INCOMING REPORT

Doc. No……………………………. Rev…..

SHEETS
CUSTOMER NAME : PT. PLN (PERSERO) PUSHARLIS UP2WIII 16

END USER NAME : PLTU. TELUK SIRIH

PROJECT NAME : INCOMING VERTICAL PUMP

ITEM/MODEL : VS6

PROJECT NO. PO./SPK./MR./SR : N/R

QUOTATION NO. : N/R

ISSUE BY : PT. PRATINDO GENERAL SERVICE

APPROVAL BY : ISMAN M.

CHECKED BY :TRI

REVIEW BY :DENI F.

PFEPARE BY : YONATAN

Kantor & Bengkel :


Jl. Cikalong Kolot RT 001/RW 004, Cikalong, Cikalongwetan, Bandung Barat
Telp : +6285294033064, email :
ismanmanipo@yahoo.com
PT. PRATINDO GENERAL SERVICE

Summary Incoming Inspection Report

TABLE OF CONTENT

INCOMING INSPECTION REPORT

A. SCOPE OF WORK :

1. CLEANING
2. INSPECTION
- Visual
- Dimensional
- NDT Inspection
- Run out Shaft
3. INCOMING REPORT & RECOMENDATION
PT. PRATINDO GENERAL SERVICE

Summary Incoming Inspection Report

1. DATA AND FINDINGS

ITEM PICTURE ENGINEERING


NO PART NAME QTY. DISCREPANCIES
NO. DISPOSITION
1 SHAFT PUMP 1 Ea  High metal on the
radial contact REPAIR
surface
 Polishing
 Radial scratch on and
the impeller area Blending

2 BUTTOM SHAFT 1Ea  Heavy scratch on


the outside SCRAP
diameter shaft
 Fabrikasi
 Radial scratch on New Part
the journal bearing

3 LINE SHAFT 2Ea  Broken on the


INTERMEDIATE thread REPAIR

 Radial scratch on  Welding


the journal bearing and
Machining

4 BEARING SPIDER 1Ea  Heavy damage


#1 on the pilot REPAIR
diameter
 Welding
and
Machining
PT. PRATINDO GENERAL SERVICE

Summary Incoming Inspection Report


ITEM PICTURE ENGINEERING
NO NO. PART NAME QTY. DISCREPANCIES DISPOSITION
5 BEARING SPIDER 1Ea  Damage and
#2 corrosion on SCRAP
body
 Fabrikasi
New Part

6 CASING PUMP 1Ea  Heavy corrosive


BOWL #1 on the water
jacket REPAIR

 Sand Blast
& Ceramic
Coating

7 COVER SUCTION 1Ea  Heavy corrosive


on the water REPAIR
jacket
 Sand Blast
& Ceramic
Coating

8 IMPELLER #1 1Ea  Minor scratch on


the sliding portion REPAIR

 Over clearance  Skin


between ID Machine
suction case ring Sliding
Eye & Hub Portion
Case Ring

9 IMPELLER #2 1Ea  Minor scratch on


the sliding portion REPAIR

 Over clearance  Skin


between ID Machine
suction case ring Sliding
Eye & Hu Portion
Case Ring
PT. PRATINDO GENERAL SERVICE

Summary Incoming Inspection Report


ITEM PICTURE ENGINEERING
NO NO. PART NAME QTY. DISCREPANCIES DISPOSITION
10 CASING PUMP 1Ea
BOWL #2  Heavy corrosive REPAIR
on the water
jacket  Sand Blast
& Ceramic
 High metal on the Coating
flange contack
Surface  Polishing
and
Blending

11 BEARING 5Ea  Damage of part


RUBBER SCRAP

 Fabrikasi
New Part

12 SHAFT COUPLING 3Ea Damage of part


SCRAP

 Fabrikasi
New Part

13 DISCHARGE 1Ea  Heavy corrosive


CASING on the water REPAIR
jacket
 Sand Blast
& Ceramic
Coating

14 MOTOR BASE 1Ea  Heavy corrosive


on the bore & REPAIR
flange contact
surface  Polishing
and
 High metal on the Blending
flange contack
Surface
PT. PRATINDO GENERAL SERVICE

Summary Incoming Inspection Report


ITEM PICTURE ENGINEERING
NO PART NAME QTY. DISCREPANCIES
NO. DISPOSITION
15 RISING MAIN 3Ea  High metal on the
flange contack REPAIR
surface and
internal casing  Welding,
Blending &
 Heavy corrosive Polishing
on the internal
casing

 cracks in the
welds

16 BEARING 1Ea  Over clearance


BRONZE between outer
diameter shaft SCRAP
pump
 Fabrikasi
 Heavy scratch on New Part
the inert diameter
bearing

17 SLEEVE TAPPER 2Ea  Damage on body


SCRAP

 Fabrikasi
New Part

18 FILTER PUMP 1Ea  Ready For Use


REUSE

 Ready For
Assemble

19 GLAND ADAPTER 1Ea  Ready For Use


REUSE

 Ready For
Assemble
PT. PRATINDO GENERAL SERVICE

Summary Incoming Inspection Report


ITEM PICTURE ENGINEERING
NO PART NAME QTY. DISCREPANCIES
NO. DISPOSITION
20 GLAND PACKING 1lot  Damage of part
SCRAP

 Order by
New

21 NUT HEX 1Ea  Damage of part


COUPLING SCRAP

 Order by
New

22 HUB COUPLING 1Ea  Ready For Use


REUSE

 Ready For
Assemble

23 STUFFING BOX 1Ea  Ready For Use


REUSE

 Ready For
Assemble

24 SCREW HEX 25
HEAD SET Ea NO RECEIVED SCRAP
M22 x 1.5mm x 100
mm  Order by
New
25 STUD BOLT 16
M16 x 1.5mm x Ea NO RECEIVED SCRAP
80mm
 Order by
New
26 KEYWAY 1 Ea
HUB NO RECEIVED SCRAP
COUPLING
 Fabrikasi
New Part
PT. PRATINDO GENERAL SERVICE

Summary Incoming Inspection Report


2. INSPECTION RECORD JUDGEMENT
No. ITEM Qty. PART STATUS
PART NAME RECOMENDATION
PART Ea Scrap Repair Reuse

1 SHAFT PUMP 1pcs V Polishing & Blending


2 BUTTOM SHAFT 1pcs V Fabrikasi by new
3 LINE SHAFT INTERMEDIATE 2pcs V V Welding & Machine
4 BEARING SPIDER #1 1pcs V Welding & Machine
5 BEARING SPIDER #2 1pcs V Fabrikasi by new
6 CASING PUMP BOWL #1 1pcs V Sand Blast & Coating
7 COVER SUCTION 1pcs V Sand Blast & Coating
8 IMPELLER #1 1pcs V Machine & Polishing
9 IMPELLER #2 1pcs V Machine & Polishing
Sand Blast,
10 CASING PUMP BOWL #2 1pcs V
Blending & Coating
11 BEARING RUBBER 5pcs V Fabrikasi by new
12 SHAFT COUPLING 1pcs V Fabrikasi by new
13 DISCHARGE CASING 1pcs V Sand Blast & Coating
14 MOTOR BASE 1pcs V Polishing & Blending
Welding, Blending &
15 RISING MAIN 3pcs V
Polishing
16 BEARING BRONZE 1pcs V Fabrikasi by new
17 SLEEVE TAPPER 2pcs V Fabrikasi by new
Ready For
18 FILTER PUMP 1pcs V
Assemble
Ready For
19 GLAND ADAPTER 1pcs V Assemble
20 GLAND PACKING 1lot V Order by New
21 NUT HEX COUPLING 1pcs V Order by new
22 HUB COUPLING 1pcs V Ready For Assemble
23 STUFFING BOX 1pcs V Ready For Assemble
SCREW HEX HEAD SET Not
24 M22 x 1.5mm x 100 mm 25pcs Receive
Order by new
STUD BOLT Not
25 M16 x 1.5mm x 80mm 16pcs Receive
Order by new
Not
26 KEYWAY HUB COUPLING 1pcs Order by new
Receive
PT. PRATINDO GENERAL

Summary Incoming Inspection


3. MECHANICAL RUN OUT SHAFT

3.1 PUMP SHAFT


PT. PRATINDO GENERAL

Summary Incoming Inspection

3.2 BUTTOM SHAFT


PT. PRATINDO GENERAL

Summary Incoming Inspection

3.3 LINE SHAFT INTERMEDIATE #1


PT. PRATINDO GENERAL

Summary Incoming Inspection

3.4 LINE SHAFT INTERMEDIATE #2


PT. PRATINDO GENERAL

Summary Incoming Inspection


4. PENETRAN TESTING REPORT

√ Incoming Final

INSPECTED BY : TRI REPORT NO. : 01

PT. LEVEL : DATE : 02 May 2023

Qty. ITEM NO. PART NAME TESTED PERFORMED

1 IMPELLER #1 V As Found

V As Left
Prosedure No. ASTM E 1417

GENERAL PENETRAN DESCRIPTION

Ardrox 970P25E ( Flourescent )

Ardrox 965 P14 ( Flourescent )

Ardrox 907 PB ( Red Dye )

V Magnaflux SKL _ SP1 ( Red Dye )

All Impeller Surface Witness on Test/Deffective areas by :


TEST AREA

PENETRAN TYPE : DWEEL TIME: REMOVAL METHODE : DRYER :

Flourescent V 15 Minutes V Solvent Wipe ( Type C ) Manual Dryer

Red Dye 30 Minutes


V Emulsifier(Type D/ Hydrophilic
V Ambient Temp
60 Minutes Or more Water Washable ( Type A )
Other

DEVELOPER APPLICATION

` Aqueous V Non Aqueous Other

INSPECTION RESULT : ACCEPTANCE RESULT :

 Found Porosity on impeller vane volute & Disc  Accept for Repair
 Not found crack indication on the impeller disc and
vane

I Certify that the above listed items were inspected in INSPECTED BY : TRI
accordance with applicable ASTM

DATE : 02 May 2023


PT. PRATINDO GENERAL

Summary Incoming Inspection


PHOTOGRAPH TESTING REPORT
PT. PRATINDO GENERAL

Summary Incoming Inspection


4. PENETRAN TESTING REPORT

√ Incoming Final

INSPECTED BY : TRI REPORT NO. : 02

PT. LEVEL : DATE : 02 May 2023

Qty. ITEM NO. PART NAME TESTED PERFORMED

1 IMPELLER #2 V As Found

V As Left
Prosedure No. ASTM E 1417

GENERAL PENETRAN DESCRIPTION

Ardrox 970P25E ( Flourescent )

Ardrox 965 P14 ( Flourescent )

Ardrox 907 PB ( Red Dye )

V Magnaflux SKL _ SP1 ( Red Dye )

All Impeller Surface Witness on Test/Deffective areas by :


TEST AREA

PENETRAN TYPE : DWEEL TIME: REMOVAL METHODE : DRYER :

Flourescent V 15 Minutes V Solvent Wipe ( Type C ) Manual Dryer

Red Dye 30 Minutes


V Emulsifier(Type D/ Hydrophilic
V Ambient Temp
60 Minutes Or more Water Washable ( Type A )
Other

DEVELOPER APPLICATION

` Aqueous V Non Aqueous Other

INSPECTION RESULT : ACCEPTANCE RESULT :

 Found Porosity on impeller vane volute & Disc  Accept for Repair
 Not found crack indication on the impeller disc and
vane

I Certify that the above listed items were inspected in INSPECTED BY : TRI
accordance with applicable ASTM

DATE : 02 May 2023


PT. PRATINDO GENERAL

Summary Incoming Inspection


PHOTOGRAPH TESTING REPORT