NO URAIAN SATUAN
1 Mandor OH
2 Kepala Tukang Batu OH
3 Tukang Batu Kasar OH
4 Tukang Batu Halus OH
5 Kepala Tukang Kayu OH
6 Tukang Kayu Kasar OH
7 Tukang Kayu Halus OH
8 Kepala Tukang Besi OH
9 Tukang Besi Konstruksi OH
10 Tukang Besi Tulangan OH
11 Kepala Tukang Cat OH
12 Tukang Cat Biasa OH
13 Kepala Tukang Listrik OH
14 Tukang Listrik OH
15 Kepala Tukang Pipa OH
16 Tukang Pipa OH
17 Pekerja OH
18 Operator OH
19 Pembantu Operator OH
B BAHAN
B.1 PIPA
1 Pipa HDPE Ø 63 mm ( 2 inch ) Pn 16 Sdr 11 m'
2 Pipa HDPE Ø 50 mm ( 1 1/2 inch ) Pn 16 Sdr 11 m'
3 Pipa HDPE Ø 32 mm ( 1 inch ) Pn 16 Sdr 11 m'
4 Pipa HDPE Ø 25 mm ( 3/4 inch ) Pn 16 Sdr 11 m'
5 Pipa HDPE Ø 20 mm ( 1/2 inch ) Pn 16 Sdr 11 m'
6 Pipa Galvanis 2" Medium A m'
7 Pipa Galvanis 1 1/2" Medium A m'
8 Pipa Galvanis 1 1/4" Medium A m'
9 Pipa Galvanis 1" Medium A m'
10 Pipa Galvanis 3/4" Medium A m'
11 Pipa Galvanis 1/2" Medium A m'
1 Reducing Coupler Ø 25 mm x Ø 20 mm Bh
2 Reducing Coupler Ø 32 mm x Ø 20 mm Bh
3 Reducing Coupler Ø 32 mm x Ø 25 mm Bh
4 Reducing Coupler Ø 40 mm x Ø 20 mm Bh
5 Reducing Coupler Ø 40 mm x Ø 25 mm Bh
6 Reducing Coupler Ø 40 mm x Ø 32 mm Bh
7 Reducing Coupler Ø 50 mm x Ø 20 mm Bh
8 Reducing Coupler Ø 50 mm x Ø 25 mm Bh
9 Reducing Coupler Ø 50 mm x Ø 32 mm Bh
10 Reducing Coupler Ø 50 mm x Ø 40 mm Bh
11 Reducing Coupler Ø 63 mm x Ø 25 mm Bh
12 Reducing Coupler Ø 63 mm x Ø 32 mm Bh
13 Reducing Coupler Ø 63 mm x Ø 40 mm Bh
14 Reducing Coupler Ø 63 mm x Ø 50 mm Bh
15 Reducing Coupler Ø 75 mm x Ø 40 mm Bh
16 Reducing Coupler Ø 75 mm x Ø 50 mm Bh
17 Reducing Coupler Ø 75 mm x Ø 63 mm Bh
18 Reducing Coupler Ø 90 mm x Ø 63 mm Bh
19 Reducing Coupler Ø 90 mm x Ø 75 mm Bh
20 Reducing Coupler Ø 110 mm x Ø 90 mm Bh
1 Elbow 90⁰ Ø 20 mm Bh
2 Elbow 90⁰ Ø 25 mm Bh
3 Elbow 90⁰ Ø 32 mm Bh
4 Elbow 90⁰ Ø 40 mm Bh
5 Elbow 90⁰ Ø 50 mm Bh
6 Elbow 90⁰ Ø 63 mm Bh
7 Elbow 90⁰ Ø 75 mm Bh
8 Elbow 90⁰ Ø 90 mm Bh
9 Elbow 90⁰ Ø 110 mm Bh
1 End Cap Ø 20 mm Bh
2 End Cap Ø 25 mm Bh
3 End Cap Ø 32 mm Bh
4 End Cap Ø 40 mm Bh
5 End Cap Ø 50 mm Bh
6 End Cap Ø 63 mm Bh
7 End Cap Ø 75 mm Bh
8 End Cap Ø 90 mm Bh
9 End Cap Ø 110 mm Bh
SK BUPATI TAHUN
2023
Rp 123,420.00
Rp 112,530.00
Rp 101,640.00
Rp 101,640.00
Rp 112,530.00
Rp 101,640.00
Rp 101,640.00
Rp 112,530.00
Rp 101,640.00
Rp 101,640.00
Rp 112,530.00
Rp 101,640.00
Rp 112,530.00
Rp 101,640.00
Rp 112,530.00
Rp 101,640.00
Rp 81,070.00
Rp 128,575.00
Rp 102,578.00
Harga Survey
12,400.00 14,880.00
12,800.00 15,360.00
16,400.00 19,680.00
16,600.00 19,920.00
18,400.00 22,080.00
22,000.00 26,400.00
23,400.00 28,080.00
43,000.00 51,600.00
43,000.00 51,600.00
43,000.00 51,600.00
70,200.00 84,240.00
108,400.00 130,080.00
219,000.00 262,800.00
219,000.00 262,800.00
225,800.00 270,960.00
493,800.00 592,560.00
14,400.00 17,280.00
15,000.00 18,000.00
18,400.00 22,080.00
18,400.00 22,080.00
20,200.00 24,240.00
26,600.00 31,920.00
26,600.00 31,920.00
28,000.00 33,600.00
47,800.00 57,360.00
47,800.00 57,360.00
79,400.00 95,280.00
129,000.00 154,800.00
241,600.00 289,920.00
249,200.00 299,040.00
459,400.00 551,280.00
14,400.00 17,280.00
15,000.00 18,000.00
18,400.00 22,080.00
18,400.00 22,080.00
20,200.00 24,240.00
26,600.00 31,920.00
26,600.00 31,920.00
28,000.00 33,600.00
47,800.00 57,360.00
47,800.00 57,360.00
79,400.00 95,280.00
129,000.00 154,800.00
241,600.00 289,920.00
249,200.00 299,040.00
459,400.00 551,280.00
29,900.00 35,880.00
40,400.00 48,480.00
55,800.00 66,960.00
107,400.00 128,880.00
154,000.00 184,800.00
253,000.00 303,600.00
486,400.00 583,680.00
500,000.00 600,000.00
1,114,200.00 1,337,040.00
37,400.00 44,880.00
49,800.00 59,760.00
54,200.00 65,040.00
18,400.00 22,080.00
20,200.00 24,240.00
26,600.00 31,920.00
26,600.00 31,920.00
28,000.00 33,600.00
47,800.00 57,360.00
47,800.00 57,360.00
79,400.00 95,280.00
129,000.00 154,800.00
241,600.00 289,920.00
249,200.00 299,040.00
459,400.00 551,280.00
459,401.00 551,281.20
23,800.00 28,560.00
27,800.00 33,360.00
30,600.00 36,720.00
46,600.00 55,920.00
49,600.00 59,520.00
53,600.00 64,320.00
68,800.00 82,560.00
68,800.00 82,560.00
72,600.00 87,120.00
86,200.00 103,440.00
113,000.00 135,600.00
113,000.00 135,600.00
114,800.00 137,760.00
127,600.00 153,120.00
245,200.00 294,240.00
245,200.00 294,240.00
245,200.00 294,240.00
245,200.00 294,240.00
288,400.00 346,080.00
698,400.00 838,080.00
20,800.00 24,960.00
28,200.00 33,840.00
40,800.00 48,960.00
75,400.00 90,480.00
107,400.00 128,880.00
170,400.00 204,480.00
335,600.00 402,720.00
364,000.00 436,800.00
781,000.00 937,200.00
-
12,400.00 14,880.00
12,800.00 15,360.00
16,400.00 19,680.00
16,600.00 19,920.00
18,400.00 22,080.00
23,400.00 28,080.00
43,000.00 51,600.00
43,000.00 51,600.00
43,000.00 51,600.00
-
70,200.00 84,240.00
219,000.00 262,800.00
-
219,000.00 262,800.00
225,800.00 270,960.00
493,800.00 592,560.00
-
19,250.00 23,100.00
15,000.00 18,000.00
18,400.00 22,080.00
19,250.00 23,100.00
20,200.00 24,240.00
26,600.00 31,920.00
38,300.00 45,960.00
28,000.00 33,600.00
47,800.00 57,360.00
47,800.00 57,360.00
109,150.00 130,980.00
173,950.00 208,740.00
-
-
-
-
-
132,500.00 159,000.00
132,500.00 159,000.00
132,500.00 159,000.00
132,500.00 159,000.00
132,500.00 159,000.00
132,500.00 159,000.00
132,500.00 159,000.00
132,500.00 159,000.00
132,500.00 159,000.00
132,500.00 159,000.00
132,500.00 159,000.00
132,500.00 159,000.00
9,400.00 11,280.00
12,400.00 14,880.00
17,200.00 20,640.00
40,400.00 48,480.00
51,800.00 62,160.00
74,000.00 88,800.00
178,000.00 213,600.00
208,000.00 249,600.00
440,000.00 528,000.00
-
616,800.00 740,160.00
660,800.00 792,960.00
822,200.00 986,640.00
904,400.00 1,085,280.00
1,541,600.00 1,849,920.00
23,800.00 28,560.00
41,400.00 49,680.00
41,400.00 49,680.00
43,200.00 51,840.00
44,200.00 53,040.00
44,200.00 53,040.00
46,600.00 55,920.00
46,600.00 55,920.00
46,600.00 55,920.00
43,800.00 52,560.00
67,000.00 80,400.00
67,000.00 80,400.00
68,200.00 81,840.00
75,200.00 90,240.00
104,800.00 125,760.00
104,800.00 125,760.00
108,400.00 130,080.00
108,400.00 130,080.00
112,400.00 134,880.00
116,400.00 139,680.00
116,400.00 139,680.00
116,400.00 139,680.00
121,800.00 146,160.00
133,200.00 159,840.00
138,200.00 165,840.00
139,000.00 166,800.00
158,000.00 189,600.00
158,000.00 189,600.00
162,800.00 195,360.00
170,400.00 204,480.00
179,800.00 215,760.00
179,800.00 215,760.00
26,900.00 32,280.00
35,300.00 42,360.00
57,900.00 69,480.00
69,000.00 82,800.00
88,700.00 106,440.00
137,300.00 164,760.00
241,700.00 290,040.00
32,300.00 38,760.00
42,800.00 51,360.00
76,800.00 92,160.00
85,600.00 102,720.00
110,000.00 132,000.00
201,900.00 242,280.00
322,800.00 387,360.00
25,600.00 30,720.00
29,400.00 35,280.00
41,900.00 50,280.00
55,300.00 66,360.00
64,900.00 77,880.00
106,750.00 128,100.00
167,400.00 200,880.00
16,133 19,359.60
29,800.00 35,760.00
38,000.00 45,600.00
53,600.00 64,320.00
65,400.00 78,480.00
97,200.00 116,640.00
147,300.00 176,760.00
38,500.00 46,200.00
87,500.00 105,000.00
112,900.00 135,480.00
128,800.00 154,560.00
194,000.00 232,800.00
244,600.00 293,520.00
433,700.00 520,440.00
19,000.00 22,800.00
24,700.00 29,640.00
29,900.00 35,880.00
40,500.00 48,600.00
49,300.00 59,160.00
68,000.00 81,600.00
126,700.00 152,040.00
23,600.00 28,320.00
26,500.00 31,800.00
33,200.00 39,840.00
44,800.00 53,760.00
55,300.00 66,360.00
81,800.00 98,160.00
145,200.00 174,240.00
26,500.00 31,800.00
33,700.00 40,440.00
41,900.00 50,280.00
63,900.00 76,680.00
74,000.00 88,800.00
96,600.00 115,920.00
204,600.00 245,520.00
44,900.00 53,880.00
50,900.00 61,080.00
71,700.00 86,040.00
113,700.00 136,440.00
189,900.00 227,880.00
203,800.00 244,560.00
365,700.00 438,840.00
24,500.00 29,400.00
26,900.00 32,280.00
37,400.00 44,880.00
49,800.00 59,760.00
73,800.00 88,560.00
82,200.00 98,640.00
128,500.00 154,200.00
-
20,600.00 24,720.00
28,500.00 34,200.00
33,250.00 39,900.00
47,500.00 57,000.00
55,350.00 66,420.00
67,200.00 80,640.00
110,700.00 132,840.00
142,300.00 170,760.00
217,400.00 260,880.00
11,500.00 13,800.00
17,400.00 20,880.00
28,100.00 33,720.00
17,400.00 20,880.00
22,500.00 27,000.00
25,600.00 30,720.00
41,900.00 50,280.00
55,500.00 66,600.00
7,750.00 9,300.00
10,900.00 13,080.00
15,500.00 18,600.00
76,000.00 91,200.00
60,000.00 72,000.00
74,850.00 89,820.00
600,000.00 720,000.00 400,000 370,000
61,800.00 74,160.00
60,000.00 72,000.00
95,000.00 114,000.00
141,000.00 169,200.00
95,000.00 114,000.00
98,500.00 118,200.00
70,800.00 84,960.00
213,400.00 256,080.00
257,400.00 308,880.00
363,000.00 435,600.00
299,000.00 358,800.00
768,852.00 922,622.40
936,100.00 1,123,320.00
1,989,900.00 2,387,880.00
2,989,900.00 3,587,880.00
4,501,400.00 5,401,680.00
AN LARANTUKA
HARGA 2023 CONFER
100
77,000.00 1,925
33,000.00
33,000.00
52,800.00
45,650.00
66,000.00
55,000.00
104,500.00 8708.33
132,000.00
247,500.00 20,625
283,250.00
38,500.00
29,700.00
29,700.00
29,700.00
29,700.00
38,500.00
38,500.00
38,500.00
44,000.00
134,200.00
77,000.00
110,000.00
161,700.00
58,300.00
35,200.00
19,250.00
183,750.00
38,500.00
38,500.00
60,500.00
82,500.00
110,000.00
121,000.00
161,700.00
HARGA 2023
404,250.00
99,000.00
47,250.00
101,750.00
27,500.00
19,250.00
33,000.00
8,250.00
88,000.00
82,500.00
73,700.00
71,500.00
93,500.00
88,000.00
115,500.00
139,125.00
302,500.00
195,000.00
165,000.00
22,000.00
21,000.00
1,155,000.00
357,000.00
409,500.00
446,250.00
267,750.00
267,750.00
661,500.00
661,500.00
661,500.00
1,155,000.00 600,000
1,333,500.00
1,753,500.00
2,100.00
250,950.00
199,500.00
294,000.00 1400 Kg/m3
157,500.00
157,500.00
157,500.00
14,700,000.00
4,200,000.00
12,600,000.00
4,200,000.00 3,200,000
4,042,500.00
2,100,000.00
11,000.00
16,500.00
22,000.00
26,250.00
HARGA 2023
69,960.00
82,500.00
27,500.00
33,000.00
34,375.00
22,000.00
33,000.00
770,000.00
472,500.00
275,000.00
467,500.00
110,000.00
46,750.00
19,250.00
27,500.00
32,120.00
247,500.00
121,000.00
99,000.00
60,500.00
38,500.00
93,500.00
55,000.00
27,500.00
22,000.00
38,500.00
107,250.00
58,667.00
40,333.00
110,000.00
52,250.00
24,750.00
16,133.00
154,000.00
183,750.00
93,500.00
68,200.00
52,500.00
44,000.00
35,750.00
19,250.00
110,000.00
60,500.00
30,250.00
27,500.00
27,500.00
66,000.00
44,000.00
30,250.00
88,000.00
26,250.00
77,000.00
60,500.00
27,500.00
22,000.00
110,000.00
VINILON LANGGENG TRILIUN Rata Rata
65,500.00 84,860.00 69,380.00 366,570.00 73,314.00
41,300.00 59,870.00 43,660.00 237,500.00 47,500.00
16,700.00 15,700.00 18,250.00 88,880.00 17,776.00
10,500.00 12,150.00 11,080.00 57,270.00 11,454.00
7,500.00 8,070.00 7,390.00 38,590.00 7,718.00
ANALISA MATERIAL ON SITE
#REF! 6948
DAFTAR AKSESORIS PIPA HDPE Ø 32 MM RENCANA
NO JENIS PIPA Volume Sat.
DUSUN 1 [ R1 ]
1 Straight Coupler HDPE Ø 32 mm 2.0 Bh
2 Tee HDPE. ∅ 32 x 32 x 32 mm 1.0 Bh
3 Elbow HDPE. ∅ 32 mm - 90 1.0 Bh
4 Dop HDPE. ∅ 32 mm 3.0 Bh
423.37 436 13
460,994
Panjang
173.79 5.21 179.01
174 5.21 179.01 382
Panjang
96.25 2.89 99.14 97,006
47.63 1.43 49.05 31,853
42.73 1.28 44.01 90,658
28.81 0.86 29.68 67,147
15.07 0.45 15.52
35.83 1.07 36.90
33.06 0.99 34.05
41.14 1.23 42.37
22.83 0.68 23.51
33.96 1.02 34.98
397.30 409.22 9.45 286,664
Panjang
45.58 1.37 46.94 97,006
36.17 1.09 37.25 31,853
25.94 0.78 26.72 90,658
83.12 2.49 85.61 67,147
27.95 0.84 28.79 26,875
71.05 2.13 73.18
30.96 0.93 31.89
50.10 1.50 51.61
27.95 0.84 28.79
74.98 2.25 77.23
87.61 2.63 90.24
31.74 0.95 32.69
20.98 0.63 21.61
43.93 1.32 45.24
40.22 1.21 41.42
51.40 1.54 52.94
749.66 772.15 22 313,539
Panjang
11.87 0.36 12.23
26.25 0.79 27.04
14.44 0.43 14.88
16.34 0.49 16.83
21.55 0.65 22.19
24.17 0.73 24.90
46.91 1.41 48.32
12.05 0.36 12.41
33.98 1.02 35.00
22.97 0.69 23.66
17.09 0.51 17.60
247.62 255.05 7 -
2801.0129
1.08
0.72
0.36
0.72
0.48
0.24
1.98
1.32
0.66
0.18 4 0.72
0.12 4 0.48
0.06 4 0.24
0.18 29 5.22
0.12 29 3.48
0.06 29 1.74
0.18 10 1.8
0.12 10 1.2
0.06 10 0.6
44 7.74
5.16
2.58
BACK UP VOLUME
#REF! 6948
DAFTAR AKSESORIS PIPA HDPE Ø 32 MM RENCANA
NO JENIS PIPA Volume Sat.
BELOTEBANG ( BT )
1 Straight Coupler HDPE Ø 32 mm 2.0 Bh
2 Tee HDPE. ∅ 32 x 32 x 32 mm 1.0 Bh
3 Elbow HDPE. ∅ 32 mm - 90 1.0 Bh
4 Dop HDPE. ∅ 32 mm 3.0 Bh
TM.B
1 Male Threaded Join 90⁰ Ø 50 mm x 1 1/5" 1.0 Bh
2 Straight Coupler HDPE Ø 32 mm 4.0 Bh
3 Tee HDPE. ∅ 50 x 50 x 32 mm 5.0 Bh
4 Tee HDPE. ∅ 50 x 32 x 32 mm 1.0 Bh
TM.C
1 Male Threaded Join 90⁰ Ø 50 mm x 1 1/2" 1.0 Bh
2 Straight Coupler HDPE Ø 32 mm 4.0 Bh
3 Tee HDPE. ∅ 50 x 50 x 32 mm 3.0 Bh
4 End Cup HDPE. ∅ 50 mm 1.0 Bh
TM.D
1 Male Threaded Join 90⁰ Ø 50 mm x 1 1/2" 1.0 Bh
2 Straight Coupler HDPE Ø 32 mm 4.0 Bh
3 Tee HDPE. ∅ 50 x 50 x 32 mm 5.0 Bh
4 End Cup HDPE. ∅ 50 mm 1.0 Bh
TM.B
1 Tee HDPE. ∅ 32 x 32 x 32 mm 2.0 Bh
2 Elbow HDPE. ∅ 32 mm - 90 5 Bh
3 End Cup HDPE. ∅ 32 mm 7 bh
TM.C
1 Elbow HDPE. ∅ 32 mm - 90 3 Bh
2 End Cup HDPE. ∅ 32 mm 3 Bh
TM.D
1 Elbow HDPE. ∅ 32 mm - 90 4 Bh
2 End Cup HDPE. ∅ 32 mm 5 Bh
2,123.17 460,994
Panjang
419.41 12.58 431.99
453.45 13.60 467.05
330.73 9.92 340.65
433.35 13.00 446.35
1,637 49.11 1,686.05 49
Panjang
54.32 1.63 55.95 97,006
27.70 0.83 28.53 31,853
37.80 1.13 38.93 90,658
160.79 4.82 165.61 67,147
73.58 2.21 75.79
30.41 0.91 31.32
384.595 11.54 396.133 11.538
66.01 1.98 67.99
100.37 3.01 103.39 0
68.82 2.06 70.88
97.02 2.91 99.93
107.87 3.24 111.11
36.57 1.10 37.66
56.74 1.70 58.44
30.41 0.91 31.32
5.698 0.17 5.87 0
569.507 586.592 17.085
115.466 3.46 118.93
81.783 2.45 84.24
89.162 2.67 91.84
286.41 295.003 8.59
115.88 3.48 119.36
52.24 1.57 53.80
94.09 2.82 96.91
68.04 2.04 70.08
48.01 1.44 49.45
378.26 389.611 11.35 286,664
1,667.34
Panjang
90.109 2.70 92.81 97,006
189.108 5.67 194.78 31,853
66.223 1.99 68.21 90,658
57.894 1.74 59.63 67,147
91.824 2.75 94.58 26,875
44.537 1.34 45.87
539.70 555.89 16 313,539
Panjang
22.98 0.69 23.67
96.34 2.89 99.23
31.85 0.96 32.81
90.66 2.72 93.38
77.27 2.32 79.58
27.88 0.84 28.71 357.387 10
269.49 8.08 277.58 8
39.07 1.17 40.24
48.68 1.46 50.14
40.56 1.22 41.78
43.64 1.31 44.95
43.43 1.30 44.73 221.84 6
131.52 3.95 135.47 357.311 10
963.37 992.28 29
0 1 0.2 0.01
2801.0129
TOTAL CROSING 50 MM 46
184
30.666667
15 19
45 57
1.26 21.6
0.84
0.42
2.88
1.92
0.96
1.98
1.32
0.66
6.12
4.08
2.04
0.18 15 2.7
0.12 15 1.8
0.06 15 0.9
0.18 5 0.9
0.12 5 0.6
0.06 5 0.3
0.18 26 4.68
0.12 26 3.12
0.06 26 1.56
33 8.28
5.52
TITIK 2.76
t
2.4
REKAPITULASI
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
TA. : 2023
LIMA RATUS LIMA PULUH TIGA JUTA DUA RATUS TIGA PULUH LIMA RIBU RUPIAH
HARGA
JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME HARGA
SATUAN
( Rp. )
1 2 3 4 5 6=4x5
A PEKERJAAN PERSIAPAN
- Pengukuran Dan Pembersihan Lokasi Ls 1.00 Rp 1,500,000.00 Rp 1,500,000.00
- Papan Nama Proyek Ls 1.00 Rp 350,000.00 Rp 350,000.00
- Mobilisasi dan Demobilisasi Ls 1.00 Rp 1,500,000.00 Rp 1,500,000.00
- Penerapan Keselamatan dan Kesehatan Kerja (K3) Set 1.00 Rp 3,000,000.00 Rp 3,000,000.00
Pengadaan Helm Proyek, Rompi, Sarung Tangan dan sepatu
(6 Manpower)
Sub Jumlah Rp 6,350,000.00
TOTAL PEKERJAAN A Rp 6,350,000.00
G PEKERJAAN AKHIR
1 Uji Coba Pengaliran Ls 1.000 Rp 2,574,733 Rp 2,574,732.50
2 Pembersihan Akhir Lokasi Ls 1.000 Rp 1,500,000 Rp 1,500,000.00
Sub Jumlah Rp 4,074,732.50
TOTAL PEKERJAAN G Rp 4,074,732.50
HARGA DASAR
HARGA SATUAN
NO. U R A I A N SAT. SK Bupati Tahun Harga Survey
2021 Terpakai
A UPAH
B BAHAN
Price List Harga
B.1 PIPA Harga Terpakai
Surabaya 2022
HARGA SATUAN
NO. U R A I A N SAT. SK Bupati Tahun Harga Survey
Harga Dasar Harga Analisa Onsite Harga Terpakai
2023 Konsultan
A UPAH
B BAHAN
Price List Harga Harga Sampai Pel. Harga Analisa
B.1 PIPA Harga Bongkar Harga Terpakai
Surabaya Larantuka Onsite
131,567.75
97,885.21
61,553.66
42,646.06
32,352.89 201,976.79
299,040.00
- 350,000.00
3 M3 3,5 M3 4 M3 / ZAK
1 Tenaga Kerja :
1 Pekerja OH 1.500 81,070.00 121,605.00
2 Mandor OH 0.060 123,420.00 7,405.20
2 Material :
1 -
3 Peralatan :
1 -
1 Tenaga Kerja :
1 Pekerja OH 0.750 81,070.00 60,802.50
2 Mandor OH 0.025 123,420.00 3,085.50
2 Material :
1 -
3 Peralatan :
1 -
1 Tenaga Kerja :
1 Pekerja OH 0.500 81,070.00 40,535.00
2 Mandor OH 0.050 123,420.00 6,171.00
2 Material :
1
3 Peralatan :
1 -
1 Tenaga Kerja :
1 Pekerja OH 0.300 81,070.00 24,321.00
2 Mandor OH 0.010 123,420.00 1,234.20
2 Material :
1 Pasir Urug m3 1.200 100,000.00 120,000.00
3 Peralatan :
1 -
Jenis Pekerjaan : A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP
Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 1,315,634.98
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5
1 Tenaga Kerja :
1 Pekerja OH 1.500 81,070.00 121,605.00
2 Tukang batu OH 0.750 101,640.00 76,230.00
3 Kepala tukang OH 0.075 112,530.00 8,439.75
4 Mandor OH 0.075 123,420.00 9,256.50
2 Material :
1 Batu belah m3 1.200 466,603.70 559,924.44
2 Semen Portland Kg 163.000 2,101.69 342,576.10
3 Pasir pasang m3 0.520 150,000.00 78,000.00
3 Peralatan :
1 -
1 Tenaga Kerja :
1 Pekerja OH 0.780 81,070.00 63,234.60
2 Tukang batu OH 0.390 101,640.00 39,639.60
3 Kepala tukang OH 0.039 112,530.00 4,388.67
4 Mandor OH 0.039 123,420.00 4,813.38
2 Material :
1 Batu belah m3 1.200 466,603.70 559,924.44
2 Pasir urug m3 0.432 150,000.00 64,800.00
3 Peralatan :
1 -
1 Tenaga Kerja :
1 Pekerja OH 1.200 81,070.00 97,284.00
2 Tukang batu OH 0.200 101,640.00 20,328.00
3 Kepala tukang OH 0.020 112,530.00 2,250.60
4 Mandor OH 0.120 123,420.00 14,810.40
2 Material :
1 Semen Portland Kg 227.000 2,101.69 477,084.51
2 Pasir Beton Kg 0.621 150,000.00 93,107.14
3 Kerikil Kg 0.556 640,406.47 355,781.37
4 Air Liter 215.000 100.00 21,500.00
3 Peralatan :
1 -
Jenis Pekerjaan : A.4.1.1.2. Membuat 1 m3 Beton Mutu f’c = 9,8 Mpa (K125)
Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 1,347,988.12
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5
1 Tenaga Kerja :
1 Pekerja OH 1.650 81,070.00 133,765.50
2 Tukang batu OH 0.275 101,640.00 27,951.00
3 Kepala tukang OH 0.028 112,530.00 3,150.84
4 Mandor OH 0.083 123,420.00 10,243.86
2 Material :
1 Semen Portland Kg 276.000 2,101.69 580,067.51
2 Pasir Beton Kg 0.591 150,000.00 88,714.29
3 Kerikil Kg 0.562 640,406.47 360,050.75
4 Air Liter 215.000 100.00 21,500.00
3 Peralatan :
1 -
Jumlah Harga Satuan 1,225,443.74
Keuntungan dan Biaya Overhead 10 % 122,544.37
Harga Satuan Pekerjaan 1,347,988.12
Jenis Pekerjaan : A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175)
Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 1,596,456.42
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5
1 Tenaga Kerja :
1 Pekerja OH 1.650 81,070.00 133,765.50
2 Tukang batu OH 0.275 101,640.00 27,951.00
3 Kepala tukang OH 0.028 112,530.00 3,150.84
4 Mandor OH 0.083 123,420.00 10,243.86
2 Material :
1 Semen Portland Kg 326.000 2,101.69 685,152.20
2 Pasir Beton Kg 0.543 150,000.00 81,428.57
3 Kerikil Kg 0.762 640,406.47 488,132.04
4 Air Liter 215.000 100.00 21,500.00
3 Peralatan :
1 -
Jumlah Harga Satuan 1,451,324.02
Keuntungan dan Biaya Overhead 10 % 145,132.40
Harga Satuan Pekerjaan 1,596,456.42
Jenis Pekerjaan : A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 Mpa (K250)
Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 1,727,748.33
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5
1 Tenaga Kerja :
1 Pekerja OH 1.650 81,070.00 133,765.50
2 Tukang batu OH 0.275 101,640.00 27,951.00
3 Kepala tukang OH 0.028 112,530.00 3,150.84
4 Mandor OH 0.083 123,420.00 10,243.86
2 Material :
1 Semen Portland Kg 384.000 2,101.69 807,050.45
2 Pasir Beton Kg 0.494 150,000.00 74,142.86
3 Kerikil Kg 0.770 640,406.47 492,875.79
4 Air Liter 215.000 100.00 21,500.00
3 Peralatan :
1 -
Jenis Pekerjaan : A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
Satuan Mata Pembayaran : Rp./Kg
Kuantitas Pekerjaan Kg
Harga Satuan : Rp. 153,035.85
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5
1 Tenaga Kerja :
1 Pekerja OH 0.700 81,070.00 56,749.00
2 Tukang Besi OH 0.070 101,640.00 7,114.80
3 Kepala tukang OH 0.007 112,530.00 787.71
4 Mandor OH 0.004 123,420.00 493.68
2 Material :
1 Besi Beton Kg 7.400 9277.47 68,653.31
2 Kawat Beton Kg 0.150 35,500.00 5,325.00
3 Peralatan :
1 -
1 Tenaga Kerja :
1 Pekerja OH 0.660 81,070.00 53,506.20
2 Tukang Kayu OH 0.330 101,640.00 33,541.20
3 Kepala tukang OH 0.033 112,530.00 3,713.49
4 Mandor OH 0.033 123,420.00 4,072.86
2 Material :
1 Kayu kelas III M³ 0.030 2,500,000.00 75,000.00
2 Paku 5 – 12 cm Kg 0.400 29,700.00 11,880.00
3 Minyak bekisting Liter 0.200 26,250.00 5,250.00
4 Balok kayu kelas II M³ 0.020 3,200,000.00 64,000.00
5 Tripleks tebal 9 mm Lbr 0.350 161,700.00 56,595.00
6 Dolken kayu ɸ (8-10) cm - panjang 4 m Batang 3.000 10,000.00 30,000.00
3 Peralatan :
1 -
1 Tenaga Kerja :
1 Pekerja OH 0.200 81,070.00 16,214.00
2 Tukang Batu OH 0.100 101,640.00 10,164.00
3 Kepala tukang OH 0.010 112,530.00 1,125.30
4 Mandor OH 0.010 123,420.00 1,234.20
2 Material :
1 Semen portland Kg 3.250 2,101.69 6,830.51
3 Peralatan :
1 -
Jumlah Harga Satuan 35,568.01
Keuntungan dan Biaya Overhead 10 % 3,556.80
Harga Satuan Pekerjaan 39,124.81
Jenis Pekerjaan : A.4.7.1.10 Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Satuan Mata Pembayaran : Rp./M²
Kuantitas Pekerjaan M²
Harga Satuan : Rp. 51,154.31
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5
1 Tenaga Kerja :
1 Pekerja OH 0.020 81,070.00 1,621.40
2 Tukang Batu OH 0.063 101,640.00 6,403.32
3 Kepala tukang OH 0.006 112,530.00 708.94
4 Mandor OH 0.003 123,420.00 370.26
2 Material :
1 Plamuur Kg 0.100 17,600.00 1,760.00
2 Cat dasar Kg 0.100 99,000.00 9,900.00
3 Cat penutup Kg 0.260 99,000.00 25,740.00
3 Peralatan :
1 -
Jumlah Harga Satuan 46,503.92
Keuntungan dan Biaya Overhead 10 % 4,650.39
Harga Satuan Pekerjaan 51,154.31
Jenis Pekerjaan : A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½”
Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 77,052.61
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5
1 Tenaga Kerja :
1 Pekerja OH 0.054 81,070.00 4,377.78
2 Tukang Pipa OH 0.090 101,640.00 9,147.60
3 Kepala tukang OH 0.009 112,530.00 1,012.77
4 Mandor OH 0.027 123,420.00 3,332.34
2 Material :
1 Pipa Galvanize 1/2" m' 1.200 33,662.80 40,395.36
2 Perlengkapan Ls 35% x Hrg Pipa 11,781.98
3 Peralatan :
1 -
1 Tenaga Kerja :
1 Pekerja OH 0.054 81,070.00 4,377.78
2 Tukang Pipa OH 0.090 101,640.00 9,147.60
3 Kepala tukang OH 0.009 112,530.00 1,012.77
4 Mandor OH 0.027 123,420.00 3,332.34
2 Material :
1 Pipa Galvanize 3/4" m' 1.200 44,254.89 53,105.87
2 Perlengkapan Ls 35% x Hrg Pipa 15,489.21
3 Peralatan :
1 -
1 Tenaga Kerja :
1 Pekerja OH 0.108 81,070.00 8,755.56
2 Tukang Pipa OH 0.180 101,640.00 18,295.20
3 Kepala tukang OH 0.018 112,530.00 2,025.54
4 Mandor OH 0.005 123,420.00 617.10
2 Material :
1 Pipa Galvanize 1" m' 1.200 63,997.95 76,797.54
2 Perlengkapan Ls 35% x Hrg Pipa 22,399.28
3 Peralatan :
1 -
1 Tenaga Kerja :
1 Pekerja OH 0.108 81,070.00 8,755.56
2 Tukang Pipa OH 0.180 101,640.00 18,295.20
3 Kepala tukang OH 0.018 112,530.00 2,025.54
4 Mandor OH 0.005 123,420.00 617.10
2 Material :
1 Pipa Galvanize 1 1/4" m' 1.200 152,523.25 183,027.90
2 Perlengkapan Ls 35% x Hrg Pipa 53,383.14
3 Peralatan :
1 -
1 Tenaga Kerja :
1 Pekerja OH 0.108 81,070.00 8,755.56
2 Tukang Pipa OH 0.180 101,640.00 18,295.20
3 Kepala tukang OH 0.018 112,530.00 2,025.54
4 Mandor OH 0.005 123,420.00 617.10
2 Material :
1 Pipa Galvanize 1 1/2" m' 1.200 101,931.88 122,318.25
2 Perlengkapan Ls 35% x Hrg Pipa 35,676.16
3 Peralatan :
1 -
1 Tenaga Kerja :
1 Pekerja OH 0.108 81,070.00 8,755.56
2 Tukang Pipa OH 0.180 101,640.00 18,295.20
3 Kepala tukang OH 0.018 112,530.00 2,025.54
4 Mandor OH 0.005 123,420.00 617.10
2 Material :
1 Pipa Galvanize 2" m' 1.200 137,093.97 164,512.76
2 Perlengkapan Ls 35% x Hrg Pipa 47,982.89
3 Peralatan :
1 -
1 Tenaga Kerja :
1 Pekerja OH 0.108 81,070.00 8,755.56
2 Tukang Pipa OH 0.180 101,640.00 18,295.20
3 Kepala tukang OH 0.018 112,530.00 2,025.54
4 Mandor OH 0.005 123,420.00 617.10
2 Material :
1 Pipa Galvanize 2 1/2" m' 1.200 #REF! #REF!
2 Perlengkapan Ls 35% x Hrg Pipa #REF!
3 Peralatan :
1 -
1 Tenaga Kerja :
1 Pekerja OH 0.108 81,070.00 8,755.56
2 Tukang Pipa OH 0.180 101,640.00 18,295.20
3 Kepala tukang OH 0.018 112,530.00 2,025.54
4 Mandor OH 0.005 123,420.00 617.10
2 Material :
1 Pipa Galvanize 3" m' 1.200 #REF! #REF!
2 Perlengkapan Ls 35% x Hrg Pipa #REF!
3 Peralatan :
1 -
1 Tenaga Kerja :
1 Pekerja OH 0.108 81,070.00 8,755.56
2 Tukang Pipa OH 0.180 101,640.00 18,295.20
3 Kepala tukang OH 0.018 112,530.00 2,025.54
4 Mandor OH 0.005 123,420.00 617.10
2 Material :
1 Pipa Galvanize 4" m' 1.200 #REF! #REF!
2 Perlengkapan Ls 35% x Hrg Pipa #REF!
3 Peralatan :
1 -
1 Tenaga Kerja :
1 Pekerja OH 0.035 81,070.00 2,837.45
2 Tukang Pipa OH 0.017 101,640.00 1,727.88
3 Mandor OH 0.003 123,420.00 370.26
2 Material :
1 Pipa HDPE dia 90 mm m' 1.000 #REF! #REF!
3 Peralatan :
1 Sewa Tripot/Tackel & handle crane 2 T Jam 0.0190 200,000.00 3,800.00
1 Tenaga Kerja :
1 Pekerja OH 0.035 81,070.00 2,837.45
2 Tukang Pipa OH 0.017 101,640.00 1,727.88
3 Mandor OH 0.003 123,420.00 370.26
2 Material :
1 Pipa HDPE dia 75 mm m' 1.000 #REF! #REF!
3 Peralatan :
1 Sewa Tripot/Tackel & handle crane 2 T Jam 0.0190 200,000.00 3,800.00
1 Tenaga Kerja :
1 Pekerja OH 0.035 81,070.00 2,837.45
2 Tukang Pipa OH 0.017 101,640.00 1,727.88
3 Mandor OH 0.003 123,420.00 370.26
2 Material :
1 Pipa HDPE dia 63 mm m' 1.000 80,695.01 80,695.01
3 Peralatan :
-
1 Tenaga Kerja :
1 Pekerja OH 0.035 81,070.00 2,837.45
2 Tukang Pipa OH 0.017 101,640.00 1,727.88
3 Mandor OH 0.003 123,420.00 370.26
2 Material :
1 Pipa HDPE dia 50 mm m' 1.000 51,086.01 51,086.01
2 Peralatan :
1 Tenaga Kerja :
1 Pekerja OH 0.035 81,070.00 2,837.45
2 Tukang Pipa OH 0.017 101,640.00 1,727.88
3 Mandor OH 0.003 123,420.00 370.26
2 Material :
1 Pipa HDPE dia 40 mm m' 1.000 #REF! #REF!
3 Peralatan :
1 Tenaga Kerja :
1 Pekerja OH 0.035 81,070.00 2,837.45
2 Tukang Pipa OH 0.017 101,640.00 1,727.88
3 Mandor OH 0.003 123,420.00 370.26
2 Material :
1 Pipa HDPE dia 32 mm m' 1.000 22,947.43 22,947.43
3 Peralatan :
1 Tenaga Kerja :
1 Pekerja OH 0.035 81,070.00 2,837.45
2 Tukang Pipa OH 0.017 101,640.00 1,727.88
3 Mandor OH 0.003 123,420.00 370.26
2 Material :
1 Pipa HDPE dia 25 mm m' 1.000 13,119.48 13,119.48
3 Peralatan :
1 Tenaga Kerja :
1 Pekerja OH 0.035 81,070.00 2,837.45
2 Tukang Pipa OH 0.017 101,640.00 1,727.88
3 Mandor OH 0.003 123,420.00 370.26
2 Material :
1 Pipa HDPE dia 25 mm m' 1.000 8,802.49 8,802.49
3 Peralatan :
1 Tenaga Kerja :
1 Pekerja OH 0.035 81,070.00 2,837.45
2 Tukang Las OH 0.017 101,640.00 1,727.88
3 Mandor OH 0.003 123,420.00 370.26
2 Material :
1 Bensin Ltr 0.005 40,000.00 200.00
3 Peralatan :
1 Mesin Las Jam 0.0190 193,592.00 3,678.25
2 Genset Jam 0.0190 200,000.00 3,800.00
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5
1 Tenaga Kerja :
1 Pekerja OH 0.053 81,070.00 4,256.18
2 Tukang Pipa OH 0.026 101,640.00
3 Mandor OH 0.005 123,420.00 555.39
2 Material :
3 Peralatan :
1 Tenaga Kerja :
1 Pekerja OH 0.035 81,070.00 2,837.45
2 Tukang Pipa OH 0.017 101,640.00 1,727.88
3 Mandor OH 0.003 123,420.00 370.26
2 Material :
1 Pipa HDPE dia 32mm m' 1.000 - -
3 Peralatan :
1 Tenaga Kerja :
1 Pekerja OH 0.035 81,070.00 2,837.45
2 Tukang Pipa OH 0.017 101,640.00 1,727.88
3 Mandor OH 0.003 123,420.00 370.26
2 Material :
1 Pipa HDPE dia 32 mm m' 1.000 - -
3 Peralatan :
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quary ke lokasi pekerjaan L 27.00 Km
4 Harga Satuan Pasir Pasang / Cor RpM01 1.00 M3 50,000.00
5 Harga Satuan Dasar Excavator RpE05 1.00 Jam 698,160.64
6 Harga Satuan Dasar Dump Truck RpE04 1.00 Jam 449,342.07
III. PERHITUNGAN
EXCAVATOR
Kapasitas Bucket V 0.97 M3
Faktor Bucket Fb 0.80 -
Faktor Efisiensi alat Fa 0.83 -
Faktor Konversi Kedalaman < 40 % Fv 0.70 -
Waktu siklus Ts1
- Menggali / memuat T1 1.00 menit
- Lain-lain T2 0.50 menit
Ts1 1.50 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 36.64 M3 / Jam
Ts1 x Fv
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quary ke lokasi pekerjaan L 27.00 Km
4 Harga Satuan Batu Kali / Karang / Gunung RpM02 1.00 M3 50,000.00
5 Harga Satuan Dasar Excavator RpE05 1.00 Jam 698,160.64
6 Harga Satuan Dasar Dump Truck RpE04 1.00 Jam 449,342.07
III. PERHITUNGAN
EXCAVATOR
Kapasitas Bucket V 0.97 M3
Faktor Bucket Fb 0.80 -
Faktor Efisiensi alat Fa 0.75 -
Faktor Konversi Kedalaman < 40 % Fv 1.10 -
Waktu siklus Ts1
- Menggali / memuat T1 0.40 menit
- Lain-lain T2 1.00 menit
Ts1 1.40 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 22.68 M3 / Jam
Ts1 x Fv
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quary ke lokasi pekerjaan L 20.00 Km
4 Harga Satuan Batu Pecah RpM02 1.00 M3 200,000.00
5 Harga Satuan Dasar Excavator RpE05 1.00 Jam 698,160.64
6 Harga Satuan Dasar Dump Truck RpE04 1.00 Jam 449,342.07
III. PERHITUNGAN
EXCAVATOR
Kapasitas Bucket V 0.97 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.87 -
Faktor Konversi Kedalaman < 40 % Fv 0.70 -
Waktu siklus Ts1
- Menggali / memuat T1 1.00 menit
- Lain-lain T2 1.00 menit
Ts1 2.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 32.55 M3 / Jam
Ts1 x Fv
ANALISA ANGKUT :
- Toko Ke Site L 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 2.75 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 5.37 Jam
- Jumlah trip perhari (Tk/t2) t3 1.30 Trip
- Kapasitas angkut per trip m 4,000.00 Kg
- Biaya Sewa Truck/Hari A 449,342.07 Rupiah
- Produksi per hari t3 x m Kp 5,212.00 Kg
- Biaya angkut A / Kp O2 86.21 Rp/kg
- Upah Pekerja 123,420.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 94.72 Rp/Kg
Kp
i - Ongkos
= angkut Upah pekerja Rp 123,420.00 O4 670.76 Rp/Kg
Produksi
ANALISA ANGKUT :
- Toko Ke Site L 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 30.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 40.00 Km/Jam
- Kecepatan Rata-rata v3 35.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 0.25 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 3.62 Jam
- Jumlah trip perhari (Tk/t2) t3 1.93 Trip
- Kapasitas angkut per trip m 4,000.00 Kg
- Biaya Sewa Truck/Hari A 449,342.07 Rupiah
- Produksi per hari t3 x m Kp 7,731.76 Kg
- Biaya angkut A / Kp O2 58.12 Rp/kg
- Upah Pekerja 123,420.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 63.85 Rp/Kg
Kp
i - Ongkos
= angkut Upah pekerja Rp 123,420.00 O4 447.17 Rp/Kg
Produksi
DIMENSI CONTAINER
1. #REF!
ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m #REF! m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp #REF! m'
- Biaya angkut A / Kp O2 #REF! Rp/m'
- Upah Pekerja 123,420.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 #REF! Rp/ m'
Kp
2. #REF!
ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m #REF! m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp #REF! m'
- Biaya angkut A / Kp O2 #REF! Rp/m'
- Upah Pekerja 123,420.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 #REF! Rp/ m'
Kp
ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m 2,419.47 m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp 3,801.16 m'
- Biaya angkut A / Kp O2 827.48 Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 85.31 Rp/ m'
Kp
ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m 3,841.15 m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp 6,034.72 m'
- Biaya angkut A / Kp O2 521.22 Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 53.74 Rp/ m'
Kp
5. #REF!
ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m #REF! m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp #REF! m'
- Biaya angkut A / Kp O2 #REF! Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 #REF! Rp/ m'
Kp
ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m 9,377.80 m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp 14,733.20 m'
- Biaya angkut A / Kp O2 213.49 Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 22.01 Rp/ m'
Kp
ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m 15,364.59 m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp 24,138.88 m'
- Biaya angkut A / Kp O2 130.30 Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 13.43 Rp/ m'
Kp
ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m 24,007.17 m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp 37,716.99 m'
- Biaya angkut A / Kp O2 83.39 Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 8.60 Rp/ m'
Kp
9. #REF!
ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m #REF! m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp #REF! m'
- Biaya angkut A / Kp O2 #REF! Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 #REF! Rp/ m'
Kp
10. #REF!
ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m #REF! m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp #REF! m'
- Biaya angkut A / Kp O2 #REF! Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 #REF! Rp/ m'
Kp
11. #REF!
ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m #REF! m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp #REF! m'
- Biaya angkut A / Kp O2 #REF! Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 #REF! Rp/ m'
Kp
ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m 3,841.15 m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp 6,034.72 m'
- Biaya angkut A / Kp O2 521.22 Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 53.74 Rp/ m'
Kp
ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m 6,001.79 m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp 9,429.25 m'
- Biaya angkut A / Kp O2 333.58 Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 34.39 Rp/ m'
Kp
ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m #REF! m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp #REF! m'
- Biaya angkut A / Kp O2 #REF! Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 #REF! Rp/ m'
Kp
ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m 15,364.59 m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp 24,138.88 m'
- Biaya angkut A / Kp O2 130.30 Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 13.43 Rp/ m'
Kp
ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m 24,007.17 m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp 37,716.99 m'
- Biaya angkut A / Kp O2 83.39 Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 8.60 Rp/ m'
Kp
ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 4.46 Jam
- Jumlah trip perhari (Tk/t2) t3 1.57 Trip
- Kapasitas angkut per trip m 42,679.41 m'
- Biaya Sewa Truck/Hari A 3,145,394.48 Rupiah
- Produksi per hari t3 x m Kp 67,052.43 m'
- Biaya angkut A / Kp O2 46.91 Rp/m'
- Upah Pekerja 81,070.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 4.84 Rp/ m'
Kp
Volume Panjang Pipa Panjang Total Biaya Kirim Biaya Kirim Total Biaya kirim
Container 20 Ft (Roll / Btg) / Container/Truck dr Pelbh Sby dr Pelbh Sby ke Lokasi
No. Diameter
(Roll / Btg) (M') (M') ke Pelbh Larantuka ke Pelbh Larantuka Sementara
(Rp./ Container 20 Ft) (Rp./ M') (Rp.M')
1 2 3 4 5 = (4 x 3) 6 7 = (6/5) 8
1 Pipa HDPE Ø 63 mm ( 2 inch ) Pn 16 Sdr 11 24.19 Rol 100.00 2,419.47 12,500,000.00 5,166.43 5,166.43
2 Pipa HDPE Ø 50 mm ( 1 1/2 inch ) Pn 16 Sdr 11 38.41 Rol 100.00 3,841.15 12,500,000.00 3,254.24 3,254.24
3 Pipa HDPE Ø 32 mm ( 1 inch ) Pn 16 Sdr 11 37.51 Rol 250.00 9,377.80 12,500,000.00 1,332.94 1,332.94
4 Pipa HDPE Ø 25 mm ( 3/4 inch ) Pn 16 Sdr 11 61.46 Rol 250.00 15,364.59 12,500,000.00 813.56 813.56
5 Pipa HDPE Ø 20 mm ( 1/2 inch ) Pn 16 Sdr 11 96.03 Rol 250.00 24,007.17 12,500,000.00 520.68 520.68
6 Pipa Galvanis 2" Medium A 640.19 Btg 6.00 3,841.15 12,500,000.00 3,254.24 3,254.24
7 Pipa Galvanis 1 1/2" Medium A 1,000.30 Btg 6.00 6,001.79 12,500,000.00 2,082.71 2,082.71
8 Pipa Galvanis 1" Medium A 2,560.76 Btg 6.00 15,364.59 12,500,000.00 813.56 813.56
9 Pipa Galvanis 3/4" Medium A 4,001.19 Btg 6.00 24,007.17 12,500,000.00 520.68 520.68
10 Pipa Galvanis 1/2" Medium A 7,113.23 Btg 6.00 42,679.41 12,500,000.00 292.88 292.88
DAFTAR ANALISA BIAYA OPERASI PERALATAN
A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR
(Merk/Type Alat) KOMATSU
2. Tenaga Pw 140.00 HP
3. Kapasitas Cp -- --
4. Alat yang dipakai : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 tahun W 2,000.00 Jam
c. Harga Alat B 1,200,000,000.00 Rupiah
E. LAIN - LAIN
A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK
(Merk/Type Alat)
2. Tenaga Pw 100.00 HP
3. Kapasitas Cp -- --
4. Alat yang dipakai : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 tahun W 3,000.00 Jam
c. Harga Alat B 350,000,000.00 Rupiah
E. LAIN - LAIN
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER 350 LTR
(Merk/Type Alat) KUBOTA (MOLEN)
2. Tenaga Pw 10.00 HP
3. Kapasitas Cp 300.00 Liter
4. Alat yang dipakai : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 tahun W 2,000.00 Jam
c. Harga Alat B 10,000,000.00 Rupiah
E. LAIN - LAIN
A. URAIAN PERALATAN
1. Jenis Peralatan MESIN LAS PIPA
(Merk/Type Alat)
2. Tenaga Pw 5.00 HP
3. Kapasitas Cp -- --
4. Alat yang dipakai : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 tahun W 2,000.00 Jam
c. Harga Alat B 8,600,000.00 Rupiah
E. LAIN - LAIN
53,333
9.6
2555
#REF!
0.1
1.61051 0.161051
0.61051
0.264
315,000,000.00
83096206.45
27,698.735
0.12
42000000
14000
1.12 2.76 0.33148
1.76 0.76
3,145,394.48 0.4348
0.1
0.000010 #######
1.1000
0.1 0.000001
0.0000100
0.1
0.015
1,398,124.62
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PERENCANAAN PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA ADABANG
LOKASI : KECAMATAN TITEHENA - KABUPATEN FLORES TIMUR - PROVINSI NTT
T.A : 2023
ANALISA ANGKUT :
- Pelabuhan ke Site S 59.00 Km
- Jarak Angkut ( PP = 2 x L ) 118.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 2.75 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 5.37 Jam
- Jumlah trip perhari (Tk/t2) t3 1.30 Trip
- Kapasitas angkut per trip m 4,000.00 m'
- Biaya Sewa Truck/Hari A 3,443,580.25 Rupiah
- Produksi per hari t3 x m Kp 5,212.00 m'
- Biaya angkut A / Kp O2 660.70 Rp/m'
- Upah Pekerja 126,380.86 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 96.99 Rp/ m'
Kp
ANALISA ANGKUT :
- Pelabuhan ke Site S - Km
- Jarak Angkut ( PP = 2 x L ) - Km
- Kecepatan Rata-rata dengan muatan v1 - Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 - Km/Jam
- Kecepatan Rata-rata v3 - Km/Jam
- Jumlah Pekerja yang dibutuhkan P - Orang
- Jam Kerja per Hari Tk - Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 - Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 - Jam
- Jumlah trip perhari (Tk/t2) t3 - Trip
- Kapasitas angkut per trip m - m'
- Biaya Sewa Truck/Hari A 3,443,580.25 Rupiah
- Produksi per hari t3 x m Kp - m'
- Biaya angkut A / Kp O2 - Rp/m'
- Upah Pekerja 126,380.86 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 - Rp/ m'
Kp
Lembar 1
HARGA JUMLAH
No. URAIAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
A. BASE CAMP
Beli / sewa tanah untuk Base Camp M2 - - -
B. PERALATAN
Periksa lembar ke-2 LS 1.00 - -
C. FASILITAS KONTRAKTOR
1 Base Camp M2 - - -
4 Workshop / Bengkel M2 - - -
5 Gudang, dan lain-lain LS 1.00 1,000,000.00 1,000,000.00
6 Pembuatan Los Pekerja LS 1.00 - -
E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT
E.II. LAIN-LAIN
1 Pengukuran & Pematokan LS 1.00 1,500,000.00 1,500,000.00
2 Shop Drawings Set 1.00 1,000,000.00 1,000,000.00
3 As Built Drawing Set 1.00 1,000,000.00 1,000,000.00
4 Quality Control LS - - -
5 Pelaporan dan Dokumentasi LS 1.00 2,500,000.00 2,500,000.00
F. DEMOBILISASI LS - - -
Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
B. PERALATAN