Download as pdf or txt
Download as pdf or txt
You are on page 1of 30

A PERSPECTIVE

PROJECT TITLE: SHEET NO.

MARK RIFE , UAP


PROPO E RE I ENTIAL R B IL IN
PROJECT LOCATION:
MR. HEZAM M. ANALO A
PRC NO. Validity
OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
Republic of the Philippines
TABLE OF CONTENTS: OFFICE OF THE BUILDING OFFICIAL
CAGAYAN DE ORO CITY, MISAMIS ORIENTAL
GEODETIC
District / City / Municipality
Lot Plan
Location Plan
Site Development Plan ENGR. KARIUS JANDRICK RIEGO
Land Use & Zoning
ARCHITECTURAL
Ground Floor
First Floor
Front Elevation ENGR. PIETRO ELLISON SALDIVAR
Line and Grade
CA
N
Rear Elevation
G
YSU MARKETING
CORP
AY
AN
DE
RPM DIESEL
CALIBRATION CENTER Left Elevation
O
RO
NA
TI
O
Right Elevation
NA
L
HI
G
HW
Cross Sections AR. MARK RIFE, UAP
AY IGLESIA NI CRISTO -
LOKAL NG OPOL Schedule of Doors Architect
Schedule of Windows
STRUCTURAL
Foundation ENGR. KEN PALUGA, RCE
RUB IT BACKYARD Roof
PET STORE
SITE
Structural Engineer
Roof Framing
B
U
Truss Details
TU
A
N
-C
A
G
Roof Beam
A
YA
N
D
E
Schedule of ENGR. GEE LABIANO , PEE
O

LULIS
R
O
-I
LI Structural Elements Electrical Engineer
LECHON G
A
N
REPUBLIC CDO
POWDERCOAT CORPORATION
R
D
Schedule of Civil
Works Elements
ELECTRICAL ENGR. RAOUL VESAURIUS RIEGO , PME
JOLLIBEE
FAST FOOD
Foundation Mechanical Engineer
Roof
Electrical Layout
IGPIT ELEMENTARY
SCHOOL Riser Diagram
ELCHRISO RESORT
Schedule of Loads ENGR. GERALD L. GARCIA, SE
Electrical Symbols Sanitary Engineer

SANITARY/PLUMBING
Location Plan
ENGR. ELIJAH MONTEFALCO , MP
Site Development Plan
Master Plumber
Sewer Line Layout
Septic Tank Detail
Catch Basin Detail
01 VICINITY MAP Water Line Layout
Water Closet
ENGR. ASTHERIELLE MERCADEJAS, EE
Electronics Engineer
A 02 SCALE 1:100 MTS. Lavatory Sink Detail
Kitchen Sink Detail
Bathtub & Shower
ENGR. KIM M. BIGTAZEN, GE
Roof Drain Geodetic Engineer
Floor Drain

PRO E T TITLE SHEET NO.

MARK RIFE , UAP


PROPOSED RESIDENTIAL (R1) BUILDING
MR. HEZAM M. ANALO A
PRC NO. Validity
PRO E T LO ATION O NER
IAPOA NO. O.R. No.
02
PTR NO. Date B
PLACE TIN
hSide
Nort
15.00

In
8.50

oad
E 34
4° S

ide R
7m w

°E
N 73
Built
-up
A
97.7 rea

3° W
6.00
5

S 25
11.50

18.00
5.50

W1
64°
N

7m w
ide R
oad
In W
est S
i de
7.00

7.00

SITE DEVELOPMENT PLAN


A SCALE 1:100 MTS.

PROJECT TITLE: SHEET NO.

MARK RIFE , UAP


PROPO E RE I ENTIAL R B IL IN
PROJECT LOCATION:
MR. HEZAM M. ANALO A
PRC NO. Validity
OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
A B C D A B C D

B B
8.50 8.50
2.90 2.70 2.90 2.90 2.70 2.90
1 1
BATH & TOILET
2.00 T&B
3.00 3.00 3.00
BEDROOM 1 BEDROOM 2 BEDROOM 3

DINING AREA
2 A A' 2 A A'
1.00 UTILITY

KITCHEN
ROOM PRAYER
4.00 2.00 ROOM
3.00
2.00
1.00
3 11.50 3 11.50
GARAGE 2.20
LIVING ROOM

4 5.50 5.50 4 T&B 5.50


BALCONY

3.30 BEDROOM 4

5 5
5.60 2.90 3.0 2.60 2.90
0.2300

B' B'

GROUND FLOOR PLAN SECOND FLOOR PLAN


A SCALE 1:100 MTS. A SCALE 1:100 MTS.

PROJECT TITLE: SHEET NO.

MARK RIFE , UAP


PROPO E RE I ENTIAL R B IL IN
PROJECT LOCATION:
MR. HEZAM M. ANALO A
PRC NO. Validity
OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
A B C D

230mm thick reinforced


concrete wall
Fixed Window on
Aluminum Frame
(1200x400mm) Gutter 0.50mm (Brown)
APEX

2.27
1.20 1.43

1ST FLOOR
CEILING LINE

0.23
Slider Window 1 on Aluminum
3.00
Frame (1200 x 960)
8.73
Double Slider 2ND FLOOR LINE
6.46 Wooden Plumbs Ceiling
Window on 0.23
GF CEILING LINE

Aluminum Frame
Fire Retardant wood door with
(1200x1920mm)
stainless hinges (2200x1000mm)
3.00
Single hung window on Aluminum
Frame (960x400mm)
FINISHED FLOOR LINE
NATURAL GROUND

0.23 FRONT ELEVATION


A SCALE 1:100 MTS.

PROJECT TITLE: SHEET NO.

MARK RIFE , UAP


PROPO E RE I ENTIAL R B IL IN
PROJECT LOCATION:
MR. HEZAM M. ANALO A
PRC NO. Validity
OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
D C B A

3.84
7.16
APEX

2.27
1.20 1.00
1.0000
2ND FLOOR
CEILING LINE

Slider Window 2 on Aluminum


Slider Window 1 on Aluminum Frame (240x500mm)
Frame (1200 x 960) 3.00

1ST FLOOR LINE


0.23 GF CEILING LINE

Slider Window 2 on Aluminum


Fire Retardant Wood Door
F

Frame (240x500mm)
3.00 with Stainless Hinges
(2500x1000mm)
230mm Reinforced Concrete
Wall Permacoat Semi Gloss FINISHED FLOOR LINE
Latex (Navy Blue) 0.23 NATURAL GROUND

REAR ELEVATION
A SCALE 1:100 MTS.

PROJECT TITLE: SHEET NO.

MARK RIFE , UAP


PROPO E RE I ENTIAL R B IL IN
PROJECT LOCATION:
MR. HEZAM M. ANALO A
PRC NO. Validity
OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
5 4 3 2 1

13.50
6.60 3.00 3.90

APEX
Union Galvasteel
Duratile 0.50mm
0.20
2.84
0.18 (Brown)
1.77
2ND FLOOR
CEILING LINE

2.86
All Glass Sliding Door on 1.0000 Double Slider Window on
3.00
Aluminum Frame Aluminum Frame

0.23 2ND FLOOR LINE


GF CEILING LINE

230mm thick Reinforced


3.00 Concrete Wall Permacoat
Semi Gloss latex (Navy
Blue)
FINISHED FLOOR LINE
0.23 NATURAL GROUND

RIGHT SIDE ELEVATION


A SCALE 1:100 MTS.

PROJECT TITLE: SHEET NO.

MARK RIFE , UAP


PROPO E RE I ENTIAL R B IL IN
PROJECT LOCATION:
MR. HEZAM M. ANALO A
PRC NO. Validity
OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
1 2 3 4 5

13.50

APEX

Union Galvasteel
Single Hung Window Duratile 0.50mm
on Alumimum frame 2.84 (Brown)
(960x400mm)
2ND FLOOR
CEILING LINE

0.23
Slider Window 2 on Aluminum
Frame (240x500mm)

230mm thick Reinforced


Concrete Wall Permacoat
Single Hung Window
on Alumimum frame 6.46
2ND FLOOR LINE
GF CEILING LINE
Semi Gloss latex (Navy
(1200x960mm) Blue)

Double Slider
Window on
Aluminum Frame
(1200x1920mm)
FINISHED FLOOR LINE
NATURAL GROUND

0.2300 0.2300

LEFT SIDE ELEVATION


A SCALE 1:100 MTS.

PROJECT TITLE: SHEET NO.

MARK RIFE , UAP


PROPO E RE I ENTIAL R B IL IN
PROJECT LOCATION:
MR. HEZAM M. ANALO A
PRC NO. Validity
OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
5 4 3 2 1

APEX APEX

2.84
2ND FLOOR
CEILING LINE 1ST FLOOR
CEILING LINE

3.00

2ND FLOOR LINE 1ST FLOOR LINE


GF CEILING LINE GF CEILING LINE

0.23
3.00

FINISHED FLOOR FINISHED FLOOR


LINE LINE
FFL FFL FFL FFL FFL

NATURAL GROUND
NATURAL GROUND

0.23

SECTION A-A' DETAILS


A SCALE 1:100 MTS.

PROJECT TITLE: SHEET NO.

MARK RIFE , UAP


PROPO E RE I ENTIAL R B IL IN
PROJECT LOCATION:
MR. HEZAM M. ANALO A
PRC NO. Validity
OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
A B C D

APEX APEX

2.27 2.50

1ST FLOOR 2ND FLOOR


CEILING LINE CEILING LINE

3.23

2ND FLOOR LINE


GF CEILING LINE
0.23

40.0001 37.5001 3.00

FINISHED FLOOR
FINISHED FLOOR
LINE
LINE
FFL FFL
0.23 NATURAL GROUND

NATURAL GROUND

32.8778 SECTION B-B' DETAILS


A SCALE 1:100 MTS.

PROJECT TITLE: SHEET NO.

MARK RIFE , UAP


PROPO E RE I ENTIAL R B IL IN
PROJECT LOCATION:
MR. HEZAM M. ANALO A
PRC NO. Validity
OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
0.9130
0.9075
0.8099 1.5000
F

0.7100

2.2182 2.4348
1.8897 1.8854 1.9500

D D D D D
1 2 3 4 5

TYPE: FIRE TYPE: FIRE


TYPE: NARRA DOOR TYPE: uPVC DOOR TYPE: ALL GLASS
RETARDANT WOOD RETARDANT WOOD
WITH STAINLESS WITH STAINLESS SLIDING DOOR ON
DOOR WITH DOOR WITH
HINGES HINGES ALUMINUM FRAME
STAINLESS HINGES STAINLESS HINGES

DESIGNATIONS: DESIGNATIONS: DESIGNATIONS:


DESIGNATIONS: DESIGNATIONS:
MAIN ENTRANCE TOILET AND LIVING ROOM AND
MAIN EXT ALL ROOMS BATHROOM BALCONY

NUMBER OF SETS: NUMBER OF SETS: NUMBER OF SETS: NUMBER OF SETS: NUMBER OF SETS:
1 1 6 3 2

1.9200 0.4000 0.5000


0.9600
0.4000
1.2000 1.2000 0.9600 1.2000
0.2400

W W W W W
1 2 3 4 5

TYPE: DOUBLE TYPE: SLIDER TYPE: SINGLE TYPE: FIXED TYPE: SLIDER
SLIDER WINDOW WINDOW 1 ON HUNG WINDOW ON WINDOW ON WINDOW 2 ON
ON ALUMINUM ALUMINUM FRAME ALUMINUM FRAME ALUMINUM FRAME ALUMINUM FRAME
FRAME
DESIGNATIONS: DESIGNATIONS: DESIGNATIONS: DESIGNATIONS:
GROUND AND SECOND GROUND AND SECOND GROUND AND SECOND DESIGNATIONS:SECOND GROUND AND SECOND
FLOOR FRONT, REAR, FLOOR FRONT, LEFT, FLOOR FRONT, AND FLOOR FRONT SIDE FLOOR REAR, AND LEFT
LEFT, AND RIGHT SIDE AND REAR SIDE LEFT SIDE SIDE

NUMBER OF SETS: NUMBER OF SETS: NUMBER OF SETS: NUMBER OF SETS: NUMBER OF SETS:
4 4 4 2 3

SCHEDULE OF DOORS AND WINDOWS


A SCALE 1:100 MTS.

PROJECT TITLE: SHEET NO.

MARK RIFE , UAP


PROPO E RE I ENTIAL R B IL IN
PROJECT LOCATION:
MR. HEZAM M. ANALO A
PRC NO. Validity
OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
NOTES ON CONCRETE MIXES & PLACING:
GENERAL NOTES:
1. ALL CONCRETE SHALL DEVELOP A MIN. COMPRESSIVE STRENGTH AT THE END OF TWENTY
1. IN THE INTERPRETATION OF THE DRAWING, INDICATED DIMENSIONS SHALL GOVERN AND EIGHT (28) DAYS W/ CORRESPONDING MAXIMUM SIZE AGGREGATE 7 SLUMPS AS FOLLOWS.
DISTANCES AND SIZES SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES.
28 DAYS MAX SIZE OF
LOCATION MAX SLUMP
2. IN REFERENCE TO OTHER DRAWINGS, SEE ARCHITECTURAL DRAWINGS FOR DEPRESSIONS STRENGTH AGGREGATE
IN FLOOR SLABS, OPENINGS IN THE WALLS AND SLABS, INTERIOR PARTITIONS, LOCATION ALL OTHER ,INCLUDING
OF DRAINS ETC.
SUSPENDED SLABS 4000 PSI (27.6 MPa) 20mm 100mm

3. IN CASE OF DISCREPANCIES AS TO THE LAYOUT, DIMENSIONS AND ELEVATIONS BETWEEN COLUMNS 4000 PSI (27.6 MPa) 20mm 100mm
THE STRUCTURAL PLANS, AND ARCHITECTURAL DRAWINGS, THE CONTRACTOR SHALL NOTIFY BEAMS, SLABS 4000 PSI (27.6 MPa) 20mm 100mm
BOTH THE STRUCTURAL ENGINEER AND THE ARCHITECT. SLAB ON FILL 4000 PSI (27.6 MPa) 20mm 100mm

4. ALL CONCRETE WORK SHALL BE DONE IN ACCORDANCE WITH THE ACI.318 95 BUILDING 2. MAINTAINING MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS.
CODE REQUIREMENTS FOR REINFORCED CONCRETE AND ALL STRUCTURAL STEEL WORK SUSPENDED SLABS------------------------------------------------------------------------------------------------ 20mm
ACCORDING WITH AISC SPECIFICATION (9TH EDITION) IN SO FAR AS THEY DO NOT CONFLICT SLAB ON GRADE---------------------------------------------------------------------------------------------------- 40mm
WALLS ABOVE GRADE-------------------------------------------------------------------------------------------- 25mm
WITH THE LOCAL BUILDING CODE REQUIREMENT. BEAM STIRRUPS AND COLUMN TIES------------------------------------------------------------------------ 40mm
WHERE CONCRETE IS EXPOSED TO
5. ACI REFERS TO AMERICAN CONCRETE INSTITUTE, AISC TO AMERICAN INSTITUTE OF STEEL EARTH BUT POURED AGAINST FOR FORMS------------------------------------------------------------- 50mm
CONSTRUCTION AND ASTM TO AMERICAN SOCIETY FOR TESTING MATERIALS. WHERE CONCRETE IS EXPOSED TO
EARTH BUT POURED AGAINST FOR FORMS------------------------------------------------------------- 75mm
6. CONSTRUCION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE
3. CONCRETE SHALL BE DEPOSITED IN ITS FINAL POSITION WITHOUT SEGRAGATION, RE-HANDLING
SHOWN OR NOTED. MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS. OR PLACING SHALL BE DONE PREFERABLY WITH BUGGIES, BUCKET OR
WHEELBARROWS, NO CHUTES WILL BE ALLOWED EXCEPT TO TRANSFER CONCRETE FROM
7. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEELS, HOPPERS TO BUGGIES, WHEELBARROWS OR BUCKETS IN WHICH CASE THEY SHALL NOT
MISCELLANEOUS IRON, PRE-CAST CONCRETE, ETC. SHALL BE SUBMITTED FOR ENGINEERS EXCEED SIX (6) METERS IN AGGREGATE LENGTH.
APPROVAL BEFORE FABRICATION.
4. NO DEPOSITING OF CONCRETE SHALL BE ALLOWED WITHOUT THE USE OF VIBRATORS
UNLESS AUTHORIZED IN WRITING BY THE DESIGNERS AND ONLY FOR UNUSUAL CONDITIONS
8. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS, TOOLS, WHERE VIBRATIONS IS EXTREMELY DIFFICULT TO ACCOMPLISH.
EQUIPMENTS AND MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL
ELECTRICAL AND MECHANICAL DRAWINGS. 5. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS SHALL BE PROPERLY POSITIONED &
SECURED IN PLACE PRIOR TO PLACING OF CONCRETE.

9. ALL RESULTS OF MATERIAL TESTING FOR CONCRETE, REINFORCING BARS & STRUCTURAL 6. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN CONSECUTIVE D
STEEL MUST BE NOTED & APPROVED BY THE STRUCTURAL DESIGNER. IMMEDIATELY AFTER POURING BY THE USE OF WET BURLAP, FOG SPRAYING, CURING
COMPOUNDS OR OTHER APPROVED METHODS.

7. STRIPPING OF FORMS AND SHORES


FOUNDATION--------------------------------------------------------------------------------------------------------- 24 HRS
SUSPENDED SLAB EXCEPT WHEN
ADDITIONAL LOADS ARE IMPOSED-------------------------------------------------------------------------- 8 DAYS
WALLS------------------------------------------------------------------------------------------------------------------ 21 DAYS
BEAMS------------------------------------------------------------------------------------------------------------------ 14 DAYS
COLUMNS-------------------------------------------------------------------------------------------------------------- 21 DAYS

8. THE CONTRACTOR SHALL SUBMIT THE SCHEDULE OF POURING AND THE LOCATION OF THE
CONSTRUCION JOINTS TO THE STRUCTURAL ENGINEER AT LEAST (4) DAYS PRIOR TO THE
POURING FOR APPROVAL.

9. THE CONTRACTOR SHALL FURNISH AND MAINTAIN ADEQUATE FORMS AND SHORING UNTIL THE
CONCRETE MEMBERS HAVE ATTENDED THEIR WORKING CONDITION AND STRENGTH.

PROJECT TITLE: SHEET NO.

ENGR. KEN PALUGA , RCE


PROPO E RE I ENTIAL R B IL IN
MR. HEZAM M. ANALO
PRC NO. Validity PROJECT LOCATION: OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
2.90 2.70 2.90
DEPTH OF FOOTING - 1400mm
THICKNESS OF FOOTING - 350mm
C1F1 C1F1 C1F1 C1F1

B1 B1 B1

8-16mm Ø. VERTICAL BARS W/ 10mm Ø


2.00 LATERAL TIES SPACED AT 100mm.

3.00 B1

S1
B1 B1

8-16mm Ø. VERTICAL BARS W/ 10mm Ø


C1F1 C1F1 C1F1 1.00 LATERAL TIES SPACED AT 200mm.
B1
B1
S1 S2
FFL

VERTICAL BARS: 8-16mm Ø


3.00 B1
S1 B1 B1
3.00 TIES: 10mm Ø
GRANULAR BASE THICKNESS - 100mm
C1F1 C1F1 C1F1 C1F1

B1 B1 B1

8-16 mm Ø FOOTING RE-BARS BOTHWAY WITH


1.2000 0.2300
150mm SPACING
0.2300
B1 B1
0.1500

0.2300 1.2000

5.50 S2
B1
5.50
S2 8-16 mm Ø FOOTING RE-BARS BOTHWAY WITH
1.2000 150mm SPACING
B1 B1 0.2300

C1F1 C1F1 C1F1 1.2000


B1 B1

SCHEDULE OF COLUMNS
VERTICAL BARS: 8-16mm Ø 5 PCS SPACED AT 100mm, 6
C1 0.2300

0.2300
LENGTH: 3000
TIES: 10mm Ø PCS AND REST AT 200mm
5.60 2.90
SCHEDULE OF FOOTINGS

REINFORCEMENTS

FOUNDATION PLAN AND DETAILS FOOTING D (DEPTH) T (THICK) L (LENGTH) W (WIDTH)

SPACING REBAR Ø
REMARKS

SCALE 1:100 MTS.


F1 1400 350 1200 1200 150 8 — Ø16 —

PROJECT TITLE: SHEET NO.

ENGR. KEN PALUGA , RCE


PROPO E RE I ENTIAL R B IL IN
MR. HEZAM M. ANALO
PRC NO. Validity PROJECT LOCATION: OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
MIDSPAN

325

SUPPORT

4 — Ø16 BOTTOM L/3 L/3 L/3 L/3 L/3


2 — Ø16 TOP L

10 Ø - 210 SPACING

SCHEDULE OF BEAMS

AT MIDSPAN AT SUPPORT
BEAM D (DEPTH) W (WIDTH) BAR ARRANGMENT STIRRUP
L/4 L/4

TOP BOTTOM TOP BOTTOM


2-16Ø mm 2-16Ø mm
2-16Ø mm

B1 325 120 2 — Ø16 4 — Ø16 2 — Ø16 4 — Ø16 2-16Ø mm


2-16Ø mm
1.2000
3.2500

1.2000
2-16Ø mm 10 Ø - 210 SPACING

2-16Ø mm 2-16Ø mm

RB 325 120 2 — Ø16 4 — Ø16 2 — Ø16 4 — Ø16 2-16Ø mm


3.2500
2-16Ø mm

2-16Ø mm
10 Ø - 210 SPACING
2-16Ø mm
1.2000 1.2000

2-16Ø mm 2-16Ø mm 1 - 12 mm Ø 1 - 12 mm Ø

2-16Ø mm 0.1100
19.8338

2 - 12 mm Ø 2 - 12 mm Ø
2-16Ø mm
2-16Ø mm 2-16Ø mm
2.5000 7.3233 7.3233

SCHEDULE OF SLAB
2.5000

REINFORCEMENT BARS SPACING


SLAB THICKNESS REINFORCEMENT BAR REMARKS
TOP BARS BOTTOM BARS

S1 110 12 Ø 200 100 TWO-WAY SLAB


ROOF BEAM DETAILS
S2 190 12 Ø 300 150 ONE-WAY SLAB
SCALE 1:100 MTS.

BEAM AND SLABS DETAILS


SCALE 1:100 MTS.

PROJECT TITLE: SHEET NO.

ENGR. KEN PALUGA , RCE


PROPO E RE I ENTIAL R B IL IN
MR. HEZAM M. ANALO
PRC NO. Validity PROJECT LOCATION: OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
A B C D
A B C D

10.5000
7.1575 3.3425 10.5000
Purlins Spaces
7.1575 3.3425 @600mm

RB RB RB
1 1

RB
RB

RB
6.5717

RB
RB
2 2

RB
RB
RB
10 Ø - 210 SPACING RB
FULL TRUSS RB
3 RB
13.5000 3 13.5000

RB
RB
RB
4 4

RB
6.8267

RB
RB
RB RB
5 5

ROOF PLAN ROOF FRAMING PLAN


SCALE 1:100 MTS. SCALE 1:100 MTS.

PROJECT TITLE: SHEET NO.

ENGR. KEN PALUGA , RCE


PROPO E RE I ENTIAL R B IL IN
MR. HEZAM M. ANALO
PRC NO. Validity PROJECT LOCATION: OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
8.50

2.90 2.70 2.90

3.00 2.90

2.00
3.00

1.00

11.50

2.20

5.60

3.30

3.0 2.60 2.90

2ND FLOOR BEAM FRAMING PLAN


SCALE 1:100 MTS.

PROJECT TITLE: SHEET NO.

ENGR. KEN PALUGA , RCE


PROPO E RE I ENTIAL R B IL IN
MR. HEZAM M. ANALO
PRC NO. Validity PROJECT LOCATION: OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
3.84
7.16
Full Roof Truss Plan A B C D
2x6 Tubular Steel
2x4 Tubular Steel

Laverne Roof Sheet


2x6 Tubular Steel King Post 2.90 2.70 2.90

2.27 Clear Polycarbonate Roof Sheet (Front) RB RB


RB
1
2x3 Tubular Steel C-Purlins 2.84

RB
3.00 3.00

RB

RB
0.89

RB
RB RB
Full Roof Truss Plan 2
2x6 Tubular Steel
0.89

RB
RB
3.00

RB
3.00
0.89
RB RB
0.89 3
RB

0.89

RB
2.75

RB
0.89
RB
4 5.50

RB
0.89

RB
RB
2.75
0.89
RB RB
5

5.60 2.90

TRUSS DETAILS
SCALE 1:100 MTS. ROOF BEAM PLAN
SCALE 1:100 MTS.

PROJECT TITLE: SHEET NO.

ENGR. KEN PALUGA , RCE


PROPO E RE I ENTIAL R B IL IN
MR. HEZAM M. ANALO
PRC NO. Validity PROJECT LOCATION: OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
2ND FLR. FIN. FLR LN

10MMØ STIRRUPS @0.15M O.C.

CHB WALL

1-12MMØ VERTICAL BARS TYPICAL

STAIR LANDING FLOOR LINE

2-10MMØ NOSSING BARS


ELEVATION
0.30
16MMØ BARS @0.15M O.C. @0.15M O.C. 10MMØ ZIGZAG BARS @0.15M O.C.

12MMØ TEMP. BARS @0.20M O.C.


0.24
DOWEL BARS TO MATCH VERTICAL BARS
8.0000
2-12MMØ TOP BARS
4.0000 2-12MMØ BOTTOM BARS
1.23
2.28

1.00
TYPICAL DETAIL OF LINTEL BEAM AT CHB
2.41
WALL OPENINGS

DETAILS AND SCHEDULE OF STRUCTURAL AND CIVIL WORK ELEMENTS


SCALE 1:100 MTS.

PROJECT TITLE: SHEET NO.

ENGR. KEN PALUGA , RCE


PROPO E RE I ENTIAL R B IL IN
MR. HEZAM M. ANALO
PRC NO. Validity PROJECT LOCATION: OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
2.8000 2.5000 2.8000 2.6700 2.5000 2.7000

1.8000

AC
1

AC
2 S

S
S
2.7999

1
2.6700
2.7000

AC

AC
2 S

AC AC 3 S

S 1
PB

C3
0.8336 C2

C4
C1

3.5000 1.5000
2 S
2 S
2.4469
1.5000 PB

C7
0.8297 C6
C8
C9
C5

3 S

11.5000
AC AC
11.5000

1.7785

1
S
S
1
5.9701 5.8000 5.7000
2 S

3.7000 3 S

AC
3 S
S
2

5.4000 2.8000 3.1700 1.9500 2.7000

0.2300
0.2000

GROUND FLOOR ELECTRICAL LAYOUT 1ST FLOOR ELECTRICAL LAYOUT


E SCALE 1:100 MTS. E SCALE 1:100 MTS.

PROJECT TITLE: SHEET NO.

ENGR. GEE LABIANO , PEE


PROPO E RE I ENTIAL R B IL IN
PROJECT LOCATION:
MR. HEZAM M. ANALO E
PRC NO. Validity
OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
2-30.0 mm² THHN wire
PB

MAIN 100 A
Ceiling light Outlet
20 A 20 A
Triplex Receptacle Outlet
1 2 Wall Light Outlet
30 A 30 A
1 S One - Way Switch
3 4 S
2
Two - Way Switch
20 A 20 A
3 S Three - Way Switch
5 6
30 A 30 A Circuit
7 8 PB
Panel Box
30 A 20 A
Air Conditioner Outlet
9 10
20 A 40 A Air Conditioner

11 12
40 40 A
SCHEDULE OF LOADS
13 14
SPARE SPARE
ELECTRICAL SYMBOLS
GROUND

RISER DIAGRAM

PROJECT TITLE: SHEET NO.

ENGR. GEE LABIANO , PEE


PROPO E RE I ENTIAL R B IL IN
PROJECT LOCATION:
MR. HEZAM M. ANALO E
PRC NO. Validity
OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
AY
OF W
GHT
D RI
ROA
SEP
TI
TAN C
K

Prop
Res osed
iden
t
(R1 ial
Buil )
ANALO'S RESIDENCE
ding
BARANGAY IGPIT, OPOL,
MISAMIS ORIENTAL

CV
WM

TAP GV
WATETO MAIN
R LI
NE

ROA
D RI
GHT
O FW
AY

LOCATION PLAN SITE DEVELOPMENT PLAN


P SCALE 1:100 MTS.
P SCALE 1:100 MTS.

PROJECT TITLE: SHEET NO.

ENGR. SKY SMITH , SE


PROPO E RE I ENTIAL R B IL IN
PROJECT LOCATION:
MR. HEZAM M. ANALO P
PRC NO. Validity
OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
SEPTIC TANK
CO.

WC 50mmØ PVC
RISER
BATH & TOILET
FD
LAV
2.7999 BEDROOM 1 BT 76mmØ PVC WC
LAV SH T&B
SH
BEDROOM 2
BEDROOM 3 2.9033
DINING AREA

0.8336 UTILITY

KITCHEN
CO.
ROOM
KS
PRAYER
1.5000 ROOM
2.4469

11.5000
FD

FD
LIVING ROOM

5.9701 GARAGE
FD SH
WC
LAV 5.7000
BALCONY
CO.

BEDROOM 4

5.4000 2.8000
0.2300 3.1700 1.9500 2.7000
0.2000

Garden Tap

GROUND FLOOR SEWER LINE LAYOUT 1ST FLOOR SEWER LINE LAYOUT
P SCALE 1:100 MTS. P SCALE 1:100 MTS.

PROJECT TITLE: SHEET NO.

ENGR. SKY SMITH , SE


PROPO E RE I ENTIAL R B IL IN
PROJECT LOCATION:
MR. HEZAM M. ANALO P
PRC NO. Validity
OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
3.7497
9.9000
6.0000 3.0000 0.9375 1.8709 0.9375

Manhole
0.9312

3.7560 Inlet Outlet


Inlet Outlet 1.8794
1.2000 1.2000
2.4000 A CO CO CO 3.0000

0.9374
1.2000 1.2000

CATCH BASIN DETAIL PLAN


SEPTIC TANK DETAIL PLAN P SCALE 1:100 MTS.
P SCALE 1:100 MTS.

R.C. COVER W/ STL


LIFTING COVER

9.9000
6.0000 2.9993 DRAINAGE PIPE
STORM DRAINAGE PIPE

Ø 10mm @.20m 0.C BOTHWAYS


100 mm THK
Inlet
CO CO CO
MH MH

Outlet
0.5909 Inlet WATER LEVEL WATER LEVEL Outlet 10 MM THK
CHB WALL W/
10 MM O BARS

4-12Ø MM BARS BOTHWAYS


4" Ø PVC PIPE 4" Ø PVC PIPE 4" Ø PVC PIPE 0.7539
3.8000 2.6091 LEACHING 5" THK CONCRETE
DIGESTIVE CHAMBER HALLOW BLOCKS
CHAMBER Ø 10MM VERTICAL BARS
@0.60m

Ø 10MM HORIZONTAL BARS


@ EVERY 3-LAYERS CHB

CATCH BASIN SECTION PLAN


0.5938 0.6099 P SCALE 1:100 MTS.
100 mm THK.
Ø 12mm @.20m 0.C BOTHWAYS

SEPTIC TANK SECTION PLAN


P SCALE 1:100 MTS.

PROJECT TITLE: SHEET NO.

ENGR. SKY SMITH , SE


PROPO E RE I ENTIAL R B IL IN
PROJECT LOCATION:
MR. HEZAM M. ANALO PL P
PRC NO. Validity
OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
PLUMBING GENERAL NOTES

1.ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE EXECUTED IN PLUMBING SYMBOL PLUMBING ABBREVIATION
ACCORDANCE WITH THE PROVISION OF THE PHILIPPINE PLUMBING CODE, THE
NATIONAL BUILDING CODE.

2. ALL DRAWINGS AND SPECIFICATIONS SHALL BE CORRECTLY REVIEWED BY


THE CONTRACTOR AND THE PROJECT MANAGER SHALL IMMEDIATELY BE DCW
DOMESTIC COLD WATER CW COLD WATER
INFORMED IN CASE OF DISCREPANCY FOUND HEREIN. HW HOT WATER
DHW
DOMESTIC HOT WATER LAV LAVATORY
GV GATE VALVE
3. ALL PLUMBING LAYOUTS ARE ONLY DIAGRAMMATIC. ACTUAL LAYOUT OF
MAIN VALVE WC WATER CLOSET
PIPES AND FITTINGS, UNLESS OTHERWISE REQUIRED, SHALL BE PROPERLY SH SHOWER
CONCEALED. PIPE UP CR COMFORT ROOM
PIPE DOWN FD FLOOR DRAIN
4. ALL PIPES SHALL BE INSTALLED AS INDICATED IN THE PLANS. ANY KS KITCHEN SINK
RELOCATION REQUIRED FOR PROPER EXECUTION OF OTHER TRADES SHALL BALL VALVE BT BATHTUB
WILL BE WITH PRIOR APPROVAL OF OF THE PROJECT MANAGER.
PIPE TEE
5. ALL MAINTENANCE FITTINGS SUCH AS GATE VALVES, BALL VALVES, UNIONS,
CLEANOUTS, SHALL BE EXPOSED AND ACCESSIBLE. ALL CLEANOUTS SHALL BE 90° ELBOW-PIPE
FLUSH MOUNTED TO FLOOR OR WALL AS INDICATED IN THE PLANS.
PIPE CAP
6. NO PIPE SHALL BE EMBEDDED IN STRUCTURAL MEMBERS UNLESS PIPE TO FIXTURE
OTHERWISE SPECIFIED OR ALLOWED.

7. INSTALLATION OF WATERLINE SYSTEM, PUMPS AND OTHER EQUIPMENTS


SHALL ONLY BE DONE IN ACCORDANCE WITH THE MANUFACTURER'S
INSTRUCTIONS AND SPECIFICATIONS.

8. ALL WATERLINE DISTRIBUTIONS PER FLOOR SHALL RUN THRU THE CEILING
BEFORE DROPPING TO INDIVIDUAL SUPPLY UNITS.

9. MINIMUM SLOPE FOR SEWER LINES SHALL BE 2% AND THE DRAINAGE SHALL
BE 9%.

10. ALL FIXTURES SHALL BE INDIVIDUALLY VENTILATED. VENTS THRU EAVES


SHALL BE DISCHARGED AT EAVES VENT SLATS. ALL VENT THRU ROOF BE
PROVIDED WITH DOWNWARD ELBOWS AND SCREEN.

11. ALL ALL WORKS SHALL BE TESTED AND COMMISSIONED AS INDICATED IN


THE SPECIFICATIONS PRIOR TO CONCEALING OF PIPES AND SHALL BE
CONDUCTED WITH THE PRESENCE OF THE OWNER, THE DESIGNER, THE
PROJECT MANAGER, THE CONTRACTOR OR THEIR DULY AUTHORIZED
REPRESENTATIVES. RESULTS SHALL BE PROPERLY DOCUMENTED.

12. ALL PLUMBING WORKS SHALL BE DONE UNDER THE DIRECT SUPERVISION
OF A DULY LICENSED SANITARY ENGINEER OR MASTER PLUMBER.

PROJECT TITLE: SHEET NO.

ENGR. SAM SMITH, MP


PROPO E RE I ENTIAL R B IL IN
PROJECT LOCATION:
MR. HEZAM M. ANALO P
PRC NO. Validity
OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
2.8000 2.5000 2.8000

WC 2.6700 2.5000 2.7000


T&B
FD 25 mm INSIDE Ø HWL PPR

1.8000
2.7999 LAV BT LAV
SH FD WC
T&B

25 mm INSIDE Ø HWL PPR


SH
2.6700 2.7000
0.8336
KS
3.5000

DHW

25 mm INSIDE Ø CWL PPR


1.5000 HW
1.5000
DCW

2.4469
11.5000
FD 0.8297

25 mm INSIDE Ø HWL PPR


FD
1.7785

5.9701 5.8000 25 mm INSIDE Ø CWL PPR

FD SH
WC

25 mm INSIDE Ø CWL PPR


LAV 5.7000
T&B

3.7000
3.0000

5.4000 2.8000
0.2300
0.2000 3.1700 1.9500 2.7000

Garden Tap

WATER
SOURCE

GROUND FLOOR WATER LINE LAYOUT 1ST FLOOR WATER LINE LAYOUT
P SCALE 1:50 MTS.
P SCALE 1:50 MTS.

PROJECT TITLE: SHEET NO.

ENGR. SAM SMITH, MP


PROPO E RE I ENTIAL R B IL IN
PROJECT LOCATION:
MR. HEZAM M. ANALO P
PRC NO. Validity
OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
T&
V B
LA
WC
FD WC
BT
SH
SH
FD T& V
B LA

KS

DH
W WC
W
DC HW T& FD

FD
B SH

V
LA

FD

WA P
TA
TE EN
RS GA
RD
OU
RC
E

GROUND FLOOR ISOMETRIC WATER LINE LAYOUT 1ST FLOOR ISOMETRIC WATER LINE LAYOUT
P SCALE 1:50 MTS. P SCALE 1:50 MTS.

PROJECT TITLE: SHEET NO.

ENGR. SAM SMITH, MP


PROPO E RE I ENTIAL R B IL IN
PROJECT LOCATION:
MR. HEZAM M. ANALO P
PRC NO. Validity
OWNER
IAPOA NO. O.R. No.

PTR NO. Date Barangay igpit, opol, misamis oriental


PLACE TIN
WATER CLOSET
LAVATORY & KITCHEN SINK
19.4198

67.3552
01 WATER CLOSET MOUNTING SECTION DETAIL
P 07 SCALE 1:50 MTS.

45.6150

27.4307

GROUND SURFACE

02 GARDEN TAP MOUNTING SECTION DETAIL


P 07 SCALE 1:50 MTS.

PRO E T TITLE SHEET NO.

ENGR. SAM SMITH , MP


PROPOSED RESIDENTIAL (R1) BUILDING
MR. HEZAM M. ANALO P
PRC NO. Validity
PRO E T LO ATION O NER
IAPOA NO. O.R. No.
07
PTR NO. Date B
PLACE TIN
BATHTUB

23.5363

100.4920
SHOWER

01 BATHTUB MOUNTING SECTION DETAIL


P 08 SCALE 1:50 MTS.

02 SHOWER MOUNTING SECTION DETAIL


P 08 SCALE 1:50 MTS.

PRO E T TITLE SHEET NO.

ENGR. SAM SMITH , MP


PROPOSED RESIDENTIAL (R1) BUILDING
MR. HEZAM M. ANALO P
PRC NO. Validity
PRO E T LO ATION O NER
IAPOA NO. O.R. No.
08
PTR NO. Date B
PLACE TIN
01 ROOF DRAIN
P 09 SCALE 1:50 MTS.

155.7064

02 DOWNSPOUT TO CATCH BASIN DETAIL


P 09 SCALE 1:50 MTS.

PRO E T TITLE SHEET NO.

ENGR. SAM SMITH , MP


PROPOSED RESIDENTIAL (R1) BUILDING
MR. HEZAM M. ANALO P
PRC NO. Validity
PRO E T LO ATION O NER
IAPOA NO. O.R. No.
09
PTR NO. Date B
PLACE TIN
01 FLOOR DRAIN (USE FOR SLAB ON GROUND) 02 FLOOR DRAIN (USE FOR SLAB ABOVE CEILING)
P 10 SCALE 1:50 MTS.
P 10 SCALE 1:50 MTS.

PRO E T TITLE SHEET NO.

ENGR. SAM SMITH , MP


PROPOSED RESIDENTIAL (R1) BUILDING
MR. HEZAM M. ANALO P
PRC NO. Validity
PRO E T LO ATION O NER
IAPOA NO. O.R. No.
10
PTR NO. Date B
PLACE TIN

You might also like