Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

LIST OF HEARING CASES WHERE THE RESPONDENT HAS BEEN FOUND GUILTY BY THE

BOARD/DISCIPLINARY COMMITTEE (DC) AND PENALTIES IMPOSED UNDER THE


REGISTRATION OF ENGINEERS ACT 1967

TABLE 2 – 20 YEARS PUBLICATION


(to be removed after 20 years of publication)

PENALTY: SUSPENSION AND/OR FINE

No Respondent Contravention to Date of Penalty


REA 1967/ Order
RER 1990

1. Ir. Tee Swee Hock Regulation 31 14.8.2007 6 months suspension


(PE No. 5690) (14.8.2007 until
13.2.2008)
2. Ir. Mohd Hasan bin Regulation 23 26.5.2008 i. Written Reprimand
Sulaiman ii. Fine of RM4,000.00
(PE No. 7901)

3. Ir. Ng Kok Chong Regulation 24 26.5.2009 2 weeks suspension


(PE No. 6818) (26.5.2009 until 8.6.2009)

4. Ir. Herman Lee Section 15(1)(m) 17.12.2009 Fine of RM2,000.00


(PE No. 4248)

5. Ir. Wong Fook Kan Regulation 25(1) 17.5.2010 1 month suspension


(PE No. 7666) (17.5.2010 until
16.6.2010)

6. Ir. Lee Peng Thiam Regulation 32(1) 10.8.2010 i. Written Warning


(PE No. 10454) ii. Fine of RM2,000.00

7. Ir. Chan Kam Leong Regulation 23 20.8.2010 1 week suspension


(PE No. 3486) and/or (20.8.2010 until
Regulation 24 27.9.2010)

8. Ir. Dr. Lam Kai Yang Regulation 31 25.8.2010 i. Written Reprimand


(PE No. 8181) ii. Fine of RM2,000.00

9. Hj. Mohd Ali bin Hj Section 15(1)(f) 9.3.2011 Suspension until such
Awang time the Respondent
(PE No. 8374) can produce evidence
that he is a discharged
bankrupt

10. Ir. Kushairi Regulation 31 8.9.2011 i. Written Reprimand


Badiuzaman ii. Fine of RM10,000.00
(PE No. 10567)

11. Ir. Dr. Sivanandam Regulation 24 9.9.2011 i. Fine of RM5,000.00


Maniam ii. 1 year suspension
(PE No. 8716) (9.9.2011 until
8.9.2012)

Appeal Board (8.4.2015)


upheld DC's decision
3

You might also like