Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

SAI CHARAN GARREPALLI

Gurugram, India · +91 9912944619


garrepallisai.charan@gmail.com · www.linkedin.com/in/sai-charan-garrepalli-a08845190

Expert Structural Engineer bringing 2 years of expertise in underground and elevated metro design
industry. Meets job demands and deadlines through diligent work ethic and dedication to quality.
Dedicated to self-development to provide expectation-exceeding service.

EXPERIENCE
APRIL 2022 – PRESENT
DESIGN ENGINEER, AMBERG ENGINEERING
WORK ON 7.93KM AGRA UNDERGROUND METRO (AGCC02) CONSISTING SEVEN
UNDERGROUND METRO STATIONS AND ELEVATED CORRIDOR CONNECTING
WITH AGCC01 AND FUTURE ELEVATED STRETCH
 Detailed design of slabs, diaphragm walls, tension piles for underground stations in Agra
Metro (AGCC02) project.
 Design of retrieval shaft, launching shaft, entire cut and cover box tunnel, underground
ramp, and elevated ramp in Agra Metro project.
 Design of substructure for elevated stretch connecting to the elevated corridor of Agra
Metro project.
 Performed flotation checks, toe stability checks, and piping check crucial to the stability
of the underground metro stations and cut and cover box tunnels.
 Preparation of 3D and 2D models in STAAD, ETABS and construction stage analysis in
Wallap and Plaxis 2D required for the analysis and technical reports supporting the
design.
 Adept in performing and reviewing the calculations involved in the analysis and design.

WORK ON DELHI UNDERGROUND METRO (DC07) CONSISTING OF THREE


UNDERGROUND METRO STATIONS AND 6 LANE NHAI FLYOVER
 Design of substructure for free and fixed piers in the 6 lane NHAI flyover proposed in the
contract body of DC07 metro project.

AUGUST 2021 – APRIL 2022


ENGINEER-I, AECOM
WORK ON MUMBAI METRO ELEVATED CORRIDOR (MML9) CONSISTING EIGHT
METRO STATIONS AND VIADUCT SYSTEM CONNECTING THE METRO STATIONS
WITH A DOUBLE DECKER METRO AND FLYOVER BRIDGE
 Detailed design of post-tensioned pier caps, cross arms, portal pier and substructure for
viaducts and elevated metro stations in Mumbai Metro project in MIDAS.
 Design of substructure for double decker bridge with metro running in the top deck and
flyover running in the bottom deck in MIDAS and STAAD-Pro.
WORK ON 32.32 KM MUMBAI METRO ELEVATED CORRIDOR (MML4)
CONSISTING THIRTY-TWO METRO STATIONS AND VIADUCT SYSTEM CONNECTING
THE METRO STATIONS.
 Design of substructure for portal piers in MML4 project in MIDAS and STAAD PRO.

WORK ON DELHI METRO ELEVATED CORRIDOR (DC04) CONSISTING DOUBLE


DECKER PIER WITH METRO AND FLYOVER PIERS
 Review work for substructure design of integrated double decker pier consisting of metro
at top level deck and flyover at bottom level deck in STAAD-Pro.

WORK ON 7.46KM DELHI METRO UNDERGROUND METRO (DC05) CONSISTING


SIX UNDERGORUND STATIONS
 Preparation of BOQs for structural steel king post and strut components in the tender
stage.

EDUCATION
MAY 2021
M.TECH IN CIVIL ENGINEERING, IISC BANGALORE
 Graduated in First Class with a GPA of 8 on 10.
 Dissertation in fatigue analysis of reinforced concrete bridges.
 Majored in structural engineering with expertise in Finite Element Methods, Solid
Mechanics, Pre-stressed Analysis and Bridge Design.
 Possesses a minor degree in geotechnical engineering and earth retaining structures.

MAY 2018
B.TECH IN CIVIL ENGINEERING, NIT WARANGAL
 Graduated in First Class with a GPA of 7.04 on 10.
 Dissertation in uncharacteristic expansive behavior study of kaolinitic soils.

SKILLS
 Communication skills  Design IN STAAD Pro, ETABS, WALLAP, PLAXIS
 Adept at working in a team environment 2D, MIDAS, ADSEC
 Flexibility with varying deadlines and targets  Quality of work in time constrained projects
 Microsoft Office

ACTIVITIES
 Playing football and table tennis, learning new languages

You might also like