INSTALLATION CONDITIONS BEFORE START COMMISSIONING
! Important note Request for commissioning engineer at minimum 4 weeks in advance
Before arrival next items must have been finished
When finished mark mentioned item as þ
Engine room works
þ Major cutting, grinding and welding works must have been finished
þ Engine room ventilation must have been finished
þ Engine room equipped with floor plates
Engine foundation and alignment
þ Engine foundation according prescriptions
þ Epoxy resin poured and dried NOT DONE
Epoxy had been done for the engine foundation soon after the installation
þ Elastic feet installation according prescriptions
þ Engine disc springs/washers installed and foundation bolts M27 x L tightened on couple
q Engine alignment report checked by ABC-Engineering Final Due
Engine installation piping and hydraulic circuit connections
þ Air inlet and gas outlet system Not complete
Installation of air inlet system is on hold due to below reasons
a. Installation held by Shining Star Engineer.
b. Horizontal air duct filters not delivered yet by Shining Star
c. Dimensions of flange delivered with tapper air duct are not compatible needs replacement
Gas outlet system installation is in progress, shall be completed by tomorrow
Note: Gas outlet system needs modification, as supplied flanges were mismatched with actual required
Fuel system is complete, except one modification for cooling of fuel in return line
þ Electrical Panels connections and wiring To be done by Comm. tea For elec team
According to the checklist needs to be done by Commissioning Engineer
a. According to the instruction of Shining Star Engineer only one single(8 core) cable was required,
which already installed
b. Required cables recommended by comm engineer already been procured by Kafou, with
expected delivery by coming Tuesday
þ 50/60 Hz AC voltage and 24V.DC available
Alarm, safety and monitoring wiring connections
q On/off contacts engine and auxiliaries To be done by Comm. team
q Analog sensors engine & auxiliaries To be done by Comm. team
Only engine filling after check installation piping and approval of Commissioning Engineer.
þ Filling of cooling water, lube oil, fuel, air bottle Not done
Lube oil, cooling water already been procured by Kafou and shall be delivered by Sunday
Note: Initial recommended lube oil was not available in KSA, alternative lube oil with same specs
been procured upon approval of comm engineer
Please return a duly completed check list to request a commissioning engineer by email or fax.