WORK BREAKDOWN STRUCTURE

Andrei Toader, Kennedy Oragwa, Patricia


PROJECT TITLE  SureFit project PROJECT TEAM
Luquez Abad
START DATE  1st of May 2023 END DATE  1st of July 2023

SureFit project

2 Upgrade Group Exercise 4 Conduct health and safety


1 24-hour gym conversion. 3 Install 24-hour security
Studio assessment

1.3 3.2 Hire 4.2 H&S


1.2 Upgrade 2.1 2.2 3.1 4.1 H&S
1.1 security tests
Design reception Refurbis Redecora 2.3 Refit Install check
Research firm after
entry h te CCTV before
during installme
project nt
1.2.1 2.1.1 Buy 2.2.1 Plan 2.3.1
1.1.1
Install the and fit new Research
Source
new new air flooring what DISCLAIMER
contractor
entrance conditioni equipment
ng 2.2.2 Buy is needed
1.1.2
Any articles,
1.2.2templates, or information provided by Smartsheet
and Fit on the website are for reference only. While we strive to keep the information up to date and
correct, we make no representations or warranties
Recruit 2.1.2 ofnewany
floorkind, express
2.3.2 Buyor implied, about the completeness, accuracy, reliability, suitability, or availability with
staff for new
respect tonight
theshift
website or the information, articles, templates,
2.2.3
or related
equipment
graphics contained on the website. Any reliance you place on such information is
therefore strictly at your own risk. Repaint
1.2.3 studio 2.3.3 Fit
Subtask new
2.2.4 equipment
Subtask