FOR CONSTRUCTION

A 19.Feb.2013 Issue for information Y.G.KIM Y.G.KIM M.G.KIM


REV. DATE DESCRIPTION DSGN CHKD APPD

PROJECT :

TWO(2) x 500 MW MONG DUONG 1 THERMAL POWER PLANT


EMPLOYER :

CONSULTANT :

CONTRACTOR :

DESIGNED BY DATE TITLE :

Y.G.KIM 19.Feb.2013 INSPECTION & TEST PLAN


CHECKED BY DATE FOR
CFBC BOILER INSTALLATION
.Y.G.KIM 19.Feb.2013
APPROVED BY DATE PROJECT NUMBER DOCUMENT NUMBER REV.

M.G.KIM 19.Feb.2013 ADB/MD1-TPIP/EPC150911 MD1-0-T-030-05-00370 A


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT
INSPECTION AND TEST PLAN FOR CFBC BOILER INSTALLATION REV. A

TABLE OF CONTENTS

1.0 MATERIAL VERIFICATION


2.0 DRUM INSPECTON
3.0 FURNACE INSPECTION
4.0 SUPERHEATER INSPECTION
5.0 ECONOMIZER INSPECTION
6.0 INTERAL PIPE INPSECTION
7.0 PENTHOUSE INSPECTION
8.0 CYCLONE INSPECTION
9.0 LOOP SEAL
10.0 AIR PREHEATER
11.0 COAL SURGE BIN
12.0 LIMESTONE SURGE BIN
13.0 DUCT
14.0 EXPANSION
15.0 STATIC EQUIPMENT
16.0 ROTATING EQUIPMENT
17.0 HYDRO TEST
19.0 ATTACHMENT
# 1 INSPECTION REPORT FOR STEAM DRUM ELEVATION & LOCATION
# 2 INSPECTION REPORT FOR DIMENSION, ELEVATION & LOCATION
# 3 INSPECTION REPORT FOR FURNACE
# 4 INSPECTION REPORT FOR INTERNAL PIPING
# 5 INSPECTION REPORT FOR PENTHOUSE
# 6 INSPECTION REPORT FOR PRIMARY SUPERHEATER
# 7 INSPECTION REPORT FOR ECONOMIZER
# 8 INSPECTION REPORT FOR CYCLONE
# 9 INSPECTION REPORT FOR LOOF SEAL
# 10 INSPECTION REPORT FOR AIR PREHEATER
TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT
INSPECTION AND TEST PLAN FOR CFBC BOILER INSTALLATION REV. A

# 11 INSPECTION REPORT FOR COAL & LIMESTONE BIN


# 12 INSPECTION REPORT FOR DUCT
# 13 INSPECTION REPORT FOR EXPANSION JOINT
# 14 INSPECTION REPORT FOR SUPPORT
# 15 INSPECTION REPORT FOR STATIC EQUIPMENT
# 16 INSPECTION REPORT FOR ROTATING EQUIPMENT
# 17 GENERAL CHECK REPORT
# 18 WELDING INSPECTION RECORD
# 19 INSPECTION REPORT INSIDE CLEANING
# 20 INSPECTION REPORT FOR FINAL PAINTING
# 21 PUNCH LIST
# 22 PRESSURE TEST REPORT
HYUNDAI ENG. & CONST. CO., LTD.

DISCIPLINE : Mechanical ITP No. ITP-M-106


INSPECTION & TEST PLAN Rev. No. A
TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT DESCRIPTION OF WORK : PAGE 1 OF 5
CFBC Boiler Installation DATE Feb. 19. 2013

REFERENCES INSPECTION INVOLVEMENT


REPORTING
NO. DESCRIPTION OF INSPECTION / TEST (PROCEDURE, SPEC. REMARK
FORMAT SUBCON HDEC EMPLOYER
CODE & STANDARDS)

1 Material Verification Material Spec. ITP-M-106-01~22 W R R

2 Steam Drum inspection As per Design DWG. ITP-M-106-01 W W S


- Level & location Manufacturer’s Instruction ITP-M-106-15
- Hanger rod ITP-M-106-19

3 Furnace inspection As per Design DWG. ITP-M-106-02 W W S


- Hanger Rod Manufacturer’s Instruction ITP-M-106-03
- Head level & location ITP-M-106-14
- Tube & head alignment ITP-M-106-18
- Seismic stopper ITP-M-106-19
- Tube butt welding joint
- Backstay corner link
- Clamp Jig
- Thermowell

4 Super heater / Re-heater inspection As per Design DWG ITP-M-106-06 W W S


- Hanger Rod Manufacturer’s Instruction ITP-M-106-14
- Head level & location ITP-M-106-18
- Super heater coil . ITP-M-106-19

LEGEND H : HOLD POINT PREPARED BY REVIEWED BY APPROVED BY


W : WITNESS POINT
R : DOC. REVIEW Y.G.KIM Y.G.KIM M.G. KIM
S : SURVEILLANCE HDEC QA/QC
HDEC QA/QC HDEC QA/QC
HYUNDAI ENG. & CONST. CO., LTD.

DISCIPLINE : Mechanical ITP No. ITP-M-106


INSPECTION & TEST PLAN Rev. No. A
TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT DESCRIPTION OF WORK : PAGE 2 OF 5
CFBC Boiler Installation DATE Feb. 19. 2013

REFERENCES INSPECTION INVOLVEMENT


REPORTING
NO. DESCRIPTION OF INSPECTION / TEST (PROCEDURE, SPEC. REMARK
FORMAT SUBCON HDEC EMPLOYER
CODE & STANDARDS)

- Hanger Rod
- Head level & location
- Super heater coil
- Tube & head alignment
- Seismic stopper
- Tube butt welding joint
- Backstay lug
- Buckstay corner link
- Clamp Jig
- Soot blower support

5 Economizer inspection As per Design DWG ITP-M-106-01 W W S


- Hanger Rod Manufacturer’s Instruction ITP-M-106-14
- Head level & location ITP-M-106-18
- economizer coil ITP-M-106-19
- Tube & head alignment
- Seismic stopper
- Tube butt welding joint
- Buckstay corner link
- Soot blower support

LEGEND H : HOLD POINT W : WITNESS POINT R : DOC. REVIEW S : SURVEILLANCE


HYUNDAI ENG. & CONST. CO., LTD.

DISCIPLINE : Mechanical ITP No. ITP-M-106


INSPECTION & TEST PLAN Rev. No. A
TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT DESCRIPTION OF WORK : PAGE 3 OF 5
CFBC Boiler Installation DATE Feb. 19. 2013

REFERENCES INSPECTION INVOLVEMENT


REPORTING
NO. DESCRIPTION OF INSPECTION / TEST (PROCEDURE, SPEC. REMARK
FORMAT SUBCON HDEC EMPLOYER
CODE & STANDARDS)

6 Internal pipe inspection As per Design DWG ITP-M-106-04 W W S


- Pipe & head alignment Manufacturer’s Instruction ITP-M-106-18
- Pipe support ITP-M-106-19
- Butt welding joint

7 Penthouse inspection As per Design DWG ITP-M-106-05 W W S


- Penthouse roof elevation & dimension Manufacturer’s Instruction
- Penthouse seismic stopper

8 Cyclone As per Design DWG ITP-M-106-08 W W S


- Hanger rod Manufacturer’s Instruction ITP-M-106-14
- Tube butt welding joint & final inspection ITP-M-106-18
- Head level & location ITP-M-106-19
- Tube & header alignment

9 Loop seal As per Design DWG ITP-M-106-09 W W S


- Clearance & Final welding inspection Manufacturer’s Instruction
- Casing
- Thermowell
- Exp. joint

LEGEND H : HOLD POINT W : WITNESS POINT R : DOC. REVIEW S : SURVEILLANCE


HYUNDAI ENG. & CONST. CO., LTD.

DISCIPLINE : Mechanical ITP No. ITP-M-106


INSPECTION & TEST PLAN Rev. No. A
TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT DESCRIPTION OF WORK : PAGE 4 OF 5
CFBC Boiler Installation DATE Feb. 19. 2013

REFERENCES INSPECTION INVOLVEMENT


REPORTING
NO. DESCRIPTION OF INSPECTION / TEST (PROCEDURE, SPEC. REMARK
FORMAT SUBCON HDEC EMPLOYER
CODE & STANDARDS)

10 Air Pre-heater As per Design DWG ITP-M-106-10 W W S


- Soot blower support Manufacturer’s Instruction ITP-M-106-14
- Slide bearing ITP-M-106-19
- Motor coupling centering

11 Coal surge bin As per Design DWG ITP-M-106-11 W W S


- Roof camber Manufacturer’s Instruction ITP-M-106-18
- Liner plate welding
- Welding joint & final inspection

12 Limestone surge bin As per Design DWG ITP-M-106-11 W W S


- Roof camber Manufacturer’s Instruction ITP-M-106-18
- Liner plate welding
- Welding joint & final inspection

13 Duct As per Design DWG ITP-M-106-12 W W S


- Duct support Manufacturer’s Instruction ITP-M-106-14
- Access door, nozzle, damper etc
- Seal welding

14 Expansion As per Design DWG ITP-M-106-13 W W S


- Expansion joint breech open Manufacturer’s Instruction

LEGEND H : HOLD POINT W : WITNESS POINT R : DOC. REVIEW S : SURVEILLANCE


HYUNDAI ENG. & CONST. CO., LTD.

DISCIPLINE : Mechanical ITP No. ITP-M-106


INSPECTION & TEST PLAN Rev. No. A
TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT DESCRIPTION OF WORK : PAGE 5 OF 5
CFBC Boiler Installation DATE Feb. 19. 2013

REFERENCES INSPECTION INVOLVEMENT


REPORTING
NO. DESCRIPTION OF INSPECTION / TEST (PROCEDURE, SPEC. REMARK
FORMAT SUBCON HDEC EMPLOYER
CODE & STANDARDS)

15 Static Equipment As per Design DWG ITP-M-106-15 W W S


Manufacturer’s Instruction ITP-M-106-18
ITP-M-100

16 Rotating Equipment As per Design DWG ITP-M-106-16 W W S


Manufacturer’s Instruction ITP-M-106-18
ITP-M-101

17 Pressure test(hydrostatic) As per Design DWG ITP-M-106-21 W W W


Manufacturer’s Instruction ITP-M-106-22

18 Final paint/Touch-up As per Design DWG ITP-M-106-20 W W S


Manufacturer’s Instruction

LEGEND H : HOLD POINT W : WITNESS POINT R : DOC. REVIEW S : SURVEILLANCE


HYUNDAI ENG. & CONST. CO., LTD.

INSPECTION REPORT FOR STEAM DRUM ELEVATION & LOCATION


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

EQUIPMENT NAME : SYSTEM :

TAG NO.(Location) : DWG. NO. :

E. Level check F. Level check

Steam Drum

A B
C D

Check point DWG Dimension Actual dimension Difference Remark

A
B
C
D
E(Level)
F(Level)

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :

FORM NO. ITP-M-106-01


HYUNDAI ENG. & CONST. CO., LTD.

INSPECTION REPORT FOR DIMENSION, ELEVATION & LOCATION


(Furnace, Super heater, Economizer, Cyclone etc)
TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

EQUIPMENT NAME : SYSTEM :

TAG NO.(Location) : DWG. NO. :

Check point DWG Dimension Actual dimension Difference Remark

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :

FORM NO. ITP-M-106-02


HYUNDAI ENG. & CONST. CO., LTD.

INSPECTION REPORT FOR FURNACE


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

EQUIPMENT NAME : SYSTEM :

TAG NO.(Location) : DWG. NO. :

RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A

1 Material verification

2 Hanger Rod

3 Header Level & Location

4 Tube & Header Alignment

5 Seismic Stopper

6 Tube butt joint welding

7 Buckstay Corner Link

8 Bed pressure & Temperature Gauge

REMARKS :

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :

FORM NO. ITP-M-106-03


HYUNDAI ENG. & CONST. CO., LTD.

INSPECTION REPORT FOR INTERNAL PIPING


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

EQUIPMENT NAME : SYSTEM :

TAG NO.(Location) : DWG. NO. :

RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A

1 Material verification

2 Pipe & Header Alignment

3 Pipe Support

4 Butt Welding Joint

REMARKS :

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :

FORM NO. ITP-M-106-04


HYUNDAI ENG. & CONST. CO., LTD.

INSPECTION REPORT FOR PENTHOUSE


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

EQUIPMENT NAME : SYSTEM :

TAG NO.(Location) : DWG. NO. :

RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A

1 Roof Level & Dimension

2 Seismic Support

3 Welding Joint

REMARKS :

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :

FORM NO. ITP-M-106-05


HYUNDAI ENG. & CONST. CO., LTD.

INSPECTION REPORT FOR PRIMARY SUPERHEATER


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

EQUIPMENT NAME : SYSTEM :

TAG NO.(Location) : DWG. NO. :

RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A

1 Material verification

2 Hanger Rod

3 Header Level & Location

4 Tube & Header Alignment

5 Seismic Stopper

6 Tube butt joint welding

7 Buckstay Corner Link

8 Soot blower Support

REMARKS :

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :

FORM NO. ITP-M-106-06


HYUNDAI ENG. & CONST. CO., LTD.

INSPECTION REPORT FOR ECONOMIZER


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

EQUIPMENT NAME : SYSTEM :

TAG NO.(Location) : DWG. NO. :

RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A

1 Material verification

2 Hanger Rod

3 Header Level & Location

4 Tube & Header Alignment

5 Economizer coil

6 Tube butt joint welding

7 Buckstay Corner Link

8 Soot blower Support

REMARKS :

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :

FORM NO. ITP-M-106-07


HYUNDAI ENG. & CONST. CO., LTD.

INSPECTION REPORT FOR CYCLONE


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

EQUIPMENT NAME : SYSTEM :

TAG NO.(Location) : DWG. NO. :

RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A

1 Material verification

2 Center & Support

3 Level & Location

4 Butt joint welding

REMARKS :

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :

FORM NO. ITP-M-106-08


HYUNDAI ENG. & CONST. CO., LTD.

INSPECTION REPORT FOR LOOP SEAL


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

EQUIPMENT NAME : SYSTEM :

TAG NO.(Location) : DWG. NO. :

RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A

1 Clearance

2 Blower with Motor

3 Casing

4 Thermowell

5 Expansion joint

REMARKS :

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :

FORM NO. ITP-M-106-09


HYUNDAI ENG. & CONST. CO., LTD.

INSPECTION REPORT FOR AIR HEATER


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

EQUIPMENT NAME : SYSTEM :

TAG NO.(Location) : DWG. NO. :

RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A

1 Material verification

2 Soot Blower support

3 Slide bearing

4 Final welding

5 Motor coupling centering

REMARKS :

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :

FORM NO. ITP-M-106-10


HYUNDAI ENG. & CONST. CO., LTD.

INSPECTION REPORT FOR COAL & LIMESTONE BIN


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

EQUIPMENT NAME : SYSTEM :

TAG NO.(Location) : DWG. NO. :

RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A

1 Material verification

2 Roof chamber

3 Liner plate welding

4 Butt joint welding

REMARKS :

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :

FORM NO. ITP-M-106-11


HYUNDAI ENG. & CONST. CO., LTD.

INSPECTION REPORT FOR DUCT


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

EQUIPMENT NAME : SYSTEM :

TAG NO.(Location) : DWG. NO. :

RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A

1 Material verification

2 Duct support & hagger

3 Air Leak Test

4 Final welding

5 Expansion joint

6 Damper(direction etc)

REMARKS :

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :

FORM NO. ITP-M-106-12


HYUNDAI ENG. & CONST. CO., LTD.

INSPECTION REPORT FOR EXPANSION JOINT


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

EQUIPMENT NAME : SYSTEM :

TAG NO.(Location) : DWG. NO. :

RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A

1 Expansion joint Breech Open

2 Seal welding

REMARKS :

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :

FORM NO. ITP-M-106-13


HYUNDAI ENG. & CONST. CO., LTD.

INSPECTION REPORT FOR SUPPORT


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

EQUIPMENT NAME : SYSTEM :

TAG NO.(Location) : DWG. NO. :

RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A

1 Support & Hanger number / Type

2 Support & Hanger Assembly

3 Location & Dimension

4 Threading/locking tread engagement

5 Adjustment of rigid hanger

6 Weld final visual / NDE

REMARKS :

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :

FORM NO. ITP-M-106-14


HYUNDAI ENG. & CONST. CO., LTD.

INSPECTION REPORT FOR STATIC EQUIPEMENT


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

EQUIPMENT NAME : SYSTEM :

TAG NO. : DWG. NO. :

RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A

1 Material Verification

Equipment Foundation And


2
Anchor Bolt

3 Equipment Handling And Setting

4 Equipment Alignment

Base Grouting
5 1)Surface Preparation
2) Mixing And Curing Of Grouting

6 Anchor Bolt Tightening

Final Acceptance
7 (Cleanliness, Touch-Up,
Appurtenances)
REMARKS :

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :

FORM NO. ITP-M-106-15


HYUNDAI ENG. & CONST. CO., LTD.

INSPECTION REPORT FOR ROTATING EQUIPEMENT


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

EQUIPMENT NAME : SYSTEM :

TAG NO. : DWG. NO. :

RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A

1 Material Verification
Equipment Foundation And
2
Anchor Bolt
3 Equipment Handling And Setting
Equipment Alignment &
4
Preliminary Coupling Alignment
Base Grouting
5 1)Surface Preparation
2) Mixing And Curing Of Grouting
6 Anchor Bolt Tightening
Final Coupling Alignment After
7
Completion Of Piping Connection
Final Acceptance
8 (Cleanliness, Touch-Up,
Appurtenances)
REMARKS :

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :

FORM NO. ITP-M-106-16


HYUNDAI ENG. & CONST. CO., LTD.

GENERAL CHECK REPORT


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

DESCRIPTION : AREA :

TAG NO. : DWG. NO. :

SKETCH :

REMARK :

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :

FORM NO. ITP-M-106-17


HYUNDAI ENG. & CONST. CO., LTD

WELDING INSPECTION RECORD


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

ISO Drawing No : Rev. No : P&ID No :

Line No : Material :

Dia. Welding Visual NDE(RT/UT/MT/PT)


Joint No. Sch. Welder No. PWHT REMARK
(㎜) Date Report No.
Fit-up Final Kind Result
No.

SUBCONTRACTOR CONTRACTOR EMPLOYER

SIGN

DATE

FORM NO. ITP-M-106-18


HYUNDAI ENG. & CONST. CO., LTD.

INSPECTION REPORT FOR INSIDE CLEANING


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

EQUIPMENT NAME : SYSTEM :

TAG NO. : DWG. NO. :

RESULT
NO. INSPECTION LOCATION REMARK
ACC’ REJ’ N/A

REMARKS :

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :

FORM NO. ITP-M-106-19


HYUNDAI ENG. & CONST. CO., LTD

INSPECTION REPORT FOR FINAL PAINTING


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

Report No. Date


Location System
Description □ Piping , □ Steel Structure, □ Mech., □ Others :
Weather Condition :
Material Applied
Time
Amb. Temp Material
Surf. Temp Thinner
R. Humidity Mixing Ratio A: B: Thinner:
Dew Point Batch No.

Ref. Dwg. No. DFT


No. From To Remark
Or, Item Np. Min. Max. Avg.

REMARKS :

SUBCONTRACTOR : DATE :

CONTRACTOR : DATE :

EMPLOYER : DATE :
FORM NO. :ITP-M-106-20
PUNCH LIST
Page : of

Category Legend A : To be cleared prior to commissioning


Equipment Name : Tag No.(KKS No.) : Area/ Unit :
B : To be cleared After commissioning

Item Raised Issue Category Draw ing Action Closed Verified By


Description Remarks
No By Date A/B No./Location By Date HDEC Employer
HYUNDAI ENG. & CONST. CO., LTD.

PUNCH LIST

TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

FORM NO. ITP-M-106-21


HYUNDAI ENG. & CONST. CO., LTD.

PRESSURE TEST REPORT


TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT

PACKAGE NO. : P & ID NO. : :

SYSTEM : DATE OF TEST :

LINE NO :

TYPE OF TEST : DESIGN PRESSURE / TEMP :


□ HYDROSTATIC □ PNEUMATIC □ OTHERS REQUIRED TEST PRESSURE :

TEST MEDIUM / TEMP : ACTUAL TEST PRESSURE :

PRESSURE GAUGE SERIAL NO.:

PRESURE HOLDING TIME : MIN., START : FINISH :

SKETCH OF TEST BOUNDARIES :

RESULT : ACCEPT REJECT

REMARK :

SIGNATURE DATE

SUBCONTRACTOR :

CONTRACTOR :

EMPLOYER :
FORM NO. ITP-M-106-22