Professional Documents
Culture Documents
D Eugp1 TPT F KPS CST FWG 1102 R0 PDF
D Eugp1 TPT F KPS CST FWG 1102 R0 PDF
KAPODRA
7 5 8 6 9 7 8 9
SARTHANA
25984134
UG RAMP Scupper Drain DREAM CITY LABHESHWARCHOWK
1832590
3117410
986830
5103170
5010000
1900000
1904130
6130000
LABHESHWAR CHOWK
CENTRALWAREHOUSE
SURATRAILWAYSTATION
800000
G G
200000
200000
ISSUED FOR
4600000
D WALL
200000
200000
AS BUILT DRAWING DEFINITIVE DESIGN
GOOD FOR CONSTRUCTION - WD PRELIMINARY DESIGN
PLINTH / TERRACE / ROOF /
S11 C1-13 NUMBER
GROUND WATER TANK MUMTY CONSTRUCTION REFERENCE DRAWING FOR REFERENCE / DISCUSSION
4000000
4000000
PD AREA
EL. 22.990 REFERENCE REPORT WITH REVISION NO. & DATE :-
5998064
EL. 19.49
600000
200000
200000
7239214
200000
22872170
6400069
600000
200000
200000
200000
EL. 15.48 REFERENCE DESIGN DOCUMENT WITH REVISION NO. & DATE :-
200000
AA
200000
600000
LANDING TOC- +13.800,
+11.700, +9.600
2049978
2049978
8000000
D WALL REFERENCE DWG. (Alignment/Land Plan/Arch./Stru./E&M/TVS-HVSC WITH REVISION NO. & DATE :-
1 C7 C1 C2
1
GB29 D132 GB30 GB31 GB32
AB
AB-01
GB6
SERVICES STAIRCASE LEGENDS : ABBREVIATIONS
1900002
ST-16
3000000
21 BASEMENT GROUND TO ABOVE
2 73X167.00/300.00
W:1200
2500051
S11A 2 NUMBER
TO GROUND TERRACE TERRACE
GB3
19
CORNER COLUMNS
500000
17
UP CUTOUT ABOVE EDGE COLUMNS
15 NOTES :-
5000000
1 EscalatorStart Point
INTERIOR COLUMNS
GB12
13
GB9
S9
3
11
STUB COLUMNS
5
S8 PLUNGE COLUMNS
7 9
S10
C4
AC
GB25 C8 GB26 C3 GB27 GB28
30KL BALANCING REVISION CONTROL
/ TRANSFER TANK
13900620
GB2
AB-02
GB11
25200022
26551936
KPS-A-P1
S4 CHILLER ROOM
KPS-A-P2
EMPLOYER:
GUJARAT METRO RAIL CORPORATION ( GMRC ) LIMITED.
SPV of Government of India and Government of Gujarat)
D151 [Formerly known as Metro-Link Express for Gandhinagar And Ahmedabad (MEGA) Company Limited]
KPS-A-P5
NO OBJECTION FROM EMPLOYER IS BEING ACCORDED FOR CONSTRUCTION.
ST-12
S-42 57x150.00/300.00 KPS-A-P6, P7, P8, P10,
SHAFT W:3000 P11, P12, P13, P15,
P16, P17, P18
AGM / MANAGER (S&T) AGM / MANAGER (SYS) AGM / MANAGER (P&D) AGM / MANAGER (CONST.)
3 D148 S-41
S-40
D150 3 KPS-A-P19
GB8
SHAFT
GB5
THE DESIGN & DRAWING AS CERTIFIED BELOW AND SUBMITTED BY THE CONTRACTOR HAVE BEEN PROOF CHECKED BY
AD GENERAL ENGINEERING CONSULTANT ON BEHALF OF MEGA AND IS RECOMMENDED TO MEGA FOR REFERENCE OF :
GB21 C10 GB22 GB23 NO OBJECTION NO OBJECTION SUBJECT TO THE COMMENTS AS NOTED
GB10
5
11
3 CSE/DY.CSE/(UG) CTSE/CSSE CTPD/SE CPM/DY.CPM(SYSTEM)/IM DY.CDE(E&M)/STATIONS
GB1
GB4
4 4
600000
200001
13517407
200000
100000
9129185
200000
13
1
6103136
15 UP
S1 S2 S3 17
ST-16
73X167.00/300.00
C.ARCH/SR.ARCH/(UG) CPM(CIVIL & SYSTEM/UG) DY.PD(CIVIL & TRACK) DY.PD(SYSTEM) PROJECT DIRECTOR
W:1200
19 EXCEPTION BY CONTRACTOR : NIL
21 CONTRACTOR :
? SAM INDIABUILTWELL Pvt.
AB-03
SERVICES STAIRCASE
Ltd.
200000
200000
IT IS CERTIFIED THAT DETAILED DRAWING PREPARED IS COMPLIED WITH THE TERM & CONDITIONS OF CONTRACT WITH MEGA AND
200000
CONTRACTOR OWNS FULL RESPONSIBILITY OF QUALITY CONTROL, CHECKING AND VERIFICATION OF ACCURACY, CORRECTNESS,
200000
COMPLETENESS, INTEGRATION, INTERFACING WITH OTHER DESIGN DISCIPLINES & CONTRACTORS AND FULL COMPLIANCE OF EMPLOYER
AE
300000
300000
& CONTRACT REQUIREMENT PROVISIONS AND STANDARD, SPECIFICATIONS, SAFETY AND STATUTORY RULES & REGULATIONS
APPLICABLE. IT IS CERTIFIED THAT, THIS DRAWING HAS NO EXCEPTIONS UNLESS DEFINED AS ABOVE EXPLICITLY.
4104238
5103169
5010000
3804134
6130000
5 6 7 8 9 INDEPENDENT LEAD
DESIGN CHECKER (I-LDC) :
CONSULTING
ENGINEERS
PROJECT NAME : DESIGN, CONSTRUCTION AND COMPLETION OF UNDERGROUND STATIONS AND TUNNEL INCLUDING FINISHES
FROM KAPODRA RAMP TO SURAT RAILWAY STATION FROM CHAINAGE 3700M TO CHAINAGE 7160.6M, COMPRISING TWIN BORED
UNDERGROUND TUNNEL BETWEEN NORTHERN RAMP AND SURAT RAILWAY METRO STATION, ALL CUT AND COVER PORTION
INCLUDING THREE UNDERGROUND STATIONS VIZ. KAPODRA, LABHESHWAR CHOWK AND CENTRAL WAREHOUSE WITH ENTRY/EXITS
NOTES :- & CONNECTING SUBWAY BY BOX PUSHING METHOD AND A PORTION OF NATM AND LAUNCHING AND RECEIVING CHAMBERS OF TBM
FOR SURAT METRO RAIL PROJECT, PHASE-I
1. STRUCTURAL FRAMING DRAWINGS ARE FOR STRUCTURAL ELEMENT SIZES (D-WALL, CONTRACT ID : GMRC/CONS/UG-01/PKG-CS2/PH-01/2020
COLUMNS, RC WALL,BEAMS, SLAB, STAIRCASE). SETTING OUT DIMENSIONS ARE INDICATIVE, DRAWING
MUST BE READ IN CONJUNCTION WITH ARCHITECTURAL DRAWINGS. ANY DISCREPANCIES NAME/TITLE : FRAMING PLAN AT GROUND LEVEL OF ANCILLARY BUILDING SIZE : A1
SHOULD BE VERIFIED BY DESIGN TEAM PRIOR TO EXECUTION. LOCATION : KAPODRA STATION SHEET NO. : --
2. STRUCTURAL FRAMING DRAWINGS ARE FOR STRUCTURAL ELEMENT SIZES (LIFT PIT, REV. NO. : R-0
DRAWING NO. : D-EUGP1-TPT-F-KPS-CST-FWG-1102
ESCALATOR PIT, LIFTING HOOK) SETTING OUT DIMENSIONS ARE INDICATIVE, MUST BE READ IN
SCALE : 1/100 DATE : 08-03-2023
CONJUNCTION WITH ARCHITECTURAL DRAWINGS. ANY DISCREPANCIES SHOULD BE VERIFIED
IT IS CERTIFIED THAT DETAILED DRAWING PREPARED IS COMPLIED WITH THE TERM & CONDITIONS OF CONTRACT WITH MEGA AND DDC
BY DESIGN TEAM PRIOR TO EXECUTION. OWNS FULL RESPONSIBILITY FOR DESIGN AS PER ODS & OCS, ADEQUACY & MEETING FUNCTIONAL, PERFORMANCE AND OPERATIONAL
REQUIREMENTS INCLUDING CONSIDERATION FOR INTERFACE REQUIREMENTS WITH OTHER CONCERNED DESIGNERS & CONTRACTORS
3. STRUCTURAL FRAMING DRAWINGS ARE FOR STRUCTURAL ELEMENT SIZES (FLOOR OPENINGS) AND COMPLIANCE TO STANDARD, SPECIFICATIONS, SAFETY AND STATUTORY RULES & REGULATIONS APPLICABLE. IT IS CERTIFIED THAT,
SETTING OUT DIMENSIONS ARE INDICATIVE, MUST BE READ IN CONJUNCTION WITH THIS DRAWING HAS NO EXCEPTIONS UNLESS DEFINED AS ABOVE EXPLICITLY. THIS DRAWING WITH RELEVANT ANALYSIS & DESIGN HAS
BEEN PRODUCED BY DDC AND INDEPENDENTLY CHECKED BY I-LDC & CONTRACTOR BEFORE SUBMISSION TO ENGINEER.
ARCHITECTURAL DRAWINGS. ANY DISCREPANCIES SHOULD BE VERIFIED BY DESIGN TEAM
PRIOR TO EXECUTION. 08-03-2023 08-03-2023 08-03-2023