Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

MIMA Facility Management

Building: PPM Task ID:


Building Code: Service Date:
Location: Manufacture:
Asset Tag: HVAC Model:
Asset Type: VAV Serial Code:
PPM TASK
INSTRUCTIONS : PPM-CHV-VAV_3M Bar code:
Asset Code :
Variable Air Volume (VAV)

S. No. Description Yes No Remarks


1 Check Filters If Applicable-Clean or Replace if Necessary

2 Check Control System and Devices For Proper Operation

3 Check For Proper Air Flow- Adjust If Necessary

4 Check Integrity Of All Panels-If Accessible

5 Check Damper For Proper Operation-Adjust If Necessary

6 Inspect Areas Of Moisture Accumulation For Biological Growth

7 Inspect Exposed Ductwork & External Piping For Integrity

Remarks

Name Technician Name Supervisor

Sign. Sign.

Date Date

You might also like