SUN INTEGRATED BUILDERS SDN. BHD.

Document Ref. SIB/ITP/SO


INSPECTION AND TEST PLAN Revision No. 0
Effective Date 15-Sep-08
SETTING OUT Page No. 1 of 1
Project Title

Sub-Contractor Job No.


Location Date
CONTRACTOR CONSULTANT
ITEM DESCRIPTION OF WORK STANDARD / REQUIREMENT Sub- Super- Proj. COW R.E. S.O. RECORD
Con visor Mgr
1 Pre-computation Plan a) Ensure that a copy of the latest pre-computation plan is SIB/ICL/SO
available @ @ o

2 Construction Drawings a) Ensure that the construction drawings are the latest SIB/ICL/SO
updated revision @ @ o

b) Check the architectural drawings and the structural Construction Drawings


drawings against any discrepancies @ @ o SIB/ICL/SO

c) Check the latest instructions with regards to the work to AI / EI / Correspondences


be set out @ @ o SIB/ICL/SO

3 Setting out position a) Reference points are as per pre-computation plan / Construction Drawings
construction drawings @ @ # # o SIB/ICL/SO

4 Protection of peg a) Pegs are to be well-protected from accidentally Construction Drawings


damaged. @ @ o SIB/ICL/SO

REMARKS PREPARED BY APPROVED BY


Legend :

@ - prepared / checked by
# - confirmed by
o - approved by Name Name
Date Date