Procurement and Installation of Multi-Ton Hot Forging Machine - Group 8 PDF
Procurement and Installation of Multi-Ton Hot Forging Machine - Group 8 PDF
& Installation
Of Multi-Ton hot forging Machine
G R O U P 8
Introduction
Fusing
orging is a manufacturing process involving the shaping of metal
localized compressive forces. The blows are delivered with a
power hammer in an open or closed die. Forging is often classified
according to the temperature at which it is performed: cold forging,
warm forging, or hot forging.
Yash Shelke
Project Manager
Scope Statement
01 02 03 04
05 06 07
Waterfall
Intiation
Procurement
Installation
Closing
WBS
ake holders
Documents
learned
Gantt Chart
Gantt Chart
GROUP 8
125
Risk &
Management
100
75
Procurement Risk: Cost Risk: Technical Risk: Safety Risk: Maintenance Risk:
The supplier may not be able The cost of the hot forging The hot forging machine Hot forging machines pose Hot forging machines require
to deliver the hot forging machine may exceed the may not be compatible with significant safety risks to regular maintenance to
machine on time or may budget, or unexpected existing equipment or may operators and maintenance ensure optimal performance
deliver a machine that does expenses may arise during require significant personnel. and prevent breakdowns.
not meet the required installation. modifications to the facility.
specifications.
Risks Involved in this process
03 04
Preparing the site for installation can be a complex and Multi-ton hot forging machines are complex pieces of equipment
time-consuming process. This may involve constructing that require specialized technical knowledge and expertise.
Project managers may face challenges in understanding the
new facilities, modifying existing ones, or installing new
technical requirements of the machine and ensuring that the
infrastructure such as electrical and plumbing systems. installation and commissioning are done correctly. Any technical
Any delays or complications during site preparation can issues that arise during the project can cause delays and
cause delays to the overall project timeline. additional costs, so project managers must ensure that they have
the necessary technical expertise on hand to manage the project
effectively.