Contents
1 OBJECTIVE 4
2 SCOPE 4
3 APPLICABLE CODES AND STANDARDS. 4
4 QUALITY OF MATERIALS. 5
5 GEOTECHNICAL PARAMETER. 5
6 REQUESTS 6
7 DESIGN REQUIREMENTS 7
8 CALCULATION METHODOLOGY USED. 7
9 ANNEXES 7
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PDVSA DOC. No. 3006-
SUBPROJECT: GENERAL 466D-DM104002
UNIT: (U-00) CETHK DOC. No.
AREA: OTHER AREAS PAL580-INM-PLA-107
PHASE: DETAILED ENGINEERING REV. A DATE: 09-08-22
DISCIPLINE: CIVIL
TITLE: CALCULATION REPORT FOR RPLC ASPHALT PUMP
PAGE 4 OF 26
FOUNDATIONS
PDVSA PROJECT No.: 3006; CETHK JOB CODE: CETHK
1 OBJECTIVE
Present the calculations corresponding to the design of the foundations for the residual pumps
foreseen in the project "ENGINEERING OF THE VDU INTERCONNECTION OF THE DEEP
CONVERSION PROJECT OF THE PUERTO LA CRUZ REFINERY", located in the Refinery of
Puerto La Cruz.
2 SCOPE
It contemplates the minimum requirements necessary for the calculations related to the activities
of the civil discipline involved in the design of the foundations corresponding to the RPLC residual
pumps, of the project "ENGINEERING OF THE INTERCONNECTION OF VDU OF THE DEEP
CONVERSION PROJECT OF THE PUERTO LA CRUZ REFINERY”. The following calculations
are developed in this document:
Foundation for the RPLC residual pumps.
COVENIN-MINDUR.
• 1753-06 Reinforced Concrete Structure for Buildings. Analysis and design.
• 1756-1:2001 Earthquake Resistant Buildings. Part 1. Requirements.
• 1756-1:2001 Earthquake Resistant Buildings. Part 1. Requirements.
• 2002-88 Criteria and Minimum Actions for the Building Project.
PDVSA.
• JA-251-ORT Concrete Structure. Design.
• A-251 Underground Concrete Design.
• JA-251 Reinforced Concrete Structure – Design.
• JA-252 Design of Foundations.
• JA-222 Seismore-Resistant Design Of Containers And Structures
• L-STC-001 Procedure for Concrete Design.
• L-STC-002 Procedure for the Design of Foundations.
4 QUALITY OF MATERIALS.
The materials to be used in the civil works of the project must meet the following characteristics:
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PDVSA DOC. No. 3006-
SUBPROJECT: GENERAL 466D-DM104002
UNIT: (U-00) CETHK DOC. No.
AREA: OTHER AREAS PAL580-INM-PLA-107
PHASE: DETAILED ENGINEERING REV. A DATE: 09-08-22
DISCIPLINE: CIVIL
TITLE: CALCULATION REPORT FOR RPLC ASPHALT PUMP
PAGE 5 OF 26
FOUNDATIONS
PDVSA PROJECT No.: 3006; CETHK JOB CODE: CETHK
5 GEOTECHNICAL PARAMETER.
The information referred to in this document, corresponding to the soil parameters, was obtained
from document No. 3006-500A-DC302102 "GEOTECHNICAL INVESTIGATION REPORT U52,
MACOTAL MAIN SUBSTATION AREA", prepared by the company VONE CONSORTIUM in
2013.
Table No.1 summarizes the most relevant parameters determined for the soil.
From the analyzes carried out for different foundation widths, table No. 2 is presented, with the
results of the load capacity analysis and estimated settlements.
In UNIT VDU, specially in BOREHOLE NH7 representing ZONE 1 is recommended to improve soil
conditions by replacing at least from G.L. (-2.00m) to G.L. (-3.00m) according to section 8.6
Special Considerations for Shallow Foundations (No. 3006-500A-DC302102).
For the design of the foundation slab of the residual pump, the seismic-resistant considerations of
the PDVSA standard J|A-222 Seismore-Resistant Design Of Containers And Structures, chapter 6
and 9, in which it is established that for the area referring to the Puerto La Cruz Refinery, where the
pump will be located, the following information is available:
• Risk level: B (Table 4.1)
• a* = 60 cm/ s 2
(Figure 6.1)
• Ύ = 3,75 (Figure 6.2)
• Probability of annual exceedance of the seismic movement p1= 0,002 (Table 4.1)
6 REQUESTS
7 DESIGN REQUIREMENTS
9 ANNEXES
ANNEXES A
PUMP CATALOG
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PDVSA DOC. No. 3006-
SUBPROJECT: GENERAL 466D-DM104002
UNIT: (U-00) CETHK DOC. No.
AREA: OTHER AREAS PAL580-INM-PLA-107
PHASE: DETAILED ENGINEERING REV. A DATE: 09-08-22
DISCIPLINE: CIVIL
TITLE: CALCULATION REPORT FOR RPLC ASPHALT PUMP
PAGE 9 OF 26
FOUNDATIONS
PDVSA PROJECT No.: 3006; CETHK JOB CODE: CETHK
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PDVSA DOC. No. 3006-
SUBPROJECT: GENERAL 466D-DM104002
UNIT: (U-00) CETHK DOC. No.
AREA: OTHER AREAS PAL580-INM-PLA-107
PHASE: DETAILED ENGINEERING REV. A DATE: 09-08-22
DISCIPLINE: CIVIL
TITLE: CALCULATION REPORT FOR RPLC ASPHALT PUMP
PAGE 10 OF 26
FOUNDATIONS
PDVSA PROJECT No.: 3006; CETHK JOB CODE: CETHK
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PDVSA DOC. No. 3006-
SUBPROJECT: GENERAL 466D-DM104002
UNIT: (U-00) CETHK DOC. No.
AREA: OTHER AREAS PAL580-INM-PLA-107
PHASE: DETAILED ENGINEERING REV. A DATE: 09-08-22
DISCIPLINE: CIVIL
TITLE: CALCULATION REPORT FOR RPLC ASPHALT PUMP
PAGE 11 OF 26
FOUNDATIONS
PDVSA PROJECT No.: 3006; CETHK JOB CODE: CETHK
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PDVSA DOC. No. 3006-
SUBPROJECT: GENERAL 466D-DM104002
UNIT: (U-00) CETHK DOC. No.
AREA: OTHER AREAS PAL580-INM-PLA-107
PHASE: DETAILED ENGINEERING REV. A DATE: 09-08-22
DISCIPLINE: CIVIL
TITLE: CALCULATION REPORT FOR RPLC ASPHALT PUMP
PAGE 12 OF 26
FOUNDATIONS
PDVSA PROJECT No.: 3006; CETHK JOB CODE: CETHK
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PDVSA DOC. No. 3006-
SUBPROJECT: GENERAL 466D-DM104002
UNIT: (U-00) CETHK DOC. No.
AREA: OTHER AREAS PAL580-INM-PLA-107
PHASE: DETAILED ENGINEERING REV. A DATE: 09-08-22
DISCIPLINE: CIVIL
TITLE: CALCULATION REPORT FOR RPLC ASPHALT PUMP
PAGE 13 OF 26
FOUNDATIONS
PDVSA PROJECT No.: 3006; CETHK JOB CODE: CETHK
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PDVSA DOC. No. 3006-
SUBPROJECT: GENERAL 466D-DM104002
UNIT: (U-00) CETHK DOC. No.
AREA: OTHER AREAS PAL580-INM-PLA-107
PHASE: DETAILED ENGINEERING REV. A DATE: 09-08-22
DISCIPLINE: CIVIL
TITLE: CALCULATION REPORT FOR RPLC ASPHALT PUMP
PAGE 14 OF 26
FOUNDATIONS
PDVSA PROJECT No.: 3006; CETHK JOB CODE: CETHK
ANNEXES B
Loads
foundation weight Wf = 4.00 x 1.50 x 0,6 x 2,5 = 9t
equipment weight W eq = 7.5 t _________________
W t = 16.5 t
2
a* = 60 cm/s Figure 6.1
= 3,75 Figure 6.2
Degree of Risk = B Table 4.1
Foundation Properties
B = 1.50 m ; L = 4.00 m ; H = 0.75 m
Area A = 6.00 m2
ANNEXES C
9.3.5 Geometry
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PDVSA DOC. No. 3006-
SUBPROJECT: GENERAL 466D-DM104002
UNIT: (U-00) CETHK DOC. No.
AREA: OTHER AREAS PAL580-INM-PLA-107
PHASE: DETAILED ENGINEERING REV. A DATE: 09-08-22
DISCIPLINE: CIVIL
TITLE: CALCULATION REPORT FOR RPLC ASPHALT PUMP
PAGE 25 OF 26
FOUNDATIONS
PDVSA PROJECT No.: 3006; CETHK JOB CODE: CETHK
9.3.7 Soil Pressure Diagram 0.421kg/cm2 < 0.75 kg/cm2 (from Table 1) OK!!
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PDVSA DOC. No. 3006-
SUBPROJECT: GENERAL 466D-DM104002
UNIT: (U-00) CETHK DOC. No.
AREA: OTHER AREAS PAL580-INM-PLA-107
PHASE: DETAILED ENGINEERING REV. A DATE: 09-08-22
DISCIPLINE: CIVIL
TITLE: CALCULATION REPORT FOR RPLC ASPHALT PUMP
PAGE 26 OF 26
FOUNDATIONS
PDVSA PROJECT No.: 3006; CETHK JOB CODE: CETHK