PRESENT INSTALLED CAPACITY Chhabra Thermal Power Station is the coal based Electricity Generating Power Plant of Rajasthan.

LOCATION Chhabra Thermal Power Station is located at 22km from Chhabra, near village Chowki Motipura, Tehsil Chhabra, Distt. Baran (Rajasthan). SANCTION OF SCHEMES (STAGE-I to V) Unit Phase Capacity(MW) Cost(Rs.Crore) No. I I & II 2x250 2350 II III & IV 2X250 2200 OPERATIONAL PARAMETERS

Year Gen(MU) PLF(%) 2009246.92 2010 20101227.28 2011 22.61 56.04

SPCFC OIL AUX. CONSUMPTION CONSUMPTION -8.37 -9.78

Project Highlights:

(1)

Planned capacity

2320MW Near village Chowki Motipura, Tehsil Chhabra, Baran District Gently sloping 400M 390M Extent of Area : About 1100 acres Site Elevation : 400M above MS(Highest Flood level 385M) Uninhabited Site No major township or industries in the

(2) Location (3) Site Features

vicinity Well connected to State Highway 51 Well connected to West Central Railway line (Bina-Kota Coal from South Eastern/Northern Coal fields (Near Korba) Calorific value : 3500K Cal/kg) (4) Primary Fuel Coal requirement : 2.5MTPY for 500MW 5.0MTPY for 1000MW Source : (i) From nearby Parvati River (ii) From nearby Bethali Dam (5) Water Water Requirement : 70,000 Cu.m/day (15.5MGD) 400kV/220kV Switchyard with (6) Power Eqation Interconnecting Transformers (7) Environmental Liquid effluent: Zero discharge concept Issues will be adopted. Complete effluent water will be treated re-used. Emission levels (Particulars, SO X, NO X): will be maintained well within the statutory stipulations. 250M tall common chimney for 2 units. Thermal Pollution: Nil Noise Pollution levels: Will be maintained well within the statutory stipulations Solid Waste management: 100%

utilisation of fly ash for commercial utilization.

SUPER CRITICAL UNITS 5 & 6

(1) Proposed Capicity (2) (3) (4) (5) (6) (7) (8) (9)

2x660 MW Near village Chowki Motipura, Location Tehsil Chhabra, Baran District TOTAL PLANT AREA 709 HECTARES PROJECT COST RS. 7920 CRORES PRIMARY FUEL: COAL FUEL SECONDARY FUEL : HSD / HFO FUEL 6.5 MTPA REQUIREMENT SOURCE OF WATER : Lashi, Parwan Irrigation Project WATER 1570 mcft ALLOCATION STACK Twin Flue Stack (275Meter)

(10)

NEAREST RAILWAY CHOWKI MOTIPURA STATION

HIGHLIGHTS :-

1. Administrative & Financial approved accorded on 02.03.2009. 2. Land Acquisition completed. 3. Water allocation has been made. 4. MOEF Clearance awaited.

Chhabra TPP Unit-3 & 4 (2X250 MW ) Extension project : _ Land available; all statutory clearances obtained; M/s TCE appointed as Project consultants _ Water from Hinglot & Baithali dam allocated and reached at site for Unit- 1&2; balance work of water conducting system for unit 3 & 4 under progress

_ All orders placed; BHEL & BOP contractor mobilized at site; almost all construction material reached at site _ Construction work of Boiler, Turbine, ESP under progress; Chimney shell completed; Boiler Drum of Unit 3 & 4 placed on 31.12.10 & 06.06.2011. _ Hydro Test of Unit-3 scheduled on 30.11.11 & Boiler light-up on 31.01.12 _ Hydro Test of Unit-4 scheduled on 31.01.12 & Boiler light-up on 30.04.12 _ Funds of Rs. 1885.290 Crs. Already booked upto 31.07.11 out of total approved project cost of Rs. 2200.00 Crs. _ Commissioning schedule : Unit 3 by Mar., 2012 & Unit 4 by June, 2012