Norsu Cit Bais190813permit Set PDF

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 29

REPUBLIC OF THE PHILIPPINES

OFFICE OF THE BUILDING OFFICIAL

BUILDING OFFICIAL
DATE:

E N R O
(ENVIRONMENT AND NATURAL RESOURCES OFFICE)

NAME & SIGNATURE


DATE:

LAND USE AND ZONING

NAME & SIGNATURE


DATE:

FIRE DEPARTMENT

NAME & SIGNATURE


DATE:

LINE AND GRADE

NAME & SIGNATURE


DATE:

ARCHITECTURAL
PERSPECTIVE
1 SCALE: 1:1

NAME & SIGNATURE


DATE:

CIVIL/STRUCTURAL

NAME & SIGNATURE


N DATE:

N ELECTRICAL

RESIDENTIAL AREA NAME & SIGNATURE


DATE:

MECHANICAL

NAME & SIGNATURE


DATE:
FISH POND
NEW TWO-STOREY
AREA SANITARY / PLUMBING
CLASSROOM
PROPOSED BUILDING
LIBRARY
EXTENSION
NAME & SIGNATURE
CAMPUS ROAD THIS AREA DATE:

PROPOSED
RESIDENTIAL LIBRARY
AREA EXTENSION
PAR K I N G AR EA
NAME & SIGNATURE
ENTRANCE
TOTO
BAISBAIS
CITY CITY PROPER
PROPER TO LO-OC PROPER DATE:

PROCESSED BY:
KEY MAP
2 N.T.S.
SCALE: 1:185.20
3
VICINITY MAP
SCALE: 1:1 NAME & SIGNATURE
DATE:
REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
A-1
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 11 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
GREENERY

73.00
1.70 1.30 15.00 55.00
2.50 2.50 2.50 2.50 2.50 2.50 6.30 48.70

MOTOR-
CYCLE CAR PARKING
6.25

5.60
PARKING

1.12
AREA
AREA
PATH WALK PATH WALK PATH WALK
GREENERY GREENERY GREENERY

0.60
23.50

CONSTRUCTION OF CIT BUILDING


13.00

951.03 m2

PATH WALK PATH WALK PATH WALK PATH WALK


2.20

GREENERY GUARD GREENERY GREENERY GREENERY


4.25

GARDEN STUDENT STUDENT STUDENT


MOTORCYCLE PARKING MOTORCYCLE PARKING HOUSE MOTORCYCLE PARKING MOTORCYCLE PARKING
2.05

2.05

LOUNGE LOUNGE LOUNGE


AREA AREA ENTRY AREA AREA
SIDE WALK SIDE WALK
27.07 6.08 6.45 13.00 35.25
87.85

ROAD RIGHT OF WAY

SITE DEVELOPMENT PLAN


1 SCALE: 1:130

REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
A-2
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 12 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
B
A B C D E F G H I J K L M N O P Q
73.00
0.20 4.50 4.50 4.50 10.90 6.10 4.50 4.50 4.50 4.50 9.00 4.50 4.50 4.50 1.98

4 0.20

4.15
4.15
HALLWAY HALLWAY HALLWAY HALLWAY HALLWAY
4.00

3
20 20 20
9.07

1 19 1 19 1 19
20 x 0.18 = 3.50

2 18 2 18 2 18
12.40

17 17 17

20 x 0.18 = 3.50

20 x 0.18 = 3.50
3 3 3

#DrgID

13.00
4 16 4 16 4 16

4.97
15 15 15
5.00

#LayID
5 5 5

4.50
6 14 6 14 6 14

7 13 7 13 7 13

8 12 8 12 8 12

9 11 9 11 9 11

4.00 STAIRS
CLASS CLASS CLASS CLASS STAIRS

8.85
0.98
B OFFICE OFFICE OFFICE ROOM 1 ROOM 2 ROOM 3 ROOM 4 B
10

10

10
1.40 1.40
1.90 0.95

2 MALE FEMALE
TOILET
3.00
3.00

TOILET
1.25 2.48 1.80

0.10

3.87
1.90

1.87
1.92 1.40 1.40

1.78
6"Ø
0.13

1.94
4.50 4.50 4.50 4.50 6.40 6.10 9.00 4.50 4.50 4.50 4.50 4.50 4.50 4.50 1.95
4.55 4.45 4.50 4.50 6.40 6.10 9.00 9.00 9.00 9.00
PHASE 1 73.00
A B C D E F G B H I J K L M N O P Q
#DrgID

GROUND FLOOR PLAN


1 SCALE: 1:120

#LayID

B
A B C D E F G H I J K L M N O P Q
0.00 73.00
0.20 4.50 4.50 4.50 4.50 6.40 6.10 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 1.83 0.13

4
0.20

1
2
3
4
5
6
7

7 x 0.19 = 1.30 7 x 0.19 = 1.30


4.15
4.00

7
6
5
4
3
2
1

3
20 20 20

1 19 1 19 1 19
20 x 0.18 = 3.50

2 18 2 18 2 18

17 17 17
20 x 0.18 = 3.50

20 x 0.18 = 3.50
12.40

3 3 3

#DrgID 4 16 4 16 4 16

15
ADMIN. 15 15
4.98

#LayID CLASS CLASS


5 5 5
5.00

OFFICE OFFICE
6 14 6 14 6 14

OFFICE OFFICE CLASS


13 13 13

CLASS
7 7 7

ROOM 6 ROOM 7
8 12 8 12 8 12

9 11 9 11 9 11

ROOM 8 ROOM 9
1.00 WHITE BOARD WHITE BOARD WHITE BOARD WHITE BOARD
B B
10

10

10
1.40 1.40 1.40 FEMALE TOILET
2
MALE3.72
3.00
3.15

3"Ø
4"Ø 1.80 4"Ø
1.79 1.40 1.23 1.85
TOILET
1.90

1.90

1.87
1.50

1
0.13
0.20

4.50 4.50 4.50 4.50 6.40 6.10 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 1.90 0.08
9.00 4.50 4.50 6.40 6.10 9.00 9.00 9.00 9.00 6.53
73.00

A B C D E F G B H I J K L M N O P Q
#DrgID
#LayID

SECOND FLOOR PLAN


2 SCALE: 1:120

REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
A-3
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 13 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
ALUMINUM CLADDING
FIX GLASS WINDOW
APEX WALL CLADDING
RIB- TYPE ROOF
PLASTERED CONCRETE WALL
SLIDING GLASS WINDOW

3.24
CONCRETE BEAMS
CONCRETE COLUMNS

1.45
ROOF BEAM
11.50

3.00

2ND FFL

5.50
PHASE 1 PHASE 1
3.50

GRND F.F.L.
NGL
0.30

FRONT ELEVATION
1
2"X 1" RECTANGULAR TUBE
SCALE: 1:120 WALL CLADDING
FIX GLASS WINDOW
GLASS SLIDING DOOR
APEX ALUMINUM CLADDING
PANEL DOOR
SLIDING GLASS WINDOW
PLASTERED CONCRETE WALL
3.24

CONCRETE BEAMS
2"x 3" RECTANGULAR TUBING
1.45

ROOF BEAM
11.50

3.00

2ND FFL
3.50

PHASE 1 PHASE 1

GRNDFFL
NGL
0.30

PHASE1

REAR ELEVATION
2 SCALE: 1:120

2" x 3" RECTANGULAR TUBING


RAILING 2" x 3" RECTANGULAR TUBING
ALUMINUM CLADDING RAILING
RIB- TYPE ROOF ALUMINUM CLADDING
PLASTERED CONCRETE WALL RIB- TYPE ROOF
CONCRETE COLUMNS
PLASTERED CONCRETE WALL
APEX APEX
CONCRETE COLUMNS APEX

3.24
3.24
3.24

4 3 2 1
1.45
1.45

1.45
SEE TRUSS DETAIL
ROOF BEAM ROOF BEAM ROOF BEAM

11.50
11.50
11.50

3.00
3.00

3.00

2ND FFL 2ND FFL 2ND FFL HALLWAY CLASS ROOM

3.50
PHASE 1
3.50

3.50

PHASE 1 PHASE 1
PHASE 1 PHASE 1
PHASE 1

HALLWAY CLASS ROOM


GRNDFFL GRND FFL GRNDFFL
NGL
NGL

0.30
0.30

0.30

BLDG SECTION B
RIGHT-SIDE ELEVATION LEFT-SIDE ELEVATION 5
3 SCALE: 1:120 4 SCALE: 1:120
SCALE: 1:120

REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
A-4
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 14 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
APEX

SEE TRUSS
DETAIL

3.23
1.47
SEE TRUSS SEE TRUSS
ROOF BEAM DETAIL DETAIL

11.50
3.00 ADMIN OFFICE

2ND FFL OFFICE OFFICE OFFICE MALE TOILET CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM FEMALE TOIET

6.80
3.50

PHASE 1 PHASE 1

OFFICE
OFFICE
GRND FFL OFFICE MALE TOILET CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM FEMALE TOILET
0.30

NGL

SECTION B
A B C D E F
1 SCALE: 1:120
G H I J K L M N O P Q

METAL 1.15 METAL 1.15 METAL 1.15

FURRING FURRING
(W/ GRILLE) (W/ GRILLE)
FURRING
(W/ GRILLE)

3
20 20 20

19 19 19
1 1 1

18 18 18
20 x 0.18 = 3.50

2 2 2

20 x 0.18 = 3.50

20 x 0.18 = 3.50
17 17 17
3 3 3

16 16 16
4 4 4

15 15 15
5 5 5

14 14 14
6 6 6

13 13 13
7 7 7

12 12 12
8 8 8

11 11 11
9 9 9
10

10

10
2

METAL
1.15 METAL 1.15

FURRING
GROUND FLOOR CEILING FRAMING PLAN FURRING
(W/ GRILLE) (W/ GRILLE)

2 SCALE: 1:120
A B C D E F G H I J K L M N O P Q

METAL 1.15 METAL1.15

FURRING
(W/ GRILLE)
FURRING
(W/ GRILLE)

4
1

7 x 0.19 = 1.30 7 x 0.19 = 1.30


7

3
20 20 20

19 19 19
1 1 1

18 18 18
20 x 0.18 = 3.50

2 2 2
20 x 0.18 = 3.50

20 x 0.18 = 3.50
17 17 17
3 3 3

16 16 16
4 4 4

15 15 15
5 5 5

14 14 14
6 6 6

13 13 13
7 7 7

12 12 12
8 8 8

11 11 11
9 9 9
10

10

10
2

METAL
1.15 METAL
SECOND FLOOR CEILING FRAMING PLAN
1.15

(W/ GRILLE)
FURRING FURRING
(W/ GRILLE)

3 SCALE: 1:120

REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
A-5
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 15 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
A B C D E F G H I J K L M N O P Q

1.20M x1.20M OPEN 1.15 CFL RECESSED 1.15 1.20M x1.20M OPEN
1.15 FLUORESCENT LAMP
JOINTED CEILING JOINTED CEILING (CEILING SURFACE)
(W/ GRILLE) (W/ GRILLE)
PINLIGHTS
(W/ GRILLE)

3
20 20 20

19 19 19
1 1 1

18 18 18
20 x 0.18 = 3.50

2 2 2

20 x 0.18 = 3.50

20 x 0.18 = 3.50
17 17 17
3 3 3

16 16 16
4 4 4

15 15 15
5 5 5

14 14 14
6 6 6

13 13 13
7 7 7

12 12 12
8 8 8

11 11 11
9 9 9
10

10

10
2

CFL RECESSED
FLUORESCENT LAMP
1.15
CEILING
CEILING PLAN
FAN
1.15

PINLIGHTS
(W/ GRILLE) (W/ GRILLE)
1.15

(CEILING SURFACE)
(W/ GRILLE)

GROUNDFLOOR CEILING PLAN


1 SCALE: 1:120

A B C D E F G H I J K L M N O P Q

1.20M x1.20M OPEN 1.15 CFL RECESSED 1.15 1.20M x1.20M OPEN
1.15 FLUORESCENT LAMP
JOINTED CEILING JOINTED CEILING (CEILING SURFACE)
(W/ GRILLE) (W/ GRILLE)
PINLIGHTS
(W/ GRILLE)

4
1

7 x 0.19 = 1.30 7 x 0.19 = 1.30


7

3
20 20 20

19 19 19
1 1 1

18 18 18
20 x 0.18 = 3.50

2 2 2
20 x 0.18 = 3.50

20 x 0.18 = 3.50
17 17 17
3 3 3

16 16 16
4 4 4

15 15 15
5 5 5

14 14 14
6 6 6

13 13 13
7 7 7

12 12 12
8 8 8

11 11 11
9 9 9
10

10

10
2

CFL RECESSED
FLUORESCENT LAMP
1.15
CEILING PLAN
FAN
1.15

PINLIGHTS
(W/ GRILLE) (W/ GRILLE)
1.15

(CEILING SURFACE)
(W/ GRILLE)

SECOND FLOOR CEILING PLAN


2 SCALE: 1:120

REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
A-6
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 16 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
1.0cm OPEN JOINT

4.5mm FIBER CEMENT BOARD

60cm x 60cm LED PANEL LIGHT

METAL FURRING AT 0.6m O.C.

0.60
i

1.20
i

i
0.01

OPEN JOINTED CEILING DETAIL


1 SCALE : NTS
SCALE: 1:0.74
2" x 3" RECTANGULAR TUBE

0.06
0.07

2" x 2" SQUARE TUBE


3 OPEN JOINTED CEILING DETAIL

0.21
0.06 0.19 0.06
A-7
2" x 2" SQUARE TUBE
NTS
PLASTER FINISH WALL

1.00
& COLUMN

0.18 0.25
(SEE SECTION) 2ND FFL
2" x 2" SQUARE TUBE
2" x 2" SQUARE TUBE
2" x 3" RECTANGULAR TUBING
4.00 0.40
0.20 0.84 0.84 0.26
0.05 0.20
0.82

RAILING SECTION
1.00

3
0.19

SCALE: 1:20
0.26

2ND FFL
0.18

RAILING DETAIL
2 SCALE: 1:20
2" x 3" RECTANGULAR TUBE
0.07

REVIEWED/ APPROVED by: PROJECT INFO: SHT. NO. REVIEWED BY/


SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
RECOMMENDING APPROVAL:
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
A-7
NEGROS ORIENTAL STATE UNIVERSITY ARCH'L. DESIGN: Designer DESIGNED BY:
ENTAL Office of the University Engineer
CLASSROOM, 6 OFFICES AND ADMIN A-7 NEGROS ORIENTAL STATE UNIVERSITY
STRUCT'L DESIGN BY: Author
CAD BY:

ERSITY Main Campus 1, Kagawasan Ave.Capitol Area


ENGR. MICHAEL A. SAGA
Dumaguete City
PRC NO.:
PTR NO.:
VALIDITY:
DR.DATE:
JOEL P. LIMSON BUILDING (CAMPUS-1)
DATE: 7/3/2019 12:50:35 PM
ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
FILE NAME: SHEET NO.

PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 17 of


TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL ARCHITECTURAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER

AGUETE CITY UNIVERSITY ENGINEER UNIVERSITY PRESIDENT


FILE NAME: C:\Users\JASON\Desktop\HASMINE\ST
BLDG\3\ST-MABINAY -sir saga.rvt
GENERAL NOTES:
WHERE:
1.0 GENERAL 3.2 LIVE LOAD (LL) V = Base Shear
3.2.1 INACCESSIBLE ROOF 1.00 KPa SEISMIC SOURCE TYPE D
1.1 THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT THE SITE, AND SHALL NOTIFY
3.2.2 ACCESSIBLE ROOF 2.00 KPa Z = 0.40 (NSCP Table 208-3, Seismic Zone Factor)
THE STRUCTURAL ENGINEER OF DISCREPANCIES BETWEEN ACTUAL CONDITIONS AND INFORMATIONS
3.2.3 ACCESSIBLE ROOF w/ MECHANICAL AREA 3.50 KPa I = 1.00 (NSCP Section 208.1, Standard Occupancy- Importance Factor)
SHOWN ON THE DRAWINGS BEFORE PROCEEDING WITH THE WORK. THIS SHALL INCLUDE THE LOCATION
3.2.4 OFFICES 3.00 KPa R = 8.5 (NSCP Table 208.11, Over Strength Factor)
AND DIMENSIONS OF GROOVES, REGLETS, SLEEVES,CURBS, OPENINGS, EMBEDDED OR ATTACHED ITEMS.
3.2.5 RESIDENTIAL 1.90 KPa Sd = Stiff Soil (NSCP Table 208.2, Soil Profile Type)
1.2 ALL DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALE SHOWN ON PLANS,SECTIONS OR DETAILS. 3.2.6 LOBBY 4.80 KPa
3.2.7 CORRIDORS AND STAIRS 4.80 KPa W = (NSCP Table 208.5.1.1, Total Seismic Dead Load of Structure)
NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS.
3.2.8 COMPUTER AND CONTROL 4.80 KPa Na =1.0 (NSCP Table 208-4, Near source Factor)
3.2.9 STORAGE (LIGHT) 6.00 KPa Nv =1.2 (NSCP Table 208-5, Near source Factor)
1.3 THE STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE.
3.2.10 ASSEMBLY AREA 4.80 KPa Ct =0.0488 (NSCP Table 208.5.2.2, For Reinforced Concrete Moment-Resisting
THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION UNLESS SO STATED. THE CONTRACTOR SHALL
3.2.11 MACHINE ROOM 7.20 KPa Frame System)
PROVIDE ALL NECESSARY MEASURES TO PROTECT THE STRUCTURE, ADJACENT PROPERTIES,
hn = 13.20 m
WORKMEN AND OTHER PERSONS DURING ALL PHASES OF CONSTRUCTION.
3.3 WIND LOAD (WL) T = 0.77 sec. (NSCP Table 208.5.2.2, eq'n 208-8, Fundamental Period)
DESIGN WIND PRESSURE (P) SHALL BE COMPUTED AS FOLLOWS
1.4 THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND/OR THE STRUCTURAL ENGINEER OF
Response Spectrum Parameters:
ANY CONDITION WHICH IN HIS OPINION MIGHT ENDANGER THE STABILITY OF THE STRUCTURE OR
P = q h [(GCpf) - (GCpi)] (NSCP Table 207-1) Ca = 0.44Na (NSCP Table 208.7, Seismic Coefficient Soil Profile Sc)
CAUSE DISTRESS IN THE STRUCTURE.
Cv = 0.64Nv (NSCP Table 208.8, Seismic Coefficient Soil Profile Sc)
-6 2
q z = 47.3x10 K z K ztK DV I w NSCP Section 207.5.1, eq'n. 207-1)
1.5 CONSTRUCTION MATERIALS SHALL NOT BE STORED ON POURED FLOORS. IT IS THE GENERAL
CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE SUB-CONTRACTORS ARE INFORMED AND 2 4.0 LOAD COMBINATION
Kzt = (1+K K K ) (NSCP Section 207.5.7.2, eq'n 207-3)
DO NOT VIOLATE THIS IMPORTANT REQUIREMENT. 1 2 3
4.1 FACTORED LOAD COMBINATION:
1.6 THE CONTRACTOR SHALL PROVIDE TEMPORARY ERECTION BRACINGS AND SHORING FOR ALL THE Where: ( NSCP 2010 SECTION 203.3)
STRUCTURAL MEMBERS AS REQUIRED FOR STRUCTURE STABILITY DURING ALL PHASES OF CONSTRUCTION. qh
=@ mean roof height using Exposure C for all terrain
GCpf , GC pi 4.1.1 1.4 (D + F) - (NSCP Eq'n 203-1)
= external & internal pressure coefficient 4.1.2 1.2 (D + F + T) + 1.6 (L + H) + 0.5 (L r or R) - (NSCP Eq'n 203-2)
1.7 THE CONTRACTOR SHALL TAKE ALL STEPS NECESSARY TO ENSURE THE PROPER ALIGNMENT OF THE
STRUCTURE AFTER THE INSTALLATION OF ALL STRUCTURAL AND FINISH MATERIALS. Exposure D 4.1.3 1.2 D + 1.6 (L r or R) + (f ' L or 0.8 W) - (NSCP Eq'n 203-3)
4.1.4 1.2 D + 1.6 W + f ' L + 0.5 (L r or R) - (NSCP Eq'n 203-4)
K z = 1.037 (NSCP Table 207-4) 4.1.5 1.2 D + 1.0 E + f ' L - (NSCP Eq'n 203-5)
1.8 THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR REVIEW AND APPROVAL BY THE STRUCTURAL
K zt = 1.0 (NSCP Section 207.5.7.2) 4.2 SERVICE LOAD COMBINATION
ENGINEER PRIOR TO EXECUTION OF ANY WORK.
K D = 0.85 (NSCP Figure 207-2) (NSCP 2010 SECTION 203.4)
V = 200kph (NSCP Table 207-1)
1.9 TYPICAL DETAILS AND GENERAL NOTES ON S-2 TO S-3 APPLY TO ALL PARTS OF THE JOB UNLESS
I W = 1.0 (NSCP Table 207-3) 4.2.1 D+F - (NSCP Eq'n 203-8)
OTHERWISE SHOWN ON THE DRAWINGS.
G = 0.80 (NSCP Section 207.5.8) 4.2.2 D+H+F+L+T - (NSCP Eq'n 203-9)
C pf = + 0.80 Windward Wall (NSCP Table 207-6) 4.2.3 D + H + F + (L r or R) - (NSCP Eq'n 203-10)
1.10 ALL DIMENSIONS, PLANS AND ELEVATIONS ARE IN MILLIMETERS, UNLESS OTHERWISE
- 0.64 Leeward Wall (NSCP Table 207-6) 4.2.4 D + H + F + 0.75 [L + T + (L ror R)] - (NSCP Eq'n 203-11)
SHOWN ON THE DRAWINGS.
GC pi = +/- 0.18 (NSCP Table 207-5) 4.2.5 D + H + F + W or E - (NSCP Eq'n 203-12)
2.0 STANDARD AND REFERENCES 1.4
3.4 SEISMIC LOAD (EQ)
2.1 GOVERNING CODES: 5.0 MATERIALS
SEISMIC LOADS FOR BUILDING STRUCTURES ARE CALCULATED BASED
NBCP/IRR REV 2004 NATIONAL BUILDING CODE OF THE PHILIPPINES ON THE FOLLOWING: 5.1 NORMAL WEIGHT CONCRETE
5.1.1 CONCRETE USED IN THIS WORK SHALL HAVE A CYLINDER COMPRESSIVE
E = ρEh + Ev
NSCP 2015 NATIONAL STRUCTURAL CODE OF THE PHILIPPINES STRENGTH AT 28 DAYS AS FOLLOWS:
E m= ΩO E h
ACI 318-05 & 318-08 BUILDING CODE REQUIREMENTS FOR WHERE: a. Mat Foundation fc’ = 20.70 MPa (3,000 psi)
STRUCTURAL CONCRETE, AMERICAN CONCRETE INSTITUTE b. Beams & Girders fc’ = 20.70 MPa (3,000 psi)
E = EARTHQUAKE LOAD ON THE STRUCTURE c. Columns & Structural Walls fc’ = 20.70 MPa (3,000 psi)
ACI SP-66 (04) AMERICAN CONCRETE INSTITUTE DETAILING MANUAL d. Retaining Walls fc’ = 20.70 MPa (3,000 psi)
E h = THE EARTHQUAKE LOAD DUE TO THE BASE SHEAR, V, OR THE DESIGN e. Water Tank fc’ = 20.70 MPa (3,000 psi)
AISC 360-05 SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS LATERAL FORCE Fp. f. Suspended Slab & Stairs fc’ = 20.70 MPa (3,000 psi)
AMERICAN INSTITUTE OF STEEL CONSTRUCTION g. Ramps fc’ = 20.70 MPa (3,000 psi)
E m = THE ESTIMATED MAXIMUM EARTHQUAKE FORCE THAT CAN BE DEVELOPED IN h. Slab on fill fc’ = 21.00 MPa (3,000 psi)
AISC 326 DETAILING FOR STEEL CONSTRUCTION THE STRUCTURE.

ΩO = THE SEISMIC FORCE AMPLIFICATION FACTOR THAT IS REQUIRED TO 5.1.2 ALL CONCRETE SHALL BE DEPOSITED, VIBRATED AND CURED IN ACCORDANCE WITH
AISI S100-2007 NORTH AMERICAN SPECIFICATION FOR THE DESIGN OF
ACCOUNT FOR STRUCTURAL OVER STRENGTH. ACI STANDARD 318-11
COLD-FORMED STEEL STRUCTURAL MEMBERS

ρ= RELIABILITY/REDUNDANCY FACTOR WHICH SHALL NOT BE TAKEN LESS THAN 5.1.3 MINIMUM CONCRETE COVER FOR REINFORCING BARS SHALL BE AS FOLLOWS:
ASCE/SEI 7-05 MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURE
1.0 AND GREATER THAN 1.5, IS GIVEN BY THE FOLLOWING FORMULA: A. FOOTINGS AND BOT. OF FOOTING TIE BEAMS = 75 mm (CAST AGAINST EARTH)
AMERICAN SOCIETY OF CIVIL ENGINEERS
B. SIDES OF FOOTING TIE BEAMS = 50 mm (CAST AGAINST FORMS)
6.1 C. BEAMS, COLUMNS = 40 mm (TO STIRRUPS AND TIES)
AWS D1.1 AMERICAN WELDING SOCIETY ρ=2- D. SLAB = 20 mm (CAST AGAINST FORMS)
r max √A B
2.2 GOVERNING STANDARDS:
r max = THE MAXIMUM ELEMENT-STORY RATIO. FOR A GIVEN DIRECTION OF 5.1.4 BEFORE CONCRETE IS POURED, CHECK WITH ALL TRADES TO ENSURE PROPER PLACEMENT
ASTM A36 STRUCTURAL STEEL OF ALL OPENINGS, SLEEVES, CURBS, CONDUITS, ETC. RELATIVE TO THE WORK.
LOADING, THE ELEMENT-STORY SHEAR RATIO IS THE RATIO OF THE DESIGN
STORY SHEAR IN THE MOST HEAVILY LOADED SINGLE ELEMENT DIVIDED THE
ASTM A611 STEEL, SHEET, CARBON, COLD- ROLLED, 5.2 REINFORCING BARS :
STRUCTURAL QUALITY TOTAL DESIGN STORY SHEAR.
5.2.1 UNLESS OTHERWISE SPECIFIED ON PLANS, ALL REINFORCING BARS SHALL BE
ASTM A615/PNS 49 SPECIFICATION FOR STEEL BARS FOR CONCRETE FOR MOMENT FRAMES, IT SHALL BE TAKEN AS THE MAXIMUM OF THE SUM OF ASTM A615 DEFORMED WITH A MINIMUM YIELD STRENGTH AS FOLLOWS:
REINFORCEMENT THE SHEARS IN ANY TWO ADJACENT COLUMNS IN A MOMENT FRAME BAY A. Fy = 415 Mpa (60,000 PSI) FOR 16 - 36 mm Ø
DIVIDED BY THE TWO SHEAR. FOR COLUMNS COMMON TO TWO BAYS, SEVENTY B. Fy = 275 Mpa (40,000 PSI) FOR 10 - 12 mm Ø
ASTM C33/PNS 18 STANDARD SPECIFICATION FOR CONCRETE AGGREGATES PERCENT OF THE SHEAR IN THE COLUMN MAY BE USED IN THE COLUMN
SHEAR SUMMATION. 5.2.2 FOR PRESTRESS REINFORCING, IT SHALL BE ASTM A416 UNCOATED 7-WIRE STRESS
ASTM C39 STANDARD TEST METHOD FOR COMPRESSIVE RELIEVED STRANDS.
A B = THE GROUND FLOOR AREA OF THE STRUCTURE
STRENGTH OF CYLINDRICAL SPECIMENS
5.2.3 ALL REINFORCING BARS SHALL BE CLEANED OF RUST, GREASE OR OTHER MATERIALS
DESIGN BASE SHEAR (V) SHALL BE COMPUTED AS FOLLOWS: WHICH TEND TO IMPAIR BOND.
ASTM C94/PNS 46 STANDARD SPECIFICATION FOR READY-MIXED CONCRETE
V = CvIW (NSCP Eq’n 208-4) 5.2.4 ALL REINFORCING BARS SHALL BE ACCURATELY AND SECURELY PLACED BEFORE POURING
ASTM C150/PNS 07 STANDARD SPECIFICATION FOR PORTLAND CEMENT (RT) CONCRETE OR APPLYING MORTAR OR GROUT.
PNS 16 PHILIPPINE NATIONAL STANDARD FOR CONCRETE V < 2.5CaIW (NSCP Eq’n 208-5)
HOLLOW BLOCKS 5.2.5 LAPPED SPLICES SHALL BE STAGGERED AS POSSIBLE.
R
SG 671 SPECIFICATION FOR THE DESIGN OF COLD FORMED 5.2.6 UNLESS INDICATED OTHERWISE, SPLICING OF REINFORCEMENT SHALL BE IN ACCORDANCE
V > 0.11CaIW NSCP Eq’n 208-6) WITH ACI - 318M – 11.
STEEL STRUCTURAL MEMBERS
BY AMERICAN IRON AND STEEL INSTITUTE.
5.2.7 UNLESS SHOWN OTHERWISE ON PLANS, SPLICES SHALL BE AS FOLLOWS:
3.0 BASIC DESIGN LOADS V > 0.8ZNvIW (NSCP Eq’n 208-7)
R A) BEAMS AND FOOTING TIE BEAMS : TOP AND BOTTOM BARS SHALL NOT BE SPLICED WITHIN THE
3.1 DEAD LOAD (DL) 3/4 COLUMN OR WITHIN A DISTANCE TWICE THE MEMBER DEPTH FROM THE FACE OF THE COLUMN.
3
3.1.1 STEEL 77.00KN/m 3 T = Ct(hn) NSCP Eq’n 208-8) THE STIRRUPS SPACING WITHIN THE SPLICE LENGTH SHALL NOT EXCEED 100 mm. THE SPLICE
3.1.2 CONCRETE 24.00 KN/m LENGTH SHALL NOT BE LESS THAN THE LENGTH SHOWN ON TABLE S-3.
3.1.3 FLOOR FINISH 1.58 KPa
3.1.4 100mm CMU 3.40 KPa B) COLUMNS : SPLICES WHEN PERMITTED SHALL BE MADE WITHIN THE CENTER HALF OF COLUMN
3.1.5 150mm CMU 4.00 KPa CLEAR HEIGHT AND LAP SPLICE SHALL NOT BE LESS THAN 60 BAR DIAMETER UNLESS NOTED
3.1.6 CEILING 0.48 KPa OTHERWISE IN THE DRAWING. SPLICES OF MAIN VERTICAL BARS SHOULD NOT BE MORE THAN 33%
3.1.7 ROOFING 0.60 KPa AT ANY ONE LOCATION. THE USE OF APPROVED MECHANICAL DEVICES MAY BE PERMITTED
3.1.8 PARTITION 1.00 KPa PROVIDED THAT NOT MORE THAN ALTERNATE BARS ARE SPLICED AT ANY LEVEL. THE MINIMUM
3.1.9 MECHANICAL & ELECTRICAL UTILITIES 0.20 KPa VERTICAL DISTANCE BETWEEN SPLICE LENGTHS SHALL BE 600 mm.
3.1.10 50mm THK RIGID INSULATION 0.15 KPa C) CHB WALLS : VERTICAL BARS SHALL BE SPLICED AT THE TOP OF WALL FOOTING OR TIE BEAM
3.1.11 3 PLY MEMBRANE WATER PROOFING 0.15 KPa
3.1.12 PEA GRAVEL 1.00 KPa AND AT THE BOTTOM OF RC LINTEL BEAM SPLICE LENGTHS SHALL BE 600 mm MIN.
REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
S-1
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 17 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
5.2.8 UNLESS INDICATED OTHERWISE ALL BEAMS TERMINATING AT THE COLUMN SHALL HAVE 6.6 DISTANCE
DIRECTION.HIGHER BEAMS, GIRDERS OR HAUNCHES
IS PERMITTED ONLY IFSHALL BE PLACED
APPROVED MONOLITHICALLY
BY THE AS PART OFAND
STRUCTURAL ENGINEER A SLAB SYSTEM, UNLESS
PROVIDED 11.0 SITE SPECIFIC DESIGN PARAMETERS
TOP AND BOTTOM BARS EXTENDING TO THE FAR FACE OF THE COLUMN TERMINATING IN A OTHERWISE SHOWN IN DESIGN DRAWINGS OR SPECIFICATIONS.
STANDARD 90º HOOK LENGTH OF ANCHORAGE NOT LESS THAN 500 mm. ZONE (SEISMIC) =4
6.7 BEAMS, GIRDERS OR SLABS SUPPORTED BY COLUMNS OR WALLS SHALL NOT BE CAST OR ERECTED UNTIL
BASIC WIND SPEED = 250 KPH
5.2.9 SHOP DRAWINGS FOR BENDING AND CUTTING OF REINFORCEMENT SPLICE LENGTH OF CONCRETE IN VERTICAL SUPPORT MEMBERS IS NO LONGER PLASTIC.
EXPOSURE =D
REINFORCING BARS SHALL BE AS SHOWN IN THE TABLE BELOW AND BE SUBMITTED FOR MINIMUM DEPTH OF FOOTING EMBEDMENT = AS SHOWN ON DRAWINGS
APPROVAL BY THE STRUCTURAL ENGINEER PRIOR TO FABRICATION. 6.8 CONTROL JOINTS IN SLAB ON GRADE SHALL BE SPACED AT 6.00 m (MAX.) INTERVAL ON BOTH DIRECTIONS. THE
FOOTINGS SHALL BE PROVIDED EVERY 30 M MAX.USING IN FILL STRIP OF WIDTH 1.00 m WHICH SHALL BE
RESULTING PANEL SHOULD BE APPROXIMATELY SQUARE.
CASTED AFTER COMPLETE HARDENING OF CONCRETE ON BOTH SIDES OF THE STRIP. THE IN-FILL STRIP SOIL BEARING CAPACITY
5.3 STRUCTURAL STEEL/ANCHOR BOLTS/BOLTS WELDS AND WELDMENTS : AS RECOMMENDED BY THE
6.9 ON WALLS HAVING FREQUENT OPENINGS, SPACING OF CONTROL JOINTS 6.00 m APART IS CONSIDERED MAXIMUM.
THE SPACING ON WALLS WITHOUT WINDOWS SHOULD NOT BE MORE THAN 7.50 m AND A JOINT WITHIN 3.00 m OF GEOTECHNICAL ENGINEER b = TBD
5.3.1 ALL STRUCTURAL STEEL SHALL HAVE A MINIMUM YIELD STRENGTH, Fy = 250 MPa (36000 PSI) c
EACH CORNER IS DESIRABLE.
AND SHALL CONFORM TO ASTM A 36 SPECIFICATIONS.
6.10 CONTRACTOR HAS TO SUBMIT CONSTRUCTION JOINTS LOCATION FOR APPROVAL BY THE
5.3.2 ALL STRUCTURAL STEEL SHALL BE FABRICATED AND ERECTED IN ACCORDANCE WITH THE STRUCTURAL ENGINEER.
AISC SPECIFICATIONS AND CODE OF STANDARD PRACTICE AS AMENDED TO DATE.
7.0 PRECAST CONSTRUCTION
5.3.3 ALL COLD FORMED STEEL SHALL HAVE A MINIMUM YIELD STRENGTH Fy = 230 MPa (33000 PSI).
7.1 WHENEVER PRECAST ELEMENTS ARE USED, THEIR SIZES AND THICKNESSES ARE BASED ON IN-PLACE LOAD
5.3.4 NO STEEL SHALL BE FABRICATED OR ERECTED UNLESS SHOP DRAWINGS HAVE BEEN
CONDITIONS, CONTRACTOR SHALL VERIFY THESE SIZES BASED ON OTHER LOAD CONDITIONS SUCH AS
APPROVED BY THE STRUCTURAL ENGINEER.
MOULDING, UP ENDING TRANSPORTATION, LIFTING AND ERECTION.
5.3.5 ALL SHOP AND FIELD WELDING SHALL BE IN ACCORDANCE WITH AWS D 1.1 AND PERFORMED
BY QUALIFIED AND CERTIFIED WELDERS. 7.2 CONTRACTOR SHALL SUBMIT DETAILED CALCULATIONS AND SHOP DRAWINGS FOR
THE STRUCTURAL ENGINEER'S APPROVAL PRIOR TO FABRICATION.
5.3.6 UNLESS INDICATED OTHERWISE, WELDING ELECTRODES SHALL BE E70XX, MINIMUM THICKNESS
OF WELD SHALL BE 4mm. 7.3 CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ALL CONNECTION DETAILS OF PRECAST ELEMENTS
TO SUPPORTING STRUCTURE PRIOR TO START OF CONSTRUCTION FOR THE STRUCTURAL ENGINEER'S APPROVAL.
5.3.7 UNLESS OTHERWISE INDICATED ALL ANCHOR BOLTS SHALL CONFORM TO ASTM - A325 SPECIFICATIONS.
7.4 DESIGN AND CONSTRUCTION OF PRECAST ELEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH
5.3.8 BOLTS FOR MEMBER CONNECTION SHALL BE HIGH STRENGTH BOLTS, CONFORMING TO ASTM A325 PROJECT SPECIFICATIONS.
SLIP CRITICAL WITH COMPLETE NUTS AND WASHERS.
5.3.9 ALL FULL AND PARTIAL PENETRATION WELDS SHALL BE ULTRASONICALLY INSPECTED. WELDS NOT 7.5 ALL NON-STRUCTURAL PRECAST ELEMENTS SUCH AS PLANTER BOXES, PRECAST SEATING ETC, SHALL
BE DESIGNED, DETAILED, FABRICATED AND INSTALLED BY THE PRECAST VENDOR.
ACCESIBLE FOR ULTRASONIC INSPECTION SHALL BE EXAMINED BY X-RAY OR OTHER
NONDESTRUCTIVE TESTING METHOD SUCH AS PENETRANT TEST.
7.6 ALL PRECAST CONNECTIONS AND LIFTING DEVICES SHALL BE DESIGNED BY PRECAST FABRICATOR
5.4.1 ALL SHEAR STUDS SHALL CONFORM TO ASTM A108, AND BE EQUAL TO NELSON GRANULAR TO CONFORM WITH PCI STANDARD, AND SHALL BE APPROVED BY THE STRUCTURAL ENGINEER.
FLUX-FILLED HEADED ANCHOR STUDS.
8.0 GRANULAR BASE
5.5 MASONRY WORK :
8.1 GRANULAR BASE SHALL BE PLACED IN POSITION ACCORDING TO THE REQUIRED THICKNESS SHOWN
5.5.1 CHB
UNLESS USED INOTHERWISE,
INDICATED THESE WORKS SHALLELECTRODES
WELDING HAVE A MINIMUM
SHALLULTIMATE COMPRESSIVE
BE E70XX, STRENGTH
MINIMUM THICKNESS ON THE DRAWINGS.
@ 28 DAYS AS FOLLOWS :
100mm THICK NON- LOAD BEARING CHB, f'm = 2.50 MPa (350 PSI) 8.2 WHERE THE REQUIRED THICKNESS IS MORE THAN 0.10m, THE BASE MATERIAL SHALL BE SPREAD AND
UNLESS OTHERWISE INDICATED
150mm ALL ANCHOR
THICK NON-LOAD BOLTS SHALL
BEARING CHB, CONFORM TO (350
f'm = 2.50 MPa ASTM - A325 SPECIFICATIONS.
PSI) COMPACTED IN 2 OR MORE LAYERS OF APPROXIMATELY EQUAL THICKNESS, AND THE MAXIMUM COMPACTED
5.5.2 ALL THICKNESS OF ANY ONE LAYER SHALL NOT EXCEED 0.15 METER.
BOLTS FORCELLS SHALL
MEMBER BE SOLIDLY
CONNECTION FILLED
SHALL WITH STRENGTH
BE HIGH GROUT. CONCRETE SHALL HAVETO
BOLTS, CONFORMING A MINIMUM
ASTM A325
COMPRESSIVE STRENGTH OF 17.20 Mpa (2500 psi) @ 28 days.
8.3 COMPACTED DRY DENSITY OF EACH LAYER SHALL NOT BE LESS THAN 100% OF THE MAXIMUM DRY DENSITY
ALL FULL
5.5.3 AND PARTIAL
UNLESS PENETRATION
INDICATED WELDS
OTHERWISE, SHALL BE ULTRASONICALLY
REINFORCEMENT INSPECTED.
SHALL BE ø12mm WELDS
HOR. BARS NOT AND
@ 400mm DETERMINED ACCORDING TO ASTM D 1557.
ø 12mm VERT. BARS @ 400mm.
9.0 FOUNDATIONS
5.5.4 PROVIDE EXPANSION JOINT/CONTROL TO ALL MASONRY COLUMN AND GIRDER CONNECTION.
9.1 FOOTINGS WERE DESIGNED USING AN ALLOWABLE SOIL BEARING CAPACITY OF (TO BE CONFIRMED IN GEOTECH REPORT) AT
5.5.5 ALL WALLS SHALL BE CONSTRUCTED IN CONVENTIONAL RUNNING BOND UNLESS NOTED OTHERWISE. DEPTHS INDICATED IN THE DRAWING.

5.5.6 GROUT MASONRY IN 2.4M MAXIMUM LIFTS. REINFORCING SHALL BE SECURED AGAINST 9.2 WHERE LOOSE/SOFT MATERIAL IS ENCOUNTERED AT DEPTH OF FOOTING/FOUNDATION INDICATED,
DISPLACEMENT PRIOR TO GROUTING BY WIRE POSITIONERS AT INTERVALS NOT EXCEEDING EXCAVATE TO FIRM LAYER AND REPLACE LOOSE/SOFT MATERIALS UNDERNEATH THE FOOTING WITHIN THE
200 BAR DIAMETERS NOR 3M. FOOTING AREA PLUS 1/2 DEPTH OF SOIL MATERIAL ON ALL SIDES WITH SELECTED BACKFILL.COMPACT
SELECTED BACKFILL TO 100% MAXIMUM DRY DENSITY (ASTM D1557)
5.5.7 IF WORK IS STOPPED ONE (1) HOUR OR LONGER, PROVIDE HORIZONTAL CONSTRUCTION JOINTS
BY STOPPING THE GROUT 50mm BELOW THE TOP OF THE BLOCK. 9.3 ALL COLUMN FOOTINGS SHALL REST ON 100mm THK COMPACTED GRAVEL BED COURSE, UNLESS
OTHERWISE STATED.
6.0 CONSTRUCTION JOINTS AND CONTROL JOINTS
9.4 FILL/BACKFILL SHALL BE PLACED IN 0.15 m LAYER AND EACH LAYER SHALL BE COMPACTED TO
6.1 VERTICAL CONSTRUCTION JOINTS SHALL BE PROVIDED IN BASEMENT RETAINING WALLS AT 100% MAXIMUM DRY DENSITY BEFORE SUBSEQUENT LAYERS ARE TO BE LAID.
SPACING
UNLESS NOT GREATER
INDICATED THAN 15.0
OTHERWISE, m.
REINFORCEMENT SHALL BE ø12mm HOR. BARS @ 400mm AND
10.0 POST TENSION DESIGN & EXECUTION REQUIREMENTS
6.2 CONSTRUCTION JOINTS IN THE RAFT FOUNDATION SHALL BE PROVIDED EVERY 30.0 m MAX. EACH
DIRECTION.HIGHER DISTANCE IS PERMITTED ONLY IF APPROVED BY THE STRUCTURAL ENGINEER AND PROVIDED 10.1 ADDITIONAL POST TENSIONED BEAMS TO BE INCLUDED IN CONTRACTOR'S SCOPE OF WORK IF REQUIRED IN
THAT SPECIAL PRECAUTIONS ARE TAKEN TO CONTROL VOLUMETRIC CHANGES OF CONCRETE SUCH DESIGN.
ALL
AS WALLS SHALL
BUT NOT BE CONSTRUCTED
LIMITED IN CONVENTIONAL
TO:USING SHRINKAGE RUNNING
REDUCTION BONDSPECIAL
ADDITIVES, UNLESS CURING,
NOTED OTHERWISE.
HEAT OF 3
HYDRATION DISSIPATION SYSTEMS, ETC. 10.2 CURTAIN WALL DESIGN SHOULD CONSIDER SLABS DEFLECTION WHICH IS TO BE PRODUCED BY POST TENSIONING
SUB-CONTRACTOR.
6.3 CONSTRUCTION JOINTS IN REINFORCED CONCRETE SLABS CASTED MONOLITHICALLY WITH
FOOTINGS SHALL BE PROVIDED EVERY 30 M MAX.USING IN FILL STRIP OF WIDTH 1.00 m WHICH SHALL BE 10.3 DESIGN OF SLABS SHALL CONSIDER EFFECTIVE LATERAL LOADS (MOMENT, SHEAR, STORY SHEAR STRENGTH)
CASTED AFTER COMPLETE HARDENING OF CONCRETE ON BOTH SIDES OF THE STRIP. THE IN-FILL STRIP AND ELASTIC SHORTENING EFFECT OF COLUMNS.
IF WORK IS STOPPED ONE (1) HOUR OR LONGER, PROVIDE HORIZONTAL CONSTRUCTION JOINTS
SHALL BE LOCATED IN BETWEEN THE FOOTINGS, PREFERABLY AT THE MIDDLE THIRD OF THE SPAN.
10.4 DESIGN AND EXECUTION OF SLABS SHALL CONSIDER FULL CONTROL FOR CRACKS IN SLAB WITH COLUMNS AND
CONSIDER STIFFNESS NOT LESS THAN 0.5 Ig.
6.4 AT CONSTRUCTION JOINTS, SURFACE OF HARDENED CONCRETE SHALL BE ROUGHENED,
CLEANED, WETTED AND STANDING WATER REMOVED IMMEDIATELY BEFORE POURING NEW CONCRETE.
10.5 POST TENSIONING SUB-CONTRACTOR SHALL SUBMIT ELONGATION CALCULATION BASED ON INITIAL
PRE-STRESSING FORCE.
6.5 CONSTRUCTON JOINTS AT FLOOR SLABS SHALL BE LOCATED AT MIDDLE THIRD OF THE SPAN OF
SLABS. IF INTERRUPTED BY INTERSECTING BEAM, CONSTRUCTION JOINT SHALL BE OFFSET BY A
10.6 CORRUGATED P.E. PIPE SHALL BE USED AS DUCTING FOR BONDED POST TENSIONING SYSTEM.
DISTANCE NOT LESS THAN TWO TIMES THE WIDTH OF THE INTERSECTING BEAM.
REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
S-2
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 18 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
40
CONCRETE SLAB
FFL

d/4 NGL 100mm THK


COMPACTED
COLUMN 8db (LONG BAR) GRAVEL BED
COLUMN S1≤ 24db (HOOP BAR)
BARS ANCHORAGE ANCHORAGE 300mm
.

MAIN VERT. BARS


LARGER OF h1 OR h2 LENGHT LENGHT
COLUMN
FLOOR Lo≥ 1/6 CLEAR SPAN Lc

.
LEVEL

h
450mm
FOOTING

50

50
50
2h
STIRRUPS W/

T
S2 ≤ d/2
SEISMIC HOOKS

75
50
C.J.
h1/4 d = EFFECTIVE DEPTH OF SECTION

Lo=B
S1≤ h2/4 h = DEPTH OF SECTION

Lo=B
16 db

.
50mm THK LEAN
100mm L CONCRETE
NOTE:
100mm THK
LAP SPLICES SHOULD NOT BE USED WITH IN A COMPACTED
DISTANCE OF TWICE THE MEMBER DEPTH GRAVEL BED
FROM
h1
THE FACE OF JOINT
h2

TYP. COLUMN & BEAM JUNCTION DETAIL TYP. TRANSVERSE REINFORCEMENT DET.
TYP. CONFINEMENT REQUIREMENT TYP. DETAIL FOR ISOLATED CONCENTRIC FOOTING
WHERE COLUMN STOPS AT FLOOR FOR
AT
LEVEL FLEXURAL MEMBERS IN SEISMIC ZONE 4
COLUMN ENDS IN SEISMIC ZONE 4

FLOOR
LEVEL
50

h1/4
Lo=B

S1≤ h2/4
.

6db
So

6db
S2≤
150mm
.

ADJACENT LAP BARS


SHALL BE
.

STAGGERED
Lc

600mm MIN
60 x DIAMETER OF BAR

Lo=B
Lo=B

GREATER THAN 75mm


75 MAX 75 MAX

COLUMN 1
6
BARS

LAP
Lo=B
Lo=B

FLOOR
Lo=B

LEVEL
50

2 ADDITIONAL
LINKS @ 100mm

TYP. SPLICE LOCATION FOR TYP. UNSYMMETRICAL COLUMN OFFSET


COLUMNS IN SEISMIC ZONE 4 TYP. SYMMETRICAL COLUMN OFFSET

REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
S-3
NEGROS ORIENTAL STATE UNIVERSITY
Republic of the Philippines PROJECT TITLE/LOCATION: OWNER: DESIGNED BY: SHT. NO.
NEGROS ORIENTAL STATE UNIVERSITY PRC LIC. NO. 52774
OfficeOF
OFFICE of THE
the University
UNIVERSITYEngineer
ENGINEER REPUBLIC OF THE PHILIPPINES
Main Campus 1, Dumaguete City VALIDITY: DEC 8, 2020
CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:
S-3
PRC NO.: PTR NO.: 0844378VALIDITY: CONSTRUCTION OF 3-STOREY FISHERIES - TECHNOLOGY BUILDING FILE NAME: SHEET NO.
BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: ISSUED ON: JAN 4, 2019
DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ISSUED AT: PNO TIN: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 19 of
STRUCTURAL
LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
ENGR. MICHAEL A. SAGA NORSU BAIS CAMPUS
UNIVERSITY ENGINEER TIN: 136-722-320 JOEL P. LIMSON, Ph. D.
PRESIDENT
A B C D E F G H I J K L M N O P Q
72.88
4.50 4.50 4.50 4.50 6.30 6.10 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 1.98

4
C1 C1 C1 C1 C2 C2 C2 C1 C1 C1 C1 C1 C1 C1 C1 C1
F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2
4.00

F1

3
C1 C1 C1 C1 C2 C2 C2 C1 C1 C1 C1 C1 C1 C1 C1 C1
F4 F4 F4 F4 F4 F4 F4 F4 F4 F4 F4 F4 F4 F4 F4
12.00

F3
5.00

2
C1 C1 C2 C2 C2 C1 C1 C1 C1 C1
3.00

F3 F4 F4 F4 F4 F4 F4 F4 F4 F4

1
C1 C1 C1 C1 C2 C2 C2 C1 C1 C1 C1 C1 C1 C1 C1 C1

F1 F5 F5 F5 F5 F5 F5 F5 F5 F5 F5 F5 F5 F5 F5 F5

FOUNDATION PLAN
BOT. OF FOOTING EL-2.00m
TOP OF TIE BEAM EL+0.00m

A B C D E F G H I J K L M N O P Q
72.88
4.50 4.50 4.50 4.50 6.30 6.10 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 1.98

TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1
4
C1 C1 C1 C1 C2 C2 C2 C1 C1 C1 C1 C1 C1 C1 C1 C1
4.00

TB4

TB4
TB4

TB4

TB4

TB4

TB4
TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2
3
C1 C1 C1 C1 C2 C2 C2 C1 C1 C1 C1 C1 C1 C1 C1 C1
12.00
5.00
TB4

TB4

TB4

TB4

TB4

TB4

TB4

TB4

TB4

TB4

TB4
TB2
2
C1 C1 C2 C2 C2 C1 C1 C1 C1
3.00
TB3

TB3

TB3

TB3

TB3

TB3

TB3

TB3

TB3

TB3

TB3
TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2
1
C1 C1 C1 C1 C2 C2 C2 C1 C1 C1 C1 C1 C1 C1 C1 C1

TIE BEAM PLAN


EL±0.00 m
STEEL DECK DIRECTION (TYP.)

REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
S-4
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 20 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
BEAM SCHEDULE (3000Psi:Grade60) (LEVEL: 0m)
BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT
SHEAR STIRRUPS WEB
REINF. REMARKS
NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT
2
TB1 250 400 2-ÿ20 2-ÿ20 2-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 1-ÿ10; 8@50mm; 9@100mm, REST @ 200mm 1-ÿ20 1 LAYER
TB2 250 400 2-ÿ20 2-ÿ20 2-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 1-ÿ10; 8@50mm; 9@100mm, REST @ 200mm 1-ÿ20 1 LAYER
TB3 250 400 2-ÿ20 2-ÿ20 2-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 1-ÿ10; 8@50mm; 9@100mm, REST @ 200mm 1-ÿ20 1 LAYER 10-20mmÿ 10-20mmÿ
TB4 250 400 2-ÿ20 2-ÿ20 2-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 1-ÿ10; 8@50mm; 9@100mm, REST @ 200mm 1-ÿ20 1 LAYER

10-20mmÿ

1 1

FOOTING SCHEDULE (3000PSI:GRADE60) B

FOOTING DIMENSION FOOTING REINFORCEMENT


FOOTING REMARKS
BOTTOM TOP
NUMBERS L B D
ALONG B ALONG L ALONG B ALONG L
10-20mmÿ
F1 2500 2500 350 10-20mmÿ 10-20mmÿ 10-20mmÿ 10-20mmÿ -
ISOLATED

-
F2 2250 2250 350 10-20mmÿ 10-20mmÿ 10-20mmÿ 10-20mmÿ ISOLATED

F3 2250 2250 350 10-20mmÿ 10-20mmÿ 10-20mmÿ 10-20mmÿ ISOLATED L


75 THK LEAN CONCRETE
F4 2100 2100 350 10-20mmÿ 10-20mmÿ - - ISOLATED

2
F5 2300 2300 350 10-20mmÿ 10-20mmÿ 10-20mmÿ 10-20mmÿ ISOLATED

TYP. FOOTING DETAIL


(SCALE MTS)

REFER TO COLUMN
REFER TO COLUMN

SCHEDULE
SCHEDULE

10-20mmØ (T) 10-20mmØ (T)


10-20mmØ (B) 10-20mmØ (B)

EL. -2.000 EL. -2.000


BOF BOF

75 THK LEAN CONCRETE 75 THK LEAN CONCRETE


SECTION 1-1 SECTION 2-2

REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
S-5
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 21 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
BEAM SCHEDULE (3000Psi:Grade60) (LEVEL: 3.8m)
BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT
SHEAR STIRRUPS WEB
REINF. REMARKS
NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT
2B1 300 400 3-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 1-ÿ10; 8@50mm; 8@100mm, REST @ 200mm 1-ÿ20 1 LAYER

2B2 300 450 4-ÿ20 4-ÿ20 4-ÿ20 5-ÿ20 5-ÿ20 5-ÿ20 1-ÿ10; 9@50mm;10@100mm, REST @ 200mm 1-ÿ20 2 LAYERS
+ +
2-ÿ20 2-ÿ20

2B3 300 450 4-ÿ20 4-ÿ20 4-ÿ20 5-ÿ20 5-ÿ20 5-ÿ20 1-ÿ10; 9@50mm; 10@100mm, REST @ 200mm 1-ÿ20 2 LAYERS
+ +
2-ÿ20 2-ÿ20

2B4 300 450 3-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 1-ÿ10; 9@50mm; 10@100mm, REST @ 200mm 1-ÿ20 1 LAYER

2B5 300 450 3-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 1-ÿ10; 9@50mm; 10@100mm, REST @ 200mm 1-ÿ20 1 LAYER

2B6 300 400 3-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 1-ÿ10; 9@50mm; 10@100mm, REST @ 200mm - 1 LAYER

2B7 300 400 3-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 1-ÿ10; 8@50mm; 9@100mm, REST @ 200mm 1-ÿ20 1 LAYER

2B8 300 400 3-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 1-ÿ10; 8@50mm; 9@100mm, REST @ 200mm - CANTILEVERED

2B9 300 500 5-ÿ20 5-ÿ20 5-ÿ20 5-ÿ20 5-ÿ20 5-ÿ20 1-ÿ20 2 LAYERS
+ + 1-ÿ10; 9@50mm; 10@100mm, REST @ 200mm
2-ÿ20 2-ÿ20

TIE BEAM PLAN


EL±0.00 m
STEEL DECK DIRECTION (TYP.)

A B C D E F G H I J K L M N O P Q
72.88
4.50 4.50 4.50 4.50 6.30 6.10 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 1.98

2B1 2B1 2B1 2B1 2B1 2B1 2B1 2B1 2B1 2B1 2B1 2B1 2B1 2B1
4
C1 C1 C1 C1 C2 C2 C2 C1 C1 C1 C1 C1 C1 C1 C1 C1
4.00
2B5

2B5

2B5

2B5

2B5

2B5

2B5

2B5

2B5

2B7
2B2 2B2 2B2 2B2 2B3 2B2 2B2 2B2 2B2 2B2 2B2 2B2 2B2 2B2 2B8
3
C1 C1 C1 C1 C2 C2 C2 C1 C1 C1 C1 C1 C1 C1 C1 C1
STAIRWELL STAIRWELL STAIRWELL
12.00
5.00
2B5

2B5

2B5

2B5

2B6

2B5

2B5

2B5

2B5

2B5

2B7
2B9

2B9

2B9

2B9

2B9

2B9

2B9
2B2 2B2 2B2 2B2 2B3 2B2 2B2 2B2 2B2 2B2 2B2 2B2 2B2 2B2 2B8
2
C1 C1 C2 C2 C2 C1 C1 C1 C1
3.00
2B4

2B4

2B4

2B4

2B4

2B4

2B4

2B4

2B4

2B7
2B2 2B2 2B2 2B2 2B3 2B2 2B2 2B2 2B2 2B2 2B2 2B2 2B2 2B2 2B8
1
C1 C1 C1 C1 C2 C2 C2 C1 C1 C1 C1 C1 C1 C1 C1 C1

2F BEAM PLAN
EL+3.80m

REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
S-6
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 22 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
BEAM SCHEDULE (3000Psi:Grade60) (LEVEL: 5.3m)
BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT
WEB
SHEAR STIRRUPS REINF. REMARKS
NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT

3B1 300 450 3-ÿ20 3-ÿ20 3-ÿ20 5-ÿ20 5-ÿ20 5-ÿ20 1-ÿ10; 8@50mm; 9@100mm, REST @ 200mm - 1 LAYER

3B2 300 450 3-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 3-ÿ20 1-ÿ10; 8@50mm; 9@100mm, REST @ 200mm 1-ÿ20 1 LAYER

A B C D E F G H I J K L M N O P Q
72.88
4.50 4.50 4.50 4.50 6.30 6.10 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 1.98

3B1
4
C2 C2
4.00

3B2

3B2
3B1
3
C23
C2 C2
12.00
5.00

3B2

3B2

3B1
2
C2 C2
3.00

3B2

3B2

3B1
1
C2 C2

2F BEAM PLAN
EL+5.30m

REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
S-7
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 23 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
BEAM SCHEDULE (3000Psi:Grade60) (LEVEL: 6.8m)
BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT
WEB
SHEAR STIRRUPS REINF. REMARKS
NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT

RB1 250 350 2-ÿ20 2-ÿ20 2-ÿ20 2-ÿ20 2-ÿ20 2-ÿ20 1-ÿ10; 7@50mm; 8@100mm, REST @ 200mm - 1 LAYER

RB2 250 350 2-ÿ20 2-ÿ20 2-ÿ20 2-ÿ20 2-ÿ20 2-ÿ20 1-ÿ10; 7@50mm; 8@100mm, REST @ 200mm - 1 LAYER
RB2 250 350 2-ÿ20 2-ÿ20 2-ÿ20 2-ÿ20 3-ÿ20 3-ÿ20 1-ÿ10; 3@50mm; 4@100mm, REST @ 200mm - CANTILEVERED

A B C D E F G H I J K L M N O P Q
72.88
4.50 4.50 4.50 4.50 6.30 6.10 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 1.98

RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB3
4
C1
C1 C1 C1 C1 C2 C2 C2 C1 C1 C1 C1 C1 C1 C1 C1 C1
4.00
RB2

RB2

RB2

RB2

RB2

RB2

RB2

RB2

RB2
RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB3
3
C1 C1 C1 C1 C2 C2 C2 C1 C1 C1 C1 C1 C1 C1 C1 C1
12.00
5.00
RB2

RB2

RB2

RB2

RB2

RB2

RB2

RB2

RB2
RB3
2
C1 C1 C2 C1 C1 C1 C1 C1
3.00
RB2

RB2

RB2

RB2

RB2

RB2

RB2

RB2

RB2
RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB3
1
C1 C1 C1 C1 C2 C2 C2 C1 C1 C1 C1 C1 C1 C1 C1 C1

ROOF BEAM PLAN


EL+6.80m

REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
S-8
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 26 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
BEAM SCHEDULE (3000Psi:Grade60) (LEVEL: 9.7m)
BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT
WEB
SHEAR STIRRUPS REINF. REMARKS
NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT
2RB1 250 350 2-ÿ20 2-ÿ20 2-ÿ20 2-ÿ20 2-ÿ20 2-ÿ20 1-ÿ10; 7@50mm; 8@100mm, REST @ 200mm - 1 LAYER
2RB2 250 350 2-ÿ20 2-ÿ20 2-ÿ20 2-ÿ20 2-ÿ20 2-ÿ20 1-ÿ10; 7@50mm; 8@100mm, REST @ 200mm - 1 LAYER

A B C D E F G H I J K L M N O P Q
72.88
4.50 4.50 4.50 4.50 6.30 6.10 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 1.98

2RB1
4
C2 C2
4.00

2RB2

2RB2
2RB1
3 C2 C2
12.00
5.00

2RB2

2RB2

2 C2 C2
3.00

2RB2

2RB2

2RB1
1 C2 C2

ROOF BEAM PLAN


EL+9.70m

REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
S-9
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 25 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
3000 Psi EL. 9.700
TOC
COLUMN SCHEDULE EL+6.80m

C
TO
3000 Psi EL+9.70m

50
B
#20

EL+3.80m SIZE (mm) 350X350


VERT. REINF. 12-#20 GRADE60
TO TIES (A) 10mmØ TIES 3 PER SET (REST@125mm)

A
CONF.REINF. (B) 10mmØ TIES 3 PER SET (8@75mm)
EL+6.80m JOINT REINF. (C) 10mmØ TIES 3 PER SET (3@100mm)
#20
3000 Psi

EL+5.30m EL. 6.800

B
SIZE (mm) 350X350 TOC
TO
VERT. REINF. 12-#20 GRADE60

50
EL+6.80m

C
TIES (A) 10mmØ TIES 3 PER SET (REST@125mm)
#20
CONF.REINF. (B) 10mmØ TIES 3 PER SET (8@75mm)

50
B
JOINT REINF. (C) 10mmØ TIES 3 PER SET (3@100mm) SIZE (mm) 350X350
VERT. REINF. 12-#20 GRADE60

A
3000 Psi
TIES (A) 10mmØ TIES 3 PER SET (REST@125mm) EL. 5.300

B
CONF.REINF. (B) 10mmØ TIES 3 PER SET (8@75mm) TOC
EL±0.00m JOINT REINF. (C) 10mmØ TIES 3 PER SET (3@100mm)

50
C
3000 Psi
TO

50
EL+3.80m
EL+3.80m
TO

A
#20
EL. 3.800
EL+5.30m

B
#20 TOC

SIZE (mm) 350X350

50
C
SIZE (mm) 350X350
VERT. REINF. 12-#20 GRADE60
VERT. REINF. 12-#20 GRADE60

50
B
TIES (A) 10mmØ TIES 3 PER SET (REST@125mm) TIES (A) 10mmØ TIES 3 PER SET (REST@125mm)
CONF.REINF. (B) 10mmØ TIES 3 PER SET (8@75mm) CONF.REINF. (B) 10mmØ TIES 3 PER SET (8@75mm)
JOINT REINF. (C) 10mmØ TIES 3 PER SET (3@100mm)
JOINT REINF. (C) 10mmØ TIES 3 PER SET (3@100mm)

TYPICAL LAP SPLICE DETAIL


3000 Psi
3000 Psi

SHALL BE STAGGERED)
(ADJACENT LAP BARS
EL±0.00m

BOT. OF FOOTING TO

A
EL+3.80m

750
TO #20

EL±0.00m
SIZE (mm) 350X350
#20
VERT. REINF. 12-#20 GRADE60
TIES (A) 10mmØ TIES 3 PER SET (REST@125mm)
CONF.REINF. (B) 10mmØ TIES 3 PER SET (8@75mm)
EL. 0.000
SIZE (mm) 350X350 JOINT REINF. (C) 10mmØ TIES 3 PER SET (3@100mm)

B
NGL
VERT. REINF. 12-#20 GRADE60 3000 Psi

(TYP.)
50
C
TIES (A) 10mmØ TIES 3 PER SET (REST@125mm)
BOT. OF FOOTING

(TYP.)
CONF.REINF. (B) 10mmØ TIES 3 PER SET (6@75mm)

100
B
TO

50
JOINT REINF. (C) 10mmØ TIES 3 PER SET (4@100mm)

(TYP.)
75
A
EL±0.00m
COLUMN MARKED C1 #20

(TYP.)
125
B

75
SIZE (mm) 350X350

50
SEE FOOTING SCHEDULE

C
VERT. REINF. 12-#20 GRADE60
NOTES: BOF
TIES (A) 10mmØ TIES 3 PER SET (REST@125mm)
1. COLUMN CONCRETE COVER IS 40mm CONF.REINF. (B) 10mmØ TIES 3 PER SET (6@75mm)
2. SEISMIC TIES SHALL BE OF GRADE 33 OR EQUIVALENT JOINT REINF. (C) 10mmØ TIES 3 PER SET (4@100mm)
3. MAIN LONGITUDINAL BARS SHALL BE GRADE 60 OR EQUIVALENT - TYPICAL COLUMN SECTION DETAIL
COLUMN MARKED C2
- (SCALE: NTS)
REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
S-10
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 28 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
L/4 L/4

L= SHORT SPAN

10mm Ø BOTT. BARS @ 300mm O.C. STRAIGHT


12mm Ø TOP TEMP. BARS @ 300mm O.C.

SLAB REINFORCEMENT PLAN


12mm Ø BOTT. TEMP. BARS @ 300mm O.C.
L/4
12mm Ø TOPBARS @ 150 mm O.C. CUT

12mm Ø TOP BARS @ 150mm O.C.


12mm Ø TOP BARS @ 150 mm O.C. CUT
12mm Ø TOP TEMP. BARS @ 300 mm O.C.
12mm Ø TOP BARS @ 300 mm O.C.

12mm
12mm ØØ BOTT.
BOTT. BARS
BARS @@ 300mm
300mm O.C.
O.C.
BEAM

BEAM
12mm Ø TOP BARS @ 150 mm O.C. CUT

0.15
0.30
12mm Ø TOP TOP BARS @ 300 mm O.C.
0.80 mm STEELDECK

0.15
12mm Ø BOTT. BARS
0.80 mm STEELDECK
SLAB 12mm ØACROSS
SECTION BOTT. BARS
STEEL DECK SPAN
BEAM L/4 L/4

L/4 L/4
L
L= SHORT SPAN

10mm Ø BOTT. BARS @ 300mm O.C. STRAIGHT


SLAB SECTION ALONG STEEL DECK SPAN
SLAB REINFORCEMENT PLAN

L/4
mm O.C. CUT 1 SLAB W/ STEEL DECK DETAILS
12mm Ø TOP BARS
12mm @ 150BARS
Ø TOP mm O.C. CUT O.C.
@ 150mm
S-7
CIT BLDG BAIS STRUCTURAL
1 : 20
12mm Ø TOP BARS @ 300 mm O.C.
2 SCALE: 1:1

12mm Ø TOP TEMP. BARS @ 300 mm O.C.


12mm Ø BOTT. BARS @ 300mm O.C. SIGN & SEAL PROJECT TITLE PROJECT OWNER
Republic of the Philippines
NEGROS ORIENTAL STATE UNIVERSITY SIGN & SEAL PROJECT:
12mm Ø BOTT. BARS @ 300mm O.C.
CONSTRUCTION OF CIT BUILDING
Republic of the Philippines
Office of the University Engineer NEGROS ORIENTAL STATE UNIVERSITY
12mm Ø TOP BARS @ 150 mm O.C. CUT NEGROS
0.30 (CAMPUS CONSTRUCTION OF
1) CIT ORIENTAL
BUILDING STATE UNIVE
12mm Ø TOP TOP1,BARS
Main Campus Kagawasan @ 300Area
Ave.Capitol mm PRCthe
O.C.of
Office NO.: University Engineer
VALIDITY: ENGR. MICHAEL A. SAGA
Dumaguete City PTR NO.: DATE: CIVIL ENGINEER (CAMPUS 1)
0.15

PLACE:
Main Campus 1, Kagawasan Ave.Capitol
TIN:Area PRC REG. NO. 52774 LOCATION: NORSU
PTR NO.:BAIS, NEGROS ORIENTAL
0844378 ADDRESS: NORSU BAIS, NEGROS ORIENTAL
Dumaguete City VALID UNTIL: DEC. 8, 2020 ISSUED ON: JAN 4, 2019 BAIS NEGROS ORIENTAL
0.15

TIN: 136-722-320 ISSUED AT: PNO

0.80 mm STEELDECK
0.80 mm STEELDECK
12mm
12mm Ø BOTT.
Ø BOTT. BARS
BARS GSPublisherVersion 0.0.100.100

L/4 L/4

SLAB SECTION ACROSS


L STEEL DECK SPAN
REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
S-11
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer
SLAB SECTION ALONG PRC NO.:
STEEL DECK SPAN
VALIDITY:
CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 29 of
LOCATION: NORSU BAIS, NEGROS ORIENTAL
TIN: UNIVERSITY ENGINEER UNIVERSITY ENGINEER

1 SLAB W/ STEEL DECK DETAILS


SLAB 2ND FFL
1.50 0.30
TYP
.

BEAM

FROM GROUND FFL TO 2ND F.F.L


1.90
16 mm Ø TOP BARS
SPACED @ 150mm O.C.
1.50 16 mm Ø BOTTOM BARS
11 12 13 14 15 16 17 18 19 20 SPACED @ 150mm O.C.
4.00

4.00
10mm Ø NOSING

0.20

3.50
BARS
10mm Ø TEMP. BARS
SPACED @250mm O.C.
16mm Ø
8mm Ø BARS CHAIR
ADDITIONAL BARS

1.90
12mm Ø TOP & BOTTOM BARS
SPACED @ 200mm O.C. BOTHWAYS

0.20
9 8 7 6 5 4 3 2 1

0.20 GF.L.
N.G. L.

0.20 0.50
0.70
TYPICAL STAIR PLAN
1:25 MTS

0.80

TYPICAL STAIR SECTION DETAIL


1:25 MTS

REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
S-12
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 30 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
75.50

1.20 0.13 4.50 4.50 4.50 4.42 6.58 5.90 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 3.28

1.20mm HAT-C-
1.20mm TYPE PURLINS
PURLINS (4"X2")

14.68
4% SLOPE

4% SLOPE

4% SLOPE
SPACED
SPACED @ 0.60m
@ 0.60m
1.20mm HAT-
1.20mm TYPE
HAT- TYPEPURLINS
PURLINS
SPACED @@0.60m
SPACED 0.60m
T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-1

ROOF FRAMING PLAN 1


1 SCALE: 1:125

8.15

3.27 1.20 3.67

1.55

1.20mm C- PURLINS (4"X2")


SPACED @ 0.60m
14.95
12.00
4% SLOPE

T-2 T-3
1.40

ROOF FRAMING PLAN 2


2 SCALE: 1:125

REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
S-13
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 29 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
1 2 3 4
1- 6.4MM X 50MM X 50MM
"JEA" SPAN 45 ANGLE BAR
1- 4.5MM X 40MM X 40MM
ANGLE BAR WEB MEMBERS HAT TYPE PURLINS

1- 6.4MM X 50MM X 50MM 0.60

0.39
ANGLE BAR BOTTOM 14.72

0.40

1.34
0.30
0.60

0.95
0.40
0.40

0.30
1.34 8.00 4.00 1.34
14.68

TRUSS 1
EL +1.34m
(FROM TOP OF RB)
1 2 3 4

1- 6.4MM X 50MM X 50MM


ANGLE BAR
"JEA" SPAN 45
1-4.5MM X 40MM X 40MM HAT TYPE PURLINS
ANGLE BAR WEB MEMBERS

0.60
1- 6.4MM X 50MM X 50MM

0.39
ANGLE BAR BOTTOM

0.40

1.34
0.30
0.60

0.95
0.40
0.40
0.30

1.40 8.00 4.00 1.55

14.95

TRUSS 2
EL +1.34m
(FROM TOP OF RB)
1 2 3 1- 6.4MM X 50MM X 50MM 4
ANGLE BAR

"JEA" SPAN 45
1-4.5MM X 40MM X 40MM HAT TYPE PURLINS
ANGLE BAR WEB MEMBERS

0.60
1- 6.4MM X 50MM X 50MM

0.40
ANGLE BAR BOTTOM

0.40

1.24
0.30
0.60

0.84
0.30

0.32
0.40

8.00 4.00

12.00

TRUSS 3
EL +1.24m
(FROM TOP OF RB)
REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
S-14
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 30 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
HALLWAY HALLWAY HALLWAY HALLWAY HALLWAY

20 20 20

19 19 19
1 1 1

20 x 0.18 = 3.50 18 18 18
2 2 2

20 x 0.18 = 3.50

20 x 0.18 = 3.50
17 17 17
3 3 3

16 16 16
4 4 4

15 15 15
5 5 5

14 14 14
6 6 6

13 13 13
7 7 7

12 12 12
8 8 8

11 11 11

STAIRS
9 9 9

CLASS CLASS CLASS CLASS STAIRS


ROOM 1 ROOM 2 ROOM 3 ROOM 4
OFFICE OFFICE OFFICE
CO
10

10

10
CO VTR FEMALE
CO MALE WC TOILET
TOILET FD
LAV LAV UR
LAV 4"Ø

FD FD FD FD LAV
FD UR 3"Ø

VTR
3"Ø
VTR LAV WC FD FD FD
WC WC 4"Ø
FD WC WC 4"Ø
CO
WC 3"Ø WC 4"Ø 4"Ø F F F
4"Ø
4"Ø
DS CO VTR
6"Ø 6"Ø 6"Ø

CO 4"Ø

6"Ø

4"Ø
4"Ø

CB CB CB

PHASE 1
MH MH MH MH

SEPTIC TANK
TO STREET CANAL TO STREET CANAL

GROUND FLOOR PLUMBING LAYOUT


1 SCALE: 1:120

7 x 0.19 = 1.30 7 x 0.19 = 1.30

1
20 20 20

19 19 19
1 1 1

18 18 18
20 x 0.18 = 3.50

2 2 2

20 x 0.18 = 3.50

20 x 0.18 = 3.50
17 17 17
3 3 3

16 16 16

ADMIN.
4 4 4

CLASS CLASS CLASS CLASS


15 15 15
5 5 5

6
14

OFFICE OFFICE OFFICE 6


14

ROOM 9
6
14

7
13

OFFICE 7
13
ROOM 6 ROOM 7 ROOM 8 7
13

12 12 12
8 8 8

11 11 11
9 9 9

CO
10

10

10
VTR
FD FEMALE TOILET
MALE WC
UR
LAV LAV LAV FD TOILET 3"Ø
4"Ø
4"Ø F
FD UR LAV
FD FD 4"Ø
FD FD F
VTR FD WC FD
VTR LAV F VTR WC WC
WC
4"Ø
WC FD
WC WC 4"Ø
F F F
VTR
DS DS

2ND FLOOR PLUMBING LAYOUT


2 SCALE: 1:120

REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
P-1
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 35 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
HALLWAY HALLWAY HALLWAY HALLWAY HALLWAY

20 20 20

19 19 19
1 1 1

20 x 0.18 = 3.50 18 18 18
2 2 2

20 x 0.18 = 3.50

20 x 0.18 = 3.50
17 17 17
3 3 3

16 16 16
4 4 4

15 15 15
5 5 5

14 14 14
6 6 6

13 13 13
7 7 7

12 12 12
8 8 8

11 11 11

STAIRS
9 9 9

CLASS CLASS CLASS CLASS STAIRS


ROOM 1 ROOM 2 ROOM 3 ROOM 4
OFFICE OFFICE OFFICE
10

10

10
FEMALE
UR MALE
WC TOILET
TOILET
UR
F F F F
UR UR UR UR F
LAV WC
UR F F F WC WC WC F
WC WC WC

6"Ø

HB
PHASE 1
MH MH MH MH 60 L

SEPTIC TANK PG
TO STREET CANAL TO STREET CANAL

PS

CV
BP
GROUND FLOOR WATER LINE LAYOUT
1 SCALE: 1:120 250 L

FROM WATER MAIN


1

7 x 0.19 = 1.30 7 x 0.19 = 1.30

1
20 20 20

19 19 19
1 1 1

18 18 18
20 x 0.18 = 3.50

2 2 2

20 x 0.18 = 3.50

20 x 0.18 = 3.50
17 17 17
3 3 3

16 16 16

ADMIN.
4 4 4

CLASS CLASS CLASS CLASS


15 15 15
5 5 5

6
14

OFFICE OFFICE OFFICE 6


14

ROOM 9
6
14

7
13

OFFICE 7
13
ROOM 6 ROOM 7 ROOM 8 7
13

12 12 12
8 8 8

11 11 11
9 9 9
10

10

10
UR FEMALE TOILET
MALE WC
UR TOILET
F F F F
UR UR UR UR F
WC
F UR F F F WC WC WC WC
UR F
WC WC WC

2ND FLOOR WATER LINE LAYOUT


2 SCALE: 1:120

REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
P-2
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 36 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
VTR

PLUMBIND LEGEND
CO
M CLEAN OUT SB SOIL BRANCH LAV
WATER METER LAV
CO
TEE
WS WASTE STACK FD
GATE VALVE
FD
WB WASTE BRANCH WC
WATER SUPPLY LINE 90 DEGREES FD
ELBOW DS DOWN SPOUT FD WC VTR
WASTE PIPE LINE WC
WYE WC WATER CLOSET
SOIL PIPE LINE
VTR VENT THRU ROOF
F FAUCET/SINK TAP ELBOW
TURNED-DOWN CATCH BASIN
CB LAV
FLOOR DRAIN GREASE TRAP LAV
FD ELBOW
BP 1.5 HP BOOSTER PUMP FD
SS SOIL STACK TURNED-UP FD WC
250 L 250L STS TANK FD WC CB
PS PRESSURE SWITCH HB HOSE BIB FD
WC CO
CV CHECK VALVE PG PRESSURE GAUGE 60 L 60 L BLADDER TANK
CO

3.35

0.05 1.15 0.70 1.40 0.05

0.10
MANHOLE MANHOLE MANHOLE MANHOLE

0.60

0.60
0.60

1.10
VTR

0.90
INLET
CO C.O. C.O. C.O.
WC
VTR FD
FD

0.10
FD
CO 1.05 0.60 0.60
UR
100MM THK. CONCRETE
UR PLAN COVER WITH 10MM dia.
WC REBARS @ 200MM O. C.
FD UR DS BOTH-WAYS
VTR
3.35
0.05 1.15 0.70 0.70 0.05 0.70 0.05
CO
WC 1.05 0.60 0.60 0.60
DS
FD WC
FD C.O. C.O. C.O. C.O. C.O.
LAV WC
UR M.H. M.H. M.H. M.H.
FD
LAV DS CO FD LAV

300 mm
0.10
WC AIR

400 mm

400 mm
AIR AIR

350 mm
min.
VTR
VTR AIR SPACE

min.

min.

min.
SPACE SPACE SPACE
INLET

CB SE PT IC VA UL T scum level

scum level scum level scum level

1.70
M
TO STREET CANAL 220.00 GAL +/-

1.50
160.0 GAL +/- 160.0 GAL +/- 160.0 GAL +/-

1.20
10MM dia. VERT. BARS
FD WC FD CB @ 600mm O. C. W/ 10MM
LAV UR dia. HORS. BARS @ EVERY
UR WC 3 LAYER OF CHB
FD
LAV

DIGESTION WELL
VTR
VTR WC
TREATMENT TREATMENT TREATMENT
TO STREET CANAL 2% slope WELL WELL WELL

0.10
10MM dia. mat. BARS
SECTION @ 600mm O. C. bothways

FD
LAV WC PER TABLE B-2 (P. 193)
CB SINGLE FAMILY DWELLING W/ 1 OR 2 BEDROOMS
UR -MIN. SEPTIC TANK CAPACITY = 750 GAL (2838LT)

REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
P-3
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 37 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
PLUMBIND LEGEND
CO
M CLEAN OUT SB SOIL BRANCH
WATER METER
TEE
WS WASTE STACK
GATE VALVE F
WB WASTE BRANCH F F
WATER SUPPLY LINE 90 DEGREES
ELBOW DS DOWN SPOUT WC
WASTE PIPE LINE WC
WYE WC WATER CLOSET
SOIL PIPE LINE WC
VTR VENT THRU ROOF
F FAUCET/SINK TAP ELBOW
TURNED-DOWN CATCH BASIN
CB
FLOOR DRAIN GREASE TRAP
FD ELBOW
TURNED-UP BP 1.5 HP BOOSTER PUMP F
SS SOIL STACK F F

HB HOSE BIB 250 L 250L STS TANK HB


PS PRESSURE SWITCH WC 60 L BT
WC PG PS
CV CHECK VALVE PG PRESSURE GAUGE 60 L 60 L BLADDER TANK
WC CV
BP

250L ST M

FROM WATER MAIN

WC
WC
F
F
UR F
UR
UR
WC UR
UR 0.40
F
TRAPPED
GREASE 0.60
0.10 0.40 0.10

0.10
WC

0.20
F WC

0.40
0.20
0.10
F UR WC F

0.60
F

0.35
UR

0.30
VTR LAV

WC F

0.20
VTR

0.10
WC
F UR
EFFLUENCE

F F
UR WC
WC
F
GREASE TRAP DETAILS
LAV
UR
VTR
WC
SCALE: 1:15

F UR
WC

REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
P-4
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 38 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
A B C D E F G H I J K L M N O P Q

PB1 PB1
C2 C3 PB1
4
C4
b b b b b b b c a b b c c c c c c c a a a a a a b b b b b b

HALLWAY HALLWAY HALLWAY HALLWAY PB1 HALLWAY PB1


C5 C8
b b c c c c c c a b b c c c c c c c a a a a a a b b b b b b

S3 a b S3 S3
3
S3 S2 S2 S3 S3 S3 S3 S3 S3 S3 S3
20 20
PB1 20

1
19

18 a a a a a b b 1
19

18 C6C6
1
19

18
20 x 0.18 = 3.50

2 2 2

a b

20 x 0.18 = 3.50

20 x 0.18 = 3.50
17 17 17
3 3 3

16 16 16
4 4 4

15 15 15
5 5 5

6
14
6
14
a b c a b c a b c a a a 6
14
c
a b
13 13 13
7 7 7

12 12 12
8 8 8

b a b c a b c a b c a b c
11 11 11

STAIRS
9 9 9

a a a a CLASS CLASS CLASS CLASS PB1 STAIRS


b b b b a b ROOM 1 ROOM 2 ROOM 3 ROOM 4 C9 c c
OFFICE OFFICE OFFICE a b
10

10

10
S3 FEMALE S2
S1 c a TOILETa
2 a MALE
TOILET
b a b c a b c a b c a a a PB1
S1 a S1 S1 a b C7
PB1 S1 a
a c c a a a a a b c b b
C1 S1 S2
1

A B C D E F G H I J K L M N O P Q

GROUND FLOOR LIGHTING LAYOUT


1 SCALE: 1:120

A B C D E F G H I J K L M N O P Q

HALLWAY HALLWAY HALLWAY HALLWAY HALLWAY

3
20 20 20

19 19 19
1
PB1 1 1

18
C13 18 18
20 x 0.18 = 3.50

2 2 2

PB1
C16
20 x 0.18 = 3.50

20 x 0.18 = 3.50
17 17 17
3 3 3

16 16 16
4 4 4

15 15 15
5 5 5

14 14 14
6 6 6

13 13 13
7 7 7

12 12 12
8 8 8

11 11 11

STAIRS
9 9 9

CLASS CLASS CLASS CLASS STAIRS


ROOM 1 ROOM 2 ROOM 3 ROOM 4
OFFICE OFFICE OFFICE
10

10

10
FEMALE
2 MALE TOILET
TOILET

PB1
PB1 PB1 C14
C11 C12 PB1 PB1
PB1 C15 C17
C10 AC
AC AC
1

PHASE 1

A B C D E F G H I J K L M N O P Q

GROUND FLOOR POWER LAYOUT


2 SCALE: 1:120

REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
E-1
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 33 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
A B C D E F G H I J K L M N O P Q

PB2 PB2
C2 C3 PB2
4 C4
b b b b b b b a a b b b b b b b b a a a a a a b b b b b b

7
a
7 x 0.19 = 1.30 7 x 0.19 = 1.30

PB2
C5 PB2
C8

1
b b a a a a a a a b a b b b b b b b a a a a a a b b b b b b

S2 a b S3
3
S3 S2 S2 S2 S3 S3 S3 S3 S3 S3 S3 S3
20 20
PB2 20

a a a a a a C6
19 19 19
1 1 1

18 18 18
20 x 0.18 = 3.50

2 2 2

a b a

20 x 0.18 = 3.50

20 x 0.18 = 3.50
17 17 17
3 3 3

16 16 16

ADMIN.
4 4 4

CLASS CLASS
15 15 15
5 5 5

6
14

OFFICE OFFICE OFFICE 6


14

a ROOM 6
b c a ROOM 7
b c a b c a b c 6
14

c
7
13

OFFICE 7
13
CLASS CLASS 7
13

ROOM 8
12 12 12

ROOM 9
8 8 8

a b PB2
a a b c a b c a b c a b c
11 11 11
9 9 9

C9
b b b b b b c c
10

10

10
S1 a b
a S3 b c FEMALE TOILET
2
a a PB2
MALE a b c a b c a b c a b c
S1 S1 TOILET C7
S1 S1 S1 a
PB2 c a
C1 a a c c a a a a b a a
a b
S2
1

A B C D E F G H I J K L M N O P Q

SECOND FLOOR LIGHTING LAYOUT


3 SCALE: 1:120

A B C D E F G H I J K L M N O P Q

4
1

7 x 0.19 = 1.30 7 x 0.19 = 1.30

1
3
20 20 20

19 19 19
1 1 1

18 18 18
20 x 0.18 = 3.50

2 2 2

PB2

20 x 0.18 = 3.50

20 x 0.18 = 3.50
17 17 17
3 3
C17 3

16 16 16

ADMIN.
4 4 4

CLASS CLASS
15 15 15
5 5 5

6
14

OFFICE OFFICE OFFICE 6


14
6
14

7
13

OFFICE 7
13
ROOM 6 ROOM 7 CLASS CLASS 7
13

ROOM 8
12 12 12

ROOM 9
8 8 8

11 11 11
9 9 9

PB2
C13
WHITE BOARD WHITE BOARD WHITE BOARD WHITE BOARD
10

10

10
FEMALE TOILET
2 MALE
TOILET

PB2 PB2 PB2 PB2


C11 C12 C14 C15 PB2
PB2 C16 PB2
C10 AC AC C18
AC AC
1

A B C D E F G H I J K L M N O P Q

SECOND FLOOR POWER LAYOUT


4 SCALE: 1:120

REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
E-2
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 34 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
SCHEDULE OF LOADS (PANEL BOARD 1) SCHEDULE OF LOADS (PANEL BOARD 2)

DESCRIPTION OF LOAD DESCRIPTION OF LOAD


CIRCUIT VOLT TOTAL BREAKE CONDUIT SIZE CIRCUIT VOLT TOTAL BREAKE CONDUIT SIZE
QT WATT
WATTS AMP WIRE SIZE WATTS AMP WIRE SIZE
NO. S AMP R SIZE (DIAMETER) NO. QT WATT S AMP R SIZE (DIAMETER)
FIXTURE FIXTURE
Y S Y S
3 11 CFL RECESSED PIN LIGHTS 33 220 0.15 3 11 CFL RECESSED PIN LIGHTS 33 220 0.15
0 0 0 220 0.00 0 0 0 0 220 0.00
1 2.51 15 AMP 3.5mm2, TW 20 MM, uPVC 1 2.51 15 AMP 3.5mm2, TW 20 MM, uPVC
13 40 FLUORESCENT LAMP (CEILING SURFACE) 520 220 2.36 13 40 FLUORESCENT LAMP (CEILING SURFACE) 520 220 2.36
CFL RECESSED PIN LIGHTS (WALL & CFL RECESSED PIN LIGHTS (WALL &
16 11 176 220 0.80 13 11 143 220 0.65
CEILING) CEILING)
2 0.80 15 AMP 2
3.5mm , TW 20 MM, uPVC 2 0.88 15 AMP 3.5mm2, TW 20 MM, uPVC
0 0 0 220 0.00 1 50 EMERGENCY LIGHT 50 220 0.23
0 0 0 220 0.00 0 0 0 220 0.00
CFL RECESSED PIN LIGHTS (WALL & CFL RECESSED PIN LIGHTS (WALL &
13 11 143 220 0.65 13 11 143 220 0.65
CEILING) CEILING)
3 1.38 15 AMP 3.5mm2, TW 20 MM, uPVC 3 1.38 15 AMP 3.5mm2, TW 20 MM, uPVC
4 40 FLUORESCENT LAMP (CEILING SURFACE) 160 220 0.73 4 40 FLUORESCENT LAMP (CEILING SURFACE) 160 220 0.73

0 220 0.00 0 220 0.00


CFL RECESSED PIN LIGHTS (WALL & CFL RECESSED PIN LIGHTS (WALL &
18 11 198 220 0.90 16 11 176 220 0.80
CEILING) CEILING)
4 0.90 15 AMP 3.5mm2, TW 20 MM, uPVC 4 1.03 15 AMP 3.5mm2, TW 20 MM, uPVC
0 0 0 220 0.00 1 50 EMERGENCY LIGHT 50 220 0.23
0 220 0.00 0 220 0.00
CFL RECESSED PIN LIGHTS (WALL & CFL RECESSED PIN LIGHTS (WALL &
19 11 209 220 0.95 19 11 209 220 0.95
CEILING) CEILING)
5 0.95 15 AMP 2
3.5mm , TW 20 MM, uPVC 5 0.95 15 AMP 3.5mm2, TW 20 MM, uPVC
9 0 0 220 0.00 0 0 0 220 0.00
0 220 0.00 0 220 0.00
0 0 0 220 0.00 0 0 0 220 0.00

6 18 40 FLUORESCENT LAMP (CEILING SURFACE) 720 220 3.27 3.27 15 AMP 3.5mm2, TW 20 MM, uPVC 6 18 40 FLUORESCENT LAMP (CEILING SURFACE) 720 220 3.27 3.27 15 AMP 3.5mm2, TW 20 MM, uPVC

0 220 0.00 0 220 0.00


CFL RECESSED PIN LIGHTS (WALL & CFL RECESSED PIN LIGHTS (WALL &
7 11 77 220 0.35 7 7 11 77 220 0.35 1.62 15 AMP 3.5mm2, TW 20 MM, uPVC
7 CEILING) 1.44 15 AMP 2
3.5mm , TW 20 MM, uPVC CEILING)
2
7 1.44 15 AMP 2
3.5mm , TW 20 MM, uPVC 7 1.62 15 AMP 3.5mm , TW 20 MM, uPVC
6 40 FLUORESCENT LAMP (CEILING SURFACE) 240 220 1.09 7 40 FLUORESCENT LAMP (CEILING SURFACE) 280
0 220
220 1.27
0.00
0 220 0.00
0 0 0 220 0.00
CFL RECESSED PIN LIGHTS (WALL &
16 11 176 220 0.80 CFL RECESSED PIN LIGHTS (WALL &
CEILING) 8 16 11 176 220 0.80 0.80 15 AMP 3.5mm2, TW 20 MM, uPVC
2 CEILING)
8 0.80 15 AMP 3.5mm , TW 20 MM, uPVC
0 0 FLUORESCENT LAMP (CEILING SURFACE) 0 220 0.00 0 220 0.00
12 20 CEILING FAN 240 220 1.09
0 220 0.00 9 1.09 15 AMP 3.5mm2, TW 20 MM, uPVC
0 0 0 220 0.00
12 20 CEILING FAN 20 220 0.09
2 10 14 200 DUPLEX CONVENIENT OUTLETS 2800 220 12.73 12.73 20 AMP 3.5mm2, TW 25 MM, uPVC
9 0 0 0 0 220 0.00 0.09 15 AMP 3.5mm , TW 20 MM, uPVC
2
0 220 0.00 11 1 1500 1.5 HP INVERTER SPLIT TYPE AIRCON 1500 220 6.82 6.82 30 AMP 5.5mm , TW 25 MM, uPVC
2
10 12 200 DUPLEX CONVENIENT OUTLETS 2400 220 10.91 10.91 20 AMP 2
25 MM, uPVC 12 1 1500 1.5 HP INVERTER SPLIT TYPE AIRCON 3300 220 15.00 15.00 30 AMP 5.5mm , TW 25 MM, uPVC
3.5mm , TW
2 13 12 200 DUPLEX CONVENIENT OUTLETS 2400 220 10.91 10.91 20 AMP 3.5mm2, TW 25 MM, uPVC
11 1 1500 1.5 HP INVERTER SPLIT TYPE AIRCON 1500 220 6.82 6.82 30 AMP 5.5mm , TW 25 MM, uPVC
14 1 1500 1.5 HP INVERTER SPLIT TYPE AIRCON 3000 220 13.64 13.64 30 AMP 5.5mm2, TW 25 MM, uPVC
12 1 1500 1.5 HP INVERTER SPLIT TYPE AIRCON 3300 220 15.00 15.00 30 AMP 5.5mm2, TW 25 MM, uPVC
2
15 1 1500 1.5 HP INVERTER SPLIT TYPE AIRCON 1500 220 6.82 6.82 30 AMP 5.5mm2, TW 25 MM, uPVC
13 9 200 DUPLEX CONVENIENT OUTLETS 1800 220 8.18 8.18 20 AMP 3.5mm , TW 25 MM, uPVC
16 12 200 DUPLEX CONVENIENT OUTLETS 2400 220 10.91 10.91 20 AMP 3.5mm2, TW 25 MM, uPVC
14 1 1500 1.50HP INVERTER SPLIT TYPE AIRCON 3000 220 13.64 13.64 30 AMP 5.5mm2, TW 25 MM, uPVC
17 12 200 DUPLEX CONVENIENT OUTLETS 2400 220 10.91 10.91 20 AMP 3.5mm2, TW 25 MM, uPVC
15 11 200 DUPLEX CONVENIENT OUTLETS 2200 220 10.00 10.00 30 AMP 3.5mm2, TW 25 MM, uPVC
18 13 200 DUPLEX CONVENIENT OUTLETS 2600 220 11.82 11.82 20 AMP 3.5mm2, TW 25 MM, uPVC
16 12 200 DUPLEX CONVENIENT OUTLETS 2400 220 10.91 10.91 30 AMP 3.5mm2, TW 25 MM, uPVC
19 0 0 SPARE
17 12 200 DUPLEX CONVENIENT OUTLETS 2400 220 10.91 10.91 30 AMP 3.5mm2, TW 25 MM, uPVC
20 0 0 SPARE
18 0 0 SPARE 0 0 0.00 0.00 0 0 0
115 2-14 mm2, 40 MM Ø, PVC
19 SPARE MAINS 24547 220 110.56
AMP THW PIPE
115 2-14 mm2, 40 MM Ø, PVC
MAINS 21432 220 96.00
AMP THW PIPE

REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
E-3
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 35 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER
ELECTRICAL NOTES
1. ALL ELECTRICAL WORKS AND INSTALLATIONS SHALL COMPLY WITH THE PROVISIONS OF TH E LATEST EDITION OF
THE PHILIPPINE ELECTRICAL CODE WITH THE RULES AND REGULATIONS OF THE NATIONAL AND LOCAL AUTHORITIES
` LOAD SUMMARY
SCHEDULE OF CONCERNED IN THE ENFORCEMENT OF ELECTRICAL LAWS AND REGULATIONS OF THE UTILITY COMPANIES
CONCERNED.

DESCRIPTION OF LOAD 2. ALL INSTALLATION SHALL BE CONCEALED FROM VIEW, WIRING SHALL BE INCASE IN POLYVINYL CHLORIDE (PVC) PIPE
CIRCUIT VOLT TOTAL BREAKE CONDUIT SIZE
WATTS WIRE SIZE SCHEDULE 40 EXCEPT POWER AND TELEPHONE SERVICE WHICH SHALL BE RIGID STEEL CONDUIT (RSC) OTHERWISE
NO. FIXTURE S AMP R SIZE (DIAMETER) NOTED.

3. MINIMUM WIRE AND CONDUIT SIZE SHALL BE NO. 12 AWG TYPE THW AND 1/2"⌀ PVC TRADE SIZE, RESPECTIVELY
2-14 mm2, UNLESS OTHERWISE SPECIFIED.
1 PANEL BOARD 1 21432 220 96.00 115 AMP 40 MM Ø, Upvc PIPE
THW 4. ALL MATERIALS TO BE USED SHALL BE NEW AND APPROVED TYPE APPROPRIATE FOR BOTH LOCATIONS AND
INTENDED USE.

5. ELECTRICAL INSTALLATIONS SHALL BE UNDER THE DIRECT SUPERVISION OF A DULY LICENSED ELECTRICAL
2-14 mm2,
2 PANEL BOARD 2 24547 220 109.47 115 AMP 40 MM Ø, Upvc PIPE ENGINEER OR A REGISTERED MASTER ELECTRICIAN.
THW
6. NO REVISION IN THE DESIGN SHALL BE DONE WITHOUT THE PRIOR KNOWLEDGE AND APPROVAL OF THE DESIGNER
AND THE OWNER, ANY OF SUCH REVISION DONE WITHOUT APPROVAL SHALL CAUSE RESPONSIBILITY OF THE
250 2-14 mm2,
3 TOTAL 45979 220 209.00 40 MM Ø, uPVC DESIGNER TO CEASE AS A WHOLE.
AMP THW
CFL RECESSED PIN LIGHTS (WALL &
198 220
CEILING)
4 0.90 15 AMP 3.5mm2, TW 20 MM, uPVC
0 220
0 220
CFL RECESSED PIN LIGHTS (WALL &
198HOUR
KILOWATT 220 ELECTRICAL LEGEND
CEILING) 2
5 POWER METER (200 A) 0.90 15 AMP 3.5mm , TW 20 MM, uPVC
SERVICE 0 2) thw in
2-#6 (14mm 220
ENTRANCE 0
40 mm dia. 220 6W LED RECESSED ACCENT/ MAIN DISCONNECT PANEL BOARD
2-#6 (14mm2) M rsc pipe DIRECTIONAL LIGHTING FIXTURE
thw in 0 220 UNDER-CABINET LIGHTING/
40 mm dia. 2 5W-40W SURFACE MOUNTED BATHROOM SCONCE
6 FLUORESCENT LAMP
2-#6 (14mm2) (CEILING SURFACE)
pvc pipe 720 220 3.27 15 AMP 3.5mm , TW 20 MM, uPVC FLUORESCENT FIXTURE 14W 24" T5 FLUORESCENT FIXTURE
thw in 250 A
40 mm dia. 0 220 10W - 20W PENDANT LIGHT FIXTURE
pvc pipe M KILOWATT-HOUR METER
CFL RECESSED PIN LIGHTS (WALL &
198 220
CEILING)
7 0.90 15 AMP 3.5mm2, TW 20 MM, uPVC 9W CFL RECESSED DOWNLIGHT POWER SERVICE ENTRANCE
0 220 NOTE: USE WATERPROOF TYPE
FOR BATHROOMS
115 A 0 115220
A
NOTE: 1. ALL CONVENIENCE OUTLET
CIRCUIT 1 15 A 15 A CIRCUIT 2 CIRCUIT 1 0 15 A 220 15 A CIRCUIT 2 9W CFL SURFACE MOUNTED DOWNLIGHT @ 0.30M A.F.F., U.O.I.
CIRCUIT 3 15 a 15 a CIRCUIT 4 CIRCUIT 3 15 a 15 a CIRCUIT 4 2. ALL SWITCHES @ 1.00M A.F.F., U.O.I.
8
CIRCUIT5
FLUORESCENT
15 a 15 a LAMP (CEILING SURFACE)
CIRCUIT 6
48015 a 220 15 a 2.18
CIRCUIT 6
15 AMP 3.5mm2, TW 20 MM, uPVC 5W WALL LAMP FIXTURE
CIRCUIT5 CIRCUIT HOME-RUN
CIRCUIT 7 15 a 15 a CIRCUIT 8 CIRCUIT 7 15 a 15 a CIRCUIT 8 DUPLEX CONVENIENCE OUTLET
CIRCUIT 9 15 a 20 a CIRCUIT 10 CIRCUIT 9 20 a 30 a CIRCUIT 10 CONTINUE CIRCUIT LINE TO OTHER
DUPLEX CONVENIENCE OUTLET
CIRCUIT 11 30 a 30 a CIRCUIT 12 CIRCUIT 11 30 a 20 a CIRCUIT 12 WP FLOOR LEVEL
W/ WATER PROOF COVER
CIRCUIT 13 20 a 30 a CIRCUIT 14 CIRCUIT 13 30 a 30 a CIRCUIT 14
CIRCUIT 15 30 a 20 a CIRCUIT 16 CIRCUIT 15 20 a 20 a CIRCUIT 16 DUPLEX CONVENIENCE OUTLET, GFCI
GFCI EMERGENCY LIGHT
CIRCUIT 17 20 a CIRCUIT 18 CIRCUIT 17 20 a 20 a CIRCUIT 18
SPARE
CIRCUIT 19 SPARE CIRCUIT 19 CIRCUIT 20 SINGLE RECEPTACLE W/ SHUTTER, GFCI
SPARE SPARE
REF (REFRIGERATOR)
POWER CIRCUIT LINE

GROUND WIRE GROUND WIRE AIRCON OUTLET SWITCH LINE


AC
PANEL BOARD -1 PANEL BOARD - 2
SWITCH LIGHTING CIRCUIT LINE

3 - WAY SWITCH

REVIEWED BY/
SIGN & SEAL PROJECT TITLE PROJECT OWNER RECOMMENDING APPROVAL APPROVED BY: PROJECT INFO: SHEET ID.
Republic of the Philippines

CONSTRUCTION OF 3- STOREY
E-4
NEGROS ORIENTAL STATE UNIVERSITY
DESIGNED BY:
Office of the University Engineer

PRC NO.: VALIDITY:


CLASSROOM, 6 OFFICES AND ADMIN NEGROS ORIENTAL STATE UNIVERSITY CAD BY:

FILE NAME: SHEET NO.


BUILDING (CAMPUS-1)
Main Campus 1, Kagawasan Ave.Capitol Area
Dumaguete City PTR NO.: DATE: ENGR. MICHAEL A. SAGA HON. JOEL P. LIMSON, Ph.D.
PLACE: ADDRESS: NORSU BAIS, NEGROS ORIENTAL DATE: 36 of
TIN: LOCATION: NORSU BAIS, NEGROS ORIENTAL UNIVERSITY ENGINEER UNIVERSITY ENGINEER

You might also like