This document provides instructions for creating a maintenance plan in 5 steps: 1) Enter basic identification details for the plan like name, category, and strategy. 2) Add a description. 3) Select attributes like functional location, order type, priority, activity type, and task list. 4) Define preferred planning parameters such as call horizon, scheduling period, and start of cycle. 5) Save the plan by clicking the Save button. The maintenance plan is used to trigger maintenance orders on a scheduled basis.
This document provides instructions for creating a maintenance plan in 5 steps: 1) Enter basic identification details for the plan like name, category, and strategy. 2) Add a description. 3) Select attributes like functional location, order type, priority, activity type, and task list. 4) Define preferred planning parameters such as call horizon, scheduling period, and start of cycle. 5) Save the plan by clicking the Save button. The maintenance plan is used to trigger maintenance orders on a scheduled basis.
This document provides instructions for creating a maintenance plan in 5 steps: 1) Enter basic identification details for the plan like name, category, and strategy. 2) Add a description. 3) Select attributes like functional location, order type, priority, activity type, and task list. 4) Define preferred planning parameters such as call horizon, scheduling period, and start of cycle. 5) Save the plan by clicking the Save button. The maintenance plan is used to trigger maintenance orders on a scheduled basis.
1 Enter the following details:- This maintenance plan is scheduled to trigger The maintenance plan name. maintenance order. The maintenance plan category. The strategy.
2 Enter the following details:-
A description of this maintenance plan.
PanAust SAP Easyguide Template Page | 1
Create Strategies Maintenance Plan 3 Enter the following details:- System copies data from the functional The functional location. location master data. The order type. The priority. The maintenance activity type. The task list.
4 Enter preferred planning parameter(s).
The call horizon. The scheduling period. The start of cycle.
5 Click the Save button to save the maintenance plan.