Professional Documents
Culture Documents
Report Latihan Industri Politeknik
Report Latihan Industri Politeknik
Report Latihan Industri Politeknik
one of the compulsory courses for every polytechnic student under the
involved in industrial training for one whole semester in order for him or her to
1.1 Preliminary
whether the students choose it or it is given to them for one whole semestar.
The main purpose of the industrial training is to produce graduates who are
1
Other than that, the industrial training exposes the students about the
real situation of the working class citizen. The industrial training also helps in
1.2.1 To expose the students to the real life working experience and
2
1.2.3 To produce trustworthy workers with high responsibility
as well.
students.
3
implication of industrial training. This opportunity should
that, the real life exposure given to the students will also
of studies.
work.
document.
the document.
4
1.4 Importance of Industrial Training
training, they are not only bound to the rules set by the
when they take their first step to the working world. This
5
CHAPTER 2 : COMPANY BACKGROUND AND ORGANIZATION
STRUCTURE
Register No : 26961-W
6
Business Address : Wisma PNFL
Bangsar Utama
Telephone No : 603-22833503
Fax No : 603-22826075
E-mail : contact@pnfl.com.my
Website : www.pnfl.com.my
Taman Perling,
Telephone No : 60-7-2342348
Fax : 60-7-2342349
7
2.2 Company Background
unlimited company under the name of Nik Farid Dan Loh Sdn. in 1976. To
move in line with the prevailing market and planned business development,
the company was restructured and renamed as Perunding NFL Sdn. Bhd.
(PNFL) in December 1994. There are one of the leading Consulting and
PNFL are currently operating from offices in Kuala Lumpur (HQ) , Kuala
8
2.3 Board of Directors
i) Executive Chairman
DATO' HAJI NIK FARID KAMIL started his career in Quantity Surveying
Bhd., formerly known as Nik Farid Dan Loh Sdn. and Jurukur Bahan
BERAKAN where Dato' Haji Nik Farid Kamil has led the company's
9
ii) Managing Director
MARA (UiTM) for seven (7) years. His involvement in projects include
EON HQ Shah Alam, Menara ESSO Office (KLCC), Southern Bank HQ,
with Public Works Department (JKR) before joining the company in 1980.
and ICT capabilities. Chua Seow Kwang has led the company to be on
10
iv) Director
v) Director
11
2.4 Company Services / Company Activities
i) Feasibility Studies :
budget control.
v) Recommendation of Contractors :
budgeting.
12
vii) Interim Valuation :
x) Final Accounts :
alternative designs.
damaged buildings.
expenditure.
tender.
13
vii) Quality Assurance.
Litigation
x) Project Management.
PNFL has experience in various types of construction works and has been a
Airport Terminal and Railway stations, Hospital and Medical Centres, Public
14
2.5.1 Completed Project
15
iv) Education and : (ISTAC)
Resort, Langkawi
16
2.6 Organization Structure
ADVISOR
EXECUTIVE CHAIRMAN
Sr. Dato Hj. Nik Farid Kamil
Sr. Hj. Abdul Manap Abdullah
MANAGING DIRECTOR
EXECUTIVE DIRECTOR I Sr. Abd. Halim Rosman EXECUTIVE DIRECTOR II
Sr. Chua Seow Kwang Sr. Teh Siew Leong
TECHNICAL DIRECTORS
PROJECT MANAGEMENT (4NOS) ADMINISTRATION &
FINANCE
SENIOR
ZULKARNAIN AYOP
Mardiah Taufiq
Shafie Amirul
Hazwani Faridah
1
Hawa
1
2.7 Mission
• Precision in work
• Neat in presentation
• Focus on Clients needs
• Leadership in services
excellent and value for money Quantity Surveying and Cost Consultancy
1
CHAPTER 3 : WEEKLY SUMMARY
new things. Apart from practicing what we had learnt in polytechnic, students
given to them according to their respective course. By doing so, students are
able to further increase their confidence upon entering the working world. On
the other hand, student had to obey every rule of the firm and need to on
time. This could educate the students to be more disciplined and make the
students to be familiar with working hours when they go for work later.
1
3.1 Following is the summary of all the activity carried out during training
period weekly :
Week 1
am.
2
Week 2
reference.
Week 3
2
Week 4
Week 5
2
Week 6
work
Week 7
Week 8
2. Folding the drawing were carried out for the whole week
2
Week 9
Week 10
2. Typing and completing the list of drawing for Jalan Bakar Batu.
Week 11
2
Week 12
Breakdown.
Week 13
2
Week 14
4. Visit the construction site with one of the quantity surveyors (Site
Valuations).
Week 15
2
Week 16
Week 17
Week 18
2
Week 19
2. Typing and completing the list of drawing for Senai Airport project.
Week 20
2. Taking off the Guard House element for Senai Airport project.