Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Office and Ship Yard

Lot 222159, Kampong Telok Kabong,


Tanjong Puteri Golf Resort,
81700 Pasir Gudang, Johor.

Tel : +607 251 2381 +6013 280 9160


E mail : etramarine@gmail.com

INVOICE NO: 2300192


Date: 28 April, 2023
MAKMUR MARINE PETROLEUM SDN. BHD. No PO NO/ JOB NO/
EES/Q/2304044/f
8A, Jalan Kebudayaan 2,Taman Universiti, 81300 ORDER NO/REF NO
Skudai JOHOR PAGE: 1 OF 1
DARUL TAKZIM

INVOICE FOR UPSLIP/DOWNSLIP,FOR VESSEL NAUTIKA MERSING ON 27 APRIL 2023

With reference to the above, we enclosed herewith our rate for your kind attention as follows: -
TOTAL
No Item Unit Price per unit (RM) (RM)
UNIT

1 Vessel Upslip and Down slip

To perform vessel upslip and downslip activity for docking


and maintenance vessel.

1.1 Upslip
Dock Vessel per time 1 Lot 1 Lot RM 15,000.00
Using a marine lauching balloon

1.2 Provide berthing space for vessel to alongside, per day

1.3 Pre-docking Preparation


· The process of dry docking of a ship needs to be
planned .
· Yard prepare a docking plan as taking consideration
all details of the structure of the ship such as hull structure
of the ship, locations of the drain plugs, and echo sounders
beneath the ship so as to not damage them during docking
the ship

1.4 Preparing a Docking Plan


· Yard to take plan a series of sketches and detailed
calculations about the ship’s height, weight, and structure.

· The docking plan to ensure successfully dock the


ship and also easily undock during upslip it. It also to
reduces the risk of a ship capsizing during undocking.
· Preparing yard equipment for upslip activity such as
winch, wire arrangement, ballon position and stool block
with consider the sequence during operation

1.5 Understanding the Stability Conditions


· The weight distribution of the ship that is to be
docked needs to be calculated accurately.
· the entire weight of the ship is borne by the stool
blocks,
· The stability condition of the ship is analysed
perfectly before the actual process begins.

Arrival
· all the stability conditions on its arrival to the dry
docking port

1.6 The Actual Docking.


· Once the ship has successfully achieved the pre-
docking conditions, the ship is to be tugged into the dock
since its engine is not available.
· When the ship is inside the docks, the ship is pull by
winch and made secure the winch wire to the vessel.
· Yard using ship launching marine airbags for
conveying the vessel.
· Pull up the vessel to land berth using winch

1.7 Consist of upslip material and equipment as below:


· Launching ballon x 5 unit
· 1.8 meter height.
· 18 meter length of usage area.
· 7 layer
· Winch
· Excavator
· Forklift
· Manpower labour

2 2.1 Downslip 1 Lot 1 Lot RM 15,000.00

Dock Vessel per time


Using a marine lauching balloon
Slipways rental per day
Provide berthing space for vessel to alongside, per day

2.2 Preparation Prior to any Slipway Activity

· Assess Weather Conditions. handling the excavator


extension pull support and make sure the ship launching
marine bags all are in good condition

2.3 Tying Up the Vessel


· All binders running to the ship ,Yard to ensure that
binder have been inspected prior to slipping the ship.

2.4 Down slip activity


· Slipping can only commence once a once operator is
satisfied that the boat latching is tied correctly

2.5 Consist of upslip material and equipment as below:


· Launching ballon x 5 unit
· 1.8 meter height.
· 18 meter length of usage area.
· 7 layer
· Winch
· Excavator
· Forklift
· Manpower labour

4 4.1 Berthing of Vessel Nautika Mersing at Etra Yards 1 FOC 0 RM -


day day

5 Provide shore supply 415V for vessel Nautika Mersing 1 RM 50.00 RM -


day
5.1 415v shore power supply per days

5.2 Connect disconnect shore supply, per time.

5.3 · Shore supply using shore power electricity


Start on 22 April 2023
Invoice will submit wekkly

AUTHORIZED SIGNATURE CUSTOMER ACCEPTANCE Sub Total RM -


Tex/SST RM -
Fright RM -
Deposit
Legal RM -
inspection/ cert RM -
Other/Discount RM -
ACTUAL AMOUNT RM -
CHOP AND SIGN
CHOP AND SIGN Currency RM

PAYMENT TERM
1) Full payment upon completion of work

REMARKS

1.Payment shall be made through ETRA ENGINEERING SERVICES, Bank Islam Malaysia Berhad Pasir Gudang Branch Current Account No: 01087010070196.

You might also like