Download as pdf or txt
Download as pdf or txt
You are on page 1of 16

PA_6 January 2014.

qxp 1/4/2014 1:39 PM Page 3

INSIDE

PROJECT PROJECT NO. PROJECT PROJECT NO.

Automobile Ancillaries Zabkul-Malwar Mini Hydel Power ...................................................................................................26


Internal Combustion Piston Engines (Paithan) -Expansion ..................................4
Internal Combustion Piston Engines (Sriperumbudur) ..............................................5 Iron Ore
Iron Ore Pellets (Kodumur) .......................................................................................................................18
Bulk Drugs
Botanical Extracts (Pithampur) .................................................................................................................1 Plastic & Plastic Products
Plastic Containers Expanssion- (Sankrail) ...............................................................................2
Business Complexes
Aranya Bhavan (Bhubaneshwar) - Modernisation.......................................................15 Real Estate
Commissioner Office Building (Gurgaon) ..............................................................................16 Residential Complex (Dronagiri) [Maple Altura]...............................................................33
Residential Complex (Ghansoli) [Fortune Altura]............................................................34
Cement Products Residential Complex (New Panvel) [Fortune Iris].............................................................35
Autoclaved Aerated Concrete Blocks (Bagnan) .................................................................3 Residential Complex (Ulwe) [Maple Carniva].......................................................................36
Residential Complex (Ulwe) [Maple Ivy].....................................................................................37
Community Services Transit Accommodation (Bellary)..........................................................................................................38
Court Building (Godda) .................................................................................................................................27 Transit Accommodation (Dharwad) .................................................................................................39
Divisional Workshop (Rupnagar) ......................................................................................................28 Transit Accommodation (Gulbarga) ................................................................................................40
Multi Skill Development Centre (Amritsar) ..............................................................................29
Multi Skill Development Centre (Bhatinda)............................................................................30 Roadways
Sahakara Bhavana Building (Belgaum) ..................................................................................31 Road Upgradation (Barakar-Purulia) ............................................................................................41
Taluka Seva Sadan (Netrang) ................................................................................................................32 Road Upgradation (Bhubaneswar) .................................................................................................42
Road Upgradation (Bonpass) ................................................................................................................43
Hospitals Road Upgradation (Mahuwadabar-Sarwan) ......................................................................44
Maternity Hospital (Kara) ................................................................................................................................6 Road Upgradation (NH-23) .......................................................................................................................45
Maternity Hospital (Manda) ........................................................................................................................7
Maternity Hospital (Phoolpur) ...................................................................................................................8 Software Parks
Maternity Hospital (Sirathu) .........................................................................................................................9 Incubation Centre (Bhubaneshwar).................................................................................................17
Mother & Child Hospital (Bhawanipatna) .............................................................................10
Mother & Child Hospital (Koraput) .................................................................................................11 Tourism & Recreation
District Ranga Mandira (Shidlaghatta Bagilu) .................................................................13
Hotels & Restaurants Sports Complex (Jind).........................................................................................................................................14
Hotel (Sector 114 [Leisure Inn]...............................................................................................................12
Water & Sewerage Pipeline & Distribution
Hydel Based Power Water Supply Scheme (Biligere)............................................................................................................46
Aripath Mini Hydel Power ..........................................................................................................................19 Water Supply Scheme (Kethupura)...................................................................................................47
Inderwal Mini Hydel Power ......................................................................................................................20 Water Supply Scheme (Kodagahally).............................................................................................48
Lanka Mini Hydel Power .............................................................................................................................21 Water Supply Scheme (Thumbala)....................................................................................................49
Mattigawran Mini Hydel Power - Stage II................................................................................22 Water Supply Scheme (Yadakola).......................................................................................................50
Mavar-Wayli Mini Hydel Power ...........................................................................................................23
Sangambati Mini Hydel Power ............................................................................................................24 Guest Article ......................................................................................................................Page No. 13 & 16
Waniyaran Mini Hydel Power ...............................................................................................................25 Interview .................................................................................................................................Page No. 14 & 15

Disclaimer: Readers are recommended to make necessary enquiries before acting upon or entering into any commitment in relation to any advertisement published
in this publication. Economic Research India Pvt Ltd does not vouch for any claims made by advertisers of products and services. The Directors, Printer, Publisher and
Editor of Economic Research India Pvt Ltd shall not be held liable for any consequences, in the event such claims are not honoured by the advertisers.

PROJECT ALERT 3 January 6, 2014


PA_6 January 2014.qxp 1/4/2014 1:39 PM Page 4

NEW PROJECTS Drugs & Pharma / Plastic / Cement / Automobile Ancillaries / Hospitals

BOTANICAL EXTRACTS (PITHAMPUR) PLASTIC CONTAINERS EXPANSSION- (SANKRAIL)


Promoter: Cygnusmorpho Biotech India Pvt. Ltd
Cost: 70.00
1 Promoter: Ostern Pvt. Ltd
Cost: 16.00
2
Industry: Bulk Drugs Industry: Plastic & Plastic Products
Completion: NA Completion: April 2014
Location: Dhar, Madhya Pradesh Location: Howrah, West Bengal

Cygnusmorpho Biotech India plans to set up botanical Ostern is expanding its plastic containers manufacturing
extract unit with a capacity of 3,000 tpa at Pithampur in capacity from 1,000 tpa to 1,800 tpa at Sankrail in Howrah
Dhar district in Madhya Pradesh. Work to commence by district of West Bengal. Work underway.
March 2014.
Contact: Ostern Pvt. Ltd, 279, Rai Bhahadur Road,
Contact: Cygnusmorpho Biotech India Pvt. Ltd, 7/1, Kolkata, West Bengal 700053. Tel: 033−24889010
Babadeep Complex, Maharani Road, Indore, Madhya
Pradesh 452001. Mobile: +91−0−90−880−27000

AUTOCLAVED AERATED CONCRETE BLOCKS (BAGNAN) INTERNAL COMBUSTION PISTON ENGINES (PAITHAN)
Promoter: Cinza Concrete Products Pvt. Ltd
Cost: 22.00
3 Promoter: Som Autotech Pvt. Ltd
Cost: 60.00
4
Industry: Cement Products Industry: Automobile Ancillaries
Completion: December 2014 Completion: December 2016
Location: Howrah, West Bengal Location: Aurangabad, Maharashtra

Cinza Concrete Products plans to set up an aerated Som Autotech is expanding an internal combustion piston
autoclave concrete blocks unit with a capacity of 2.5 lakh engines unit at Paithan in Aurangabad district in
cubic metres per year at Bagnan in Howrah district of Maharashtra. Work underway.
West Bengal. Awaiting financial closure. Work to
commence by April 2014. Contact: Som Autotech Pvt. Ltd, Gat No.927 & 928,
Bidkin Village, Paithan Taluka, Aurangabad, Maharashtra
Contact: Cinza Concrete Products Pvt. Ltd, 1, Sarojini 431105. Mobile: +91−94−044−77995
Naidu Sarani, Shubham Building, Suite 202, Kolkata,
West Bengal 700017. Email: cinzaconcrete@gmail.com
Mobile No: +91−0−97−487−83055

INTERNAL COMBUSTION PISTON ENGINES (SRIPERUMBUDUR) MATERNITY HOSPITAL (KARA)


Promoter: Kyowa Castec India Pvt. Ltd
Cost: 53.00
5 Promoter: U P Projects Corpn. Ltd
Cost: 2.55
6
Industry: Automobile Ancillaries Industry: Hospitals
Completion: NA Completion: September 2015
Location: Kancheepuram, Tamil Nadu Location: Kaushambi, Uttar Pradesh

Kyowa Castec India, a subsidiary of T T Techno Park The project envisages construction of maternity hospital
Management Services India plans to set up an internal with a capacity of 30 beds at Community Health Centre,
combustion piston engines unit with a capacity of 6.2 lakh Kara in Kaushambi in Uttar Pradesh. On December 20,
numbers per year at Sriperumbudur in Kancheepuram 2013 bids were invited. Last date for submission: January
district in Tamil Nadu. Awaiting financial closure. 16, 2014.

Contact: Kyowa Castec India Pvt. Ltd, F1 & F2, Block ’B’, Contact: U P Projects Corpn. Ltd, Gomti Barrage, Left
Ameen Manor, 138, Nungambakkam High Road, Bank, Gomti Nagar, Lucknow, Uttar Pradesh 226010.
Chennai, Tamil Nadu 600034. Tel: 044−28332053 Fax: Tel: 0522−2308945/946
044−28332050

*Cost: `Crore, NA: Not Available


PROJECT ALERT 4 January 6, 2014
PA_6 January 2014.qxp 1/4/2014 1:39 PM Page 5

NEW PROJECTS Hospitals

MATERNITY HOSPITAL (MANDA) MATERNITY HOSPITAL (PHOOLPUR)


Promoter: U P Projects Corpn. Ltd
Cost: 2.55
7 Promoter: U P Projects Corpn. Ltd
Cost: 2.55
8
Industry: Hospitals Industry: Hospitals
Completion: September 2015 Completion: September 2015
Location: Allahabad, Uttar Pradesh Location: Allahabad, Uttar Pradesh

The project envisages construction of maternity hospital The project envisages construction of maternity hospital
with a capacity of 30 beds at Community Health Centre, with a capacity of 30 beds at Community Health Centre,
Manda in Allahabad district in Uttar Pradesh. On Phoolpur in Allahabad district in Uttar Pradesh. On
December 20, 2013 bids were invited. Last date for December 20, 2013 bids were invited. Last date for
submission: January 16, 2014. submission: January 16, 2014.

Contact: U P Projects Corpn. Ltd, Gomti Barrage, Left Contact: U P Projects Corpn. Ltd, Gomti Barrage, Left
Bank, Gomti Nagar, Lucknow, Uttar Pradesh 226010. Bank, Gomti Nagar, Lucknow, Uttar Pradesh 226010.
Tel: 0522−2308945 / 946 Tel: 0522−2308945 / 946

MATERNITY HOSPITAL (SIRATHU) MOTHER & CHILD HOSPITAL (BHAWANIPATNA)


Promoter: U P Projects Corpn. Ltd
Cost: 2.55
9 Promoter: PWD, Orissa
Cost: 13.74
10
Industry: Hospitals Industry: Hospitals
Completion: September 2015 Completion: September 2015
Location: Kaushambi, Uttar Pradesh Location: Kalahandi, Orissa

The project envisages construction of maternity hospital The project envisages construction of mother and child
with a capacity of 30 beds at Community Health Centre, hospital with a capacity of 100 beds at Bhawanipatna in
Sirathu in Kaushambi in Uttar Pradesh. On December 20, Kalahandi in Orissa. Bids were invited and tendering
2013 bids were invited. Last date for submission: January process underway.
16, 2014.
Contact: Chief Engineer, PWD, World Bank Project,
Contact: U P Projects Corpn. Ltd, Gomti Barrage, Left Nirman Soudha, Keshari Nagar, Unit−V, Bhubaneswar,
Bank, Gomti Nagar, Lucknow, Uttar Pradesh 226010. Khurda, Orissa 751001. Tel: 0674−2396783 / 2394804 /
Tel: 0522−2308945 / 946 2391523 Fax: 0674−2390080
Email: pmuosrp@gmail.com

MOTHER & CHILD HOSPITAL (KORAPUT) FRESH PROJEX BY MAJOR SECTORS - DEC 2013
Promoter: PWD, Orissa
Cost: 6.77
11 Sectors Projects `Crore Share (%)
Industry: Hospitals
Completion: June 2015 Manufacturing 74 7,041 18.13
Location: Orissa
Mining 8 8,262 21.27
The project envisages construction of mother and child
hospital complex with a capacity of 50 beds at Koraput in Electricity 21 1,150 2.96
Orissa. Bids were invited and tendering process
Services & Utilities 509 22,294 57.40
underway.
Irrigation 4 91 0.24
Contact: Chief Engineer, PWD, World Bank Project,
Nirman Soudha, Keshari Nagar, Unit−V, Bhubaneswar, All Sectors 616 38,837 100.00
Khurda, Orissa 751001. Tel: 0674−2396783 / 2394804 /
2391523 Fax: 0674−2390080 www.Projectstoday.com
Email: pmuosrp@gmail.com

PROJECT ALERT 5 January 6, 2014


PA_6 January 2014.qxp 1/4/2014 1:39 PM Page 6

NEW PROJECTS Hotels & Restaurants / Tourism / Business Complexes

HOTEL (SECTOR 114 [LEISURE INN] DISTRICT RANGA MANDIRA (SHIDLAGHATTA BAGILU)
Promoter: StayWell Hospitality Group Pty. Ltd
*Cost: NA
12 Promoter: Karnataka Housing Board
Cost: 8.00
13
Industry: Hotels & Restaurants Industry: Tourism & Recreation
Completion: June 2015 Completion: NA
Location: Haryana Location: Chickmagalur, Karnataka

StayWell Hospitality Group plans to develop a hotel The project envisages construction of District Ranga
’Leisure Inn’ with a capacity of 120 rooms at Gurgaon in Mandira at Shidlaghatta Bagilu in Chickmagalur district in
Haryana. Work to commence by June 2014. Karnataka. Bids were invited and tendering process
underway.
Contact: Leisure Inn West Gurgaon, 17/6 Old Delhi−
Gurgaon Road, Sector 14, Gurgaon, Haryana. Tel: 0124− Contact: Karnataka Housing Board, Cauvery Bhavan, III
4931100 Email: info@staywellgroup.com Floor, K.G. Road, Bangalore, Karnataka 560009. Tel:
080−22273511−3515 / 22215125 / 2210 Fax: 080−
22240976 / 22215125 Email: khbhc@mantraonline.com

SPORTS COMPLEX (JIND) ARANYA BHAVAN (BHUBANESHWAR) - MODERNISATION


Promoter: Haryana Urban Devp. Authority
Cost: 5.10
14 Promoter: Orissa Industrial Infrastructure Devp.
Corpn.
15
Industry: Tourism & Recreation Cost: 3.77
Completion: March 2015 Industry: Business Complexes
Location: Haryana Completion: July 2014
Location: Khurda, Orissa
The project envisages development of sports complex at
Jind in Haryana. Bids were invited and tendering process The project involves modernisation of Aranya Bhavan at
underway. Bhubaneshwar in Khurda in Orissa. Work underway.

Contact: Haryana Urban Development Authority, HUDA Contact: Chief General Manager (Civil), Orissa Industrial
Office Complex, C−3, Sector 6, Panchkula, Haryana Infrastructure Development Corporation, IDCO Towers,
134109. Tel: 0172−2564048 / 2560605 Fax: 0172− Janpath, P&C Wing, Bhubaneswar, Khurda, Orissa
2267008 Email: huda@hry.nic.in 751022. Tel: 0674−2540820/2784/2869 Fax: 0674−
2542956 Email: cmd@idco.in

COMMISSIONER OFFICE BUILDING (GURGAON) FRESH PROJEX BY OWNERSHIP - DEC 2013


Promoter: Haryana Police Housing Corpn. Ltd
Cost: 22.00
16 Ownership Projects `Crore Share (%)
Industry: Business Complexes Government 462 28,690 73.87
Completion: March 2016
Location: Gurgaon, Haryana Central Govt 42 13,806 35.55

The project envisages construction of office building for State Govt 420 14,884 38.33
Commissioner of Police in Gurgaon district of Haryana. Private Sector 154 10,147 26.13
Bids were invited and tendering process underway.
Private (Indian) 145 8,467 21.80
Contact: Haryana Police Housing Corporation Ltd, Plot
C−10, Sector 6, Panchkula, Haryana 134109. Tel: 0172− Private (Foreign) 9 1,680 4.33
5004204 / 208 / 209
Grand Total 616 38,837 100.00

www.Projectstoday.com

PROJECT ALERT 6 January 6, 2014


PA_6 January 2014.qxp 1/4/2014 1:39 PM Page 7

NEW PROJECTS IT Parks / Iron Ore / Power

INCUBATION CENTRE (BHUBANESHWAR) IRON ORE PELLETS (KODUMUR)


Promoter: Orissa Industrial Infrastructure Devp.
Corpn.
17 Promoter: MPL Mineral Processing Pvt. Ltd
Cost: NA
18
Cost: NA Industry: Iron Ore
Industry: Software Parks Completion: NA
Completion: NA Location: Kurnool, Andhra Pradesh
Location: Khurda, Orissa
MPL Mineral Processing plans to set up an iron ore pellets
The project envisages development of an incubation unit with a capacity of 0.6 million tpa at Kodumur mandal
centre at Bhubaneshwar in Khurda in Orissa. It comprises in Kurnool district in Andhra Pradesh. Work to commence
a tower of G+14 floors. soon.

Contact: Chief General Manager (Civil), Orissa Industrial Contact: MPL Mineral Processing Pvt. Ltd, MPL House,
Infrastructure Development Corporation, IDCO Towers, 13−6−439/4/6, Balaji Nagar, Pillar No.70, Mehdipatnam
Janpath, P&C Wing, Bhubaneswar, Khurda, Orissa Ring Road, Hyderabad, Andhra Pradesh 500006.
751022. Tel: 0674−2540820 / 2784 / 2869 Fax: 0674− Tel: 040−67330000 Fax: 040−67330010
2542956 Email: cmd@idco.in Email: project@mplgroup.in

ARIPATH MINI HYDEL POWER INDERWAL MINI HYDEL POWER


Promoter: Jammu & Kashmir Energy Devp.
Agency
19 Promoter: Jammu & Kashmir Energy Devp.
Agency
20
Cost: NA Cost: NA
Industry: Hydel Based Power Industry: Hydel Based Power
Completion: NA Completion: NA
Location: Jammu & Kashmir Location: Doda, Jammu & Kashmir

The project envisages setting up a 1.75 MW Aripath mini The project envisages setting up a 1.8 MW Inderwal mini
hydel power unit at Anant Nag in Jammu & Kashmir. On hydel power unit at Kishtwar in Doda district in Jammu &
December 14, 2013 bids were invited. Last date for Kashmir. On December 14, 2013 bids were invited. Last
submission: February 19, 2014. date for submission: February 19, 2014.

Contact: Jammu & Kashmir Energy Development Contact: Jammu & Kashmir Energy Development
Agency, 181, Jawahar Nagar, Srinagar, Jammu & Agency, 181, Jawahar Nagar, Srinagar, Jammu &
Kashmir. Tel: 0194−2311985 Fax: 0194−2546495 Kashmir. Tel: 0194−2311985 Fax: 0194−2546495
Email: xenjakeda@gmail.com Email: xenjakeda@gmail.com

LANKA MINI HYDEL POWER MATTIGAWRAN MINI HYDEL POWER - STAGE II


Promoter: Jammu & Kashmir Energy Devp.
Agency
21 Promoter: Jammu & Kashmir Energy Devp.
Agency
22
Cost: NA Cost: NA
Industry: Hydel Based Power Industry: Hydel Based Power
Completion: NA Completion: NA
Location: Udhampur, Jammu & Kashmir Location: Jammu & Kashmir

The project envisages setting up a 1.75 MW Lanka mini The project envisages setting up a 1.5 MW Mattigawran
hydel power unit at Ramban in Udhampur district in mini hydel power unit (Stage II) at Anant Nag in Jammu &
Jammu & Kashmir. On December 14, 2013 bids were Kashmir. On December 14, 2013 bids were invited. Last
invited. Last date for submission: February 19, 2014. date for submission: February 19, 2014.

Contact: Jammu & Kashmir Energy Development Contact: Jammu & Kashmir Energy Development
Agency, 181, Jawahar Nagar, Srinagar, Jammu & Agency, 181, Jawahar Nagar, Srinagar, Jammu &
Kashmir. Tel: 0194−2311985 Fax: 0194−2546495 Kashmir. Tel: 0194−2311985 Fax: 0194−2546495
Email: xenjakeda@gmail.com Email: xenjakeda@gmail.com

PROJECT ALERT 7 January 6, 2014


PA_6 January 2014.qxp 1/4/2014 1:39 PM Page 8

NEW PROJECTS Power / Community Services

MAVAR-WAYLI MINI HYDEL POWER SANGAMBATI MINI HYDEL POWER


Promoter: Jammu & Kashmir Energy Devp.
Agency
23 Promoter: Jammu & Kashmir Energy Devp.
Agency
24
Cost: NA Cost: NA
Industry: Hydel Based Power Industry: Hydel Based Power
Completion: NA Completion: NA
Location: Jammu & Kashmir Location: Doda, Jammu & Kashmir

The project envisages setting up a 1.8 MW Mavar−Wayli The project envisages setting up a 2 MW Sangambati mini
mini hydel power unit at Anant Nag in Jammu & Kashmir. hydel power unit at Kishtwar in Doda district in Jammu &
On December 14, 2013 bids were invited. Last date for Kashmir. On December 14, 2013 bids were invited. Last
submission: February 19, 2014. date for submission: February 19, 2014.

Contact: Jammu & Kashmir Energy Development Contact: Jammu & Kashmir Energy Development
Agency, 181, Jawahar Nagar, Srinagar, Jammu & Agency, 181, Jawahar Nagar, Srinagar, Jammu &
Kashmir. Tel: 0194−2311985 Fax: 0194−2546495 Kashmir. Tel: 0194−2311985 Fax: 0194−2546495
Email: xenjakeda@gmail.com Email: xenjakeda@gmail.com

WANIYARAN MINI HYDEL POWER ZABKUL-MALWAR MINI HYDEL POWER


Promoter: Jammu & Kashmir Energy Devp.
Agency
25 Promoter: Jammu & Kashmir Energy Devp.
Agency
26
Cost: NA Cost: NA
Industry: Hydel Based Power Industry: Hydel Based Power
Completion: NA Completion: NA
Location: Srinagar, Jammu & Kashmir Location: Doda, Jammu & Kashmir

The project envisages setting up a 1.1 MW Waniyaran The project envisages setting up a 2 MW Zabkul−Malwa
mini hydel power unit (Stage II) at Ganderbal in Srinagar mini hydel power unit at Kishtwar. On December 14, 2013
in Jammu & Kashmir. On December 14, 2013 bids were bids were invited. Last date for submission: February 19,
invited. Last date for submission: February 19, 2014. 2014.

Contact: Jammu & Kashmir Energy Development Contact: Jammu & Kashmir Energy Development
Agency, 181, Jawahar Nagar, Srinagar, Jammu & Agency, 181, Jawahar Nagar, Srinagar in Doda district in
Kashmir. Tel: 0194−2311985 Fax: 0194−2546495 Jammu & Kashmir. Tel: 0194−2311985 Fax: 0194−
Email: xenjakeda@gmail.com 2546495 Email: xenjakeda@gmail.com

COURT BUILDING (GODDA) DIVISIONAL WORKSHOP (RUPNAGAR)


Promoter: Building Construction Department,
Jharkhand
27 Promoter: Assam State Transport Corpn.
Cost: 2.73
28
Cost: 4.73 Industry: Community Services
Industry: Community Services Completion: NA
Completion: September 2015 Location: Kamrup, Assam
Location: Godda, Jharkhand
The project envisages development of divisional
The project envisages construction of court building in workshop at Rupnagar in Kamrup district of Assam. Bids
Godda district of Jharkhand. Bids were invited and were invited and tendering process underway.
tendering process underway.
Contact: Assam State Transport Corpn., Paltan Bazar,
Contact: The Nodal Officer, e−Procurement Cell, Building Guwahati, Kamrup, Assam 781008. Tel: 0361−2739552
Construction Department, Ranchi, Jharkhand. Tel: 0651− Fax: 0361−2730726
2405066 / 2446166 Mobile: +91−0−97−712−55265

PROJECT ALERT 8 January 6, 2014


PA_6 January 2014.qxp 1/4/2014 1:39 PM Page 9

NEW PROJECTS Community Services / Real Estate

MULTI SKILL DEVELOPMENT CENTRE (AMRITSAR) MULTI SKILL DEVELOPMENT CENTRE (BHATINDA)
Promoter: Department of Technical Education &
Industrial Training, Punjab
29 Promoter: Department of Technical Education &
Industrial Training, Punjab
30
Cost: NA Cost: NA
Industry: Community Services Industry: Community Services
Completion: NA Completion: NA
Location: Punjab Location: Punjab

The project envisages construction of multi skill The project envisages construction of multi skill
development centre on hub and spoke model with development centre on hub and spoke model with
placement facilities at Amritsar in Punjab. On December placement facilities at Bhatinda in Punjab. On December
20, 2013 bids were invited. Last date for submission: 20, 2013 bids were invited. Last date for submission:
February 11, 2014. February 11, 2014.

Contact: Department of Technical Education & Industrial Contact: Department of Technical Education & Industrial
Training, Mini Secretariat, Sector−9, Chandigarh 160009. Training, Mini Secretariat, Sector−9, Chandigarh 160009.
Tel: 0172−2614031 Fax: 0172−2614622 Tel: 0172−2614031 Fax: 0172−2614622

SAHAKARA BHAVANA BUILDING (BELGAUM) TALUKA SEVA SADAN (NETRANG)


Promoter: Karnataka Housing Board
Cost: 3.03
31 Promoter: Roads & Buildings Department,
Gujarat
32
Industry: Community Services Cost: 9.50
Completion: NA Industry: Community Services
Location: Karnataka Completion: NA
Location: Bharuch, Gujarat
The project envisages construction of Sahakara Bhavana
building for Karnataka State Co−operative Federation at The project envisages construction of new taluka seva
Belgaum in Karnataka. Bids were invited and tendering sadan at Netrang in Bharuch district in Gujarat. Bids were
process underway. invited and tendering process underway.

Contact: Karnataka Housing Board, Cauvery Bhavan, III Contact: The Secretary, Roads & Buildings Department,
Floor, K.G. Road, Bangalore, Karnataka 560009. Tel: Block 14, II Floor, New Sachivalaya, Gandhinagar,
080−22273511−3515 / 22215125 / 2210 Fax: 080− Gujarat 382010. Tel: 079−23251801−1804 Fax: 079−
22240976 / 22215125 Email: khbhc@mantraonline.com 23252509 Email: secrnb@gujarat.gov.in

RESIDENTIAL COMPLEX (DRONAGIRI) [MAPLE ALTURA] RESIDENTIAL COMPLEX (GHANSOLI) [FORTUNE ALTURA]
Promoter: Yushan Realty Ventures
Cost: NA
33 Promoter: LeoFortune Infra Buildcon Pvt. Ltd
Cost: NA
34
Industry: Real Estate Industry: Real Estate
Completion: December 2017 Completion: NA
Location: Raigarh, Maharashtra Location: Thane, Maharashtra

Yushan Realty Ventures, a group company of Shreeji LeoFortune Infra Buildcon in joint venture with Kshama
Associates plans to develop a residential complex ’Maple Sagar Developers plans to construct a residential
Altura’ at Dronagiri in Raigarh district in Maharshtra. It complex ’Fortune Altura’ at Ghansoli in Thane, Navi
comprises a tower of G+24 floors. Work to commence by Mumbai in Maharashtra. It comprises a tower of G+15
June 2014. floors with 60 flats including various modern amenities.

Contact: Yushan Realty Ventures, Shreeji Associates, Contact: LeoFortune Infra Buildcon Pvt. Ltd, 4, 10th
1104, Satra Plaza, Plot 20, Sector−19, Palm Beach Road, Floor, Real Tech Park, Plot 39/2, Sector 30 A, Vashi, Navi
Vashi, Navi Mumbai, Thane, Maharashtra 400705. Mumbai, Maharashtra 400703. Tel: 022−27811333/1310
Tel: 022−27836624 / 25 Email: info@yushanrealty.com

PROJECT ALERT 9 January 6, 2014


PA_6 January 2014.qxp 1/4/2014 1:39 PM Page 10

NEW PROJECTS Real Estate

RESIDENTIAL COMPLEX (NEW PANVEL) [FORTUNE IRIS] RESIDENTIAL COMPLEX (ULWE) [MAPLE IVY]
Promoter: LeoFortune Infra Buildcon Pvt. Ltd
Cost: NA
35 Promoter: Yushan Realty Ventures
Cost: NA
36
Industry: Real Estate Industry: Real Estate
Completion: NA Completion: December 2017
Location: Raigarh, Maharashtra Location: Thane, Maharashtra

LeoFortune Infra Buildcon in joint venture with Cityscapes Yushan Realty Ventures, a group company of Shreeji
Buildwell plans to develop a residential complex ’Fortune Associates plans to develop a residential complex ’Maple
Iris’ at Kewale in Raigarh district of Maharashtra. It Ivy’ at Ulwe in Thane, Navi Mumbai, Maharashtra. It
comprises buildings of G+3 floors with 48 flats including comprises a tower of G+14 floors. Work to commence by
various modern amenities. Work to commence by June June 2014.
2014.
Contact: Yushan Realty Ventures, Shreeji Associates,
Contact: LeoFortune Infra Buildcon Pvt. Ltd, 4, 10th 1104, Satra Plaza, Plot 20, Sector−19, Palm Beach Road,
Floor, Real Tech Park, Plot 39/2, Sector 30 A, Vashi, Navi Vashi, Navi Mumbai, Thane, Maharashtra 400705.
Mumbai, Maharashtra 400703. Tel: 022−27811333/1310 Tel: 022−27836624 / 25 Email: info@yushanrealty.com

RESIDENTIAL COMPLEX (ULWE) [MAPLE CARNIVA] TRANSIT ACCOMMODATION (BELLARY)


Promoter: Yushan Realty Ventures
Cost: NA
37 Promoter: Karnataka Housing Board
Cost: 16.00
38
Industry: Real Estate Industry: Real Estate
Completion: December 2016 Completion: NA
Location: Thane, Maharashtra Location: Karnataka

Yushan Realty Ventures, a group company of Shreeji The project envisages construction of transit
Associates is developing a residential complex ’Maple accommodation building for Labour Welfare Board at
Carniva’ at Ulwe in Thane, Navi Mumbai, Maharashtra. It Bellary in Karnataka. Bids were invited and tendering
comprises a tower of G+14 floors. Work underway process underway.

Contact: Yushan Realty Ventures, Shreeji Associates, Contact: Karnataka Housing Board, Cauvery Bhavan, III
1104, Satra Plaza, Plot 20, Sector−19, Palm Beach Road, Floor, K.G. Road, Bangalore, Karnataka 560009. Tel:
Vashi, Navi Mumbai, Thane, Maharashtra 400705. 080−22273511−3515 / 22215125 / 2210 Fax: 080−
Tel: 022−27836624 / 25 Email: info@yushanrealty.com 22240976 / 22215125. Email: khbhc@mantraonline.com

TRANSIT ACCOMMODATION (DHARWAD) TRANSIT ACCOMMODATION (GULBARGA)


Promoter: Karnataka Housing Board
Cost: 16.00
39 Promoter: Karnataka Housing Board
Cost: 16.00
40
Industry: Real Estate Industry: Real Estate
Completion: NA Completion: NA
Location: Karnataka Location: Karnataka

The project envisages construction of transit The project envisages construction of transit
accommodation building for Labour Welfare Board at accommodation building for labour welfare board in
Dharwad in Karnataka. Bids were invited and tendering Gulbarga district of Karnataka. Bids were invited and
process underway. tendering process underway.

Contact: Karnataka Housing Board, Cauvery Bhavan, III Contact: Karnataka Housing Board, Cauvery Bhavan, III
Floor, K.G. Road, Bangalore, Karnataka 560009. Tel: Floor, K.G. Road, Bangalore, Karnataka 560009. Tel:
080−22273511−3515 / 22215125 / 2210 Fax: 080− 080−22273511−3515 / 22215125 / 2210 Fax: 080−
22240976 / 22215125. Email: khbhc@mantraonline.com 22240976 / 22215125. Email: khbhc@mantraonline.com

PROJECT ALERT 10 January 6, 2014


PA_6 January 2014.qxp 1/4/2014 1:39 PM Page 11

NEW PROJECTS Roadways / Water & Sewerage Pipeline & Distribution

ROAD UPGRADATION (BARAKAR-PURULIA) ROAD UPGRADATION (BHUBANESWAR)


Promoter: PWD, West Bengal
Cost: 25.37
41 Promoter: PWD, Orissa
Cost: 4.31
42
Industry: Roadways Industry: Roadways
Completion: NA Completion: NA
Location: West Bengal Location: Khurda, Orissa

The project envisages widening and strengthening of The project envisages upgradation of road from BPCL
Barakar−Purulia road (SH−5 from 19.00 to 22.25 km and Petrol Pump to Fire Station via Chandraloka Market, C S
also strengthening from 32.00 to 33.50 km and widening Pur at Bhubaneswar in Orissa. Bids were invited and
from 41.25 to 74.00 km at Purulia in West Bengal. Bids tendering process underway.
were invited and tendering process underway.
Contact: Chief Engineer, D.P.I. & Roads, PWD, Nirman
Contact: Superintending Engineer, PWD, Western Circle Soudha Bhubaneswar, Khurda, Orissa 751001.
No−I, Court Compound, Bardhaman, West Bengal. Tel: 0674−2394107 / 2392678
Tel: 0342−2646430 / 2662425.
Email: sepwdwestern@wb.gov.in

ROAD UPGRADATION (BONPASS) ROAD UPGRADATION (MAHUWADABAR-SARWAN)


Promoter: PWD, West Bengal
Cost: 7.50
43 Promoter: Road Construction
Jharkhand
Department, 44
Industry: Roadways Cost: 24.72
Completion: NA Industry: Roadways
Location: West Bengal Completion: September 2015
Location: Jharkhand
The project envisages upgradation of Bonpass village to
Bonpass railway station road from 0.00 km to 7.50 km at The project envisages upgradation of Mahuwadabar to
Bardhaman district in West Bengal. Bids were invited and Sarwan road via Kumidih road in length of 19.43 km at
tendering process underway. Deoghar in Jharkhand. On December 16, 2013 bids were
invited. Last date for submission: January 15, 2014.
Contact: Superintending Engineer, PWD, Western Circle
No−I, Court Compound, Bardhaman, West Bengal. Contact: Executive Engineer, Road Construction
Tel: 0342−2646430 / 2662425. Department, Road Division, Gumla, Jharkhand.
Email: sepwdwestern@wb.gov.in Tel: 06524−222097

ROAD UPGRADATION (NH-23) WATER SUPPLY SCHEME (BILIGERE)


Promoter: PWD, Orissa
Cost: 11.61
45 Promoter: Panchayath
Department, Karnataka
Raj Engineering 46
Industry: Roadways Cost: 25.66
Completion: February 2015 Industry: Water & Sewerage Pipeline & Distribution
Location: Sundargarh, Orissa Completion: February 2015
Location: Mysore, Karnataka
The project envisages upgradation of NH−23 from 286.70
km to 296.95 km at Sundargarh in Orissa. Bids were The project envisages implementation of water supply
invited and tendering process underway. scheme to Biligere and other 41 villages at Nanjangud.
On December 11, 2013 bids were invited. Last date for
Contact: Chief Engineer, D.P.I. & Roads, PWD, Nirman submission: February 15, 2014.
Soudha Bhubaneswar, Khurda, Orissa 751001.
Tel: 0674−2394107 / 2392678 Contact: Panchayath Raj Engineering Department, K.R.
Nagara, Mysore, Karnataka. Tel: 08223−262228

PROJECT ALERT 11 January 6, 2014


PA_6 January 2014.qxp 1/4/2014 1:39 PM Page 12

NEW PROJECTS Water & Sewerage Pipeline & Distribution

WATER SUPPLY SCHEME (KETHUPURA) WATER SUPPLY SCHEME (KODAGAHALLY)


Promoter: Panchayath
Department, Karnataka
Raj Engineering 47 Promoter: Panchayath
Department, Karnataka
Raj Engineering 48
Cost: 18.46 Cost: 21.87
Industry: Water & Sewerage Pipeline & Distribution Industry: Water & Sewerage Pipeline & Distribution
Completion: February 2015 Completion: February 2015
Location: Mysore, Karnataka Location: Mysore, Karnataka

The project envisages implementation of water supply The project envisages implementation of water supply
scheme to Kethupura and other 29 villages at T scheme to Kodagahally and other 29 villages at T
Narasipura. On December 11, 2013 bids were invited. Narasipura. On December 11, 2013 bids were invited.
Last date for submission: February 15, 2014. Last date for submission: February 15, 2014.

Contact: Panchayath Raj Engineering Department, K.R. Contact: Panchayath Raj Engineering Department, K.R.
Nagara, Mysore, Karnataka. Tel: 08223−262228 Nagara, Mysore, Karnataka. Tel: 08223−262228

ERIL Index of Cost of Project Inputs: November 2013


WATER SUPPLY SCHEME (THUMBALA)
Promoter: Panchayath
Department, Karnataka
Raj Engineering 49 Non-metallic mineral products
Wholesale Price Index: 2004-05=100
Index

164.7
Incr. (%) during
2013/12 2012/11
9.5 4.8
Incr. since Mar (%)
2013
-1.3
2012
3.1
Cost: 13.64 Structural clay products 178.6 -1.2 4.2 6.6 2.6
Industry: Water & Sewerage Pipeline & Distribution Cement & Lime 162.8 -3.2 4.7 -5.5 3.1
Completion: February 2013 Basic metals, alloys, metal products 164.0 -1.5 4.5 -0.5 2.0
Ferrous Metals 153.9 -1.3 4.1 -0.5 0.7
Location: Mysore, Karnataka
Non-Ferrous Metals 164.4 2.1 2.7 1.8 1.8
Machinery & Machine tools 132.2 2.6 2.6 2.2 1.9
The project envisages implementation of water supply Industrial Machinery 150.5 2.8 2.9 2.0 1.5
scheme to Thumbala and other 21 villages at T Construction Machinery 136.1 -0.1 3.4 -0.4 3.3
Narasipura in Mysore in Karnataka. On December 11, Air Conditioner & Refrigerators 116.9 3.4 3.4 2.8 2.7
Non-electrical Machinery 124.1 0.8 0.9 0.8 0.4
2013 bids were invited. Last date for submission:
Electrical Machinery, Batteries 137.0 2.5 2.1 2.2 2.1
February 15, 2014. Electrical Accessories, Wires, Cables. 150.7 4.8 3.8 4.0 2.7
Transport equipment & parts 135.5 3.6 4.4 2.5 3.5
Contact: Panchayath Raj Engineering Department, K.R. Automotives 135.3 4.0 4.5 2.7 3.6
Nagara, Mysore, Karnataka. Tel: 08223−262228 Auto Parts 133.0 1.5 4.1 1.3 3.1
Composite ERIL Index for project inputs 148.3 0.8 3.9 0.7 2.3
Overall WPI 181.5 7.5 7.2 6.7 4.8

WATER SUPPLY SCHEME (YADAKOLA) POST YOUR NEW PROJECTS


Promoter: Panchayath
Department, Karnataka
Raj Engineering 50 If you have any information on
Cost: 13.83
Industry: Water & Sewerage Pipeline & Distribution New Projects
Completion: February 2015 please e-mail with details to
Location: Karnataka
editor@projectalert.biz
The project envisages implementation of water supply Tel: 022-61011700/01
scheme to Yadakola (M C Hundi) and other 36 villages in
Mysore in Karnataka. On December 11, 2013 bids were
invited. Last date for submission: February 15, 2014.

Contact: Panchayath Raj Engineering Department, K.R.


Nagara, Mysore, Karnataka. Tel: 08223−262228

PROJECT ALERT 12 January 6, 2014


PA_6 January 2014.qxp 1/4/2014 1:39 PM Page 13

GUEST ARTICLE

High speed corridors could help save nation’s fuel bill


ith over 64,000 km of network, 7,400 It was also helped to a very large extent by

W stations, transporting 17 million


passengers daily on its 11,000 long
distance and 6,000 suburban trains, plus over
the new Special Railway Projects Act of 2008,
which replaces certain provisions of the earlier
Railway Act of 1886. Under this an award
billion tonnes of freight every year, it is the cannot be challenged in a court of law, though
second largest system in the world under a the complainant could go for arbitration. The
single management. whole process would take about one year as
After commissioning of 741-km long against the normal three years or more for
Konkan Railway from Roha in Maharashtra to acquisitions under the earlier system.
Mangalore in Karnataka in 1998, and project Moreover by actively pursuing construction
uni-gauge involving conversion of about 20,000 of ROBs (Road Over Bridges) to eliminate level
km of metre and narrow gauge tracks to broad crossings wherever its tracks are close to the
gauge, over the last two decades, an existing alignments, the District administration
ambitious project of building two brand new R.C. Acharya, was only too happy to help the DFCCIL to
Dedicated Freight Corridors is now in hand. Former Member, speed up the process with various permissions
Estimated to cost over `80,000 crore, it Railway Board, and sanctions.
promises to provide a quantum leap in IR's email: acharya@bol.net.in The multi crore project has now got into high
freight carrying capabilities. A gear with award of the 640 km
1,278-km long eastern section long Rewari-Palanpur section
from Dankuni in West Bengal to of Western corridor to a
Ludhiana will carry consortium of Japanese infra
burgeoning coal traffic from the major Sojitz and India's L&T
eastern coalfields to scores of (Larsen & Toubro) for `6,700
thermal plants in Bihar, UP, crore while a consortium of
Haryana and Punjab. Tata Projects and a Spanish
Similarly a 1,515-km firm Aldesa is to undertake
western section from Dadri Civil engineering works on 343
near Delhi to Mumbai will carry km of Khurja-Kanpur section in
vital exim container traffic, and UP at a cost of `3,300 crore.
provide an efficient rail Meanwhile Railways had on
transport backbone for the their own completed civil
150-km-wide Delhi-Mumbai engineering works such as
Industrial Corridor all along the bridges, embankment etc. on
route. the land already in their
Financing by JICA possession on the
(Japanese International Cooperation Agency) which helped Mughalsarai-Sonnagar section, thereby saving precious
kick start the World class DMRC (Delhi Metro Rail time.
Corporation) has been provided for the western section Now the first ever 'Track Laying Machine', supplied by
while World Bank has pitched in to help create the eastern Ferrovia Transrail Solutions Pvt. Ltd is in operation from New
section. Karwandiya to Durgawati, a distance of 66 km. This work
Though JICA loan may come cheap at about one per costing about `147-crore involves design, procurement,
cent interest and most generous repayment terms, it comes construction of track and other related works, testing and
with strings tied. Not only 30 per cent of the material commissioning of electrified double rail track on a design-
purchases has to be from Japan, for the balance 70 per cent build-lump sum-basis.
the lead contractor has to be Japanese, though it may have This opens up a brand new chapter in building new rail
Indian partners. alignments, a major departure from a labour intensive semi-
This has ensured not only long-term business opportunity mechanised operation involving nearly 3,000 workers taking
for the Japanese industries but also a captive market for 10 days to build a km. of track, to building more than one km.
Japan's locomotives, rolling stock, signaling equipment, and every day!
the construction industry in general. Recent crisis in availabiIity of coal has prompted the Coal
No less than seven CPMs (Chief Project Managers) on India Ltd to open up new deposits and Railways have been
the Western section based at Mumbai, Surat, Vadodara, asked to construct a 132-km long section from Bhupdeopur-
Ahmedabad, Ajmer, Jaipur, and Dadri for the short but highly Gharghoda-Dharamjaygarh to Korba, and a 122-km long
vital Dadri-Rewari link have ensured completion of critical
task of land acquisition. PAGE 16 

PROJECT ALERT 13 January 6, 2014


PA_6 January 2014.qxp 1/4/2014 1:40 PM Page 14

INTERVIEW

'Rag picking can be made more


scientific and rewarding'
What are the main activities of GIREM in urban infrastructure sector, especially
solid waste management in India?
GIREM is working towards solving the solid waste by decentralizing the waste
management process using the hub & spoke model. We have conducted a
detailed study on solid waste management, published a report titled "Managing
Municipal Solid Waste at the Assembly Constituency Level".

What are the main issues and challenges faced by the stakeholders in adopting
public-private partnership for solid waste management sector?
There is no standard formula followed in PPP in MSWM sector, it operates in a
controlled environment and favorism to few contractors having the right influence
& reach. This way it will create an obstacle to adopt new technologies and
oppurtunities to new entrants.

What are your guidelines and policy recommendations for catalysing PPP in urban
water supply and municipal solid waste management projects?
MSWM & Water supply are to be dealt locally and they have to utilize scientific
methods and innovative technologies in delivering these services. Today all the
corporations and departments are working in isolation, the boundaries of
jurisdiction of each urban service provider is different. Unless all these
jurisdictional boundaries and departments are in phase, exchange good
practices among similar corporations and departments from cities and utilize
GIREM (Global Initiative for innovative technology in delivering urban services we cannot expect improvement
Restructuring Environment in this sector. We should encourage source segregation and zero land fill policy
at the earliest before it becomes a major disaster.
and Management) is an
What is the current status of MSW management in India and what are the factors
industry body focused on that lead to the slower growth in the sector?
urbanisation, future cities, and At present, the MSWM is being ignored, and it is not been dealt with proper
planning in Indian cities. The corporations are working reactively rather than
eco-socio-economic having a proactive sustainable, scalable long term plan.
infrastructure, with a vision to Though people say that it is lack of civic sense & awareness about the subject
which is making it so pathetic, but unfortunately it is other way round too. A lot of
help create better sustainable work has been done in improving the civic sense and create awareness but
business-eco systems and unfortunately it is not been implemented properly.

societal infrastructure through What is GIREM's role in waste-to-energy projects and how well India is
PPP. Shyam Sundar S Pani - established in segregation and storage of MSW?
GIREM is advocating and working towards waste to energy. Waste should not be
President, GIREM, in an email dealt as waste but rather as a resource to convert it to a useful energy.
interaction with Lalitha Rao India is not yet established in segregation and storage, but there is a huge
opportunity if it gets practiced by all. We often hear people complaining that, in
talks at length on the solid spite of handing over the segregated waste it gets mixed during the transit
between the source and destination. i.e; though people are slowly learning to
waste management in India. segregate the waste at source the corporations have not yet pulled up their socks
to maintain the segregated waste, in transportation and storage before it is reused

PROJECT ALERT 14 January 6, 2014


PA_6 January 2014.qxp 1/4/2014 1:40 PM Page 15

INTERVIEW

or dumped to landfills. According to us, whose growth trajectory could be modeled


there will not be more than 5 per cent of on similar lines. These recommendations
waste which will go to land fill and every bit encapsulate Creating awareness, Policy /
of the rest 95 per cent is a valuable resource Legislative Issues, Financial Issues,
which can be utilized in various industries as Management Issues, Supportive Issues and
raw material or incinerate it to produce enabling communities.
energy. Creating awareness: Awareness about solid
waste management and its importance to the
With rapid urbanisation in most cities and health and hygiene, as well as for protection
towns, there is a shift in the quantity and of the environment is of paramount
quality of waste generated across the importance. Even if people may be aware,
country, which in turn contributes to a rising they are not implementing the simple but
deficit between demand and supply of MSW very important task of segregating the waste
services. Comment. at source (be it in homes or in corporate).
Yes, off course, the cities are getting a rising Policy / Legislative Issues: The local
deficit between demand and supply of MSW government should formulate a long term
services due to the rapid urbanisation. The strategy with a detailed implementation and
main reason or the root cause can be traced back to the monitoring plan. The central government should provide fiscal
planning process, as we said earlier the city administrations incentives and encourage the recycling industry by adopting
are more working reactively, and are busy solving yesterdays the appropriate technology through Green Productivity.
problems than proactively planning for the future. Financial Issues: Finance is an important resource for
As you can recall, last year there were huge media sustainable waste management. Generally most of the
reports w.r.t the MSWM in Bangalore, the main reason being municipal corporations do not have many resources due to
that the landfills of Bengaluru were created more than a various constraints and priorities.
decade back and that was meant for the Bangalore of  Transparency in financial regulations by incorporating the
yesteryears. No one has anticipated that Bengaluru will grow double-entry system.
to the extent as it is today; hence all the developments were  Fiscal incentive to PPP projects that provide a capital
reactive to the urban growth. The landfills or its services were incentive for SWM alternatives.
not scalable to proportionately improve to be tuned with the  To encourage private-sector participation, grants of soft
rise in urbanization. Hence a great mess occurred, loans, subsidies, and exemption from taxes including the
managing waste now. duty for machinery and equipment.
Management Issues: Green productivity linkages and
What is GIREM's outlook on waste-to-energy and the factors mandatory recovery will reduce the generated waste at both
leading to the growth? the manufacturing and consumer ends.
On adopting the GIREM recommendation on MSWM in a Supportive Issues: Promote public education programs
decentralised way and building a waste to energy plant at through the electronic media. Encourage the participation of
the Assembly constituency level, each unit can deliver the NGO, CBO, and self-help groups.
annual electricity consumption for almost 6500+ Enable Communities: Corporate can come forward in
apartments/households and heating and hot water for providing specialised dust bins to the communities to
approximately 13000+ apartments/households. segregate and store waste at the source itself. Corporations
 Energy production per year: 190 GWh can have specialized transporting vehicles at three levels to
 Of which district heating: 158 GWh carry the waste separately using the hub and spoke model.
 Of which electricity is 32 GWh
 Capacity with combustion of 60225 tonnes of waste per year Do you think the informal activity of rag picking could be
This can in turn translates into economic growth, by having made more scientific, at least with the objective of waste
reduced number of power segregation?
cuts, and power supply at Yes, rag picking can be made
reduced cost per unit. more scientific and rewarding
too. If we implement the
In your report, you have made decentralization of the MSWM
some recommendations on at Ward / Assembly
waste to energy plants at constituency level, we can
Assembly Constituency level. create lots of employment
Brief them. opportunities for rag pickers,
GIREM has compiled an who can be trained on
integrated framework of scientific methods to
recommendations which segregate waste and picking
would be useful for not only useful recyclable wastes. 
Gurgaon but also other cities

PROJECT ALERT 15 January 6, 2014


PA_6 January 2014.qxp 1/4/2014 1:40 PM Page 16

GUEST ARTICLE

High speed corridors could help save nation’s fuel bill


 PAGE 13 fully packed. These sections could easily support a much
higher tariff, with passengers still opting for it on account of
alignment from Gevra Road to Pendra Road, costing about lower city center to city center transit time.
`4,000 crore. While CIL would increase its output by 300 The High Speed trains of Europe viz. TGVs and 'Intercitys'
million tonnes, inching closer to its target of 615 million connect major towns most of which are now only less than 3
tonnes by 2016-17, Railways could end up earning an hours away, or provide overnight service between various
additional freight revenue of `10,000 crore a year. European Capitals, offering stiff competition to the Airlines for
Over the last one decade or so introduction of High Speed total transit time.
trains has been limited to commissioning feasibility reports, These high speed corridors could also be viewed as a
no less than six of them at the last count. With poor financial socially desirable investment, helping to slow down the
health, Railways have not been able to make much headway rampant growth and decongest Metros such as Delhi,
and most of the proposals have remained stuck on paper. Kolkata, Chennai, Hyderabad and Mumbai, by spurring the
Since a price tag of `150 crore per km for the 250 kmph development of Tier 2 and Tier 3 cities around them.
and over variety would need deep pockets for even a PPP It could help to save on the Nation's fuel bill, reduce air
project, Railways is now seeking low cost solutions, aiming at pollution with a more fuel efficient mode of Rail transport,
hiking maximum speeds of its premier trains such as reduce road congestion and resultant accidents. Reduction
Rajdhani and Shatabdi etc. from 130 kmph to a level of only of commuter fatigue is perhaps is one of the single factor
160-200 kpmh. This could result in 10 to 25 per cent which is making such high speed services of, Japan, Europe
reduction in transit time depending on how much of the track and China increasingly popular.
would be upgraded to run such trains at 160-200 kpmh. However choice of a section could easily degenerate into a
Upgrading the entire 64,000 km of its network being out political one-up-manship amongst various States and Metros,
of the question, only a few sections with a potential for high but its success would ultimately depend on the business
passenger volumes have been identified, viz. Ahmedabad- model developed and its financial viability, which could even
Mumbai, Howrah-Haldia, New Delhi-Agra-Jhansi-Bhopal, attract Private investment in a PPP venture - an option being
Delhi-Lucknow, Chennai-Bengaluru-Mysore, Delhi-Amritsar, vigorously encouraged by the Planning Commission.
and Delhi-Chandigarh. Ultimately its success would depend on 'Techno-Economic'
Amongst these, Ahmedabad-Mumbai already has 22 trains rather than 'Political' considerations, a concept which our
while Delhi-Amritsar runs 32 trains each day, most of them worthy 'Netas' are unfortunately seldom comfortable with! 

PROJECT ALERT 16 January 6, 2014


PA_6 January 2014.qxp 1/4/2014 1:40 PM Page 17

PROJECT ALERT 17 January 6, 2014


PA_6 January 2014.qxp 1/4/2014 1:40 PM Page 18

PROJECT ALERT 18 January 6, 2014

You might also like