DENSITY TEST (BY SAND REPLACEMENT METHOD)
Project Date of Sampling
Contractor Date of Testing
Area/Building Ref Dwg No
Location/Grid Layer/Level
Layer N o: M.D.D. :
Trial No 1 2 3 4 5 6
Container No.
Weight of wet soil + Container(gm)
Weight of Dry s oil + Co ntainer(gm)
Weight of water (gm)
Weight of Dry S oil (gm)
Wt. of container (gm)
Moisture Content (%)
Dry Density (Yd) = y/{1+Wc/100} (gm/cc)
Degree of Compaction = (Yd/Ydmax)× 100 (%)
Average Degree of compaction
Acceptance Criteria
REMARKS: Accepted/ Rejected/ Accepted with comments
TBPL ITC
Date & Time Date & Time
FIELD DENSITY TEST (BY CORE CUTTER METHOD)
Project Date of Sampling
Contractor Date of Testing
Area/Building Ref Dwg No
Location/Grid Layer/Level
Layer N o: M.D.D. :
Trial No 1 2 3 4 5 6
TBPL ITC
Date & Time Date & Time
SIEVE ANALYSIS OF COARSE AGGREGATE (20MM)
Project Date of Sampling
Contractor Date of Testing
Source/Location Qty of Sample
Vehicle no. Tested by
40 100
20 85-100
10 0-20
4.75 0-5
P AN
TBPL ITC
Date & Time Date & Time
SIEVE ANALYSIS OF COARSE AGGREGATE (10MM)
Project Date of Sampling
Contractor Date of Testing
Source/Location Qty of Sample
Vehicle no. Tested by
IS S IEV E SIZE WEIGH T % WEIG HT CUM ULATIVE % PAS SING LIM ITS AS P ER IS
(MM ) RETAINED RETAIN ED % RETA INED
12.5 100
10 85-100
4.75 0-20
2.36 0-5
P AN
TBPL ITC
Date & Time Date & Time
SIEVE ANALYSIS OF FINE AGGREGATE
Project Date of Sampling
Contractor Date of Testing
Source/Location Qty of Sample
Vehicle no. Tested by
%
P ASS ING (as per IS )
WEIG HT % WEIG HT CUM ULATIVE LIMITS
IS S IEV E SIZE RETAIN ED AS
(G MS) RETAIN ED % RETA INED PER IS
As per Zone-I Zone-II Zone- III Zone-IV
Tes t
10MM 100 100 100 100
TBPL ITC
Date & Time Date & Time
FLAKINESS/ELONGATION INDEX OF COARSE AGGREGATE
Project Date of Sampling
Contractor Date of Testing
Source/Location Qty of Sample
Vehicle no. Tested by
IS SIEVE S IZE
(MM) S IZE O F AGG REG ATE
Weight of Aggregate Retained Weight of A ggregate Retained
Between Gauge Remarks
Between Gauge (gm) W (gm) W
S . No. Pass ing Retained
1 31.5 25
2 25 20
3 20 16
4 16 12.5
5 12.5 10
6 10 6.3
Total Weight
Contractor ITC
Date & Time Date & Time
SIEVE ANALYSIS OF GSB (Granular Sub-base)
Project Date of Sampling
Contractor Date of Testing
Source/Location Qty of Sample
Vehicle no. Tested by
53 100
26.5 70-100
9.5 50-80
4.75 40-65
2.36 30-50
0.425 15-25
0.075 3-10
TBPL ITC
Date & Time Date & Time
SIEVE ANALYSIS OF WMM (Wet Mix Macadam)
Project Date of Sampling
Contractor Date of Testing
Source/Location Qty of Sample
Vehicle no. Tested by
53 100
45 95-100
22.4 60-80
11.2 40-60
4.75 25-40
2.36 15-30
0.600 8-22
0.075 0-5
TBPL ITC
Date & Time Date & Time
AGGREGATE IMPACT VALUE
Project Date of Sampling
Contractor Date of Testing
Source/Location Qty of Sample
Vehicle no. Tested by
N os of Blows- Height of F all-
Sieve range -10MM to 12.5M M 15 380MM
TBPL ITC
Date & Time Date & Time