Professional Documents
Culture Documents
CForbesConstruction140MechanicalRoomQuote PDF
CForbesConstruction140MechanicalRoomQuote PDF
C. Forbes Construction
Ridgeland Park West
P.O. Box 2137
Nassau, Bahamas
Tel: (242) 325-4145/805-2833
Email: cforbesconstruction@gmail.com
1. Removal of all of the built up salt, rust, and mildew from the Skid metal base.
2. Apply rust cure to the Skid metal base.
3. Prime and paint Skid metal base.
4. Removal of all of the built up salt and mildew from the concrete support base.
5. Prime and print the concrete support base.
6. Clean the floor with Blanco Degreaser.
7. Paint 140 Mechanical Room floor with non-skid floor and deck enamel. (Color to D. Tech
Energy Specifications)
DocuSign Envelope ID: 9D44DC6E-2AEE-4258-90C2-7D37D4594EB1
Total Cost: Four thousand Dollars ($4,000). This price is inclusive of the arma flex glue, 2"
Rockwool fiberglass cladding, 2"×3' metal cans, ½ arma flex tubing, acetone, primer, paint, rust
cure, tape, and Blanco degreaser.
Thank you for inquiring about our services and the opportunity to submit this quote. If you
require any additional information please feel free to call the above listed telephone number.