Project Code Project Title Sheet No.

01
Zangotai Dam Detailed Design Designed UAM

Proj. Element: Weir Design Checked FS

Description: Hydraulic Design Date 27/06/20

Input Data:

High Flood Discharge Q 18068.00 cusecs


511.63 cumecs
Crest Elevation 1500 m
Approach Channel Elevation 1491 m
Height of Ogee Wall P 6.00 m
Trial Head over Crest Ho 9.29 ft
Coefficient of Contraction (0.1-0.04) K 0.1
Acceleration due to gravity g 9.81 m/sq sec
Coefficient of Discharge Cd 3.94
Length of Spillway L 50 m
Head Difference (b/w U/s & D/s) Z 9 m
1.5
A) Head above Crest Q = Cd LHd Hd 9.29 ft
2.83 m
B) Geometric Configuration of Ogee

𝑋𝑋𝑐𝑐 = 0.2818𝐻𝐻𝑑𝑑 Xc 2.62 m


𝑌𝑌𝑐𝑐 = 0.136𝐻𝐻𝑑𝑑 Yc 1.26 m
𝑅𝑅1 = 0.5𝐻𝐻𝑑𝑑 R1 4.64 m
𝑅𝑅2 = 0.2𝐻𝐻𝑑𝑑 R2 1.86 m
𝑅𝑅3 = 0.04𝐻𝐻𝑑𝑑 R3 0.37 m
Project Code Project Title Sheet No. 02
0 Zangotai Dam Detailed Design Designed UAM

Proj. Element: Weir Design Checked FS

Description: Hydraulic Design Date 27/06/20

Ogee Downstream profile


𝑋𝑋1.85 = 2𝐻𝐻𝑑𝑑 0.85 𝑌𝑌

X (m) Y (m) Coordinates


0.00 0.00 0,0
0.94 0.07 0.94,0.07
1.88 0.24 1.88,0.24
2.81 0.51 2.81,0.51
3.75 0.87 3.75,0.87
4.69 1.31 4.69,1.31
5.63 1.84 5.63,1.84
6.56 2.44 6.56,2.44
7.50 3.13 7.5,3.13
8.44 3.89 8.44,3.89
9.38 4.72 9.38,4.72
10.31 5.64 10.31,5.64
11.25 6.62 11.25,6.62
12.19 7.68 12.19,7.68
13.13 8.80 13.13,8.8
14.06 10.00 14.06,10
15.00 11.27 15,11.27
15.94 12.61 15.94,12.61
16.88 14.02 16.88,14.02
17.81 15.49 17.81,15.49
18.75 17.03 18.75,17.03
19.69 18.64 19.69,18.64
20.63 20.32 20.63,20.32
21.56 22.06 21.56,22.06
22.50 23.86 22.5,23.86
23.44 25.74 23.44,25.74
24.38 27.67 24.38,27.67
25.31 29.67 25.31,29.67
26.25 31.74 26.25,31.74
27.19 33.87 27.19,33.87
28.13 36.06 28.13,36.06
29.06 38.32 29.06,38.32
30.00 40.63 30,40.63
Project Code Project Title Sheet No. 03
0 Zangotai Dam Detailed Design Designed UAM

Proj. Element: Weir Design Checked FS

Description: Hydraulic Design Date 27/06/20

Stage Curve
L 50.00 m
Cd 3.94
Hd 2.83 m
Q 511.63 cumecs
H Q
H/Hd C/Cd C
m cumecs cusecs
0 0.00 0.80 3.15 0 0
0.4 0.14 0.84 3.32 23 817
0.8 0.28 0.88 3.46 68 2412
1.2 0.42 0.91 3.59 130 4592
1.6 0.57 0.94 3.70 206 7284
2 0.71 0.96 3.80 296 10440
2.4 0.85 0.99 3.88 397 14023
2.8 0.99 1.01 3.96 510 18007
3.2 1.13 1.02 4.03 634 22375
3.6 1.27 1.04 4.09 768 27118
4 1.41 1.06 4.15 913 32240

Rating Curve for Ogee Spillway


5

4
Head, H (m)

0
0 100 200 300 400 500 600 700 800 900 1,000
Discharge, Q (cumecs)
Project Code Project Title Sheet No. 04
0 Zangotai Dam Detailed Design Designed UAM

Proj. Element: Weir Design Checked FS

Description: Hydraulic Design Date 27/06/20

Hydraulic Jump Calculations


Discharge per unit width 𝑄𝑄 q 10.23 cumecs/m
𝑞𝑞 =
𝐿𝐿

Energy Equation 𝑉𝑉1 2


𝑍𝑍 + 𝐻𝐻𝑑𝑑 = 𝑦𝑦1 +
2𝑔𝑔
g 9.81 m/sec
𝐿𝐿𝐿𝐿𝐿𝐿 = 𝑍𝑍 + 𝐻𝐻𝑑𝑑 LHS 18.29 m
𝑞𝑞 2
𝑅𝑅𝑅𝑅𝑅𝑅 = 𝑦𝑦1 +
2𝑔𝑔𝑦𝑦1 2

y1 0.55 m
RHS 18.30 m

𝐿𝐿𝐿𝐿𝐿𝐿 = 𝑅𝑅𝑅𝑅𝑅𝑅 LHS-RHS -0.01

From energy eq 𝑉𝑉1 = 2𝑔𝑔 𝑍𝑍 + 𝐻𝐻𝑑𝑑 − 𝑦𝑦1 V1 18.66 m/sec


Froude Number 𝑉𝑉1 Fr 8.04
𝐹𝐹𝑟𝑟 =
𝑔𝑔𝑦𝑦1 Steady
Conjugate Depth 𝑦𝑦2 1 y2 5.97 m
= −1 + 1 + 8𝐹𝐹𝑟𝑟 2
𝑦𝑦1 2
Length of Jump 𝐿𝐿𝑗𝑗 = 6.1𝑦𝑦2 Lj 24.00 m
Type of Stilling Basin to be used Type II

Chute Block
Height 0.59 m
Width 0.59 m
Spacing 0.59 m

End Sill
Height 1.14 m
Width 0.86 m
Top Thickness 0.11 m
Spacing 0.86 m
Side Slope (H:V) 2:1
Project Code Project Title Sheet No. 01
0 Zangotai Dam Detailed Design Designed UAM
Proj. Element: Weir Design Checked FS

Description: Anchor Bar Design Date 27/06/20

Anchor Bar Design


Unusual - 1 = Normal Pool Conditions + OBE 63031.75 kN
Extreme - 1 = Normal Pool Condition + MCE/MDE 75106.26 kN
Unusual - 2 = 50 Year Flood Condition (Without Earthquake) 47486.50 kN

Dragging Force
Coeifficient of Discharge flow 1.00
Unit weight of water 9.81 kN/sq m
Velocity of Water 17.26 m/sec
Depth of water 0.59 m
Width of Chute 50.00 m
Area of flow 29.64 sq m
Dragging Force 1 Fd 43308.27 kN
𝐹𝐹𝑑𝑑 = 𝐶𝐶𝜌𝜌𝜌𝜌𝑣𝑣 2
2
Concrete Lining 0.60 m
Side wall height 0.00 m
Side wall thichkness 1.00 m
Length of Chute 69.00 m
Unit weight of Concrete 24.00 kN/cu m
Concrete bed Area 30.00
Concrete Wall 0.00
Self Weight of Water 290.75 kN
Self Weight of Concrete 49680.00 kN

Total Resisting Force 28983.03 kN


Net Dragging Force 89431.50 kN
Dia of Bar 11.00 No
8.4 Clear cover 63.50 mm
EC2 Basic Required Anchorage Length 𝜑𝜑 𝑞𝑞𝑠𝑠𝑠𝑠 LBD req 2.01 m
𝑙𝑙𝑏𝑏 𝑟𝑟𝑟𝑟𝑟𝑟 =
4 𝑓𝑓𝑏𝑏𝑏𝑏
Effect of bar form a1 1.00
Effect of Concrete Cover a2 0.88
Effect of Transverse Reinforcement a3 1.00
Effect of transverse Pressure a5 1.00
qsd 434.78 Mpa
Ultimate Bond Stress fbd 1.89 Mpa
lb min 0.35 mm
Design Anchorage Length 𝐿𝐿𝑏𝑏𝑏𝑏 = 𝛼𝛼1 𝛼𝛼2 𝛼𝛼3 𝛼𝛼5 𝑙𝑙𝑏𝑏 𝑟𝑟𝑟𝑟𝑟𝑟 ≥ 𝑙𝑙𝑏𝑏 𝑚𝑚𝑚𝑚𝑚𝑚 lbd 1.77 m
Project Code Project Title Sheet No. 02
0 Zangotai Dam Detailed Design Designed UAM
Proj. Element: Weir Design Checked FS
Description: Anchor Bar Design Date 27/06/20

Length of embedment L 2.50 m


Pull out Strength P 800.00 psi
5515.81 kPa
Pull out Force F 4963.87 kN
Concrete Area A 3450.00 sq m
Required No of bars N 41.00
Required Spacing s 9.00 m
say 3.00 m
Total Anchor bar length L 4.43 m
No of Anchors N 384.00
Project Code Project Title Sheet No.
Designed

Proj. Element: Stilling Basin Design Checked

Description: Hydraulic Design Date

Input Data:

High Flood Discharge Q 18068


512
Manning Roughness n 0.018
Chute Inlet Elevation 1491
Stilling Basin Level 1482
Chute Length L 45.00
Chute Slope 1: 5.00
Chute Width W 50.0
g 9.81

Water Depth y1 0.59


Section Area A 29.64
Wetted Perimeter P 51.19
Hydraulic Radius R 0.58
Velocity v 17.26
Discharge Q 511.55

Project Code Project Title Sheet No.


0 0 Designed

Proj. Element: Stilling Basin Design Checked

Description: Hydraulic Design Date

Froude Number 𝑉𝑉1 Fr 7.16


𝐹𝐹𝑟𝑟 =
𝑔𝑔𝑦𝑦1 Steady
Conjugate Depth 𝑦𝑦2 1 y2 5.71
= −1 + 1 + 8𝐹𝐹𝑟𝑟 2
𝑦𝑦1 2
Length of Jump 𝐿𝐿𝑗𝑗 = 6.1𝑦𝑦2 Lj 24.00
Type of Stilling Basin to be used Type II

Chute Block
Height 0.59
Width 0.59
Spacing 0.59

End Sill
Height 1.14
Width 0.86
Top Thickness 0.11
Spacing 0.86
Side Slope (H:V) 2:1
01
UAM

FS

27/06/20

cusecs
cumecs

m
m
m

m
m/sq sec

m
sq m
m
m
m/sec
cumecs

02
UAM

FS

27/06/20

m
m
m

m
m
m
m

You might also like