LIST OF METHOD STATEMENT TO BE SUBMITTED FOR CLIENT APPROVAL ON PROJECT "C"

ITEM
DESCRIPTION
NO.
1 Method statement for survey works (submitted)
2 Method statement for concreting works (submitted)
3 Method statement for earth works ( submitted )
4 Method statement for concrete repair works ( submitted )
5 Method statement for embedded items ( submitted )
6 Method statement for block works (prepared)
7 Method statement for precast works (prepared)
8 Method statement for constructions of road way ( submitted )
9 Method Statement for Excavation of HRSG Foundation (Submitted Final Rev.01)
10 Method statement for installation of doors & windows (prepared)
11 Method Statement for Backfill and compaction of warehouse (Submitted Final)
12 Method statement for preparation of HRSG Type-A footing foundation (Approved)
13 Method statement for Termite control (prepared)
14 Method statement for plastering works (prepared)
15 Method statement for painting works (prepared)
16 Method statement for tile works (prepared)
17 Method statement for water proofing works (prepared)
18 Method statement for HDPE works (prepared)
19 Method statement for ceiling works (prepared)
20 Method statement for construction of electrical duct & manholes (prepared)

21 Method statement for fencing works (prepared)

22 Method statement for road marking (prepared)

23 Method statement for installation of curbstone (prepared)

24 Method statement for deep exaction, dewatering, and shoring works (prepared)

25 Method statement for scaffolding works (submitted by safety)

26 Method statement for coal tar epoxy coating (prepared)

27 Method statement for Grouting works (prepared)


Method statement for excavation of MV/LV Switch Gear Foundation from Block 1 to 5. (prepared)
28

29 Method statement for installation of roof and dry wall cladding (prepared)