Professional Documents
Culture Documents
HIP-Berri Water Injection System Expansion-REV-03-Updated PDF
HIP-Berri Water Injection System Expansion-REV-03-Updated PDF
___________________________________________________
H.I.P. Package
REV. 03
Revision Made in Yellow Highlights
As of May 30, 2020
Table of Contents
SECTION 1 : Introduction 3
SECTION 2 : Project Location (Ariel Map) 5
SECTION 3 : HIP Tour Attendance Sheet 7
SECTION 4 : References 9
SECTION 5 : Definitions 11
SECTION 6 : Objectives 14
SECTION 7 : Scope of Work 16
SECTION 8 : Roles & Responsibilities 19
SECTION 9 : List of Tasks & Activities 23
SECTION 10 : Hazard Identification Methodology 25
SECTION 11 : Hazard Identification & Risk Assessment Procedure 29
SECTION 12 : Hazard Identification Plan 34
SECTION 13 : Evaluation, Review and Record Keeping Procedure 65
SECTION 14 : Attachments 67
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
SECTION 1 : Introduction
Page 3 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
INTRODUCTION
Br. C.A.T. International Co. Ltd. place paramount importance on Health, Safety and Environmental
issues. We continually strive to eliminate risk of accidents and incident and loss with regard to both
Client and C.A.T. Personnel and Property.
We are very proud of our long construction industry experience which spans some 82 years and our
very good record where Health, Safety and Environmental performance is concerned.
In order to continue to improve performance we embarked on totally modifying and updating our Health,
Safety and Environmental structure and were certified compliant with OHSAS 18001 by Bureau Veritas
on 20th December 2005. We have developed and implement an OHSAS Management System of
modular format that addresses all aspects of H.S.E. currently anticipated in our general scope of work
and also facilitates easy expansion should the need arise.
The Structure of The Management System is a proactive one with Planning and Preventive Action
being core elements through the initiation of regular Health and Safety Training & Instruction, Hazard
and Risk Identification, Health and Safety Audits and comprehensive analysis of Near Miss Incidents.
However no system is perfect and we also include Corrective Action combined with Root Cause
Analysis, Remedial Action, Lessons Learned and a comprehensive Reporting, Investigation and Data
Analysis system that should contribute to a dynamic system that is continually improving.
There are within the system various levels of documentation which are approved at differing levels
within our organization; the separate Structure Chart shows in detail these levels.
In addition to all C.A.T’s Safety Policies, Rules and Regulations all the applicable requirements as per
Saudi Aramco Construction Safety Manual (SACSM), General Instructions (GI’s) and other applicable
standards shall be complied with while executing this project.
This Project HIP shall be revised and amended as needed, after a major incident or occurrence, if
conditions change, new hazards are arise and if there is any change in scope of work. Moreover, the
thorough review will be used to monitor compliance with the program and the rate of success in
achieving its objectives and goals.
Page 4 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Page 5 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Page 6 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Page 7 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Page 8 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
SECTION 4 : References
Page 9 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
1. References
➢ Construction Safety Manual Version October 2011
Controls
(MMSR)
Page 10 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 02
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
SECTION 5 : Definitions
Page 11 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 02
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Work Method Statement: Methodology of execution of work with specific description and safety
protocols which identifies step by step procedure of work in correlation with each activity. The
statement generally includes the process for carrying out the task with the required resources and
prescribed responsibilities of involved personnel.
Hazard: A source or substance with potential to cause harm to people and property.
Risk: A risk is the likelihood that a hazard will cause a specified harm to personnel, property or
environment
Risk assessment: An identification of what within our work or workplace, which may have the
potential to cause harm to people or workers, so that you can consider whether you have provided
sufficient precautions or need to do more to prevent harm
Severity (Consequence): This includes the nature of the harm that may result from the hazard
Likelihood: is typically used to refer to events that have a reasonable probability of occurring, but
are not definite or may be influenced by factors not yet observed or measured.
Probability: The likelihood of a specific outcome, measured by the ratio of specific outcome to the
total number of possible outcomes.
Page 12 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 02
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Risk Rating: Risk rating means you can simply decide whether the risk is minimal, low, medium
or high. Usually risk rating is the outcome of the following;
Page 13 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 02
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
SECTION 6 : Objectives
Page 14 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 02
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
This Hazard Identification Plan is formulated in conjunction with Saudi Aramco Construction Safety
Manual 5th Edition. It is Br C.A.T. International Co. Ltd. desire to anticipate and prevent all potential
hazards by identifying and providing preventive actions before the work execution. This plan
constitutes the written commitment of Saudi Aramco Project Management Team (SAPMT) and Br
C.A.T. International Co. Ltd., to administer or manage the construction of Berri Water Injection
System Expansion in a safe manner, with minimum risks to Saudi Aramco employees and facilities
as well as to the contractor’s manpower and equipment. Br C.A.T. International Co. Ltd. will ensure
that all work shall be carried out in accordance with Saudi Aramco Construction Safety Manual,
Schedule “D” and all relevant G.I’s and Saudi Aramco Engineering Standards (SAES).
Before starting work on the project site, especially inside live plant or facility, all existing U/G power
cables, communication cables, pipelines etc. must be clearly and physically highlighted on ground
Level with proper identification.
Page 15 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Page 16 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Scope of Work identifies the work required to support the Berri 250 MBCD AL Increment by installing
a remote water injection plant (SBWIP) at the southern part of Berri field with a total system capacity of
301 MBCD for reservoir pressure maintenance. The proposed facilities will provide water injection for
the southern and central part of Berri field.
The facilities shall be constructed I installed in accordance with this Scope of Work, standards &
drawings referenced herein.
Wastewater Disposal
Septic tanks with either seepage pits or wastewater disposal fields will be used for wastewater
disposal.
Page 18 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Page 19 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
• Project Manager:
• Project Manager shall report to the Area Manager regarding project related matters.
• Enforce C.A.T. & Saudi Aramco Health and Safety Policies and Procedures.
• Ensure proper coordination with SAPO.
• To ensure that a high level of H.S.E. Commitment is communicated to all employees.
• To demonstrate commitment by the provision of adequate resources essential to
comply with all project and legal requirements.
• Understand the Project requirements and Local laws with regard to H.S.E. and ensure
they are complied with.
• Ensure that through all phases of work are properly planned and meeting safety
requirements.
• Ensure all Supervisory personnel are qualified and receive required trainings.
• Provide all necessary resources to deal with any emergency situation or incident
occurrence.
• Construction Managers:
• Construction Managers shall report to the Project Manager regarding project related
matters.
• Enforce C.A.T. & Saudi Aramco Health and Safety Policies and Procedures.
• To ensure that a high level of H.S.E. Commitment is communicated to all employees.
• Ensure provision of adequate resources to construction team for safe execution of work.
• Ensure that through all phases of work are properly planned and meeting safety
requirements.
• Ensure effective communication with supervisory staff and SAPO representatives.
• Provide all necessary resources to deal with any emergency situation or incident
occurrence.
Page 20 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
• HSE Coordinator shall be reported to Safety Manager and keep close coordination with
Construction managers regarding HSE matters.
• Ensure implementation of CAT and SA HSE policies at project site.
• Assist Project Safety Manager in the formulation and review of documents and
procedures inclusive of Hazard Identification Plans, Emergency Response Plans, Work
Instructions and other documents that may be required to ensure a Safe and Healthy
Work Environment.
• Coordination with site safety staff and Area HSE Office.
• Understand the project requirements and Local laws with regard to H.S.E. and ensure
they are complied with.
• Ensure safest possible methodology is employed.
• Confirming that Work Permit Procedure is followed.
• Ensure that all company resources are being utilized in safe manners.
• Promote H.S.E. awareness at all levels.
• Set a personal example by working safely.
• Ensure all accidents and incidents are promptly and correctly reported.
• Organize the site in order that activities are conducted on a safe manner.
• Communicate Hazard and Risk Information.
• Be aware of and communicate project and location specific H.S.E. requirements.
• Cooperate and assist H.S.E. personnel in their duties.
• Set a personal example to build a positive safety culture.
• Be familiar with and implement the Work Permit System.
• SA certified WPRs (work permit receivers) shall ensure safe execution of activities.
• Coordinate with other contractors / subcontractors on safety issues.
• Make sure that appropriate PPEs are available and used correctly.
• Ensure good housekeeping.
• Regularly check condition of tools and equipment.
• Conduct regular safety meetings.
• Safety Officers:
• Reported to site safety supervisor and close coordination with construction supervision.
• Understand the project requirements and local laws with regard to H.S.E. and ensure
they are complied with.
• Maintain accurate records of activities related to H.S.E.
Page 21 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
• Workers:
Page 22 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Page 23 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Page 24 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Page 25 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Hazard identification
Hazard identification is the process of identifying hazards in the workplace or for a work procedure. In
order to understand what hazard identification involves, it is first necessary to understand the nature
of hazards.
Following are the common types of hazards which we may interface at our workplace.
1. Physical hazards
A physical hazard is a naturally occurring process that has the potential to create loss or
damage such as;
• Noise
• Electricity
• Heat and cold
• Fire
• Floods
2. Mechanical Hazards
Mechanical hazards are created as a result of either powered or manual (human) use of tools,
equipment or machinery and plant such as;
• Crushing
• Shearing
• Cutting or severing
• Entanglement
• Drawing-in or trapping
• Impact
• Stabbing or puncture
• Friction or abrasion
3. Chemical hazards
A chemical can be considered a hazard if by virtue of its intrinsic properties it can cause harm
or danger to humans, property, or the environment. Health hazards associated with chemicals
are dependent on the dose or amount of the chemical such as;
• Toxic gases
• Noxious fumes
• Corrosive liquids
• Acid and alkalis
• Organic compounds
• Asbestos
Page 26 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
4. Ergonomic hazards
Ergonomic hazards are physical conditions that may pose risk of injury to the musculoskeletal,
such as the muscles or ligaments the lower back, tendons or nerves of the hands/wrists, or
bones surrounding the knees. Ergonomics hazards include things such as;
5. Radiation hazards
The emission of energy as electromagnetic waves or as moving subatomic particles, especially
high-energy particles which cause ionization.
6. Psychological hazards
Psychological hazards are hazards that affect the psychological well-being of people, including
their ability to participate in a work environment among other people such as;
• Physical stress
• Mental stress
• Fatigue
• Peer group pressure
7. Biological hazards
Biological hazards are also known as biohazards usually these originate in biological
processes of living organisms and refer to agents that pose a threat to the health of living
organisms, the security of property or the environment such as;
Page 27 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
There are number of methodologies which can be used in hazard identification process. Following
are few useful methods or techniques which can be used in hazard identification process.
• Walkthroughs such as to carry out pre-work site visit to know about the area and
proposed task.
• Analyzing the available data such as manufacturer data, incident data, scope of work,
work method statements and previously developed JSAs or risk assessments etc.
• Work site inspections carry out work site inspections and use their data in hazard
identification process such as management walkthroughs, audits, health and safety surveys
etc.
• Use of checklists is one of the useful tool for identification of hazards at workplace such
as daily, weekly and monthly inspection checklists.
Page 28 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Page 29 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
8. Introduction
The hazard identification or risk assessment process can be illustrated in the following flow chart.
04- 02-Evaluate
Implement and Assess
the Control the Risk
03-Decide
Control
Hazard or risk identification is part of the process used to evaluate if any particular workplace
condition, equipment, tools etc. may have the potential to cause harm to personnel, property
or environment.
Following are the key steps to identify the hazards but not limited to;
• Gather & review the information about the hazards present or likely to be present in the
workplace.
• Carry out initial and routine inspections of the workplace to identify new or repetitive
hazards.
• Collect the data from incidents investigations & illness records etc.
• Consider hazards associated with emergency or non-routine situations.
• Collect information from manufacturer data for the equipments/tools to be used at
workplace.
Risk evaluation is to determine the consequences of hazards and then to decide the severity
level. Thus, the risk evaluation process is the combination of consequences and likelihood
of the hazards (Ref. to Below Risk Assessment Worksheet)
Page 30 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
3. Decide Control:
Deciding control is a critical step in assessing the risk. After identification the hazards and
severity level of risk, it is required to decide suitable and reasonably practicable control
measures to protect the people, property and environment from harm.
While deciding control measures adopt ALARP (As Low as Reasonably Practicable)
technique.
• Elimination.
• Substitution.
• Engineering Controls.
• Signage/Warnings and /or Administrative Controls.
• Personal Protective Equipment.
Decided control measures to be implemented as per risk severity, such as some control
measures would need immediate attention, some may need additional resources or even
some hazards may need to be eliminated as reasonably practicable.
Page 31 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
HIP must be reviewed and findings should be recorded. However, beside periodic review
HIP shall be revised and amended, as needed, when conditions change, process change,
new hazards are introduced or the scope of work changes.
Page 32 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Boundaries of Study
Set-up the Scope
H&S Action Group Objectives
References
Boundaries of Study
Define the scope and Scope
Objectives
Areas for Assessment References
Regulatory Requirements
Conduct Preliminary Checklists
Audits
desktop assessment and Historical Data & Experience
brainstorming Equipment / Machinery Data
Material Data Sheets
Feedback
For Evaluate Evaluate
Determination of Likelihood Severity
Appropriate Controls
Monitor Controls,
Calculate Risk Near Misses and
Levels Incidents in order
Low, Medium, High. that effectiveness is
analyzed
Unacceptable Acceptable
Page 33 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Page 34 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
2. Transportation 1. Manual handling 1.1 Task, load, individual capacity and working 3 2 X
of Materials environment should be known prior to start
any activity.
1.2 Throwing of materials shall not be allowed.
1.3 Avoid manual handling and prefer mechanical
aids.
Page 35 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
3. Transportation 1. Vehicle accident 1.1 All drivers shall be competent and possess a 3 3 X
of Heavy valid Saudi Arabian Government License.
Equipments 1.2 Safety orientation shall be conducted for all
drivers/operators.
1.3 Traffic signs and speed limits shall be posted
along thoroughfares.
1.4 Road traffic signs and barricades, shall
conform to G.I. 1021.000
1.5 All transportation of heavy equipment and
pipes shall be done using the main highway to
any work location after getting the required
permit from the government.
1.6 Ensure flagmen will be provided at all entry
and exits.
2. Damage to 2.1 Keep safe distance from existing structures. 3 3 X
company
Page 36 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
property/ 2.2 Ensure that all goal post are installed on both
structures sides where crossing overhead power lines,
and ensure that a safe distance is maintained
to prevent electrocution.
2.3 Keep extensions of heavy equipments at safe
distance from overhead powerlines.
2.4 Ensure that crane’s boom shall be fully
retracted while crossing under OHPLs.
3. Equipment/ 3.1 All loads/ equipment shall be tied up and 2 4 X
materials over- secured properly.
board (drop 3.2 Ensure all roads leading to the site are wide
object) enough and in good condition.
3.3 Equipment (Side boom, forklift, Tele handler,
etc.) shall include Rollover Protective
Structure (ROPS) and seat restraint system
for driver/operator.
4. Work Site 1. Equipment 1.1 Assign trained flagman/spotter to monitor 2 4 X
Preparation collision movement of heavy equipment’s.
1.2 Restrict unauthorized movement in the
working area.
1.3 Only use defined routes for the movement of
heavy equipment.
1.4 Provide warning signs and barricade along
with spotlights for night.
1.5 Maintain safe distance of equipment from
each other.
1.6 Assign trained flagmen/spotters to control
movement of heavy equipment on work site.
Page 37 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
5. Lifting and 1. Lifting 1.1 Lifting equipment’s operator shall inspect their 3 3 X
Rigging equipment’s equipment prior its operation by completing
Operations (boom truck, fork the Operators Daily Inspection Checklist.
lift, side boom 1.2 Lifting equipment’s operator shall ensure that
etc.) malfunction the equipment is in good working condition.
1.3 Operator shall immediately report any defect
found to Workshop, for repair or parts
replacement.
1.4 Operators shall be tested and certified as per
G.I. 7.025.
2. Defective rigging 2.1 Rigger shall inspect regularly and before use 3 4 X
equipment’s all the rigging equipment’s by completing the
Rigging Equipment Inspection form.
2.2 Rigger shall only use rigging equipment’s that
are rated for the load being hoisted and in
good condition.
2.3 Don’t use defective rigging equipment.
Page 38 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
Page 39 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
Page 40 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
7. Working Near 1. Gas release 1.1 Obtain relevant work permit prior to commence 2 4 X
Hydrocarbon (i.e.H2S or any the work.
Area Toxic gas) 1.2 Gas test shall be performed before working in
hydrocarbon area.
1.3 Give awareness to workforce regarding H2S
safety.
2. Fire, Explosion 2.1 Don’t allow any naked flame in live
hydrocarbon area.
2 4 X
2.2 Evacuate the area in case of gas release.
2.3 Designated assembly area shall be at safe
distance from live area.
2.4 Keep heavy equipment away (3m) from live
lines/equipment.
2.5 Mechanical excavators shall not work within
3m (10ft) of any underground utility cable as
per SA CSM section 3.7.3(C).
8. Working close 1. Electrocution 1.1 Goal Post shall be installed at a safe distance 3 4 X
to Overhead from overhead power line and conduct pre-job
Powerlines and meeting with heavy equipment drivers to
High Voltage highlight this hazard.
Electrical 1.2 Work permit shall be required when working
Equipments near or under overhead and need countersign
the permit as per G.I. 2.100.
1.3 Ensure that booms and extensions of all heavy
equipment are lowered to maximum safe limit
while crossing under OHPLs.
1.4 Assign trained flagmen or signal men.
1.5 The power lines clearance distances are as
follows:
Page 41 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
9. Use of Hand 1. Damaged tools 1.1 All hand tools must be inspected, color coded 2 2 X
Tools and in good condition.
1.2 Don’t use damaged hand tools on job site.
1.3 Use right tools for right job.
2. Homemade tools
2.1 Don’t allow use of homemade tools.
2 2 X
2.2 Discard homemade immediately from site.
3. Physical injuries
3.1 Ensure provision of proper PPEs (Hand gloves
and safety glasses).
2 3 X
3.2 Keep safe distance from each other while
using hand tools.
3.3 Throwing of hand tools shall be strictly
prohibited.
10. Use of Power 1. Damaged or 1.1 Ensure that all power tools are inspected, color 2 3 X
Tools defective Tools coded and in good condition.
1.2 Don’t use damaged and defective tools on site.
1.3 Remove damaged or defective tools from site.
2. Personnel Injuries 2.1 Ensure PPEs; hand gloves, safety googles,
3 3 X
hard hat, ear plugs are provided and well
maintained.
2.2 Use face shield while using power tools like
grinder, drill machine, portable jack hammer
etc.
2.3 Trained and qualified personnel shall be
allowed to use power tools.
Page 42 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
Page 43 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
Page 44 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
Page 45 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
12. Confined Space 1. Possible exposure 1.1 A confined space entry procedure shall be 3 4 X
Entry to H2S & other implemented.
Flammable gas 1.2 Atmospheric gas tests shall be performed and
immediately recorded prior to entry, after
breaks or other interruptions in the work, if
there is any reason to believe that conditions
inside the confined space have changed or at
periodic intervals (every 2 hours) as
necessary to determine whether acceptable
atmospheric conditions are being maintained
during the course of the confined space entry.
2. Oxygen 2.1 Ensure to provide air mover for proper 3 4 X
deficiencies ventilation.
2.2 Normal condition atmosphere shall be
monitored regularly.
3. Chemical 3.1 All chemical shall be stored properly, labeled 3 4 X
exposure and in closed containers.
3.2 Specific recommendation for the materials
should be obtained and followed.
3.3 Safety Officers shall maintain in file a Material
Safety Data Sheet (MSDS) of all chemicals in
use and shall take charge in disseminating
related information to concerned, personnel
on its use, handling, storage, transportation
and disposal.
Page 46 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
13. Concrete form 1. Personnel Injuries 1.1 Conduct JSA & HIP briefing with the workers. 3 3 X
Works 1.2 PPEs such as hand gloves, safety glasses
(Steel fixing, shall be provided.
shuttering, 1.3 All workforce must be trained and well
concreting and qualified.
grouting etc.) 1.4 Ensure proper handling of steel and shuttering
materials to avoid personnel injuries
2. Damaged 2.1 All tools/equipment must be inspected, color
2 3 X
tools/equipment coded and in good condition.
2.2 Damaged tool/equipment shall not be allowed.
All chemicals must be handled properly.
3. Chemical handling 3.1 MSDS shall be provided and communicated to 2 4 X
the working crew.
3.2 Ensure that every chemical container has clear
labeling on it.
3.3 Chemicals shall be stored and transported in
safe manners.
3.4 Rubber gloves, eyes protection, face
protection etc. shall be provided when handling
the chemicals or concrete.
3.5 Ensure that first aid kit and trained first aider is
available at site.
3.6 Protect sharp edged steel re-bars with
appropriate capping.
4. Sharp edges 4.1 Use leather gloves while steel fixing and form 2 3 X
work.
5. Slip, trip and fall 5.1 Keep access ways free from any kind of 3 3 X
obstructions.
5.2 Maintain good housekeeping all the time.
Page 47 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
Page 48 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
Page 49 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
Page 50 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
Page 51 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
Page 52 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
Page 53 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
19. Welding, 1. Eye injury 1.1. Welder shall wear the appropriate welding 3 3 X
Cutting & helmet with proper grade of filter plate.
Grinding 1.2. Unauthorized personnel shall be kept away
from welding area.
1.3. Personnel shall wear the appropriate safety
spectacle as per G.I. 8.002
3 3 X
2. Burns 2.1 Personnel involve in the work activity shall wear
the recommended protective clothing.
2.2 Ensure that any exposed skin of personnel
involved in the activity shall be covered during
the welding process.
2.3 Personnel shall wear the appropriate safety
shoes as per G.I. 8.005.
3. Electric shock 3.1 Ensure that welding machine is properly 3 3 X
grounded.
3.2 Welder should be insulated from live electrical
parts and dry.
3.3 Ensure to inspect and replace cables, plugs
and leads that show any signs of defects.
3.4 Welders shall wear the appropriate gloves and
clothing.
4.1 Personnel exposed shall wear hearing
4. Noise 3 2 X
protection.
Page 54 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
Page 55 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
Page 56 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
Page 57 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
22. Coating and 1. Accidental eye 1.1 Flush eyes with clean water in case of 3 2 X
Painting contact accidental eye contact.
1.2 Ensure that personnel shall wear appropriate
eye protection.
1.3 Ensure provision of eye wash stations at
painting areas.
2.1 Ensure utilization of personnel with proper
2. Incompetent 2 3 X
training.
personnel
2.2 Personnel involved shall be knowledgeable of
the work activity.
2.3 Competent foreman / supervisor shall be
present to supervise the work activity.
Page 58 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
23. Hydro-test 1. Over pressure 1.1 The “Checklist for Pressure Testing Safely” 3 4 X
shall be completed before, during and after
the test. This checklist shall be kept on-site
with the work permit.
1.2 Hydrostatic testing shall comply with all
related standards as stated in the Reference
section of submitted “Hydro-test Procedure “.
1.3 Approved hydro-test procedure as per G.I.
2.101 and G.I. 432.000 shall be available on
site and strictly followed.
1.4 Pressure relief valve shall be installed on the
system to be tested and shall be set at 5%
above test pressure.
1.5 Pressure test manifold shall be installed
between pump and system and shall be pre
tested at 20% above test pressure.
1.6 Bleed valve shall be installed in order that
pressure can be release quickly if required.
2.1 Ensure to close monitor, identify pressure
2. Failure of
rating and working pressure by using
joints/pipe 3 4 X
calibrated gauges.
2.2 Hydro-test supervisor shall ensure that all
equipment utilized, complies with all relevant
safety standards and are certified for use.
2.3 Ensure that all flanges bolts are in good
condition before hydro-test activity starts.
2.4 Pressure shall be increased in stages to
prevent sudden increases of stress in all pipe
works and fittings.
Page 59 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
Page 60 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
2. Pressurized fluid 2.1 Make sure all hoses connections all secured 3 3 X
and whip latches are properly attached.
Page 62 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
5. Dust & dirt 5.1 Water sprinkling for dust suppression shall be 2 2 X
particles ensured on regular basis at site.
5.2 Disposable dust mask respirator shall be worn
with combination of face shield.
6. Inclement weather 6.1 Stop heavy equipment operation in case of
3 3 X
condition sand storm and heavy rain.
6.2 Heat stress plan shall be available at site and
communicated with the work force.
6.3 Appropriate clothing shall be worn by the
workers as per the weather condition
26. Inclement 1. Heat stress/ heat 1.1 STOP work in case of extreme or inclement 3 3 X
weather stroke, weather conditions.
conditions asphyxiation 1.2 Educate workers time to time regarding safety
(Rain, sand/dust
precautions during extreme weather.
storms, extreme
weather, fog 1.3 Heat stress plan shall be provided and
etc.) implemented on work site.
1.4 Provide sufficient numbers of rest shelters on
work site.
1.5 Use penalty of fresh water to avoid heat stress
or heat stroke.
1.6 Limit the working hours in extreme weather.
1.7 Take rest after specific intervals.
1.8 Report any abnormal condition immediately to
your supervisor.
1.9 Trained first aider with equipped first aid kits
and ambulance shall be available on job site.
2. Poor visibility 2.1 Stop movement of heavy equipment and
3 3 X
vehicles in case of inclement weather
conditions.
Page 63 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Likelihood
S Hazard Hazard & Risk Level
Task Potential Hazards Control Measures of
Severity
# Occurrence Low Med High
Page 64 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Page 65 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Evaluation Process
After deciding suitable control measures there should be continues monitoring or evaluation
process which will be helpful for periodic or necessary review of HIP.
➢ When the results of monitoring (accidents, ill-health effects, environmental) are adversely not
as expected
➢ When interface with the new hazards
➢ When there is change in a method statement or process
➢ Change in management
➢ Change in legislation
➢ The introduction of new plant or technology
➢ As the time passes, risk assessment should be periodically reviewed and updated
Records
All records relevant to above procedure related to projects shall be kept by the Safety Department
in the site office; on the achievement of the Project, the Health and Safety records shall be
transferred to be archived and kept for a period of Five Years.
Records not related to projects shall be maintained by the responsible person and copied to the
Management Representative.
➢ Management walkthroughs
➢ Audit findings
➢ Incident review recommendations
➢ Accidents, ill-health effects & environmental records
➢ Job safety analysis
➢ Daily, weekly and monthly routine inspections
➢ Preventive maintenance record
Page 66 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
SECTION 14 : Attachments
Page 67 of 68
CONTRACTOR BR. C.A.T. INTERNATIONAL CO. LTD. CONTRACT #: 6600044086 BI #: 10-00622
PROJECT TITLE Berri Water Injection System Expansion HIP # : CATKSABERRIWIPHIP1901 REV: 03
PROJECT LOCATION New SBWIP Eastern Province - Jubail Area
Page 68 of 68