Jha - Working at Height
Jha - Working at Height
JHA Preparation Date: 22 DECEMBER 2022 Working Date: Work Duration: PTW No:
Job Title: EPCC OF NEW K440 AT TRAIN 1 – WORKING AT HEIGHT ( WAH ) HER No :
Ethylene / Polyethylene
Plant Area: PCPSB Equip. Tag No.: Service / Medium: EAI No :
ZETO RULES
Permit to Work? √ Safety Critical Equipment? Working at Height? √ Excavation? Ignition Source Control?
Energy Isolation? Confined Space Entry? Chemical Handling? Lifting Operations? Driving Safety?
References used in this JHA Legislations : Job Method Statement (JMS) Noise Exposure Monitoring Report
OSHA FMA EQA BOMBA AELA Hazard & Effect Register (HER) Health Risk Assessment (HRA) Report
(Tick if applicable) Guidelines (Specify): __________________________________ Environmental Aspect & Impact (EAI) Local Exhaust Ventilation (LEV) Report
PTS: ____________________________________________________
COP (Specify): ______________________________________
HAZOP Safety Data Sheet (SDS)
___________________________ ____________________________________________________ Environmental Impact Assessment (EIA) Report Chemical Reactivity Matrix
_______ Others (Specify): _____________________________________ QRA Report Others Report :
____________________________________________________ CIMAH Report
Company Procedure (Specify): _________________________________
Chemical Health Risk Assessment (CHRA) report
___________________________ Chemical Exposure Monitoring Report _________________________________
__________ _________________________________
Company / PETRONAS Memo /
Notice_________
1 2 3 4 5
Signature: Signature: Signature: Signature:
Insignificant Minor Moderate Major Catastrophic
E
Name: E1 E2
Name: E3 E4 E5
Name: Name:
Almost Certain
Dept./ Company: Dept.: Position / Dept.: Position / Dept.:
LIKELIHOOD
D
D1 D2 D3 D4 D5
Date: Likely Date: Date: Date:
C
C1 C2 C3 C4 C5
Possible
A
Open
A1 A2 A3 A4 A5
Remotely likely
to happen
JOB HAZARD ANALYSIS
RISK CATEGORY
Descriptions
Work should not be started until the risk has been reduced. Considerable resources shall be allocated to reduce
VERY HIGH the risk. Where the risk involves work in progress, urgent action (immediately, minimum admin control shall
be taken)
Efforts SHALL be made to reduce the risk. Risk reduction measures should be implemented within a defined
HIGH
time period.
Efforts MAY be made to reduce the risk. Risk reduction measures should be implemented within a defined time
MEDIUM
period.
LOW No additional controls required. Monitoring required to ensure existing controls are maintained.
LIKELIHOOD
Descriptions
REMOTELY LIKELY TO HAPPEN (A) Never heard of in Oil & Gas / Petrochemical Industry
Open
JOB HAZARD ANALYSIS
NO DESCRIPTION
1. First aid injury or slight health effects not affecting work performance or causing disability e.g. first aid injury, exposure to non-hazardous dusts.
1
INSIGNIFICANT 1. Spill/leak causing negligible impact to local environment, contained within the secondary containment and does not reach water and soil, and no volatilization to atmosphere.
2. Noise, air emission, discharges not exceeding company or legislative limits.
1. Medical Treatment Case , Restricted Work Case, Lost Time Injury or minor health effects (involving health hazards capable of minor health effects which are reversible, e.g. irritant agents, defatting agents, food poisoning bacteria) affecting work
performance, such as restriction to work activities or a need to take a few days to fully recover.
2
MINOR 1. Spill/leak contained within secondary containment causing volatilization to atmosphere causing limited contamination of soil or water within the containment area causing non-permanent impacts to the environment.
2. Noise, air emission, discharges not exceeding legislative limit but exceeding company limit (where available).
3. No immediate cumulative and/or delayed effect.
1. Permanent Partial Disability, significant health effects (capable of irreversible health damage without loss of life, e.g. noise, poor manual handling tasks, hand/arm vibration, chemicals causing systemic effects, sensitizers), exposure to possible human
or animal carcinogens, or results of injury/illness in the lower categories (category 1 & 2 above) which affect performance in the longer term such as prolonged absence from work for more than 4 days.
1. Spill/leak causing limited contamination to soil or water outside the secondary containment but remain contained within facility perimeter (for onshore operation) ** OR resulting in Potential Consequence A, B or C below;
3 2. Noise , air emission, discharges exceeding legislative limit OR resulting in Potential Consequence as below;
MODERATE Note:
Potential Consequence
a) Cumulative and/or delayed environmental impact,
b) Short term recovery action < 1 month
c) Rehabilitation period < 6 months
1. Permanent Total Disability, single fatality from accident or occupational illness or major health effects caused by health hazards capable of irreversible damage with serious disability or death e.g. exposure to corrosives, probable human carcinogens,
extreme heat and cold, psychosocial risk factors
1. Spill/leak spreading outside the facility perimeter, managed to be contained/recovered but causing major contamination OR resulting in Potential Consequence A, B or C below;
2. Noise , air emission, discharges exceeding legislative limit with possible prosecution OR resulting in Potential Consequence as below;
4 Note:
MAJOR Potential Consequence
a) Immediate effect with serious damage to environment
b) Medium term recovery action (1- 3 months)
c) Rehabilitation period 6 – 12 month
Multiple fatalities or Multiple Permanent Total Disability from accident or occupational illness caused by health hazards with the potential to cause multiple fatalities, e.g. chemicals with acute toxic effects (hydrogen sulphide, carbon monoxide), known
human carcinogens.
1. Spill/leak spreading outside the facility perimeter, causing massive contamination OR resulting in Potential Consequence A, B or C below;
2. Noise , air emission, discharges resulting in legal prosecution with possible shutdown of facility, OR resulting in Potential Consequence as below;
5
Note:
CATASTROPHIC
Potential Consequence
a) Severe environmental damage
b) Long term recovery action (> 3 months)
c) Rehabilitation period > 12 month
Open
JOB HAZARD ANALYSIS
Open
JOB HAZARD ANALYSIS
Falling object from height C 3 Medium Proper container/ storage for tools (to Prior to Supervisor/ RA
Objek jatuh dari tempat avoid falling object) start work Work
tinggi Menyimpan bahan yang tidak digunakan Sebelum Leader/SSS
dalam bekas yang sesuai mula
Personal injury bekerja
Kecederaan diri Scaffolding structure installed with toe
board in good condition
Struktur perancah dipasang dengan toe
board yang dalam keadaan baik
Open
JOB HAZARD ANALYSIS
Bad weather Stop any work during bad weather and Prior to Supervisor/ RA
Cuaca buruk B 1 Low report to work supervisor. start work Work
Berhenti kerja dan maklumkan kpada Sebelum Leader/SSS
Personal injury supervisor mula
Kecederaan diri bekerja
Open
JOB HAZARD ANALYSIS
Open
JOB HAZARD ANALYSIS
1. (JHA LEADER)
2.
3.
4.
5.
6.
7.
8.
9.
10.
JHA requirements have been communicated by WL / RA and understood by every person working on the job.
Name Signature Date Name Signature Date
1. 14.
2. 15.
3. 16.
4. 17.
5. 18.
6. 19.
7. 20.
8. 21.
9. 22.
10. 23.
11. 24.
12. 25.
13. 26.
Open
JOB HAZARD ANALYSIS
PERHATIAN
1. Borang ini hendaklah dikepilkan bersama PTW dan JHA dan dipamerkan di tempat kerja.
2. Perubahan Minor: Penemuan Hazad baru dan langkah kawalan yang diperlukan mencukupi – Auditor berbincang dengan WL dan RA. Kemas kini borang dan beritahu Approving Authority (AA) /
Shift Supervisor.
3. Perubahan Major: Perubahan dalan langkah kerja (STEP) ATAU penemuan Hazad baru yang mempunyai risiko yang tinggi dan memerlukan langkah kawalan yang lebih efektif – Auditor berbincang
dengan WL atau RA. Hentikan kerja dan beritahu Approving Authority (AA) / Shift Supervisor untuk tidakan selanjutnya. PTW perlu ditahan sementara dan JHA baru diperlukan sebelum boleh
dibenarkan untuk memulakan kerja semula.
4. JHA asal hendaklah dikemaskini dengan memasukkan maklumat yang terdapat di dalam borang ini semasa hendak memperbaharui PTW (Renew PTW).
Open
JOB HAZARD ANALYSIS
OTHER (specify) :
CRANE :
HYDRAULIC LIFT :
COMPRESSOR :
WELDING MACHINE :
OTHER (Specify) :