PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-Karegaon Phata-Babli Phata-Be
Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction KM 0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge J
( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM 00/00 to 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

COMPRESSIVE STRENGTH OF CONCRETE CUBE


(TEST METHOD : IS 516)
Location of Lab : Date of Casting

Sample No. : Date of Testing

Location : Age of the Cube

Name of Structure : Tested by

Part of the Structure :


Grade of Concrete :
S.NO. L x B x H (cm) Area (cm2) Volume (Cc) Weight (Kg) Density Load (kN) Comp. Strength
(gm/cc) (N/mm2)

Average Strength

EPC Contractor's Representative Authority Engineer's Representative