CONSTRUCTION OF ADMIN BLOCK AT SOUTH CAMPUS AIR UNIVERSITY,

ISLAMABAD
Date: 17/2/2023

Wiring Quantity (Basement and Ground)

S.No Description Unit Quantity


Light Point Wire
Basement
1 3/0.29 Red Coil 8
2 3/0.29 Yellow Coil 9
3 3/0.29 Blue Coil 6
4 3/0.29 Black Coil 10
5 1mm Green Coil 10
Ground Floor
1 3/0.29 Red Coil 5
2 3/0.29 Yellow Coil 5
3 3/0.29 Blue Coil 4
4 3/0.29 Black Coil 6
5 1mm Green Coil 6

Light Circuit
Basement
1 2.5mm sq Red Coil 3
2 2.5mm sq Yellow Coil 4
3 2.5mm sq Blue Coil 2
4 2.5mm sq Black Coil 6
5 1mm sq Green Coil 7
Ground Floor
1 2.5mm sq Red Coil 4
2 2.5mm sq Yellow Coil 3
3 2.5mm sq Blue Coil 3
4 2.5mm sq Black Coil 7
5 1mm sq Green Coil 9

Light Plug Wire


Basement
1 4mm sq Red Coil 2
2 4mm sq Yellow Coil 2
3 4mm sq Blue Coil 1
4 4mm sq Black Coil 5
5 1.5mm sq Green Coil 5
First Floor
1 4mm sq Red Coil 15
2 4mm sq Yellow Coil 14
3 4mm sq Blue Coil 13
4 4mm sq Black Coil 42
5 1.5mm sq Green Coil 42