Report on

Reinforcement Scanning Work of


Barishal Airport

This report is prepared based on images can and quick scan only.
Date of reporting: November 2022
Dear Sir,
We are enclosing the NDT reports for the scanning work that has been performed at your site. The scans have been done using
HILTI PS250. Details are mentioned below:

PS250 Scans:
1. Please note that the dimensions per scan is maximum 600mm X 600mm (1 scan)
2. The scan will give an estimate of the following parameters:
 Rebar Layout
 Rebar Diameter
 Rebar Spacing &
 Others
3. The Scan surface should be as smooth as possible for optimal results.

Depends on scan mode, rebar spacing and diameter.


Position/Diameter: To resolve single bars min. spacing 36mm or spacing : coverage
Operating range
(s:c) = min. 2 : 1 whichever is greater.
Depth: Min. depth 10 mm for depth reading.
Depth: depends on scan mode, rebar spacing and diameter.
Typical accuracy Bar diameter: ±1 standard diameter (s:c ≥ 2:1)(Up to 60mm depth)
Bar location: bar center ±3mm / ±1in (s:c ≥ 1.5:1).

4. There should not be any ferrous material/pipes nearby at a distance of at least 30mm which can cause a deviation in the magnetic waves.
5. Results are mentioned, however scans were not clear for accurate estimation of diameter

This report is prepared based on images can and quick scan only.
Date of reporting: November 2022
Project Name: Barishal Airport.

Project Address: Rohomotpur, Bhanga-Barisal Highway, Barishal 8211, Bangladesh.

Scanner Operate By:


Engr. Biprojit Hore Shouvo
(B.Sc in Civil Engineering)
Managing Partner
RE-Tech Associates

Report Generated By:


Engr. Biprojit Hore Shouvo
(B.Sc in Civil Engineering)
Managing Partner
RE-Tech Associates
Call: +8801714545272

This report is prepared based on images can and quick scan only.
Date of reporting: November 2022
LETTER OF DECLARATION

We do hereby declare that this report is prepared based on the scanning data from different location in the structure
as suggested by the engineer/consultant using Hilti PS 200 under the guidance and supervision of us. We will be
responsible for rationality and verification of any data presented in this report based on scanning only. While scanning
and analyzing, civil engineering knowledge and judgment was applied where necessary.

This report is prepared based on images can and quick scan only.
Date of reporting: November 2022
Image of Used Apparatus

This report is prepared based on images can and quick scan only.
Date of reporting: November 2022
Member Details: Finding & Remarks:
 Member: Column  Main Reinforcement:
 Member Type: N/A (06-20Ømm)
 Location: Ground Floor  Stirrup: Ø10 mm @ 12.01” C/C
 Ferro scanning no: 01  Remarks: Image not clear due to extra
covering & wet surface.

This report is prepared based on images can and quick scan only.
Date of reporting: November 2022
Member Details: Finding & Remarks:
 Member: Column  Main Reinforcement:
 Member Type: N/A (06-20Ømm)
 Location: Ground Floor  Stirrup: Ø10 mm @ 10.56” C/C
 Ferro scanning no: 02

This report is prepared based on images can and quick scan only.
Date of reporting: November 2022
Member Details: Finding & Remarks:
 Member: Column  Main Reinforcement:
 Member Type: N/A (03-20Ømm)
 Location: Ground Floor  Stirrup: Ø10 mm @ 10.84” C/C
 Ferro scanning no: 03  Remarks: Visible Phase

This report is prepared based on images can and quick scan only.
Date of reporting: November 2022
Member Details: Finding & Remarks:
 Member: Column  Main Reinforcement:
 Member Type: Corner Column (08-20Ømm)
 Location: Ground Floor  Stirrup: Ø10 mm @ 6.15” C/C
 Ferro scanning no.- 04

This report is prepared based on images can and quick scan only.
Date of reporting: November 2022
Member Details: Finding & Remarks:
 Member: Column  Main Reinforcement:
 Member Type: N/A (02-20Ømm)
 Location: Ground Floor  Stirrup: Ø10 mm @ 10.0” C/C
 Ferro scanning no: 05  Remarks: Visible Phase

This report is prepared based on images can and quick scan only.
Date of reporting: November 2022
Member Details: Finding & Remarks:
 Member: Column  Main Reinforcement:
 Member Type: C/A (08-20Ømm)
 Location: 1st Floor  Stirrup: Ø10 mm @ 8.04” C/C
 Ferro scanning no: 06

This report is prepared based on images can and quick scan only.
Date of reporting: November 2022
Member Details: Finding & Remarks:
 Member: Column  Main Reinforcement:
 Member Type: N/A (08-20Ømm)
 Location: 1st Floor  Stirrup: Ø10 mm @ 7.15” C/C
 Ferro scanning no: 07  Remarks: Image not clear due to extra covering
& uneven surface.

This report is prepared based on images can and quick scan only.
Date of reporting: November 2022
Member Details: Finding & Remarks:
 Member: Beam  Main Reinforcement:
 Member Type: Floor Beam Side: 02-20Ømm
 Location: 1st Floor Bottom: 03-20Ømm
 Ferro scanning no: 08  Stirrup: Ø10 mm @ 9.25” C/C

Side Bottom

This report is prepared based on images can and quick scan only.
Date of reporting: November 2022
Member Details: Finding & Remarks:
 Member: Beam (Side)  Main Reinforcement:
 Member Type: Stair Case Beam Side: 03-20Ømm
 Location: 1st Floor  Stirrup: Ø10 mm @ 6.89” C/C
 Ferro scanning no: 09 & 10  Remarks: 28” beam side in two scan

1st Scan (24”) 2nd Scan (4”)

This report is prepared based on images can and quick scan only.
Date of reporting: November 2022
Member Details: Finding & Remarks:
 Member: Slab  Main Reinforcement:
 Member Type: Slab Bottom X direction: Ø10 mm @ 6.45” C/C (Average)
 Location: 1st Floor Y direction: Ø10 mm @ 7.59” C/C (Average)
 Ferro scanning no: 11

This report is prepared based on images can and quick scan only.
Date of reporting: November 2022
Member Details: Finding & Remarks:
 Member: Slab  Main Reinforcement:
 Member Type: Slab Bottom X direction: Ø10 mm @ 6.64” C/C (Average)
 Location: 1st Floor Y direction: Ø10 mm @ 7.15” C/C (Average)
 Ferro scanning no: 12

This report is prepared based on images can and quick scan only.
Date of reporting: November 2022
Working Image

This report is prepared based on images can and quick scan only.
Date of reporting: November 2022