LOMBOK CFSPP FTP-2 (2X50 MW) PROJECT

DAILY CONSTRUCTION EXECUTIVE SUMMARY

Date #REF! Weather Condition Drizzle a - hrs Consecutive Perfect Days


Day #REF! 07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 Rain b - hrs Worked Remaining
-
#REF! #REF!
Prepared by #REF! d d d d d d d d d d d Cloud c hrs
Report No. #REF! Clear d 11 hrs
Work Tittle #REF! Start #REF! MC #REF!

A) MAJOR ACHIEVEMENTS DURING THE DAY ; B) PLANNING FOR TOMORROW :


NO DESCRIPTION OF WORK TIME NO DESCRIPTION OF WORK
1 INSTALL GIRDER & BEAM STG-ANNEX PRIO.5
2 TOUCH-UP FOR BULLDOZER GARAGE

OFF

C) MANPOWER STATUS D) EQUIPMENT STATUS

S/N Name Work Require Actual Bal S/N EQUIPMENT LIST QTY Actual Bal Initial
ment
HO 1 1 1 Crane 50T 1 1 CR50
1 BUDI WIBOWO SM
Local DIRECT 21 2 Tronton /Truk 1 0 TR
HO 2 2 INDIRECT 12 3 Webing 3T & 5T 4 4 Wb
2 ASEP SOPYAN & RUDI HSE
Local TOTAL >>> 33 4 Sackle 4 4 Sck
HO 1 1 5 Kunci Rachet 4 4 Kr
3 ANTOKO QC
Local 6 Gerinda Mesin 4" 1 1 Gr4
HO 1 1 7 Gerinda Mesin 7" 1 1 Gr7
4 BAGUS ARDIANSYAH SPV
Local 8 cutting wheel 14 " 1 1 Gr14
HO 1 1 9 Bor Mesin 13mm 1 1 Bm
5 BAGUS ANDRIANTO ADM
Local 10 Bodem / Palu 3 3 Bo
HO 1 1 11 Tali nylon 20mm 4 4 Tl
6 LUDFIE MECH
Local 12 Kunci Pass ring 20 20 Kpr
HO 4 4 13 Gergaji kayu 1 1 Gk
7 SITO, HALIM, ARIEF , CIPTO SCF
Local 14 Gas Cutting 1 1 Gc
HO 1 1 15 Apar 2 1 Apr
8 GUNARIANTO RG
Local 16 Forklift 1 1 Fr

HO 15 15 17
SUGENG, CHOIRUL, ERIC, LUDFIE, BAKRI,
9 MUZAKIR, SIGIT, HERI, SUBELKI, SKILL
ANAS ,IBNU, DIDIT, SAKIN, SULIS, AFDHOL
Local 18

HO 1 1 19
10 SUHANTO SVR
Local 20
HO 1 1 21
11 SUPRI WELDER
Local 22
HO 1 1 23
12 HUDA PC
Local 24
HO 1 1 23
13 ROMI LOG
Local 24
HO 1 1 25
14 MALIK INDRA OPR
Local 26
HO 1 1 25
15 RICKY SURYA SE
Local 26
33 27

PROPOSED ACKNOWLEDGE
PT SUPRA SURYA INDONESIA PT REKAYASA INDUSTRI

........................................................ ........................................................
SITE MANAGER /
PROJECT MANAGER
NIKKO STEEL BANJARMASIN PROJECT
LAPORAN HARIAN

Tanggal 28 October 2021 Kondisi Cuaca Gerimis a - Jam Masa Kerja


Hari Thursday 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 Hujan b 2 Jam Hari Kerja Sisa Hari
Kontraktor PT. PRATAMA HITA JAYA d d d d d d d b b d d Mendung c - Jam
Report No. 2 19.00 20.00 21.00 22.00 Cerah d 13 Jam
Pekerjaan Struktur & Arsitektur d d d d Start Finish

A) AKTIVITAS HARI INI B) RENCANA UNTUK BESOK :


PROGRESS WAKTU
NO PEKERJAAN Kumula
Vol. Sat. Lalu Vol/Hari % IN OUT NO PEKERJAAN
tif

1 Install U-ditch 6.535 m1 0 6.535 6.535 100% 08.00 16.00 1 Buang tanah di luar lokasi

2 Penutup Cover U-ditch 8.4 m1 0 8.4 8.4 100% 08.00 16.00 2 Pek. Batu tempel random gudang sisi timur

3 Buang tanah di luar lokasi 13 rit 5 5 10 77% 08.00 16.00 3 Pek. Sealer dinding double sisi utara (depan)

4 Urugan tanah taman bekas site office & depan) 23.265 m3 0 23.265 23.265 100% 08.00 16.00 4 Pek. Pengecatan dua lapis interior gudang

5 Galian tangga post 0.525 m3 0 0.525 0.525 100% 08.00 16.00 5 Pek. Benangan opening glass block & nat glass block

6 Pek.Acian & benangan dinding double sisi timur (samping) 22 m2 9.8 7.02 16.82 76% 08.00 18.00 6 Pek. Stripping puing (potongan bata ringan & material)

7 Pek. Batu tempel random gudang sisi timur 16.7 m2 0 1.35 1.35 8% 08.00 18.00 7 Pek. Leveling tanah urugan (paving)

8 Pek. Sealer dinding double sisi utara (depan) 21.72 m2 0 21.72 21.72 100% 08.00 18.00 8 Pek. Cutting urugan Ramp

9 Pek. Pengecatan dua lapis interior gudang 407.2 m2 209.2 46.7 255.9 63% 08.00 18.00 9 Buang pancang (Jembatan)

10 Pek. Benangan opening glass block & nat glass block 10 unit 3 3 6 60% 08.00 18.00

C) STATUS PEKERJA D) STATUS ALAT & MATERIAL


REQUI AKTUA BALAN
NO NAMA JaABATAN NO NAMA VOL SAT INISIAL
RMENT L CE
HO 1 1 STAFF >> 3
1 RIANTO SPV 1 Semen Tonasa 12 zak PC
Local NON STAFF >> 10
HO 1 1 TOTAL 13
2 ADI SUMARNO DRF 2 Acian putih TR 30 2 zak TR30
Local
HO 1 1
3 HENI ALFURINI ADM 3 Pasir pasang 3 m3 PP
Local
HO
4 TEAM SIPIL (PRAPTO) CVL 4
Local 9 9
HO
5 EXCAVATOR OP 5
Local 1 1

MATERIAL OUTSTANDING

1 Wiremesh M-10 6 Lbr WM-10

2 Wiremesh M-8 12 Lbr WM-8

3 Batu tempel random 114 m2 BT

4 D13 10 Btg D13

5 D10 13 Btg D10

6 ø10 11 Btg ø10

6 Paving K-400 t=80mm 402 m2 Pav

6 Kanstin 150 m1 Kanst

DIBUAT OLEH MENGETAHUI


PT PRATAMA HITA JAYA

........................................................
ADI SUMARNO
NIKKO STEEL BANJARMASIN PROJECT
LAPORAN HARIAN

Tanggal 28 October 2021 Kondisi Cuaca Gerimis a - Jam Masa Kerja


Hari Thursday 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 Hujan b 2 Jam Hari Kerja Sisa Hari
Kontraktor PT. PRATAMA HITA JAYA d d d d d d d b b d d Mendung c - Jam
Report No. 2 19.00 20.00 21.00 22.00 Cerah d 13 Jam
Pekerjaan Struktur & Arsitektur d d d d Start Finish

DOKUMENTASI

Install U-ditch Penutup Cover U-ditch

Buang tanah di luar lokasi Urugan tanah taman bekas site office & depan)

Galian tangga post Pek.Acian & benangan dinding double sisi timur (samping)

Pek. Sealer dinding double sisi utara (depan) Pek. Pengecatan dua lapis interior gudang

Pek. Benangan opening glass block & nat glass block Pek. Benangan opening glass block & nat glass block