Construction of Wastewater Treatment Plant in Makassar

(Package: Makassar WWTP B1)


REQUEST FOR INSPECTION
Ref. No. : PP-MIT/QC/RFI/E/120

TO : SMEC International ISSUED DATE : 7-Mar-23

DATE OF INSPECTION : 8-Mar-23 TIME : 10.00 Wita


REF. DRAWING : PP-MIT-ENG-MAR-188-CABLE

PART OF WORK : Commisioning - Electrical Work


LOCATION : Site WWTP B1 Makassar

TYPE OF INSPECTION : Electrical Commissioning Cable :


OTHER INFORMATION : - Outgoing PLN - Incoming MVMDP
- Outgoing MVMDP - HV Side Transformer
- LV Side Transformer - Incoming LVMDP
- Outgoing LVMDP - Incoming MCC
- Outgoing Generator - Incoming ATS/AMF LVMDP

COMMENTS

☐ NO OBJECTION

☐ NO OBJECTION WITH COMMENT

☐ FAILS TO MEET EMPLOYER'S


REQUIREMENTS OR CONTRACT

Requested by, Checked by,


Acknowledge by,
Contractor PISC
Owner Representative
PP-Memiontec KSO SMEC International
Signature : Signature : Signature :

Name : Name : Name :


Date : Date : Date :
Construction of Wastewater Treatment Plant in Makassar
(Package: Makassar WWTP B1)
PHOTO DOCUMENTATION
Commisioning - Electrical Work
Ref. No. : PP-MIT/QC/RFI/E/120

Flange HDPE

Filling Water

HDPE Grease Trap To Oil Tank


Construction of Wastewater Treatment Plant in Makassar
(Package: Makassar WWTP B1)
PHOTO DOCUMENTATION
Commisioning - Electrical Work
Ref. No. : PP-MIT/QC/RFI/E/120

Installation Diffuser MBBR MediaTank

Installation Diffuser Nitrification A & B

Installation Diffuser Nitrification C & D