Dear Salim,
Please find below table with tentative LC dates for below required materials. These are tentative dates as we
working on internal Programme and final dates to be finalized accordingly.
Description Tentative LC Date
Polymer Concrete Manhole for Foul Sewer & Storm
25-Dec-22
Water
Ductile Iron Pipes & fitting for infra, Potable, Foul, Storm
03-Jan-23
water application
Dismantling joints, stepped coupling, flange adapter for
14-Mar-23
infra potable, foul, storm, TSE water application
Above ground fire hydrant 18-Jul-23