Download as pdf or txt
Download as pdf or txt
You are on page 1of 34

GENERAL - GERMANY GERMANY

6° E 8° E 10° E 12° E

Flensburg
GERMANY Kappeln

Eckernforde
Holtenau
Rendsburg al Stralsund
an Kiel

C
Busum
el Rostock
Ki

54° N
54° N

Cuxhaven Brunsbuttel Itzehoe


Lubeck
Wismar
Gluckstadt
Butzfleth
Bremerhaven Hamburg
Wilhelmshaven Stadersand
Nordenham
Emden
Brake
Elsfleth
Oldenburg Bremen
Papenburg

NETHERLANDS
52° N

52° N
GERMANY

Duisburg-Ruhrort
Krefeld
Neuss

© Shipping6°
Guides
E Ltd, Reigate, United Kingdom 8° E 10° E 12° E

Country Plan

GENERAL - GERMANY GERMANY


GERMANY
ELBE HELICOPTER PILOTAGE (1)

WINCHING AREA RESTRICTED LANDING AREA FULL LANDING AREA


22

22
10

10
10
10

10

10
10

10

22

22

1. Clear Zone Diameter 4.6m 1. Centre Circle spot Diameter 0.5m 1. Centre Circle spot Diameter 0.5m
Full painted circle spot Full painted white or yellow Full painted white or yellow
(White or yellow, non–skid) H symbol may be painted, dimensions
see ICS Guide.
2. Manoeuvring Zone Diameter 30.5m 2. Aiming Circle Diameter 10m
H Symbol may only be marked in
No Obstruction higher than 3m No Obstruction higher than 0.1m
FULL LANDING AREA
Manoeuvring Zone circle need Circle line painted white or 2. Aiming Circle Diameter 10m
not to be marked. yellow, width 0.2m 0.1m
No Obstruction higher than
Manoeuvring Zone may extend Circle diameter to be marked (10).
over Ship's side. Non–Skid Surface Circle line painted white or
If obstruction higher than 3m, 3.. Manoeuvring Zone Diameter 25.5m yellow, width 0.2m
helicopter will hover No Obstruction higher than 1.25m Circle diameter to be marked (10).
approximately 3.05m (10 ft.) Non–Skid Surface
above the highest obstacle Manoeuvring Zone to be 3. Clear Zone Diameter 22m
within the manoeuvring zone. marked with broken circle 0.25m
No Obstruction higher than
line, width 0.2m
Manoeuvring Zone may Circle line painted white or yellow, width 0.2m
extend over Ship’s side Circle diameter to be marked (22)
4. Manoeuvring Zone Diameter 27.5m
No Obstruction higher than 1.25m
Manoeuvring Zone circle line
need not be marked
Manoeuvring Zone may
extend over Ship's side
© Shipping Guides Ltd., Reigate, United Kingdom

Elbe Helicopter Pilotage


P752
GENERAL - GERMANY GERMANY
GERMANY
ELBE HELICOPTER PILOTAGE (2)
For use with ICS Guide to Helicopter/Ship Operations SAFETY CHECK LIST
To be checked by the Officer In Charge q
2. Landing on
1. General
(a) Is the deck party aware that a landing is to be made? q
(a) Have all loose objects within and adjacent to the operating (b) Is the operating area free of heavy spray or seas on deck? q
area been secured or removed? (c) Have side rails and, where necessary, awnings, stanchions
q
(b) Have all aerials, standing or running gear above, and in the and derricks been lowered or removed? q
vicinity of, the operating area been lowered or secured? (d) Where applicable, have portable pipes been removed and
q
(c) Has the officer of the watch been consulted about the ship's have the remaining apex ends been blanked off? q
readiness? (e) Are rope messengers to hand for securing the helicopter, if
q
(d) Are the fire pumps running and is there adequate pressure necessary? (Note: Only the helicopter pilot may decide
on deck? whether or not to secure the helicopter) q
q
(e) Are fire hoses ready, (Hoses should be near to, but clear of
operating area)? q
(f) Are foam hoses, monitors and portable foam equipment 3. Tankers: Additional items for Check List
ready? q
(g) Are foam equipment operators, of whom at least two are (A) Gas Control, ships not fitted with an Inert Gas System: Has
wearing the prescribed fireman's outfits, standing by? pressure been released from tanks within thirty (30) minutes of
q
(h) Are the foam nozzles pointing away from the helicopter? commencement of helicopter operations? q
q (b)
(i) Has a rescue party, of whom at least two are wearing Gas control, ship's fitted with an Inert Gas System: Has
firemans's outfits, been detailed? q pressure in cargo tanks been reduced to slight positive
(j) Is a man overboard rescue boat ready for immediate lowering? pressure q
q (c) All tankers: Have all tank openings been secured following
(k) Are the following items of equipment to hand?
(i) Portable fire extinguishers? q
venting operations? q
(ii) Large Axe? q
(iii) Crow bar? 4. Bulk and Combination Carriers: Additional items for
q
(iv) Wire cutters? q Check List
(v) Red emergency signal/Torch? q
(vi) Marshaling batons (at night)? (a) Has surface ventilation to dry bulk cargoes ceased, and have
q
(l) Has the correct lighting. (including special navigation lights), all hatch openings been fully battened down prior to helicopter
been switched on prior to night operations? q operations? q
(m) Is the deck party ready, and are all passengers clear of the
5. Gas Carriers: Additional items for Check List
operation area? q
(n) Have hook handlers been equipped with helmets, strong
rubber or suitable gloves and rubber soled shoes to avoid the (a) Have all precautions been taken to prevent gas emission on
danger of static discharge? q deck? q

Radio Communication Wind Conditions Limiting Helicopter Operations


The helicopter will contact the vessel on VHF–FM channel 16 and will request the ship to change to For most purposes the best relative wind is between 35° abaft the beam and ahead with speed
Channel 9 or 70 normally from 10–50 knots. However certain sea conditions may make it necessary to obtain a
The vessel shall advise the helicopter pilot of it’s position, heading, speed and the actual wind relative wind which is between 35° abaft the beam and dead astern.
direction and speed over the deck.
Sea and Swell
If possible the Master should ensure that spray, roll and pitch are kept to a minimum by selecting a
suitable course and speed. This is particulary important in preventing sea and spray from entering the
helicopter’s engine. The helicopter pilot should be informed of any likelihood of seas or heavy spray
on deck.
When personnel are being winched to or from smaller ships, the helicopter pilot may request the ship
to head into the sea to reduce rolling.
© Shipping Guides Ltd., Reigate, United Kingdom

Elbe Helicopter Pilotage

BRAKE GERMANY

Inn Crane Legend


er
Do Symbol Type
ck

32 ton Jib Grabs


ck
Crane al Do
Can
BRAKE Jib Cranes

L oc
ks SOUTH Gantry Cranes

Silos 0 500
SB3
Shiploader
Scale in Metres
1

Sou 4
th P
ier 3
SB2
Shiploader Mid
Rive dle
Pier
rW
ese
r

W3
W2
W1
Nor th
aaaaaaaaaaaaaaaaaaaaaaaaaaa Pier
aaaaaaaaaaaaaaaaaaaaaaaaaaa 25 ton Jib Cranes
aaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaa B2
B1
SB1
Sulphur
88 ton Gantry Cranes Shiploader

aaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaa

© Shipping Guides Ltd., Reigate, United Kingdom

South
P753
BRAKE GERMANY

BRAKE
NORTH

Brake
Tank
Terminal

Planned
Expansion
Ferry
Area

aaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaa
River Weser
aaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaa 0 500
aaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaa
Scale in Metres
© Shipping Guides Ltd., Reigate, United Kingdom

North

BREMEN GERMANY

Industriehafen
Hafen F

Ste
fen

Holz-u Fabrikenhafen ph
Kraftwerkhafen
ha

an
ide

Power Station
Hafe

en
i-B
af
ttre

H n Ro/Ro
ri
Kall

n- ahafe
nE

or Europ
Ge

H
hafe

p-
Ka
Ko

Werfthafen
n

afen
hl

Ol-H
enh

A River Weser aaaaaaaaaaaaaaaaaaaaaaa


Hu

fen
aaaaaaaaaaaaaaaaaaaaaaa
afe

Ha rshafen
tte

aaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaaaaaa Hohento


n
nh

aaaaaaaaaaaaa
aaaaaaaaaaaaa
afe

Zone
naaaaaaaaaaaaa
n

Cu
Boun stom-
ha aaaaaaaaaaaaa
fe
Vo r aaaaaaaaaaaaa Beck
dry
en II
Lock Ro/Ro Con
taine
r Ter
mina
aaaaaaaaaaaaaaaaa l
aaaaaaaaaaaaaaaaa
Terminal aaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaa
fe n Neustader Hafen
Ha
e r-
kn
K loc

BREMEN
fn
or tha
Sp
0 1,500
Scale in Metres

© Shipping Guides Ltd., Reigate, United Kingdom

Layout
P754
BREMERHAVEN GERMANY

.
2 km
.) 7

64
NORDENHAM BLEXEN
– 12 m

km
(SKN

.
m
71 k

(S
North Lock je
mka

KN
70 k
m . Stro Eurogate

–1
Container Terminal

1m
m.
m. 69 k
68 k

.)
Wendebecken
m.) kaje
– 12 bus

65
Vorhafen m Verbindu
m Ebb (SKN Colu ngshafen

k
. d
(S Floo
Luneorthafen KN 6 7 km. Kaise
r Lock
– 11 s Nordhafen Weddewarden
m.) 66 km.
Fischereihafen Osthafen
Kaiserhafen III
Labradorhafen Fischereihafen II Lock
s Neuer Hafen
Fischereihafen I hafen
Handels Kaiserhafen II
Radar Tower
UBERSEEHAFEN
Speckenbuttel

BREMERHAVEN

0 1,500 3,000

metres
© Shipping Guides Ltd, Reigate, United Kingdom

Layout

BRUNSBUTTEL GERMANY

e
Braak
River

Yacht JOSENBURG
Haven LEHE

BRUNSBUTTEL
Harbour
Authority

Oil Port
Mole 3 Ferry Kiel Canal

VTS
Mole 2 Tugs
Mole 1 Rail Depot
Ostermoor
Pilot Port
Station

Ri
ve
rE OSTERMOOR
lb
e

BRUNSBUTTEL
Elbehafen

© Shipping Guides Ltd, Reigate, United Kingdom

Layout
P755
BRUNSBUTTEL GERMANY

Approach Road West Approach Road East

Administration
Workshop

Open Storage

Warehouse

Harbour for inland vessels

Harbour Master
Mooring Hooks Gantry Crane

Mooring Hook

Oil and Gas Section Dry Cargo Section

BRUNSBUTTEL
ELBEHAFEN

© Shipping Guides Ltd, Reigate, United Kingdom

Elbehafen

BRUNSBUTTEL GERMANY

BRUNSBUTTEL
DRY CARGO SECTION

Warehouse
2 Bollards

Ostbecken
34
33
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

190,000 dwt

Elbe River

Vessels exceeding 35,000 gt or draft exceeding 11.8m FW must meet the following minimum requirements for mooring:

1 Maximum transverse docking speed of vessel = 0.15m/s = 0.29 kn.


2 6 head and 6 stern lines
3 2 forward and 2 aft springs
4 4 forward and 4 aft breastlines
5 Vessel may not exceed mooring position more eastward than that shown above
6 Double-lines (slip-lines) will be accepted as two lines
7 Releasing time of assisting tugs to be agreed between vessels command and mooring master
8 A minimum of one nautical officer as well as two deck crew to be on watch as long as the draft reads 11.8m FW or more.
The crew involved have to start their watch duly rested

© Shipping Guides Ltd, Reigate, United Kingdom

Elbehafen Dry Cargo Section


P756
BRUNSBUTTEL
GAS AND OIL SECTION

Oil and gas


discharge

BRUNSBUTTEL
BRUNSBUTTEL

Harbour
tower Master’s

DEA
building

Inner Harbour
Hook Hook Bollard

4
2 Hook
1 3 Hook
Fire-fighting

© Shipping Guides Ltd, Reigate, United Kingdom


4 Hook tower 30m
5 11 12 13 14 15 16 17 18

Air Barrier
Compressed
6 7 8 9 10

Close to Barrier
No Anchoring
250,000 dwt

Fire Wire Fire Wire

River Elbe

KIEL CANAL
110,000 dwt

8
7
Fire Wire Fire Wire
River Elbe

Oil Port
Elbehafen
Shore Wire Shore Wire

Gas Tanker 15,000 cu.m max.

Fire Wire Fire Wire


River Elbe

OIL PORT
BRUNSBUTTEL
Tankers exceeding 35,000 gt must meet the following minimum requirements for mooring:

1 Maximum transverse docking speed of vessel = 0.15m/s = 0.29 kn


2 5 head and 5 stern lines
3 2 forward and 2 aft springs
4 2 forward and 2 aft breast lines, of which 1 forward and 1 aft (wires, breaking strength 120 mt are provided by terminal)
5 Releasing time of assisting tugs to be agreed between vessel’s command and mooring master
Gas and Oil Section

© Shipping Guides Ltd, Reigate, United Kingdom


GERMANY
GERMANY

P757
P758
BRUNSBUTTEL
BRUNSBUTTEL

Jetty No. 6
Loading Arm
Berth 4

© Shipping Guides Ltd, Reigate, United Kingdom


No anchoring North Basin

Pollution
80m
near barrier
Height of berths 2.7m

Barrier
above normal water level

Lay-by berth

Jetty No. 5

Office
Berth 2

Loading Arm
No anchoring

Ostermoor
Ostermoor
near barrier
Jetty No. 4

Polluti
Jetty No. 1

o
South Basin South Basin

100m

n Barr
Jetty No. 2

ier
Top edge of rail and hatches
not higher than 14m (for bulk urea)
above normal water level in the working range

Berth 1
0

metres

BRUNSBUTTEL
Depths in metres

OSTERMOOR
OSTERMOOR
BRUNSBUTTEL

300

Layout

© Shipping Guides Ltd, Reigate, United Kingdom


GERMANY
GERMANY
BRUNSBUTTEL GERMANY
KIEL CANAL

Bollards

BRUNSBUTTEL
OSTERMOOR
BERTH 6

Berth No. 6

Crude discharge rate 2000 cu.m/hr


Turning Basin
depth 12m Product loading rate 400 cu.m/hr
Total Berth No. 6
Crude loading arms 1

Bollards Crude loading hoses 3

Product loading hoses 1

Terminal Gangway 12m

LOCATION

Bollards Berth No. 6

Berth No. 5

0 50 100 Bayer AG Berth No. 5

metres

© Shipping Guides Ltd, Reigate, United Kingdom

Ostermoor Berth No. 6

BUSUM GERMANY
Museumshafen

Lighthouse
BUSUM

Basin 2 Shiplift

Harbour Master

Customs Fishery
Basin 3

Grain Elevator

Grain Storage

Basin 4
Marina

Ro-Ro

© Shipping Guides Ltd, Reigate, United Kingdom

Layout
P759
BUTZFLETH GERMANY

aaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaa
BUTZFLETH aaaaaaaaaaaaaaaaaaaaa

ELBE
km 658 km 657

50.0 m.
Depth 15 m.
Southern Waiting Area
aaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaa

DOW Handling Installation


Pier
AOS Handling Installation

aaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaa 112.0 m.
Depth 7 m.
Discharge Head

Depth 10 m.
NORTH HARBOUR
Port Line

120.0 m.
SOUTH HARBOUR

Discharge Head
aaaaaaaaaaaaaa (Under Construction)
aaaaaaaaaaaaaa
aaaaaaaaaaaaaa

© Shipping Guides Ltd., Reigate, United Kingdom

Layout

CUXHAVEN GERMANY

Seebäderbrücke
Alte Liebe
Steubenhoft
Radar
Centre
Fahrhafen Marina
Vorhafen
Lubber tkai

Freihafen
n
fe

Helg
Tran
ha

CUXHAVEN
er
Ew

sh

olan

Border Police
ipme
Alter

der
nt Q
Hafe

Kai
uay
n

Lentzkai

Marine Academy
Lo
ck
s

Marina
Alter Fisc
hereihafen
Service Quay

Nordseekai

Meinkenka
Ritzebutte

for Trawlers

i
ler Schleu
senpriel

© Shipping Guides Ltd, Reigate, United Kingdom

North
P760
Rh Hafen Walsum-Nord der
ine Bergbau AG Niederrhein
CUXHAVEN

Haindl Papier Gmbh

Amerikahafen
Hafen Walsum Sud der Thyssen AG

Humberkai
Hafen Schwelgern der Thyssen AG

© Shipping Guides Ltd, Reigate, United Kingdom

DUISBURG-RUHRORT
Ro-Ro Pier

Neuer Fischereihafen
Ro-Ro ramp 1
1

Hansakai

Niedersachsenkai
Ro-Ro ramp 2
2

Hafen Rheinpreussen der


RUHRORT
Bergbau AG Niederrhein

Umschlagstellen Homberg
Europkai

Rh
ur
3

South

Location
DUISBURG
River Elbe

Rheinkai Nord

Rheinkai Sud

HOCHFELD

Hafen Rheinhausen Curtilus

Berzelius Metallhuttenges Gmbh

Hafen Huckingen der


Mannesmann AG Huttenwerke
ine
SOUTH

Rh
CUXHAVEN

DUISBURG-RUHRORT
LOCATION AND ANCHORAGES

© Shipping Guides Ltd, Reigate, United Kingdom


GERMANY
GERMANY

P761
DUISBURG-RUHRORT GERMANY

Freeport
Containers DUISBURG-RUHRORT
R Ro-Ro
ai
lw
ay
Po
HOMBERG r t

r
ou
ee a r b
Coal

r
H

ou
r th

rb
l
Ha

Ha
No
St
fe

C
ut
nm
Water and

al
So

ck
RUHRORT

et
und

Do
Traffic Control

M
A

p
Ore

ra
ck

ck
Oil

Sc
Do
Do
Intermodal
Terminal Coal
Port
Vinekek
anal Authority
Customs
l
Cana
Port
Ruh
r Por
t Ca
Freight Traffic Centre nal
Ruhr

Crude Oil Refinery Timber Harbours

KAPLERFELD HOCHFELD
RHEINHAUIL n
fe
ha
en
Inn
Kultushafen
NEUENKAMP

Rhine
INNENSTADT
fe n n Sudhafen
lha afe
alle h
Par en
ss Rhine
Au
Containers
HOCHFELD

© Shipping Guides Ltd, Reigate, United Kingdom

Layout

ECKERNFORDE GERMANY
N

ECKERNFORDE

Outer Port 0 40 80 120m

Depths in metres

5.1
5.1
3.7 2 3
4.7
1 5.5
4
3.3 6

5.6 6
4.5
5

Water Police
t
or
rP

5.8
ne

Harbour
In

Master

Stadtwerke Eckernforde GmbH


Lighthouse

© Shipping Guides Ltd, Reigate, United Kingdom

Layout
P762
EMDEN GERMANY

N
Emspier

Vehicle Terminal
Emskai
Cassens-Werft
Shipyard EMDEN

Silos Ro-Ro
Emder Fahrwasser Alter Binnenhafen
Port Limit Outer Harbour
Lock
Nordseewerke

Eisenbahndock
Shipyard

Lock Ro-Ro
Ro-Ro

Terminal 1
Neuer Binnenhafen
RI
VE

Stichkanal

Bin

Olhafen
R

nen
EM

sch
iffs
Tanker
S

Ind
bec
Nordkai Terminal

us
ken

tr
ieh
afe
Sudkai

n
EMDEN
Ja

0 500m
rs
sum
er
Ha
fen

© Shipping Guides Ltd, Reigate, United Kingdom

Layout

FLENSBURG GERMANY
FLENSBURG
)
(T

22

Industrial
Harbour
ne
Li
ng
di a
Le

Ballast
Quay
Harnis
Quay

Quay
Inner
Power Station Quay

© Shipping Guides Ltd., Reigate, United Kingdom


Schiffbruck
Quay

Layout
P763
GLUCKSTADT GERMANY

Approach Road North

GLUCKSTADT

Crane

Storage Area
Ap
pro
ac
hR
oa
Warehouse dS
ou
th

Warehou
se
Administration
Building
River Elbe
Storage
Area

Storage Area
0 100

metres
© Shipping Guides Ltd, Reigate, United Kingdom

Layout

HAMBURG GERMANY
Blohm & Voss Shipyard

UNTERELBE

Baak
enha
KO

fen
To

HHLA Container Ku NORDE


HL

ll

hw R ELBE
ero

Terminal erd
BR

e
r t TCT

Ruschkanal Petroleumhafen Un r Ha
KO

AND

Steendiekkanal Burchardkai CTB Ka i fe


ise k a i U n
H

FL HHLA
L

Wa r W CT
EE Eurogate lters Fruit Centre
T ho ilh
Container fer elm Ha
Nautical Centre Seemannshoeft
Reiher Stieg

Terminal Ha ns
Pilot Station 1 fen ah
afe
Hamburg Port n
en

Hamburg
Rosshafen

af
rH

Steel
afen
de

Works Spreehafen
O

eh
Trav

Kohlbrand Bridge
rt

Neu
Po

hofe
RE

r Ka
a
ns

nal
TH
Ha

WILHELMSBURG

HHLA Container
Terminal
fen k
Ha ttwy

Reih
Ka

Altenwerder CTA er
Blumensand
Stie

Hafen
g

Kattwyk
Bridge

HAMBURG
4
afen

fen 3

fen 2

Suderelbe
fen 1
Seeh

Seeha

SUDE Bridge
RELB
Seeha

E
Seeha

HARBURG
© Shipping Guides Ltd, Reigate, United Kingdom

Layout
P764
HAMBURG GERMANY

HAMBURG
RADIO REPORTING POINTS
TINSDAL

HAMBURG
Buoy No. 125
Western Port Limit Hamburg Port
Traffic Radio
Altona
Buoy No. 133 Uberseebrucke
ELBE
Buoy No. 135 Vorhafen
Parkhafen Amerikahoft
Norderelbbrucken

FINKENWERDER
Kohlbrandbrucke

ALTENWERDER
Dove - Elbe
Rathebrucke
Dove - Elbe

Kattwykbrucke

MO
Su
de

O
re

RW
lbe

ER
Suderelbbrucken

DE
R
Harburg
0 3000

metres
Oorkaten
Eastern Port Limit
© Shipping Guides Ltd, Reigate, United Kingdom

Radio Reporting Points

HAMBURG GERMANY

187m

34m 92m

36
m 11m
110m 125m 69m
41.95m 24m 26.6m
81.5m 48.5m Berth No. 2
Berth No. 3 23m

30m 30m 22m 41m 37.8m 37.8m Berth No. 1


85,000 dwt 4m 4m 6m 85,000 dwt
200,000 dwt 200,000 dwt
7m

85,
30.

20m

000
5m

dw
t
25.

RETHE

HAMBURG
VOPAK

© Shipping Guides Ltd, Reigate, United Kingdom

VOPAK
P765
HAMBURG GERMANY
N

11.5

HAMBURG
VOPAK

BERTH No. 4

Max. length 210m


Max. draft 13.3m
60,000 dwt
6m
r7
11.5 nde
Fe

Rethe

© Shipping Guides Ltd, Reigate, United Kingdom

VOPAK Berth No. 4

HAMBURG GERMANY

WEST

3
2 4 1 1 3 2

2 4 1
1 3 2
3

EAST

HAMBURG
KATTWYKHAFEN

SHELL BERTH

© Shipping Guides Ltd, Reigate, United Kingdom

Kattwykhafen Shell Berth


P766
HAMBURG GERMANY

HAMBURG
KOEHLFEETHAFEN - BOMINFLOT

Up to 95,000 dwt

North Berth

3 1 1 3 2

South Berth

Up to 70,000 dwt

© Shipping Guides Ltd, Reigate, United Kingdom

Koehlfeethafen

HAMBURG GERMANY
2
2
Berth 3

3
3
4

1
HAMBURG

1
SEEHAFEN IV

SEEHAFEN IV

Berth No. 6
1

1
4

© Shipping Guides Ltd, Reigate, United Kingdom


3

Berth 1
2

Seehafen
P767
HOLTENAU GERMANY
X

Road Bridge
aaaaaaaaaaaaaaaaaaaaaaaaaaaaa Inner Harbour Assembly Area aaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaa Floating aaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaa Container Pier aaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaa

KIEL – NORTH PORT


KIEL – NORTH PORT

X
HOLTENAU ROADS

HOLTENAU
y
LOCKS AND PORT INSTALLATIONS Qua
nau
Holte

Drainage Channel aaaaaaaaaaaaaaaaaaaaaa


Yacht Harbour
aaaaaaaaaaaaaaaaaaaaaa APPROACHES
aaaaaaaaaaaaaaaaaaaaaa KIEL CANAL
X
ocks
Old L

aaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaa

Limit of Lock Area


FORE PORT
rr y
a
re

r Fe
ck A

aaaaaaaaaaaaaaaaa
nge

aaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaa
of Lo

New Locks
INNER HARBOUR aaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaa
se

aaaaaaaaaaaaaaaa
Pas
Limit

Nor th Mole
X 10

© Shipping Guides Ltd., Reigate, United Kingdom Kiel

Layout

ITZEHOE GERMANY

ITZEHOE

aaaaaaaaaaaaaaaaaaaaaa lb
e
aaaaaaaaaaaaaaaaaaaaaa rE
aaaaaaaaaaaaaaaaaaaaaa ve
River Stor
aaaaaaaaaaaaaaaaaaaaaa To
Ri
60 m.

m .
00
-2 .
cle m
g C ir e 8 5
n in Siz
Tur Max. aaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaa 6 ton Crane 3.5 ton Crane
aaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaa
Conveyor Belt
Conveyor Belt

aaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaa

Harbour Master Silo Silo

© Shipping Guides Ltd., Reigate, United Kingdom

Layout
P768
HOLTENAU N

KIEL
KIEL

Alte Schleuse

Kiel Canal entrance


Alte Schleuse
Kiel Canal Neue Schleuse
Neue Schleuse
Nordmole
SCHEERHAFEN

E
OSTSEEKAI Tanker Jetty

30
RD

Ro
-
Ro
R FO
LE
Nor
dm ole

KIE
8 WIK
o2
-R
Ro
Tanker Berth

Scheerhafen Ro-Ro 27

KIEL
0 0.25 0.5 n.m.

0 300
metres

i
lo -Ka
Os
feld
Ro-Ro 6

Layout
Layout

Vor
KIEL Seegartenbrucke Ro-Ro 7
Ro-Ro 4
DUSTERNBROOK
Ro-Ro 1
0 300 Ro-Ro 8
Ro-Ro 2
metres

NORDHAFEN Ro-Ro 30
Ro-Ro 29
Kn Ro-Ro 28
oo
pe Ro-Ro 27
rL
an KIEL
ds
tr.
Sartorikai
Schwedenkai
Ro-Ro 25 WELLINGDORF
Ro-Ro 34
Ro-Ro 33 Kiel Canal Ro-Ro 23 Howaldtswerke-Deutsche Werft
Shipyard
Nordhafen 2
Ro-Ro 21
Ro-Ro 22

Nordhafen 1

0 300
metres
© Shipping Guides Ltd, Reigate, United Kingdom © Shipping Guides Ltd, Reigate, United Kingdom
GERMANY
GERMANY

P769
P770
KIEL
KIEL

KIEL
STADTHAFEN
Depths in metres

Ro-Ro 5

ai
10

rik
r to
Ro-Ro 6

Sa
Ro-Ro 7
i
n ka
e de
hw 10
Sc Ro-Ro 4

Ro-Ro 25

rd 11
Port Authority No
kai
Kiel rn 12
o
Ro

llh
-R

Bo 10
o

10
1

14
Ro
-R
o
3

Ro-Ro 23

Stadthafen
Ostuferhafen

i
21

ka

Sud
10

g en
-R

kai
we
Ro

Nor

hor n
Boll
Ro-Ro 8
Ro-Ro 22 Scrap

Germ
ania
hafe
n
Grain
Berth 9A

i
t Ufe

fska
nd
Grain

nho
-Bra

Bah
Berth 9B

Willy
KIEL
OSTUFERHAFEN

© Shipping Guides Ltd, Reigate, United Kingdom © Shipping Guides Ltd, Reigate, United Kingdom
GERMANY
GERMANY
KIEL CANAL GERMANY

Baltic Sea
Rade

RENDSBURG 70
35 60 75
30 Oldenbuttel 65 Sehestedt
40
Grunenthal 55 Nobiskrug
50 80
25 Fischerhutte Rusterbergen
Breiholz
20 Hohenhorn 85
Hochdonn
Levensau
Holtenau
15 Landwehr 90
BRUNSBUTTEL 10 Hochdonn 98km
5km
Burg
Ostermoor

KIEL
River Elbe

KIEL CANAL

© Shipping Guides Ltd, Reigate, United Kingdom

Kiel Canal

LUBECK GERMANY
Nordwestdeutsche
Kraftwerke

Metal Works
Lehmann Kai IV

HERRENWYK
Dia. 200m
Turning
Circle

Lehmann Kai I

Seeland Kai

Lehmann Kai II

ai III
ann K
Lehm
CTL

Hochofenhafen

9.5m
9.5m

Flenderwerft
GOTHMUND

Dock

Schlutuper Wiek
Herren
Bridge

Ro/Ro

SCHLUTUP
Breitling

NORDGETREIDE
LUBECK

© Shipping Guides Ltd., Reigate, United Kingdom


Nordgetreide

Nordgetreide
P771
LUBECK GERMANY

LUBECK
LAGERHAUS

Vi
W eh
all of
ha ka
Ku fen i Ro/Ro
len 5
Be am k Lagerhaus 8m
hn p
1 ka kai 8m Sigoka
i
Ha i 9.5m
ns Vorwerker Hafen
2 ah 8m
afe
3 n
8m Ro/Ro 6 9.5m Ro/Ro 2
4 1
8m rhafen 2 Ro/Ro 1 8.7m
Hanse Kai Burgto 3 8m 4
5 4 Nordlandkai
Burgtorkai 5 Ro/Ro
6
River Police 6
7
8 7 Crane
8

10 River Trave
11 10m
Konstinkai
12 Umschlaghafen
13
14
15

3.5m

Cranes

© Shipping Guides Ltd., Reigate, United Kingdom

Lagerhaus

LUBECK GERMANY
Police

23 M.
Berths

Radar
Ferry
Harbour
Fishing

24 M.
Depth 10m
Dia. 345m

10m
Turning
Circle

6a

7 7a
25m

6
Marina

Berths
5

Ferry

8
4
3
Terminal
Bunkering

Ferry

SKANDINAVIENKAI
Station

TRAVEMUNDE
LUBECK
Railway
Station

© Shipping Guides Ltd., Reigate, United Kingdom

Travemunde
P772
N

BLEXEN
NEUSS

NEUSS

NORDENHAM
Kronos Titan Power Station

Ferry Terminal fen


i nha
Rhe
Petrotank
RIVER RHEIN

EINSWARDEN
Ro-Ro

Terminal Blexen Ro-Ro


Ro-Ro

BLEXERSANDE
Con
t
aine
Aut
om

r Te
rm
obil

Stuhrenberg Transporte
inal
e Te

Weser-Metall
rmin
al

n
afe
inh
Rhe
Hafen
be

Layout
Layout
cke
n5

Norddeutsche
Ha

Seekabelwerke
fen
be
cke
n4

H
afe

Terminal Blexen Bulk


n
be
cke
n3

NORDENHAM Timber Terminal


NORDENHAM
Oil Berth
No. 1
Haf
enb
ecke

Haf
2 n

enb
ecke
n1

Harbour
Office

© Shipping Guides Ltd, Reigate, United Kingdom © Shipping Guides Ltd, Reigate, United Kingdom
GERMANY
GERMANY

P773
NORDENHAM GERMANY

N
NORDENHAM
RHENUS MIDGARD QUAY
0 50 100 150m

Port
Office
West Shed

Weigh
Bridge
Open Storage

North Shed
ation
Railway St
Open Storage
Workshops Open Storage

Open Storage Open Storage Open Storage


South Shed Open Storage

Open Storage Open Storage


Open Storage

Planned
Ro-Ro

© Shipping Guides Ltd, Reigate, United Kingdom

Rhenus Midgard Quay Rhenus Midgard GmbH and Co. KG

NORDENHAM GERMANY
N
Storage
Area

NORDENHAM
Conveyor

TERMINAL BLEXEN
0 50 100 150m

yor
nve
Co

Ro-Ro

© Shipping Guides Ltd, Reigate, United Kingdom

Terminal Blexen Rhenus Midgard GmbH and Co. KG


P774
OLDENBURG GERMANY

3.
0
km
OLDENBURG

.
LAYOUT
t OHU
or
tp
E as ra
t
tty Ve
Je

Rh
ei
n
ole

n-
2.

Um
Th

0
km

sc
.

hl
ag
PetroTank
AGRAVIS

1.0 km
te

.
STAU River Hun
Jetty
Pier benstr
Yacht Port North Jetty Dal
OHU
0.

AGRAVIS
0

South Por t
km

schlag
Jetty Rhein-Um

© Shipping Guides Ltd, Reigate, United Kingdom

Layout

PAPENBURG GERMANY
To North Sea

Ems

PAPENBURG
Am Nordhafen

Port Authority
Vorhafen Office Marina
Hafen
l
na
Ka
s
Em

235m
d–

Sielka
un

Werfthafen nal
rtm

130m
Do

158m
Drydock

Water Protection Police


Ind

De
ust

ve
ieh

rh
afe
afe

Building Dock 1
n
nS
ou
th

Building Dock 2

0 500

metres
© Shipping Guides Ltd, Reigate, United Kingdom

Layout
P775
RENDSBURG GERMANY

aaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaa
Shell Oil
aaaaaaaaaaaaaaa
aaaaaaaaaaaaaaa
aaaaaaaaaaaaaaa
aaaaaaaaaaaaaaa
Turning
Circle
Nobiskrug Repair
Yard

RENDSBURG
Power Cables
(40m)

Kreishafen Quay

Werfthafen

Dredged Channel
Bridge (40m)

0 1,000
metres

© Shipping Guides Ltd, Reigate, United Kingdom Plan Supplied by Ship's Master
Layout

ROSTOCK GERMANY
N

37
Pier 2 6
46 36 Chemical
55
Basin B Pier 3 18N Oil Harbour Harbour
Pier 1
Basin A
25 7
67
45 35
Coal Terminal Basin C Pier 4 1 4
54 18 3 5
14
66
24
44 2
34

17
53 23
Fahr 43 13
Terminal 33
65
42
52 12
32 22 16

10
41
64 31
21
51 50
30
K6

63

62
Paper
ROSTOCK
Terminal
61
SEEHAFEN ROSTOCK
Ro-Ro and
Container
60 Terminal 0 500m

© Shipping Guides Ltd, Reigate, United Kingdom

Layout
P776
STRALSUND GERMANY

Northern
Entrance East Mole

Eastern
Entrance

North Mole STRALSUND

4 16
3
15
Fischbrucke
te

Steinerne
tkis

14
8 9 nkai
wede
llas

2 6 13 r Sch
Neue
Ba

7 10
Hansaka Alter Schw 11 12
eden kai

Depth of Water: 8m
Length of Quays: 1,500m
Area of Port: 150,000 sq.m
Postition: 54° 19’ N
13° 06’ E
0 500

metres

© Shipping Guides Ltd., Reigate, United Kingdom

Layout

WILHELMSHAVEN GERMANY

JADEBUSEN
N

Niedersachsenbrucke Jetty

NWO Jetty
Container Terminal
WRG Oil Jetty Island

Jadeweser Port
Site of future
1 and 1A
Voslapper Groden Jetty (INEOS)

WILHELMSHAVEN
2 and 3
WRG Oil Jetty
DFTG Gas Jetty
Site of future
1
3

WILHELSMSHAVEN
2

2,000m
OUTER BERTHS

© Shipping Guides Ltd, Reigate, United Kingdom


1,000
Sea Lock

INEOS

0
Hooksiel

Outer Berths
P777
N °
7.8
20

P778
d e

Berth 1
100m

WILHELMSHAVEN
WILHELMSHAVEN

Works Office
Westkaje
Connecting Bridge Vorhafen
Berth 2 Berth 3
WILHELMSHAVEN
Ostkaje

200m

Approach Bridge
c b Sea
Lock
Installation Bridge
Braunschweigkai
Instandsetzungskaje

Luneburgkai

r Limits
Nordhafen
Positions
a 53°38’01”N

Harbou
08°05’47”E Deviation Buoy
rkai Oldenburgkai

b 53°38’14”N
ove

08°06’40”E
ann

c 53°38’35”N

Inner Harbour
H

08°06’18”E Transport Bridge Arsenal-


d 53°38’42”N hafen
08°06’37”E
e 53°38’16”N
08°07’04”E Hafenkanal 6.2m

INEOS Transhipment Jetty


Ausrustungshafen
f 53°37’58”N

n
afe
sh
ng
du
r bin
Ve
Al

Fluthafen
ter
V

9m
or
ha
fen

a f

DFTG ICI WILHELMSHAVEN


INNER HARBOUR
WILHELMSHAVEN 0 0.5nm

INEOS TRANSHIPMENT JETTY


0 200
metres
© Shipping Guides Ltd, Reigate, United Kingdom © Shipping Guides Ltd, Reigate, United Kingdom
GERMANY
GERMANY
WILHELMSHAVEN GERMANY

WILHELMSHAVEN
INEOS JETTY, BERTH 2
MOORING PLAN

Branch 2

P7 P8 P9 P10

Berth 2

Berth 2
400 - 3,000 dwt 3,000 - 12,000 dwt Ships of 120m to 137m in length and more
3 Head and Stern Lines 3 Head and Stern Lines than 7,000 dwt require 1 additional spring
2 Breast Lines Fore and Aft 2 Breast Lines Fore and Aft both fore and aft (available from shore)
1 Spring Fore and Aft 2 Spring Fore and Aft

© Shipping Guides Ltd, Reigate, United Kingdom

INEOS Jetty - Berth No. 2

WILHELMSHAVEN GERMANY

P5 P6

Branch 3

P11 P12 P13 P14

Berth 3

WILHELMSHAVEN
Berth 3
400 - 3000 dwt 3,000 - 12,000 dwt INEOS JETTY, BERTH 3 Ships of 120m to 137m in length and more
3 Head and Stern lines 3 Head and Stern lines MOORING PLAN than 7,000 dwt require 1 additional spring
2 Breast lines Fore and Aft 2 Breast lines Fore and Aft both fore and aft (available from shore)
1 Spring Fore and Aft 2 Springs Fore and Aft

© Shipping Guides Ltd, Reigate, United Kingdom

INEOS Jetty - Berth No. 3


P779
P780
WILHELMSHAVEN WILHELMSHAVEN
WRG OIL
WRG PORT AREA
RANGE OF EXCLUSION ZONES
AROUND JETTIES 1 AND 1A
Distances in metres
90m
67m

WILHELMSHAVEN
WILHELMSHAVEN

54m Jetty 1/1A


40m A 53°37’30”N 8°08’17”E
B B 53°37’34”N 8°08’33”E
C 53°37’21”N 8°08’44”E
D 53°37’16”N 8°08’28”E
D

150
150
A
Jetty 2/3
A 53°37’22”N 8°07’20”E
B 53°37’28”N 8°07’40”E
C 53°37’11”N 8°07’53”E
D 53°37’05”N 8°07’53”E

Jetty 1a Jetty 1

Max. 45,000 dwt


C

Max. 250,000 dwt


WRG Port Area

WRG Oil - 1 and 1A


B
145

40m
54m
Danger Zone 1 D
Danger Zone 2
200

145

67m
200

Access Jetty

90m
A
Danger Zone 1

Danger Zone 2 50
1,020m to Jetty 2/3
50

Port Area

Border of port area


Voslapp UF

© Shipping Guides Ltd, Reigate, United Kingdom © Shipping Guides Ltd, Reigate, United Kingdom
GERMANY
GERMANY
WILHELMSHAVEN GERMANY

160m
195.92m

Jetty 1/1A
1020m
65m
Jetty 2

49m
Max. 11,000 dwt
RANGE OF EXCLUSION ZONES
WILHELMSHAVEN

AROUND JETTIES 2 AND 3

Max. 8,000 dwt


Danger Zone 1
WRG OIL

150m
Jetty 3
Danger Zone 2

49m
65m

Pump House

105.8m

© Shipping Guides Ltd, Reigate, United Kingdom


Dyke

WRG Oil - 2 and 3

WILHELMSHAVEN GERMANY

Floodtide
160,000 dwt (LOA 350m max.)

45,000 dwt – 160,000 dwt (LOA 165m – 350m)

Ebbtide 15,000 dwt – 45,000 dwt (LOA 165m – 350m)

Jetty 1
P7 P8
A1 B1 D1 D2 B2 A2

C1 Jetty 1A C1

Berth 1 - 15,000 – 45,000 dwt


for Emergency use
1 Shore wire with 110 tons SWL
is available on dolphins B1 and B2

Alternatively 2 wires/atlas lines with 35 tons SWL


and 1 additional ropes is accepted
Berth 1a - 5,000 – 45,000 dwt
Mixed moorings are not allowed 5,000 dwt – 45,000 dwt (LOA = 100m – 230m) for Emergency use
1 Shore wire with 66 tons SWL
is available on dolphins B1 and B2
Berth 1 - 45,000 – 160,000 dwt
for Emergency use
Alternatively 2 wires/atlas lines with 35 tons SWL
1 Shore wire with 110 tons SWL
and 1 additional ropes is accepted
is available on dolphins B1 and B2
Mixed moorings are not allowed
Alternatively 2 wires with 75 tons SWL and
2 additional ropes is accepted
WILHELMSHAVEN
Alternatively 3 wires with 50 tons SWL and WRG OIL - JETTIES 1 AND 1A
1 additional rope is accepted
MOORING PLAN
Berth 1 - 160,000 dwt (max)
for Emergency use
1 Shore wire with 110 tons SWL
is available on dolphins B1 and B2

© Shipping Guides Ltd, Reigate, United Kingdom

WRG Oil - Jetties 1 and 1A Mooring Plan


P781
WILHELMSHAVEN WILHELMSHAVEN

P782
WRG OIL WRG OIL
LOADING ARMS ON JETTY 1 LOADING ARMS ON JETTY 1A
Details of: Loading arm designation
Details of: Loading arm designation
Loading arm diameter
Loading arm diameter
Maximum loading capacity per arm
Maximum loading capacity per arm
Load type and transhipment medium
Load type and transhipment medium

WILHELMSHAVEN
WILHELMSHAVEN

Export Gasoline component - 1,200 Gasoline export. - 950


Export Middle distillate - 2,400 Gasoline and - 550
16 in. Import Middle distillate - 1,200 Gasoline Component import - 950 10 in.
MA - 5405 A MA - 5409
Loading arm 5A Loading arm 9

Export Gasoline - 1,200 Gasoline and - 1,200


Import Gasoline - 2,400 Gasoline Component export
16 in. Import Crude Oil - 4,000 Middle distillate - 1,200 12 in.
MA - 5401 MA - 5410
Loading arm 1 Loading arm 10

Import Crude Oil - 4,000 Gasoline Component export - 1,200


Ballast Water - 800 Middle distillate - 1,200
16 in. 12 in.
MA - 5402 MA - 5411
Loading arm 2 Loading arm 11

Export Heavy Fuel Oil - 3,200 Gasoline and - 550


Import Crude Oil - 4,000 Gasoline Component import - 950
16 in. Middle Distillate - 1,200 12 in.
MA - 5403 Ballast Water - 800 MA - 5406
Loading arm 3 Loading arm 6

WRG Oil - Jetty 1


WRG Oil - Jetty 1A
See
Export Heavy Fuel Oil - 3,200 Heavy Fuel Oil export. - 2,600
Notes
Import Crude Oil - 4,000 Heavy Fuel Oil import. - 800
16 in. 12 in
MA - 5404 MA - 5407
Loading arm 4 Loading arm 7

See
Heavy Fuel Oil export - 2,600
NOT IN USE Notes
10 in. 12 in.
MA - 5405 MA - 5408
Loading arm 5 Loading arm 8

Not in Use

8 in.
Notes MA - 5412
Loading arm 12
All pumping rates are cubic metres per hour
When heavy fuel oil is being loaded via loading arms 3 and 4 simultaneously,
the total amount must not exceed 3,200

If crude is being discharged, the total capacity of each loading arm should not be exceeded Note
All pumping rates are cubic metres per hour

The capacity of the shore pump with medium viscosity distillate and gasoline is 2,400 When Heavy fuel oil is being loaded via arms 7 and 8 simultaneously,
the total amount of 3,200 (shore pump capacity) cannot be exceeded

Loading Arms
Loading Arms

© Shipping Guides Ltd, Reigate, United Kingdom © Shipping Guides Ltd, Reigate, United Kingdom
GERMANY
GERMANY
WILHELMSHAVEN GERMANY

WILHELMSHAVEN
WRG OIL JETTIES 2 AND 3

3,000 dwt to 11,000 dwt (LOA = 135m max.)

G G
Jetty 2
H1 H3 I2 I4

I1
I3
Jetty 3

G G

300 dwt – 3,000 dwt (LOA = 135m max.)

Jetty 2 Jetty 3
3,000 dwt to 11,000 dwt 300 dwt to 3,000 dwt
For Emergency Use Bunkering boats and small tankers up to 1,000 dwt are allowed 2 bow
1 Shore wire with 30 tons SWL is available on dolphins H3 and I2 and stern lines and 1 forward and aft spring line.

LPG Tankers have to use synthetic fibre line

© Shipping Guides Ltd, Reigate, United Kingdom

WRG Oil - Jetties 2 and 3

WILHELMSHAVEN GERMANY
- 550/950
- 550/950
- 1,300

Export Gasoline Component - 1,200

- 1,200

- 1,200
- 800

- 950

Export Middle Distillate

Export Middle Distillate


Export Heavy Fuel Oil

Export Gasoline
Import Gasoline
Ballast Water

10 in. Gasoline

All pumping rates are cubic metres per hour


10 in.

10 in.

10 in.

10 in.

10 in.
WILHELMSHAVEN

LOADING ARMS JETTY 2


WRG OIL

Note
Loading arm 17

Loading arm 18

Loading arm 14

Loading arm 13

Loading arm 16

Loading arm 15

© Shipping Guides Ltd, Reigate, United Kingdom


MA - 5417

MA - 5418

MA - 5414

MA - 5416

MA - 5415
MA - 543

WRG Oil - Jetty 2


P783
P784
WILHELMSHAVEN
WRG OIL
LW
LOADING ARMS JETTY 3

WILHELMSHAVEN
WILHELMSHAVEN

242.3m

Tidal current up to 4 knots.


Approx 3.5m

Pier orientation 341°(T) Middle Distillate Export - 550


4
8 in.
MA - 5424
Loading arm 24
HW

Middle distillate export - 550


Gasoline and
Gasoline component import - 550 8 in.
MA - 5423
Ballast Water - 800
Loading arm 23

442.5m
Gasoline export - 950
10 in.
MA - 5421
Loading arm 21

1,207.3m MTBE Import - 550


8 in.

NWO Jetty
MA - 5420
WILHELMSHAVEN Loading arm 20

WRG Oil - Jetty 3


NWO JETTY 2
Propane Export - 400
Butane - 400
Pier Master on duty day and night must be Propane Import - 150 6 in.
Butane - 100 MA - 5422
informed immediately about unusual incidents
Loading arm 22
Alarm: If shore horn is sounding - Stop cargo pumps at once

315.0m
4 in.

Gas Flare Line

3 1

Notes: Berth No. 1 Note


Strong Ebb current 2 hrs. after HW. 207.0m All pumping rates are Cubic Metres per hour
Strong load on breast wires, check
winch brakes for max. holding capacity The import quantity depends on the temperature of the loading product.
The load must not be colder than –10° C

© Shipping Guides Ltd, Reigate, United Kingdom © Shipping Guides Ltd, Reigate, United Kingdom
GERMANY
GERMANY
53° 54’ N
Jade (sea) Side Shore Side

WISMAR
Portal crane removed to Lueneburgkai
WILHELMSHAVEN

WENDORF
Crane
159
.5°

© Shipping Guides Ltd, Reigate, United Kingdom


14

Wendorf
9.9

Rear Light
°

Dr
y
+ 7.49

Do
+ 5.06

ck
+ 1.46
0
- 1.98 2,000 dwt
30.0
190,000 dwt 30,000 dwt

LP1

LP2

Wismar
Tanker Berth

LP3

11° 27’ E
11° 27’ E

Layout
LP4
Timber
Terminal
Westh
afen

Basin
Turning
LP5

LP
Planned Deep Water Berth Extension

19
Niedersachsenbrucke

Grain
25.0 300.0 166.15

Terminal

LP
LP6

LP
LP
18
LP1

20
3
11
Outer Side

LP10
Shiploader

LP20
LP7
32/40 t

7
Alt
er
190,000 dwt

LP11

LP1 LP14
Ha

LP8
fen
30

LP12

LP1
8/25t

LP9

5
2,000 dwt 1,000 dwt

0
Transport
Bridge Works Office 30,000 dwt

Ro-Ro
Inner Side

Pipe Conduit

200
metres
30.0
WILHELMSHAVEN
Depths in metres
WISMAR
NIEDERSACHSENBRUCKE
400
LOWER SAXONY BRIDGE
CARGO HANDLING FACILITIES AND BERTHING PLAN
Dimensions in metres

53° 54’ N
© Shipping Guides Ltd, Reigate, United Kingdom
GERMANY