MD1-0-T-030-05-00370-A - ITP For CFBC Boiler Installation
MD1-0-T-030-05-00370-A - ITP For CFBC Boiler Installation
PROJECT :
CONSULTANT :
CONTRACTOR :
TABLE OF CONTENTS
- Hanger Rod
- Head level & location
- Super heater coil
- Tube & head alignment
- Seismic stopper
- Tube butt welding joint
- Backstay lug
- Buckstay corner link
- Clamp Jig
- Soot blower support
Steam Drum
A B
C D
A
B
C
D
E(Level)
F(Level)
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material verification
2 Hanger Rod
5 Seismic Stopper
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material verification
3 Pipe Support
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
2 Seismic Support
3 Welding Joint
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material verification
2 Hanger Rod
5 Seismic Stopper
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material verification
2 Hanger Rod
5 Economizer coil
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material verification
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Clearance
3 Casing
4 Thermowell
5 Expansion joint
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material verification
3 Slide bearing
4 Final welding
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material verification
2 Roof chamber
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material verification
4 Final welding
5 Expansion joint
6 Damper(direction etc)
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
2 Seal welding
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material Verification
4 Equipment Alignment
Base Grouting
5 1)Surface Preparation
2) Mixing And Curing Of Grouting
Final Acceptance
7 (Cleanliness, Touch-Up,
Appurtenances)
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material Verification
Equipment Foundation And
2
Anchor Bolt
3 Equipment Handling And Setting
Equipment Alignment &
4
Preliminary Coupling Alignment
Base Grouting
5 1)Surface Preparation
2) Mixing And Curing Of Grouting
6 Anchor Bolt Tightening
Final Coupling Alignment After
7
Completion Of Piping Connection
Final Acceptance
8 (Cleanliness, Touch-Up,
Appurtenances)
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
DESCRIPTION : AREA :
SKETCH :
REMARK :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
Line No : Material :
SIGN
DATE
RESULT
NO. INSPECTION LOCATION REMARK
ACC’ REJ’ N/A
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
REMARKS :
SUBCONTRACTOR : DATE :
CONTRACTOR : DATE :
EMPLOYER : DATE :
FORM NO. :ITP-M-106-20
PUNCH LIST
Page : of
PUNCH LIST
LINE NO :
REMARK :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-22