EXPECTED COST/ 21-01-2023

SR. PARTICULAR APPROX COST


1 CIVIL LABOUR 9,49,390
2 CIVIL MATERIAL 5,18,600
3 FABRICATION MATERIAL & LABOUR 6,84,300
4 PAINTING OF FABRICATION 2,41,821
5 PLUMBING MATERIAL 3,00,000
6 CUSTOM DIY BASIN (4 PC) 1,00,000
7 PLUMBING LABOUR 1,20,000
8 POP CEILING & REPAIR 2,50,000
10 ELECTRICAL MATERIAL 4,00,000
11 LIGHTS & AUTOMATION 8,50,000
12 ELECTRICAL LABOUR 1,75,000
13 CARPENTRY MATERIAL 3,50,000
14 CARPENTRY LABOUR 3,50,000
15 HARDWARE 1,50,000
16 GLASS 2,00,000
17 FUMIGATION 4,500
18 CORE CUTTING 4,000
19 THERMOCOL 20,125
20 DEBRIS TRUCKS (5 TRUCKS) 25,000
21 CNC MDF CUTTING 1,00,000
22 ROCKWOOL 8,400
23 PAINTING WORKS 2,00,000.00
24 MELAMINE+POLISH+ PU 1,50,000.00
25 BAMBOO WORK 75,000.00
26 DÉCOR 5,00,000.00
27 FURNITURE 13,00,000.00
28 STAMP CONCRETE 2,25,000.00
29 3D BASIC RENDER 65,000
30 BRANDING & SINNAGE & MISCELLENOUS 75,000.00
TOTAL 83,91,136
DESIGNING & SUPERVISION 4,00,000