2 Material :
1 Pipa HDPE dia 25 mm m' 1.000 13,119.48 13,119.48

3 Peralatan :

Jumlah Harga Satuan 18,055.07


Keuntungan dan Biaya Overhead 10 % 1,805.51
Harga Satuan Pekerjaan 19,860.58

Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 20 mm


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 15,111.89
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.035 81,070.00 2,837.45
2 Tukang Pipa OH 0.017 101,640.00 1,727.88
3 Mandor OH 0.003 123,420.00 370.26

2 Material :
1 Pipa HDPE dia 25 mm m' 1.000 8,802.49 8,802.49

3 Peralatan :

Jumlah Harga Satuan 13,738.08


Keuntungan dan Biaya Overhead 10 % 1,373.81
Harga Satuan Pekerjaan 15,111.89
Jenis Pekerjaan : Las HDPE
Satuan Mata Pembayaran : Rp./Ttk
Kuantitas Pekerjaan Titik
Harga Satuan : Rp. 13,875.22
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.035 81,070.00 2,837.45
2 Tukang Las OH 0.017 101,640.00 1,727.88
3 Mandor OH 0.003 123,420.00 370.26

2 Material :
1 Bensin Ltr 0.005 40,000.00 200.00

3 Peralatan :
1 Mesin Las Jam 0.0190 193,592.00 3,678.25
2 Genset Jam 0.0190 200,000.00 3,800.00

Jumlah Harga Satuan 12,613.84


Keuntungan dan Biaya Overhead 10 % 1,261.38
Harga Satuan Pekerjaan 13,875.22

Jenis Pekerjaan : A.2.2.1.13 Pembongkaran


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 5,292.72

HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.053 81,070.00 4,256.18
2 Tukang Pipa OH 0.026 101,640.00
3 Mandor OH 0.005 123,420.00 555.39

2 Material :

3 Peralatan :

Jumlah Harga Satuan 4,811.57


Keuntungan dan Biaya Overhead 10 % 481.16
Harga Satuan Pekerjaan 5,292.72

Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan Kembali 1 m pipa HDPE Ø 32 mm


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 5,429.15
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.035 81,070.00 2,837.45
2 Tukang Pipa OH 0.017 101,640.00 1,727.88
3 Mandor OH 0.003 123,420.00 370.26

2 Material :
1 Pipa HDPE dia 32mm m' 1.000 - -

3 Peralatan :

Jumlah Harga Satuan 4,935.59


Keuntungan dan Biaya Overhead 10 % 493.56
Harga Satuan Pekerjaan 5,429.15
Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 32 mm
Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 5,429.15
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.035 81,070.00 2,837.45
2 Tukang Pipa OH 0.017 101,640.00 1,727.88
3 Mandor OH 0.003 123,420.00 370.26

2 Material :
1 Pipa HDPE dia 32 mm m' 1.000 - -

3 Peralatan :

Jumlah Harga Satuan 4,935.59


Keuntungan dan Biaya Overhead 10 % 493.56
Harga Satuan Pekerjaan 5,429.15
ANALISA BIAYA PIPA DILOKASI SEMENTARA ( ADONARA )
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

Price List 2023 Pengiriman Harga Pipa


Harga surabaya Door To Door dari Pabrik Asuransi 0,3 % di Pelabuhan
No. Jenis dan Ukuran
ke Lokasi di Larantuka Larantuka
(Rp./M') (Rp./M') (Rp./M') (Rp./M')

1 Pipa HDPE Ø 63 mm ( 2 inch ) Pn 16 Sdr 11 74,236.80 5,166.43 222.71 79,625.94


2 Pipa HDPE Ø 50 mm ( 1 1/2 inch ) Pn 16 Sdr 11 46,959.66 3,254.24 140.88 50,354.78
3 Pipa HDPE Ø 32 mm ( 1 inch ) Pn 16 Sdr 11 21,252.73 1,332.94 63.76 22,649.42
4 Pipa HDPE Ø 25 mm ( 3/4 inch ) Pn 16 Sdr 11 12,063.48 813.56 36.19 12,913.23
5 Pipa HDPE Ø 20 mm ( 1/2 inch ) Pn 16 Sdr 11 8,103.00 520.68 24.31 8,647.99
6 Pipa Galvanis 2" Medium A 131,567.75 3,254.24 394.70 135,216.68
7 Pipa Galvanis 1 1/2" Medium A 97,885.21 2,082.71 293.66 100,261.58
8 Pipa Galvanis 1" Medium A 61,553.66 813.56 184.66 62,551.88
9 Pipa Galvanis 3/4" Medium A 42,646.06 520.68 127.94 43,294.68
10 Pipa Galvanis 1/2" Medium A 32,352.89 292.88 97.06 32,742.83
ANALISA HARGA DASAR SATUAN MATERIAL LOKAL

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
TA. : 2023

JENIS : Pasir Pasang / Cor


LOKASI : Quary Nobo
TUJUAN : LOKASI PEKERJAAN
Lembar (1/2)
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quary ke lokasi pekerjaan L 27.00 Km
4 Harga Satuan Pasir Pasang / Cor RpM01 1.00 M3 50,000.00
5 Harga Satuan Dasar Excavator RpE05 1.00 Jam 698,160.64
6 Harga Satuan Dasar Dump Truck RpE04 1.00 Jam 449,342.07

II. URUTAN KERJA


1 Excavator memuat pasir pasang ke dalam Dump Truck
2 Dump Truck mengangkut pasir pasang ke lokasi
Pekerjaan

III. PERHITUNGAN

EXCAVATOR
Kapasitas Bucket V 0.97 M3
Faktor Bucket Fb 0.80 -
Faktor Efisiensi alat Fa 0.83 -
Faktor Konversi Kedalaman < 40 % Fv 0.70 -
Waktu siklus Ts1
- Menggali / memuat T1 1.00 menit
- Lain-lain T2 0.50 menit
Ts1 1.50 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 36.64 M3 / Jam
Ts1 x Fv

Biaya Excavator / M3 = (1 : Q1) x RpE05 Rp1 19,056.65 Rupiah


Lembar (2/2)
DUMP TRUCK
Kapasitas bak V 4.00 M3
Faktor efisiensi alat Fa 0.83 -
Faktor Konversi Kedalaman < 40 % Fv 0.70
Kecepatan rata-rata bermuatan v1 20.00 KM/Jam
Kecepatan rata-rata kosong v2 50.00 KM/Jam
Berat Isi Material Lepas D 1.24 T/m3
Waktu siklus Ts2
- Muat = (V x 60)/(D xQ1exc) T1 5.27 menit
- Waktu tempuh isi = (L/v1) x 60 T2 81.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 32.40 menit
- Lain-lain T4 5.00 menit
Ts2 123.67 menit

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 1.30 M3 / Jam
D x Ts2

Biaya Dump Truck / M3 = (1 : Q2) x RpE04 Rp2 346,756.10 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI BASE CAMP

Harga Satuan Dasar Pasir Pasang / Cor

( RpM01 + Rp1 + Rp2 ) M01 415,812.75 Rupiah

Dibulatkan : M01 415,800.00 Rupiah

V. BIAYA ANGKUT MANUAL KE LOKASI PEKERJAAN


a - Jarak L 1.00 km.
b - Jarak angkut PP 2xL 2.00 km.
2,000.00 meter
c - Jam kerja effektif 7.00 jam
d - Kecepatan berjalan 1.10 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 0.51 Jam
e2. Waktu lain-lain PP 72.17 Menit
1.20 Jam
f - Jumlah trip perhari (c-e2) / e1 11.48 Trip
g - Kapasitas Angkut perorang 40.00 Kg
h - Produksi per hari gxf 459.14 Kg
i - Upah pekerja 81,070.00 Rupiah
j - Ongkos angkut i/h 176.57 Rp/kg
M02 219,475.56 m3
VI. HARGA SATUAN DI LOKASI PEKERJAAN M
M = (MO1 + M02) 635,275.56
JENIS : Batu Kali / Karang / Gunung
LOKASI : Quary Nobo
TUJUAN : LOKASI PEKERJAAN
Lembar (1/2)
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quary ke lokasi pekerjaan L 27.00 Km
4 Harga Satuan Batu Kali / Karang / Gunung RpM02 1.00 M3 50,000.00
5 Harga Satuan Dasar Excavator RpE05 1.00 Jam 698,160.64
6 Harga Satuan Dasar Dump Truck RpE04 1.00 Jam 449,342.07

II. URUTAN KERJA


1 Batu kali/gunung digali dengan Excavator
2 Excavator sekaligus memuat Batu Kali / Karang / Gunung
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut Batu Kali / Karang / Gunung
lokasi pekerjaan

III. PERHITUNGAN

EXCAVATOR
Kapasitas Bucket V 0.97 M3
Faktor Bucket Fb 0.80 -
Faktor Efisiensi alat Fa 0.75 -
Faktor Konversi Kedalaman < 40 % Fv 1.10 -
Waktu siklus Ts1
- Menggali / memuat T1 0.40 menit
- Lain-lain T2 1.00 menit
Ts1 1.40 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 22.68 M3 / Jam
Ts1 x Fv

Biaya Excavator / M3 = (1 : Q1) x RpE05 Rp1 30,789.44 Rupiah


Lembar (2/2)
DUMP TRUCK
Kapasitas bak V 4.00 M3
Faktor efisiensi alat Fa 0.90 -
Berat Isi Material Lepas D 0.96 T/m3
Kecepatan rata-rata bermuatan v1 20.00 KM/Jam
Kecepatan rata-rata kosong v2 40.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(D x Q1) T1 11.03 menit
- Waktu tempuh isi = (L/v1) x 60 T2 81.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 40.50 menit
- Lain-lain T4 0.50 menit
Ts2 133.03 menit
Kapasitas Produksi / Jam =
V x Fa x 60 Q2 1.69 M3 / Jam
D x Ts2

Biaya Dump Truck / M3 = (1 : Q2) x RpE04 Rp2 265,661.42 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar Batu Kali / Karang / Gunung

( RpM02 + Rp1 + Rp2 ) M01 346,450.86 Rupiah

Dibulatkan : M01 346,500.00 Rupiah

V. BIAYA ANGKUT MANUAL KE LOKASI PEKERJAAN


a - Jarak L 1.00 km.
b - Jarak angkut PP 2xL 2.00 km.
2,000.00 meter
c - Jam kerja effektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 0.37 Jam
e2. Waktu lain-lain PP 60.00 Menit
1.00 Jam
f - Jumlah trip perhari (c-e2) / e1 16.20 Trip
g - Kapasitas Angkut perorang 40.00 Kg
h - Produksi per hari gxf 648.00 Kg
i - Upah pekerja 81,070.00 Rupiah
j - Ongkos angkut i/h 125.11 Rp/kg
M02 120,103.70 m3

VI. HARGA SATUAN DI LOKASI PEKERJAAN M


M = (MO1 + M02) 466,603.70
JENIS : Batu Pecah
LOKASI : Quary Talenta Lewolaga
TUJUAN : LOKASI PEKERJAAN
Lembar (1/2)
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quary ke lokasi pekerjaan L 20.00 Km
4 Harga Satuan Batu Pecah RpM02 1.00 M3 200,000.00
5 Harga Satuan Dasar Excavator RpE05 1.00 Jam 698,160.64
6 Harga Satuan Dasar Dump Truck RpE04 1.00 Jam 449,342.07

II. URUTAN KERJA


1 Batu pecah 3/5 digali dengan Excavator
2 Excavator sekaligus memuat Batu Pecah
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut Batu Pecah
lokasi pekerjaan

III. PERHITUNGAN

EXCAVATOR
Kapasitas Bucket V 0.97 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.87 -
Faktor Konversi Kedalaman < 40 % Fv 0.70 -
Waktu siklus Ts1
- Menggali / memuat T1 1.00 menit
- Lain-lain T2 1.00 menit
Ts1 2.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 32.55 M3 / Jam
Ts1 x Fv

Biaya Excavator / M3 = (1 : Q1) x RpE05 Rp1 21,448.59 Rupiah


Lembar (2/2)
DUMP TRUCK
Kapasitas bak V 4.00 M3
Faktor efisiensi alat Fa 0.83 -
Berat Isi Material Lepas D 1.20 T/m3
Kecepatan rata-rata bermuatan v1 20.00 KM/Jam
Kecepatan rata-rata kosong v2 50.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(D x Q1) T1 6.14 menit
- Waktu tempuh isi = (L/v1) x 60 T2 60.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 24.00 menit
- Lain-lain T4 2.00 menit
Ts2 92.14 menit
Kapasitas Produksi / Jam =
V x Fa x 60 Q2 1.80 M3 / Jam
D x Ts2

Biaya Dump Truck / M3 = (1 : Q2) x RpE04 Rp2 249,423.59 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar Batu Pecah

( RpM02 + Rp1 + Rp2 ) M01 470,872.18 Rupiah

Dibulatkan : M01 470,900.00 Rupiah

V. BIAYA ANGKUT MANUAL KE LOKASI PEKERJAAN


a - Jarak L 1.00 km.
b - Jarak angkut PP 2xL 2.00 km.
2,000.00 meter
c - Jam kerja effektif 7.00 jam
d - Kecepatan berjalan 1.10 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 0.51 Jam
e2. Waktu lain-lain PP 72.17 Menit
1.20 Jam
f - Jumlah trip perhari (c-e2) / e1 11.48 Trip
g - Kapasitas Angkut perorang 40.00 Kg
h - Produksi per hari gxf 459.14 Kg
i - Upah pekerja 81,070.00 Rupiah
j - Ongkos angkut i/h 176.57 Rp/kg
M02 169,506.47 m3

VI. HARGA SATUAN DI LOKASI PEKERJAAN M


M = (MO1 + M02) 640,406.47
ANALISA HARGA ANGKUT MATERIAL NON-LOKAL

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
TA. : 2023

NO. URAIAN KODE KOEFISIEN SATUAN KET.

1. Semen /Pc @40 Kg


a. Biaya Angkut ( Trasportasi truk )
- Harga di Toko Larantuka O1 1,250.00 Per Kg

ANALISA ANGKUT :
- Toko Ke Site L 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 2.75 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 5.37 Jam
- Jumlah trip perhari (Tk/t2) t3 1.30 Trip
- Kapasitas angkut per trip m 4,000.00 Kg
- Biaya Sewa Truck/Hari A 449,342.07 Rupiah
- Produksi per hari t3 x m Kp 5,212.00 Kg
- Biaya angkut A / Kp O2 86.21 Rp/kg
- Upah Pekerja 123,420.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 94.72 Rp/Kg
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 0.01 km.
b - Jarak angkut PP = 2xL 0.02 km.
20.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.50 Jam
e2. Waktu lain-lain PP 6.00 Menit
0.10 Jam
f - Jumlah trip perhari (c-e2) / e1 4.60 Trip
g - Kapasitas Angkut perorang 40.00 Kg
h - Produksi per hari gxf 184.00 Kg

i - Ongkos
= angkut Upah pekerja Rp 123,420.00 O4 670.76 Rp/Kg
Produksi

C. Total Harga Material di Lokasi


1 Harga Dasar di Lokasi Pembelian 1,250.00 Rp/Kg
2 Biaya Angkut dari Toko Ke Desa Adabang 86.21 Rp/Kg
3 Biaya Bongkar Muat 94.72 Rp/Kg
4 Biaya Angkut Dari Site Ke Lokasi 670.76 Rp/Kg
Harga Material Sampai Lokasi 2,101.69 Rp/Kg
ANALISA HARGA ANGKUT MATERIAL NON-LOKAL

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
TA. : 2023

NO. URAIAN KODE KOEFISIEN SATUAN KET.

2 Besi Beton Polos


a. Biaya Angkut ( Trasportasi truk )
- Harga di Toko Larantuka O1 8,708.33 Per Kg

ANALISA ANGKUT :
- Toko Ke Site L 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 30.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 40.00 Km/Jam
- Kecepatan Rata-rata v3 35.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 0.25 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 3.62 Jam
- Jumlah trip perhari (Tk/t2) t3 1.93 Trip
- Kapasitas angkut per trip m 4,000.00 Kg
- Biaya Sewa Truck/Hari A 449,342.07 Rupiah
- Produksi per hari t3 x m Kp 7,731.76 Kg
- Biaya angkut A / Kp O2 58.12 Rp/kg
- Upah Pekerja 123,420.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 63.85 Rp/Kg
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 0.01 km.
b - Jarak angkut PP = 2xL 0.02 km.
20.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.50 Jam
e2. Waktu lain-lain PP 6.00 Menit
0.10 Jam
f - Jumlah trip perhari (c-e2) / e1 4.60 Trip
g - Kapasitas Angkut perorang 60.00 Kg
h - Produksi per hari gxf 276.00 Kg

i - Ongkos
= angkut Upah pekerja Rp 123,420.00 O4 447.17 Rp/Kg
Produksi

C. Total Harga Material di Lokasi


1 Harga Dasar di Lokasi Pembelian 8,708.33 Rp/Kg
2 Biaya Angkut dari Toko Ke Desa Adabang 58.12 Rp/Kg
3 Biaya Bongkar Muat 63.85 Rp/Kg
4 Biaya Angkut Dari Site Ke Lokasi 447.17 Rp/Kg
Harga Material Sampai Lokasi 9,277.47 Rp/Kg
DIMENSI PIPA

Diameter Panjang Luas Volume


No. Jenis Pipa
m m m2 m3
1 2 3 4 5 = 3,14 * 4 ² 6=5*4

1 Pipa HDPE Ø 90 mm 0.090 50 0.025 1.272


2 Pipa HDPE Ø 75 mm 0.075 100 0.018 1.766
3 Pipa HDPE Ø 63 mm 0.063 100 0.012 1.246
4 Pipa HDPE Ø 50 mm 0.050 100 0.008 0.785
5 Pipa HDPE Ø 40 mm 0.040 100 0.005 0.502
6 Pipa HDPE Ø 32 mm 0.032 250 0.003 0.804
7 Pipa HDPE Ø 25 mm 0.025 250 0.002 0.491
8 Pipa HDPE Ø 20 mm 0.020 250 0.001 0.314
9 Pipa Galvanis 4" Medium A 0.100 6 0.031 0.188
10 Pipa Galvanis 3" Medium A 0.080 6 0.020 0.121
11 Pipa Galvanis 2 1/2" Medium A 0.065 6 0.013 0.080
12 Pipa Galvanis 2" Medium A 0.050 6 0.008 0.047
13 Pipa Galvanis 1 1/2" Medium A 0.040 6 0.005 0.030
14 Pipa Galvanis 1 1/4" Medium A 0.032 6 0.003 0.019
15 Pipa Galvanis 1" Medium A 0.025 6 0.002 0.012
16 Pipa Galvanis 3/4" Medium A 0.020 6 0.001 0.008
17 Pipa Galvanis 1/2" Medium A 0.015 6 0.001 0.004

DIMENSI CONTAINER

Panjang Lebar Tinggi Volume


No. Jenis Container
m m m m3
1 2 3 4 5 6=5*4*3

1 20 Feet 5.7 2.3 2.3 30.15


2 40 Feet 12.0 2.3 2.3 63.48
3 45 Feet 13.5 2.3 2.3 71.42
7113.234
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

No. URAIAN Sat KET.

1. #REF!

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 #REF! Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m #REF! m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp #REF! m'
- Biaya angkut A / Kp O2 #REF! Rp/m'
- Upah Pekerja 123,420.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 #REF! Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 50.00 meter
h - Produksi per hari gxf 259.38 meter

i - Ongkos angkut = Upah pekerja Rp 123,420.00 O4 475.84 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka #REF! Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Adabang #REF! Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Adabang #REF! Rp/m
d Biaya Angkut dari Desa Ke Lokasi 475.84 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI #REF! Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

No. URAIAN Sat KET.

2. #REF!

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 #REF! Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m #REF! m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp #REF! m'
- Biaya angkut A / Kp O2 #REF! Rp/m'
- Upah Pekerja 123,420.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 #REF! Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 100.00 meter
h - Produksi per hari gxf 518.75 meter

i - Ongkos angkut = Upah pekerja Rp 123,420.00 O4 237.92 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka #REF! Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Adabang #REF! Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Adabang #REF! Rp/m
d Biaya Angkut dari Desa Ke Lokasi 237.92 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI #REF! Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

No. URAIAN Sat KET.

3. Pipa HDPE Ø 63 mm ( 2 inch ) Pn 16 Sdr 11

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 79,625.94 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m 2,419.47 m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp 3,801.16 m'
- Biaya angkut A / Kp O2 827.48 Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 85.31 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 100.00 meter
h - Produksi per hari gxf 518.75 meter

i - Ongkos angkut = Upah pekerja Rp 81,070.00 O4 156.28 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka 79,625.94 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Adabang 827.48 Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Adabang 85.31 Rp/m
d Biaya Angkut dari Desa Ke Lokasi 156.28 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI 80,695.01 Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

No. URAIAN Sat KET.

4. Pipa HDPE Ø 50 mm ( 1 1/2 inch ) Pn 16 Sdr 11

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 50,354.78 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m 3,841.15 m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp 6,034.72 m'
- Biaya angkut A / Kp O2 521.22 Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 53.74 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 100.00 meter
h - Produksi per hari gxf 518.75 meter

i - Ongkos angkut = Upah pekerja Rp 81,070.00 O4 156.28 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka 50,354.78 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Adabang 521.22 Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Adabang 53.74 Rp/m
d Biaya Angkut dari Desa Ke Lokasi 156.28 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI 51,086.01 Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

No. URAIAN Sat KET.

5. #REF!

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 #REF! Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m #REF! m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp #REF! m'
- Biaya angkut A / Kp O2 #REF! Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 #REF! Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 100.00 meter
h - Produksi per hari gxf 518.75 meter

i - Ongkos angkut = Upah pekerja Rp 81,070.00 O4 156.28 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka #REF! Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Adabang #REF! Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Adabang #REF! Rp/m
d Biaya Angkut dari Desa Ke Lokasi 156.28 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI #REF! Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

No. URAIAN Sat KET.

6. Pipa HDPE Ø 32 mm ( 1 inch ) Pn 16 Sdr 11

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 22,649.42 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m 9,377.80 m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp 14,733.20 m'
- Biaya angkut A / Kp O2 213.49 Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 22.01 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 250.00 meter
h - Produksi per hari gxf 1,296.88 meter

i - Ongkos angkut = Upah pekerja Rp 81,070.00 O4 62.51 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka 22,649.42 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Adabang 213.49 Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Adabang 22.01 Rp/m
d Biaya Angkut dari Desa Ke Lokasi 62.51 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI 22,947.43 Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

No. URAIAN Sat KET.

7. Pipa HDPE Ø 25 mm ( 3/4 inch ) Pn 16 Sdr 11

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 12,913.23 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m 15,364.59 m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp 24,138.88 m'
- Biaya angkut A / Kp O2 130.30 Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 13.43 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 250.00 meter
h - Produksi per hari gxf 1,296.88 meter

i - Ongkos angkut = Upah pekerja Rp 81,070.00 O4 62.51 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka 12,913.23 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Adabang 130.30 Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Adabang 13.43 Rp/m
d Biaya Angkut dari Desa Ke Lokasi 62.51 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI 13,119.48 Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

No. URAIAN Sat KET.

8. Pipa HDPE Ø 20 mm ( 1/2 inch ) Pn 16 Sdr 11

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 8,647.99 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m 24,007.17 m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp 37,716.99 m'
- Biaya angkut A / Kp O2 83.39 Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 8.60 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 250.00 meter
h - Produksi per hari gxf 1,296.88 meter

i - Ongkos angkut = Upah pekerja Rp 81,070.00 O4 62.51 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka 8,647.99 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Adabang 83.39 Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Adabang 8.60 Rp/m
d Biaya Angkut dari Desa Ke Lokasi 62.51 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI 8,802.49 Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

No. URAIAN Sat KET.

9. #REF!

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 #REF! Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m #REF! m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp #REF! m'
- Biaya angkut A / Kp O2 #REF! Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 #REF! Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 6.00 meter
h - Produksi per hari gxf 31.13 meter

i - Ongkos angkut = Upah pekerja Rp 81,070.00 O4 2,604.66 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka #REF! Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Adabang #REF! Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Adabang #REF! Rp/m
d Biaya Angkut dari Desa Ke Lokasi 2,604.66 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI #REF! Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

No. URAIAN Sat KET.

10. #REF!

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 #REF! Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m #REF! m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp #REF! m'
- Biaya angkut A / Kp O2 #REF! Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 #REF! Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 6.00 meter
h - Produksi per hari gxf 31.13 meter

i - Ongkos angkut = Upah pekerja Rp 81,070.00 O4 2,604.66 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka #REF! Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Adabang #REF! Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Adabang #REF! Rp/m
d Biaya Angkut dari Desa Ke Lokasi 2,604.66 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI #REF! Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

No. URAIAN Sat KET.

11. #REF!

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 #REF! Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m #REF! m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp #REF! m'
- Biaya angkut A / Kp O2 #REF! Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 #REF! Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 6.00 meter
h - Produksi per hari gxf 31.13 meter

i - Ongkos angkut = Upah pekerja Rp 81,070.00 O4 2,604.66 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka #REF! Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Adabang #REF! Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Adabang #REF! Rp/m
d Biaya Angkut dari Desa Ke Lokasi 2,604.66 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI #REF! Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

No. URAIAN Sat KET.

12. Pipa Galvanis 2" Medium A

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 135,216.68 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m 3,841.15 m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp 6,034.72 m'
- Biaya angkut A / Kp O2 521.22 Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 53.74 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 12.00 meter
h - Produksi per hari gxf 62.25 meter

i - Ongkos angkut = Upah pekerja Rp 81,070.00 O4 1,302.33 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka 135,216.68 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Adabang 521.22 Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Adabang 53.74 Rp/m
d Biaya Angkut dari Desa Ke Lokasi 1,302.33 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI 137,093.97 Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

No. URAIAN Sat KET.

13. Pipa Galvanis 1 1/2" Medium A

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 100,261.58 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m 6,001.79 m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp 9,429.25 m'
- Biaya angkut A / Kp O2 333.58 Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 34.39 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 12.00 meter
h - Produksi per hari gxf 62.25 meter

i - Ongkos angkut = Upah pekerja Rp 81,070.00 O4 1,302.33 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka 100,261.58 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Adabang 333.58 Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Adabang 34.39 Rp/m
d Biaya Angkut dari Desa Ke Lokasi 1,302.33 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI 101,931.88 Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

No. URAIAN Sat KET.

14. Pipa Galvanis 3/4" Medium A

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 43,294.68 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m #REF! m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp #REF! m'
- Biaya angkut A / Kp O2 #REF! Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 #REF! Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 18.00 meter
h - Produksi per hari gxf 93.38 meter

i - Ongkos angkut = Upah pekerja Rp 81,070.00 O4 868.22 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka 43,294.68 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Adabang #REF! Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Adabang #REF! Rp/m
d Biaya Angkut dari Desa Ke Lokasi 868.22 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI #REF! Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

No. URAIAN Sat KET.

15. Pipa Galvanis 1" Medium A

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 62,551.88 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m 15,364.59 m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp 24,138.88 m'
- Biaya angkut A / Kp O2 130.30 Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 13.43 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 12.00 meter
h - Produksi per hari gxf 62.25 meter

i - Ongkos angkut = Upah pekerja Rp 81,070.00 O4 1,302.33 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka 62,551.88 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Adabang 130.30 Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Adabang 13.43 Rp/m
d Biaya Angkut dari Desa Ke Lokasi 1,302.33 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI 63,997.95 Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

No. URAIAN Sat KET.

16. Pipa Galvanis 3/4" Medium A

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 43,294.68 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m 24,007.17 m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp 37,716.99 m'
- Biaya angkut A / Kp O2 83.39 Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 8.60 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 18.00 meter
h - Produksi per hari gxf 93.38 meter

i - Ongkos angkut = Upah pekerja Rp 81,070.00 O4 868.22 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka 43,294.68 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Adabang 83.39 Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Adabang 8.60 Rp/m
d Biaya Angkut dari Desa Ke Lokasi 868.22 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI 44,254.89 Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

No. URAIAN Sat KET.

17. Pipa Galvanis 1/2" Medium A

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 32,742.83 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m 42,679.41 m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp 67,052.43 m'
- Biaya angkut A / Kp O2 46.91 Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 4.84 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 18.00 meter
h - Produksi per hari gxf 93.38 meter

i - Ongkos angkut = Upah pekerja Rp 81,070.00 O4 868.22 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka 32,742.83 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Adabang 46.91 Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Adabang 4.84 Rp/m
d Biaya Angkut dari Desa Ke Lokasi 868.22 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI 33,662.80 Rp/m
ANALISA BIAYA ANGKUTAN PIPA

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

Volume Panjang Pipa Panjang Total Biaya Kirim Biaya Kirim Total Biaya kirim
Container 20 Ft (Roll / Btg) / Container/Truck dr Pelbh Sby dr Pelbh Sby ke Lokasi
No. Diameter
(Roll / Btg) (M') (M') ke Pelbh Larantuka ke Pelbh Larantuka Sementara
(Rp./ Container 20 Ft) (Rp./ M') (Rp.M')
1 2 3 4 5 = (4 x 3) 6 7 = (6/5) 8

1 Pipa HDPE Ø 63 mm ( 2 inch ) Pn 16 Sdr 11 24.19 Rol 100.00 2,419.47 12,500,000.00 5,166.43 5,166.43
2 Pipa HDPE Ø 50 mm ( 1 1/2 inch ) Pn 16 Sdr 11 38.41 Rol 100.00 3,841.15 12,500,000.00 3,254.24 3,254.24
3 Pipa HDPE Ø 32 mm ( 1 inch ) Pn 16 Sdr 11 37.51 Rol 250.00 9,377.80 12,500,000.00 1,332.94 1,332.94
4 Pipa HDPE Ø 25 mm ( 3/4 inch ) Pn 16 Sdr 11 61.46 Rol 250.00 15,364.59 12,500,000.00 813.56 813.56
5 Pipa HDPE Ø 20 mm ( 1/2 inch ) Pn 16 Sdr 11 96.03 Rol 250.00 24,007.17 12,500,000.00 520.68 520.68
6 Pipa Galvanis 2" Medium A 640.19 Btg 6.00 3,841.15 12,500,000.00 3,254.24 3,254.24
7 Pipa Galvanis 1 1/2" Medium A 1,000.30 Btg 6.00 6,001.79 12,500,000.00 2,082.71 2,082.71
8 Pipa Galvanis 1" Medium A 2,560.76 Btg 6.00 15,364.59 12,500,000.00 813.56 813.56
9 Pipa Galvanis 3/4" Medium A 4,001.19 Btg 6.00 24,007.17 12,500,000.00 520.68 520.68
10 Pipa Galvanis 1/2" Medium A 7,113.23 Btg 6.00 42,679.41 12,500,000.00 292.88 292.88
DAFTAR ANALISA BIAYA OPERASI PERALATAN

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

ANALISA BIAYA OPERASI PERALATAN


No. URAIAN KODE KOEFISIEN SATUAN

A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR
(Merk/Type Alat) KOMATSU
2. Tenaga Pw 140.00 HP
3. Kapasitas Cp -- --
4. Alat yang dipakai : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 tahun W 2,000.00 Jam
c. Harga Alat B 1,200,000,000.00 Rupiah

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x c C 120,000,000.00 Rupiah

2. Faktor Angsuran Modal = i x ( 1 + i ) ^ A'


D 0.26 -
( 1 + i ) ^ A - 1

Biaya Pasti Perjam :


a. Biaya Pengembalian Modal = ( B- C )x D
E 142,450.64 Rupiah
W

b. Asuransi, dan Lain -Lain = 0.002 x B


F 1,200.00 Rupiah
W

Biaya Pasti Perjam = ( E + F ) G 143,650.64 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = ( 0.125 - 0.175 Ltr/Hp/Jam ) x Pw x Ms H 252,000.00 Rupiah

2. Pelumas = ( 0.01 - 0.020 Ltr/Hp/Jam ) x Pw x Mp I 44,800.00 Rupiah

3. Perawatan dan Perbaikan = ( 12.5 % - 17.5 % )x B


K 75,000.00 Rupiah
W
4. Operator = ( 1 Orang / Jam ) x U1 L 101,640.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 81,070.00 Rupiah

Biaya Operasi Per Jam = ( H+ I + K + L+ M ) P 554,510.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G +P ) S 698,160.64 Rupiah

E. LAIN - LAIN

Tingkat Suku Bunga i 10.00 % Tahun


Upah Operator / Sopir U1 101,640.00 Rp./jam
Upah Pembantu Operator / Pembantu Sopir U2 81,070.00 Rp./jam
Bahan Bakar Bensin Mb 12,000.00 Liter
Bahan Bakar Solar Ms 12,000.00 Liter
Minyak Pelumas Mp 32,000.00 Liter
ANALISA BIAYA OPERASI PERALATAN
No. URAIAN KODE KOEFISIEN SATUAN

A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK
(Merk/Type Alat)
2. Tenaga Pw 100.00 HP
3. Kapasitas Cp -- --
4. Alat yang dipakai : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 tahun W 3,000.00 Jam
c. Harga Alat B 350,000,000.00 Rupiah

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x B C 35,000,000.00 Rupiah

2. Faktor Angsuran Modal = i x ( 1 + i ) ^ A'


D 0.26 -
( 1 + i ) ^ A - 1

Biaya Pasti Perjam :


a. Biaya Pengembalian Modal = ( B- C )x D
E 27,698.74 Rupiah
W

b. Asuransi, dan Lain -Lain = 0.003 x B


F 350.00 Rupiah
W

Biaya Pasti Perjam = ( E + F ) G 28,048.74 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = ( 0.120 - 0.15 Ltr/Hp/Jam ) x Pw x Ms H 144,000.00 Rupiah

2. Pelumas = ( 0.025 - 0.030 Ltr/Hp/Jam ) x Pw x Mp I 80,000.00 Rupiah

3. Perawatan dan Perbaikan = ( 0.125 % - 0.175 % ) x B


K 14,583.33 Rupiah
W
4. Sopir = ( 1 Orang / Jam ) x U1 L 101,640.00 Rupiah
5. Pembantu Sopir = ( 1 Orang / Jam ) x U2 M 81,070.00 Rupiah

Biaya Operasi Per Jam = ( H+ I + K + L+ M ) P 421,293.33

D. TOTAL BIAYA SEWA ALAT / JAM = ( G +P ) S 449,342.07 Rupiah

E. LAIN - LAIN

Tingkat Suku Bunga i 10.00 % Tahun


Upah Operator / Sopir U1 101,640.00 Rp./jam
Upah Pembantu Operator / Pembantu Sopir/Pem.Mekanik U2 81,070.00 Rp./jam
Bahan Bakar Bensin Mb 12,000.00 Liter
Bahan Bakar Solar Ms 12,000.00 Liter
Minyak Pelumas Mp 32,000.00 Liter
ANALISA BIAYA OPERASI PERALATAN
No. URAIAN KODE KOEFISIEN SATUAN

A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER 350 LTR
(Merk/Type Alat) KUBOTA (MOLEN)
2. Tenaga Pw 10.00 HP
3. Kapasitas Cp 300.00 Liter
4. Alat yang dipakai : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 tahun W 2,000.00 Jam
c. Harga Alat B 10,000,000.00 Rupiah

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x B C 1,000,000.00 Rupiah

2. Faktor Angsuran Modal = i x ( 1 + i ) ^ A'


D 0.26 -
( 1 + i ) ^ A - 1

Biaya Pasti Perjam :


a. Biaya Pengembalian Modal = ( B- C )x D
E 1,187.09 Rupiah
W

b. Asuransi, dan Lain -Lain = 0.002 x B


F 10.00 Rupiah
W

Biaya Pasti Perjam = ( E + F ) G 1,197.09 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = ( 0.100 - 0.175 Ltr/Hp/Jam ) x Pw x Ms H 12,000.00 Rupiah

2. Pelumas = ( 0.01 - 0.020 Ltr/Hp/Jam ) x Pw x Mp I 3,200.00 Rupiah

3. Perawatan dan Perbaikan = ( 12.5 % - 17.5 % )x B


K 625.00 Rupiah
W
4. Operator = ( 1 Orang / Jam ) x U1 L 101,640.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 81,070.00 Rupiah

Biaya Operasi Per Jam = ( H+ I + K + L+ M ) P 198,535.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G +P ) S 199,732.09 Rupiah

E. LAIN - LAIN

Tingkat Suku Bunga i 10.00 % Tahun


Upah Operator / Sopir U1 101,640.00 Rp./jam
Upah Pembantu Operator / Pembantu Sopir/Pem.Mekanik U2 81,070.00 Rp./jam
Bahan Bakar Bensin Mb 12,000.00 Liter
Bahan Bakar Solar Ms 12,000.00 Liter
Minyak Pelumas Mp 32,000.00 Liter
ANALISA BIAYA OPERASI PERALATAN
No. URAIAN KODE KOEFISIEN SATUAN

A. URAIAN PERALATAN
1. Jenis Peralatan MESIN LAS PIPA
(Merk/Type Alat)
2. Tenaga Pw 5.00 HP
3. Kapasitas Cp -- --
4. Alat yang dipakai : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 tahun W 2,000.00 Jam
c. Harga Alat B 8,600,000.00 Rupiah

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x B C 860,000.00 Rupiah

2. Faktor Angsuran Modal = i x ( 1 + i ) ^ A'


D 0.26 -
( 1 + i ) ^ A - 1

Biaya Pasti Perjam :


a. Biaya Pengembalian Modal = ( B- C )x D
E 1,020.90 Rupiah
W

b. Asuransi, dan Lain -Lain = 0.002 x B


F 8.60 Rupiah
W

Biaya Pasti Perjam = ( E + F ) G 1,029.50 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = ( 0.125 - 0.175 Ltr/Hp/Jam ) x Pw x Ms H 7,500.00 Rupiah

2. Pelumas = ( 0.01 - 0.020 Ltr/Hp/Jam ) x Pw x Mp I 1,600.00 Rupiah

3. Perawatan dan Perbaikan = ( 12.5 % - 17.5 % )x B


K 752.50 Rupiah
W
4. Operator = ( 1 Orang / Jam ) x U1 L 101,640.00 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 81,070.00 Rupiah

Biaya Operasi Per Jam = ( H+ I + K + L+ M ) P 192,562.50 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G +P ) S 193,592.00 Rupiah

E. LAIN - LAIN

Tingkat Suku Bunga i 10.00 % Tahun


Upah Operator / Sopir U1 101,640.00 Rp./jam
Upah Pembantu Operator / Pembantu Sopir U2 81,070.00 Rp./jam
Bahan Bakar Bensin Mb 12,000.00 Liter
Bahan Bakar Solar Ms 12,000.00 Liter
Minyak Pelumas Mp 32,000.00 Liter
KET.
KET.
KET.
KET.
4,887,124.48
250,000.00
975,000.00
2,900,000.00
4,125,000.00

53,333
9.6

2555

#REF!

0.1
1.61051 0.161051
0.61051
0.264

315,000,000.00
83096206.45
27,698.735

0.12
42000000
14000
1.12 2.76 0.33148
1.76 0.76
3,145,394.48 0.4348
0.1
0.000010 #######
1.1000

0.1 0.000001
0.0000100

0.1
0.015

1,398,124.62
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

No. URAIAN Sat KET.

4. Pipa HDPE Ø 50 mm ( 1 1/2 inch ) Pn 16 Sdr 11

a. Biaya Angkut ( Trasportasi truk )


- Harga Bongkar Pipa per m O1 5,292.72 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 2.75 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 5.37 Jam
- Jumlah trip perhari (Tk/t2) t3 1.30 Trip
- Kapasitas angkut per trip m 4,000.00 m'
- Biaya Sewa Truck/Hari A 3,443,580.25 Rupiah
- Produksi per hari t3 x m Kp 5,212.00 m'
- Biaya angkut A / Kp O2 660.70 Rp/m'
- Upah Pekerja 126,380.86 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 96.99 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 100.00 meter
h - Produksi per hari gxf 518.75 meter

i - Ongkos angkut = Upah pekerja Rp 123,420.00 O4 237.92 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Bongkar 5,292.72 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Adabang 660.70 Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Adabang 96.99 Rp/m
d Biaya Angkut dari Desa Ke Lokasi 237.92 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI 6,288.33 Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023

No. URAIAN Sat KET.

6. Pipa HDPE Ø 32 mm ( 1 inch ) Pn 16 Sdr 11

a. Biaya Angkut ( Trasportasi truk )


- Harga Bongkar Pipa per m O1 5,292.72 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S - Km
- Jarak Angkut ( PP = 2 x L ) - Km
- Kecepatan Rata-rata dengan muatan v1 - Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 - Km/Jam
- Kecepatan Rata-rata v3 - Km/Jam
- Jumlah Pekerja yang dibutuhkan P - Orang
- Jam Kerja per Hari Tk - Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 - Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 - Jam
- Jumlah trip perhari (Tk/t2) t3 - Trip
- Kapasitas angkut per trip m - m'
- Biaya Sewa Truck/Hari A 3,443,580.25 Rupiah
- Produksi per hari t3 x m Kp - m'
- Biaya angkut A / Kp O2 - Rp/m'
- Upah Pekerja 126,380.86 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 - Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 0.54 km.
b - Jarak angkut PP = 2xL 1.08 km.
1,080.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 0.72 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 9.61 Trip
g - Kapasitas Angkut perorang 250.00 meter
h - Produksi per hari gxf 2,401.62 meter

i - Ongkos angkut = Upah pekerja Rp 123,420.00 O4 51.39 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Bongkar 5,292.72 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Adabang - Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Adabang - Rp/m
d Biaya Angkut dari Desa Ke Lokasi 51.39 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI 5,344.11 Rp/m
Jenis Pekerjaan : Mobilisasi & Demobilisasi
Satuan Mata Pembayaran : -
Kuantitas Pekerjaan -
Harga Satuan : Rp. 7,000,000.00

Lembar 1
HARGA JUMLAH
No. URAIAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)

A. BASE CAMP
Beli / sewa tanah untuk Base Camp M2 - - -

B. PERALATAN
Periksa lembar ke-2 LS 1.00 - -

C. FASILITAS KONTRAKTOR
1 Base Camp M2 - - -
4 Workshop / Bengkel M2 - - -
5 Gudang, dan lain-lain LS 1.00 1,000,000.00 1,000,000.00
6 Pembuatan Los Pekerja LS 1.00 - -

D. FASILITAS DIREKSI TEKNIS


1 Kantor M2 - - -
2 Administrasi (Pelaporan) LS - - -

E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT

E.II. LAIN-LAIN
1 Pengukuran & Pematokan LS 1.00 1,500,000.00 1,500,000.00
2 Shop Drawings Set 1.00 1,000,000.00 1,000,000.00
3 As Built Drawing Set 1.00 1,000,000.00 1,000,000.00
4 Quality Control LS - - -
5 Pelaporan dan Dokumentasi LS 1.00 2,500,000.00 2,500,000.00

F. DEMOBILISASI LS - - -

Total Biaya Mobilisasi 7,000,000.00

Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.

Jenis Pekerjaan : Mobilisasi & Demobilisasi


Satuan Mata Pembayaran : -
Lembar 2
HARGA JUMLAH
NO. JENIS ALAT KODE ALAT SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)

B. PERALATAN

1 CONCRETE MIXER 0.3-0.6 M3 E06 Unit - 199,732.09 -


2 DUMP TRUCK 3-4 M3 E08 Unit - 449,342.07 -
3 DUMP TRUCK E09 Unit
4 EXCAVATOR 80-140 HP E10 Unit - 698,160.64 -
5 VIBRATORY ROLLER 5-8 T. E19 Unit - 200,000.00 -
6 CONCRETE VIBRATOR E20 Unit - 200,000.00 -
7 MESIN LAS Unit - 200,000.00 -

Total untuk Item B pada Lembar 1 -

You might also like