No of boxes on thurst bed (only one box being pushed) 1.00 Nos
Length of RCC cutting edge at top L.ce.c.t 1.40 m
Length of Steel cutting edge at top L.ce.s.t 1.10 m
Length of cutting edge at top =L.ce.c.t+L.ce.s.t L.ce.t 2.50 m
Length of cutting edge at bottom L.ce.b 0.50 m
Av length of cutting edge for side =0.5(L.ce.t+L.ce.b) 1.50 m
Length of intermediate cover L.ic 1.00 m
Dist of road from slope edge (No road) 6.00 m
Thrust Bed 1
DESIGN OF THURST BED FOR RVNL, KOLKATA
Rated jack capacity (bundle of 2 jacks per pin) 300.00 T
Design Jack capacity (bundle of 2 jacks per pin) @ 90% Jk.cap 270.00 T
Jack base dia+2xScreed D.jk 0.50 m
Conc. Grade Fck M 40 Mpa
Steel Fy Fe 500 Mpa
2.0 Soil Properties
Thrust Bed 2
DESIGN OF THURST BED FOR RVNL, KOLKATA
4.0 Frictional Load Calculations
C D
Earth pressure at top of Box = Ko . Y.s (GL.s - RL.tb+h.v) EP.t 4.47 T/sqm
Earth pressure at bottom of Box = Ko . Y.s (GL.s - RL.bb+h.v) EP.b 11.54 T/sqm
Area of side wall of box = CD . OH.box A.b.s 59.54 sqm
Area of cutting edge of first box = EG . OH.box/2 A.ce.s 7.35 sqm
Earth pressure on CDGF = (EP.t + EP.b) A,bs / 2 476.51 T (A)
Earth Pressure on Cutting Edge side = EP.t + EP.b) A,bs / 2 50.18 T (B)
Total earth pressure on one side 526.69 T (A+B)
Weight of soil above box =( L.s1 + L.ce.t - dbb) W.b (GL.s - RL.tb+h.v). Ys 1324.78 T (C)
Weight of box+soil over it =Wt.s1 + C 2331.55 T (D)
Frictional forces
Sides = 2 d.b (A+B) 401.54 T (E)
Top = Tan f.b . C 805.48 T (F)
Bottom = Tan f.b . D 1417.61 T (G)
Total/box =E+F+G 2624.63 T
Total 2624.63 T TBF.S1
C D
Earth pressure at top of Box = Ko . Y.s (GL.s - RL.tb+h.v) EP.t 4.47 T/sqm
Earth pressure at bottom of Box = Ko . Y.s (GL.s - RL.bb+h.v) EP.b 11.54 T/sqm
Area of side wall of box = CD . OH.box A.b.s 66.89 sqm
Area of cutting edge of first box = EG . OH.box/2 A.ce.s 14.70 sqm
Earth pressure on CDGF = (EP.t + EP.b) A,bs / 2 535.34 T (A)
Earth Pressure on Cutting Edge side = EP.t + EP.b) A.ce.s / 2 100.35 T (B)
Total earth pressure on one side 635.69 T (A+B)
Weight of soil + vehicle above box =WS.1 + (L.s1+L.ce.t) W.b h.v Y.s 1534.28 T (C)
Weight of box+vehicle+soil over it =Wt.s1 + C + + (L.s1+L.ce.t) W.b h.v Y.s 2541.06 T (D)
Frictional forces
Sides = 2 d.b (A+B) 484.65 T (E)
Top = Tan f.b . C 932.86 T (F)
Bottom = Tan f.b . D 1544.99 T (G)
Total/box =E+F+G 2962.49 T
Total 2962.49 T Tbf.s21
Thrust Bed 3
DESIGN OF THURST BED FOR RVNL, KOLKATA
4.5 Stage three - First segment at highest earth cushion
C D
Earth pressure at top of Box = Ko . Y.s (GL.m - RL.tb) EP.t 4.54150535 T/sqm
Earth pressure at bottom of Box = Ko . Y.s (GL.s - RL.bb) EP.b 11.6045744 T/sqm
Area of side wall of box = CD . OH.box A.b.s 66.885 sqm
Area of cutting edge of first box = EG . OH.box/2 A.ce.s 14.7 sqm
Earth pressure on CDGF = (EP.t + EP.b) A,bs / 2 539.97 T (A)
Earth Pressure on Cutting Edge side = EP.t + EP.b) A,bs / 2 101.37 T (B)
Total earth pressure on one side 641.33 T (A+B)
Weight of soil above box =( L.s1 + L.ce.t - dbb) W.b (GL.s - RL.tb). Ys 1138.68 T (C)
Weight of box+soil over it =Wt.s1 + C 2145.45 T (D)
Frictional forces
Sides = 2 d.b (A+B) 488.95 T (E)
Top = Tan f.b . C 692.33 T (F)
Bottom = Tan f.b . D 1304.46 T (G)
Total/box =E+F+G 2485.73 T
Total 2485.73 T
Earth pressure at top of Box = Ko . Y.s (GL.s - RL.tb) EP.t 3.31916198 T/sqm
Earth pressure at bottom of Box = Ko . Y.s (GL.s - RL.bb) EP.b 10.382231 T/sqm C D
Area of side wall of box = CD . OH.box A.b.s 71.3 sqm
Earth pressure on CDGF = (EP.t + EP.b) A,bs / 2 488.42 T (A)
Total earth pressure on one side 488.42 T (A)
Weight of soil above box =L.s2 . W.b (GL.s - RL.tb). Ys 995.06 T (C)
Weight of box+soil over it =Wt.s2 + C 2041.45 T (D)
Frictional forces
Sides = 2 d.b (A+B) 372.37 T (E)
Top = Tan f.b . C 605.01 T (F)
Bottom = Tan f.b . D 1241.22 T (G)
Total/box =E+F+G 2218.60 T
Total 2218.60 T
FOS 1.55
Effective resistance 1427.23 T
Force on Thurst Bed 1058.51 T TBF.S3
5.0 Checking of Thurst Bed Against Sliding
5.1 Friction due to weight of thrust bed
Total force on thurst bed (Max TBF-S1, S2 & S3) 2624.63 T TBF
Force carried by thurst bed (Normal) 2624.63 T with skew effect
Force carried by thurst bed (Lateral) 0.00 T
No of jacks required =TBF/Jk.cap 9.72 Nos
Provide N.jk 10 Nos
Thrust Bed 4
DESIGN OF THURST BED FOR RVNL, KOLKATA
Pockets
Length L.p 0.37 m (From drawing)
Width W.p 0.67 m (From drawing)
Depth Main D.p1 0.80 m (From drawing)
Depth Air pushing D.p2 0.45 m (From drawing)
Nos along length Main bed N.p1 15 Nos (From drawing)
Air pushing N.p2 13 Nos (From drawing)
Main bed
Spacing along length Psm.l 1.60 m (From drawing)
Nos along width N.p3 = N.jk 10 Nos
Spacing along width Psm.w 1.55 m (From drawing)
Air pushing bed
Spacing along length Psa.l 2.00 m (From drawing)
Nos along width N.p4 5 Nos
Spacing along width Psa.w 3.10 m (From drawing)
End Shear Keys
Ht of surcharge 0.00 m (From drawing)
Depth below main bed D.sk 1.10 m (From drawing)
Width at base W.sk 0.75 m (From drawing)
Width at bottom of bed 0.75 m (From drawing)
Width at top 0.75 m (From drawing)
Intermediate shear keys
Depth below main bed D.sk 1.10 m (From drawing)
Width at base W.sk 0.75 m (From drawing)
Width at top 0.75 m (From drawing)
Nos N.sk 4.00 Nos
Volume of main bed =A.tb1 . T.tb1 570.22 (A)
Volume of air pushing bed =A.tb2 . T.tb2 475.72 (B)
Volume of Pockets in main bed =L.p . W.p . D.p1 . N.p1.N.p3 29.75 (C)
Volume of Pockets in air pushing bed =L.p . W.p . D.p1 . N.p2.N.p4 7.25 (D)
Volume of bed - pockets =(A)+(B)-(C)-(D) 1008.94 cum (E)
Volume of keys =W.tb . D.sk . W.sk . (2 + N.sk) 92.57 cum (F)
Thrust Bed 5
DESIGN OF THURST BED FOR RVNL, KOLKATA
Surcharge (Due to box wt) 8.19 T/sqm =Wt.s2/W.b/L.s2
Active EP (D) 129.89 MT
=0.5 Ka.h (SS.bx + Do.lsk ys/2) L.lsk Do.lsk
Inside shear key
Depth 1.30 m (Av depth considered)
Di.sk = Do.lsk-(T.tb1 + T.tb2)/2
Surcharge 2.75 T/sqm S.tb1=T.tb1 yc
Passive EP (E) 1606.93 MT
= N.sk K.ph (S.tb1 + Di.sk ys /2 ) Di.sk W.tb
Active EP (F) 119.64 MT
= N.sk K.ph (S.tb1 + Di.sk ys /2 ) Di.sk W.tb
Thrust Bed 6
DESIGN OF THURST BED FOR RVNL, KOLKATA
Check for sliding of thurst Bed+Soil - Stage-II
Mobilising Force
Pushing force = Tbf.s21 2962.49 T
Active EP on bed =D 129.89 T
Total MF.s4= Tbf.s21+D 3092.38 T
Restraining Force
Coeff of friction =mb 0.61
Friction on bed wt L=(5.1:M) mb 3843.76 T
Friction on segment = Tbf.s22 636.25 T
Passive EP =A 507.55 T
Pile capacity 0.00 T
Total RF.s4=L +Tbf.s22 + A 4987.55 T
FOS against sliding FOS4=RF.s4/MF.s4 1.61
Min FOS against sliding FOS=MIN(FOS1 to FOS4) 1.55 > 1.5 O.K.
Material properties
Grade of concrete Fck M 40
Steel Fy Fe 500
Load Factor (Erection Temporary Loads) LF 1.35
Section Forces
Force per jack F.pin=TBF / N.jk 262.46 T
F.pin 2575 kN
LA of force 0.80 m
BM M.mb1=(T.tb1 + D.jk) / 2 2060 kN.m
Tensile force F.pin 2575 kN
Mu = M.mb1 LF 2781 kN.m
Pu = F.pin LF 3476 kN
P2
deff 1005.50
Min steel @ 0.12% 1061.81 sqmm
Main steel
P1u = P1 LF 5846 kN
Contact area = W.p A 0.17 sqm
Contact stress = P1u /(W.p A) 34.9 MPa
Perm contact stress (Cl 34.4 of IS 456) =2 * 0.45 * Fck 36.0 MPa O.K.
Top face
Though top face has compressive force which is resisted by concrete,
However, provide steel to resist 50% of force P1u
Ast = 0.5 P1u /(0.87 Fy) 6719 sqmm
pt 0.74%
Provide 9 nos 32 dia bars @ 122 c/c= 7238 sqmm O.K.
Thrust Bed 7
DESIGN OF THURST BED FOR RVNL, KOLKATA
Bottom face
P2u = P2 LF 2370 kN
Ast = P2u/(0.87 Fy) 5448 sqmm
pt 0.34%
Provide 12 nos 25 dia bars @ 133 c/c= 5890 sqmm O.K.
Width of resisting section-top face (dist between pockets) 2.43 m =Psa.w - W.p
Width of resisting section - bottom face (c/c dist of pockets) 3.10 m =Psa.w
Depth of resisting section, D deff.mb1 0.70 m = T.tb2
deff.ab1 640.00 mm
7.1 Section Forces
Pushing force (m = 0.5) Pab = 0.5 Wt.s2 523.19 MT
Force per jack F.pin = Pab / N.p4 104.64 T
1026.51 kN
LA of force LA = (D.jk + T.tb1) / 2 0.60 m
BM BM = F.pin LA 615.90 kN.m
Tensile force F.pin 1026.51 kN
Mu = BM LF 831.47 kN.m
Pu = F.pin LF 1385.78 kN
Ast.bottomface
For half tensile force = 0.5 Pu / (0.87 Fy) 1593 sqmm (D)
For 0.5 BM (Ast for 0.5 Mu) 1535 sqmm (E)
Total 3128 sqmm (F) = D + E
Min steel 2306 sqmm
Provide 20 nos 16 dia bars @ 155 c/c= 4021 sqmm O.K.
Provide 0 nos 12 dia bars @
Thrust Bed 8
DESIGN OF THURST BED FOR RVNL, KOLKATA
7.3 Design of transverse steel (by strut & tie model)
P2
deff 620.00
Min steel @ 0.12% 744.00 sqmm/m
Thrust Bed 9
DESIGN OF THURST BED FOR RVNL, KOLKATA
Shear Force V= (T.tb1 + D.sk - T.tb2 - deff) (EP2 + EP3)/2 11.87 MT/m
Vu Vu = V LF 157.14 kN/m
deff at shear plane W.sk 750.00 mm
tv = Vu / W.sk 0.21 Mpa
pt 0.13 %
tc 0.36 Mpa O.K.
ts -0.15 Mpa
Provide nominal shear stirrups
Provide 10 dia 2L STRPS @ 142 c/c
Thrust Bed 10
DESIGN OF DRAG SHEET
Reinforcement Fy = Fe 500 D
Concrete Fck = M 40
Yield stress of drag sheet Fy.ds = 260 MPa
Load factor for pushing = 1.35
Friction between GI drag sheet and concrete msc = 0.35 (concrete to steel friction)
Friction between drag sheet and steel mss = 0.20 (steel to steel friction)
For anchorage system, force will be from the box being pushed from thrust bed only.
Wt of soil over first box+cutting edge WS1 = 1138.68 T (E)
Load of soil over steel cutting edge WS.ce.s = 112.84 T (F)
= W.b . L.ce.s.t (GL.s - RL.tb). Ys
Total frictional force =msc(E-F)+mss(F) = 381.61 T (G)
DN SAS/1502/HCC 11
Front Wall
No of walls N.wall = 2
Mu/wall =K / N.wall = 13014 kN.m (K)
Vu/wall = LF . F.dsa/2 = 1685 kN
Length of wall
For BM L.wbm = 3.00 m (as per drawing)
For SF L.wsf = 1.50 m (as per drawing)
Thickness of wall T.w = 0.60 m
Design for BM
d =T.w - cover = 2928 mm
Mu/bd2 = 2.53
pt = 0.666 %
Ast.design = 11698 sqmm
Provide 15x 32T at end
Provide min 0.12 % steel on side face Ast = 2160 sqmm
No of bars of dia 12 mm = 19.1 Nos
say = 20
Spacing = 150 mm
Vu/bd =Vu/(L.wsf-cover)/T.w = 1.98 MPa < 3.3 MPa
Tc for steel provided = 0.57 MPa
Asv/sv = 2.34
provide 2L-12 dia STRPS @ 90 c/c
DN SAS/1502/HCC 12
Provide section as follows
550
Y
25
ISA 130x130x16
A = 3920
CG = 38.2 1380 1430
I = 6090000
Z1 Z1
16
25
Z Y Z
W.dsg = 550
Element
MoI about
Width b Depth d Area A CG from Ii + Ayi2
Element 3
Ayi [m ] element
[mm] [mm] [m2] ZZ axis yi [m4]
CG Ii [m4]
[mm]
DN SAS/1502/HCC 13
Design of cutting edge
Weld design
No of welds 2.00
Depth of weld =H.stf + weld size 606.00 mm
Vert shear stress in weld 47.49 N/mm
Shear due to bending at joint 258.59 N/mm
Resultant stress 262.91 N/mm
Perm shear stress in weld 115.00 MPa
Reqd weld size 3.22 mm
Provide weld size as 6.00 mm
DN SAS/1502/HCC 14