Download as pdf or txt
Download as pdf or txt
You are on page 1of 99

IMPORTANT ITEMS

SSR 2022-23
(UN AUTHENTICATED)
(See authenticated SSR when preparation and
scrutiny of Estimates)
With effect vide proceedings No:
Procs.No.ENC/IW/P&M/EE.1/DEE-3/AEE (N)/ SoR 2022-
23/Vol.1 Dated: 13 .07.2022 of the Engineer-in-Chief (A.W/
I.W) Chairman, BOCE (SoR) Water Resources Department,
Vijayawada.
INDEX
1 CONVEYANCE CHARGES UPTO 240 KMS
2 LEAD STATEMENT FOR BUILDING ITEMS
3 RATES OF CID JOINTS
4 SSR IMPORTANT ITEMS, PVC, HDPE, DI PIPES
5 RATES OF DRILLING OF BORE WELLS
6 CALCULATION SHEET OF PVC PIPE LAYING & JOINTING
7 CALCULATION SHEET OF HDPE PIPE LAYING & JOINTING
8 DATAS FOR 40,60,90 KL OHSRS
9 INTERPOLATION FORMULA
10 IMPORTANT DATAS
11 WEIGHTS OF CI, DI, MS, HDPE, GI AND SS PIPES
12 SEIGNIORAGE CHARGES, CEMENT CALCULATIONS
13 WEIGHT OF STRUCTURAL WORKS STEEL
14 CENTERING CHARGES FOR RCC ITEMS
15 CIRCULAR MEMOS ON PIPE LINES
16 RATES OF GAS CHLORINATION
17 APPROVED QUOTATIONS ON RO PLANTS SPECIALS
18 HAND PUMP SPARES
19 APPROVED RO PLANTS RATES
20 GUIDE LINES ON SUBMISSION OF BILLS
CONVEYANCE CHARGES FOR MACHINERY BY TIPPERS & TRUCKS FOR THE YEAR 2022-23
(No loading an un loading charges allowed for machinery loading and un loading)
Earth/ Earth/ Earth/
Sand/ Metal / Bricks / Sand/ Metal / Bricks / Sand/ Metal /
Bricks /
KM Gravel/ Stone / 1000 KM Gravel/ Stone / 1000 KM Gravel/ Stone /
1000 Nos
Murrum/ 1 cum Nos Murrum/ 1 cum Nos Murrum/ 1 cum
1 cum 1 cum 1 cum

1 36.00 34.70 57.80 41 588.00 567.50 943.90 81 1068.00 1031.50 1715.90


2 50.40 48.50 80.90 42 600.00 579.10 963.20 82 1080.00 1043.10 1735.20
3 67.20 64.70 107.80 43 612.00 590.70 982.50 83 1092.00 1054.70 1754.50
4 81.60 78.60 131.00 44 624.00 602.30 1001.80 84 1104.00 1066.30 1773.80
5 96.00 92.40 154.10 45 636.00 613.90 1021.10 85 1116.00 1077.90 1793.10
6 110.40 106.30 177.20 46 648.00 625.50 1040.40 86 1128.00 1089.50 1812.40
7 124.80 120.20 200.30 47 660.00 637.10 1059.70 87 1140.00 1101.10 1831.70
8 139.20 134.10 223.40 48 672.00 648.70 1079.00 88 1152.00 1112.70 1851.00
9 153.60 148.00 246.50 49 684.00 660.30 1098.30 89 1164.00 1124.30 1870.30
10 168.00 161.90 269.60 50 696.00 671.90 1117.60 90 1176.00 1135.90 1889.60
11 182.40 175.80 292.70 51 708.00 683.50 1136.90 91 1188.00 1147.50 1908.90
12 196.80 189.70 315.80 52 720.00 695.10 1156.20 92 1200.00 1159.10 1928.20
13 211.20 203.60 338.90 53 732.00 706.70 1175.50 93 1212.00 1170.70 1947.50
14 225.60 217.50 362.00 54 744.00 718.30 1194.80 94 1224.00 1182.30 1966.80
15 240.00 231.40 385.10 55 756.00 729.90 1214.10 95 1236.00 1193.90 1986.10
16 254.40 245.30 408.20 56 768.00 741.50 1233.40 96 1248.00 1205.50 2005.40
17 268.80 259.20 431.30 57 780.00 753.10 1252.70 97 1260.00 1217.10 2024.70
18 283.20 273.10 454.40 58 792.00 764.70 1272.00 98 1272.00 1228.70 2044.00
19 297.60 287.00 477.50 59 804.00 776.30 1291.30 99 1284.00 1240.30 2063.30
20 312.00 300.90 500.60 60 816.00 787.90 1310.60 100 1296.00 1251.90 2082.60
21 326.40 314.80 523.70 61 828.00 799.50 1329.90 101 1308.00 1263.50 2101.90
22 340.80 328.70 546.80 62 840.00 811.10 1349.20 102 1320.00 1275.10 2121.20
23 355.20 342.60 569.90 63 852.00 822.70 1368.50 103 1332.00 1286.70 2140.50
24 369.60 356.50 593.00 64 864.00 834.30 1387.80 104 1344.00 1298.30 2159.80
25 384.00 370.40 616.10 65 876.00 845.90 1407.10 105 1356.00 1309.90 2179.10
26 398.40 384.30 639.20 66 888.00 857.50 1426.40 106 1368.00 1321.50 2198.40
27 412.80 398.20 662.30 67 900.00 869.10 1445.70 107 1380.00 1333.10 2217.70
28 427.20 412.10 685.40 68 912.00 880.70 1465.00 108 1392.00 1344.70 2237.00
29 441.60 426.00 708.50 69 924.00 892.30 1484.30 109 1404.00 1356.30 2256.30
30 456.00 439.90 731.60 70 936.00 903.90 1503.60 110 1416.00 1367.90 2275.60
31 468.00 451.50 750.90 71 948.00 915.50 1522.90 111 1428.00 1379.50 2294.90
32 480.00 463.10 770.20 72 960.00 927.10 1542.20 112 1440.00 1391.10 2314.20
33 492.00 474.70 789.50 73 972.00 938.70 1561.50 113 1452.00 1402.70 2333.50
34 504.00 486.30 808.80 74 984.00 950.30 1580.80 114 1464.00 1414.30 2352.80
35 516.00 497.90 828.10 75 996.00 961.90 1600.10 115 1476.00 1425.90 2372.10
36 528.00 509.50 847.40 76 1008.00 973.50 1619.40 116 1488.00 1437.50 2391.40
37 540.00 521.10 866.70 77 1020.00 985.10 1638.70 117 1500.00 1449.10 2410.70
38 552.00 532.70 886.00 78 1032.00 996.70 1658.00 118 1512.00 1460.70 2430.00
39 564.00 544.30 905.30 79 1044.00 1008.30 1677.30 119 1524.00 1472.30 2449.30
40 576.00 555.90 924.60 80 1056.00 1019.90 1696.60 120 1536.00 1483.90 2468.60

UN AUTHENTICATED
CONVEYANCE CHARGES FOR MACHINERY BY TIPPERS & TRUCKS FOR THE YEAR 2022-23
(No loading an un loading charges allowed for machinery loading and un loading)
Earth/ Earth/ Earth/
Sand/ Metal / Bricks / Sand/ Metal / Sand/ Metal /
Bricks / Bricks /
KM Gravel/ Stone / 1000 KM Gravel/ Stone / KM Gravel/ Stone /
1000 Nos 1000 Nos
Murrum/ 1 cum Nos Murrum/ 1 cum Murrum/ 1 cum
1 cum 1 cum 1 cum

121 1548.00 1495.50 2487.90 161 2028.00 1959.50 3259.90 201 2508.00 2423.50 4031.90
122 1560.00 1507.10 2507.20 162 2040.00 1971.10 3279.20 202 2520.00 2435.10 4051.20
123 1572.00 1518.70 2526.50 163 2052.00 1982.70 3298.50 203 2532.00 2446.70 4070.50
124 1584.00 1530.30 2545.80 164 2064.00 1994.30 3317.80 204 2544.00 2458.30 4089.80
125 1596.00 1541.90 2565.10 165 2076.00 2005.90 3337.10 205 2556.00 2469.90 4109.10
126 1608.00 1553.50 2584.40 166 2088.00 2017.50 3356.40 206 2568.00 2481.50 4128.40
127 1620.00 1565.10 2603.70 167 2100.00 2029.10 3375.70 207 2580.00 2493.10 4147.70
128 1632.00 1576.70 2623.00 168 2112.00 2040.70 3395.00 208 2592.00 2504.70 4167.00
129 1644.00 1588.30 2642.30 169 2124.00 2052.30 3414.30 209 2604.00 2516.30 4186.30
130 1656.00 1599.90 2661.60 170 2136.00 2063.90 3433.60 210 2616.00 2527.90 4205.60
131 1668.00 1611.50 2680.90 171 2148.00 2075.50 3452.90 211 2628.00 2539.50 4224.90
132 1680.00 1623.10 2700.20 172 2160.00 2087.10 3472.20 212 2640.00 2551.10 4244.20
133 1692.00 1634.70 2719.50 173 2172.00 2098.70 3491.50 213 2652.00 2562.70 4263.50
134 1704.00 1646.30 2738.80 174 2184.00 2110.30 3510.80 214 2664.00 2574.30 4282.80
135 1716.00 1657.90 2758.10 175 2196.00 2121.90 3530.10 215 2676.00 2585.90 4302.10
136 1728.00 1669.50 2777.40 176 2208.00 2133.50 3549.40 216 2688.00 2597.50 4321.40
137 1740.00 1681.10 2796.70 177 2220.00 2145.10 3568.70 217 2700.00 2609.10 4340.70
138 1752.00 1692.70 2816.00 178 2232.00 2156.70 3588.00 218 2712.00 2620.70 4360.00
139 1764.00 1704.30 2835.30 179 2244.00 2168.30 3607.30 219 2724.00 2632.30 4379.30
140 1776.00 1715.90 2854.60 180 2256.00 2179.90 3626.60 220 2736.00 2643.90 4398.60
141 1788.00 1727.50 2873.90 181 2268.00 2191.50 3645.90 221 2748.00 2655.50 4417.90
142 1800.00 1739.10 2893.20 182 2280.00 2203.10 3665.20 222 2760.00 2667.10 4437.20
143 1812.00 1750.70 2912.50 183 2292.00 2214.70 3684.50 223 2772.00 2678.70 4456.50
144 1824.00 1762.30 2931.80 184 2304.00 2226.30 3703.80 224 2784.00 2690.30 4475.80
145 1836.00 1773.90 2951.10 185 2316.00 2237.90 3723.10 225 2796.00 2701.90 4495.10
146 1848.00 1785.50 2970.40 186 2328.00 2249.50 3742.40 226 2808.00 2713.50 4514.40
147 1860.00 1797.10 2989.70 187 2340.00 2261.10 3761.70 227 2820.00 2725.10 4533.70
148 1872.00 1808.70 3009.00 188 2352.00 2272.70 3781.00 228 2832.00 2736.70 4553.00
149 1884.00 1820.30 3028.30 189 2364.00 2284.30 3800.30 229 2844.00 2748.30 4572.30
150 1896.00 1831.90 3047.60 190 2376.00 2295.90 3819.60 230 2856.00 2759.90 4591.60
151 1908.00 1843.50 3066.90 191 2388.00 2307.50 3838.90 231 2868.00 2771.50 4610.90
152 1920.00 1855.10 3086.20 192 2400.00 2319.10 3858.20 232 2880.00 2783.10 4630.20
153 1932.00 1866.70 3105.50 193 2412.00 2330.70 3877.50 233 2892.00 2794.70 4649.50
154 1944.00 1878.30 3124.80 194 2424.00 2342.30 3896.80 234 2904.00 2806.30 4668.80
155 1956.00 1889.90 3144.10 195 2436.00 2353.90 3916.10 235 2916.00 2817.90 4688.10
156 1968.00 1901.50 3163.40 196 2448.00 2365.50 3935.40 236 2928.00 2829.50 4707.40
157 1980.00 1913.10 3182.70 197 2460.00 2377.10 3954.70 237 2940.00 2841.10 4726.70
158 1992.00 1924.70 3202.00 198 2472.00 2388.70 3974.00 238 2952.00 2852.70 4746.00
159 2004.00 1936.30 3221.30 199 2484.00 2400.30 3993.30 239 2964.00 2864.30 4765.30
160 2016.00 1947.90 3240.60 200 2496.00 2411.90 4012.60 240 2976.00 2875.90 4784.60

UN AUTHENTICATED
LEAD STATEMENT (YEAR 2022-23)
NAME OF THE WORK:-

Sl. Lead in Conveyance Blasting Add 25% for


Description of material Source of supply Unit Initial cost Total
No. KMs charges charges crushed metal

1 Cement At site 1 M.T. 4220.00 4220.00


2 Steel Fe415 At site 1 M.T. 62000.00 62000.00
3 Sand for Concrete/ Filtering item 1 Cum 605.00
Sand for mortor/ Plastering (Including
4 1 Cum 700.00
screening)
5 Sand for filling 1 Cum 460.00
6 40 mm HBT SS Metal 1 Cum 716.00 70.00
7 20 mm HBG SS M/C Metal 1 Cum 1196.00 70.00 299.00
8 Stone crusher dust (MAT 00189) 1 Cum 395.00
9 Country Bricks (23x11x7cm) 1000 Nos 7500.00
Fly ash Cement Bricks 50 Kgs/sqcm
10 1 No 30.00
(290x225x140mm) (0.009135/1.771)
11 Rough Stone (Other than Granite) 1 Cum 171.45 70.00
12 CR Stone (Other than Granite) 1 Cum 197.15 82.00
Bond Stone (Rate worked out size of bond
13 1 Cum 1983.33
0.60 x 0.20 x 0.20 Mts = Rs.47.60)
14 Best Teak Wood Local 1 Cum 134500.00 134500.00
15 Sal/ Country Wood Local 1 Cum 51000.00 51000.00
16 Kadapa slabs 40mm thick 10 Sqm x0.40= 1250.00
17 Polished 25mm thick colour slabs Bethamcherlla 10 Sqm x0.25= 3200.00
18 Gravel 1 Cum 149.00
19 Quarry rubbish 1 Cum 93.00
20 Rough Stone (GRANITE) Available in Adoni Division 1 Cum 298.00 70.00
21 CR Stone (GRANITE) Available in Adoni Division 1 Cum 274.30 82.00
(Revised Seigniorage charges vide G.O.Ms. No: 11 Dated: 11-02-2020 of Industries and commerce (M.II) Department)
Certified that the above leads are correct to the best of my knowledge and belief
Cement Mortars Quantity Rate Per CM (1:3) CM (1:5) CM (1:6)
Cement 480/288/240 kgs 1 MT
Sand for Mortor 1.05 Cum 1 Cum
Man Mazdoor charges 0.20 days 525.00 1 Day 105.00 105.00 105.00
Total
IMPORTANT ITEMS IN THE SSR 2022-23
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
Common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-
1 BMT-A.01 1000 Nos 7500.00
Modular or traditional size 23 x 11 x 7 cm (512 Nos / 1 Cum)

Common burnt clay bricks of class as per Table-1 of IS:1077-1992


2 BMT-A.02 1000 Nos 8400.00
Modular or traditional size 19 x 9 x 9 cm (570 Nos / 1 Cum)

Fly ash cement/ lime solid blocks with compressive strength of 50


10 BMT-A.10 Each 30.00
kg/sq.cm - IS:12894-1990 - CLASS - 5 - 290 x 225 x 140 mm
23 BMT-B.01 Kadapa slab 40 mm thick and size not less than 0.457 M x 0.457 M 1 Sqm 1250.00
24 BMT-B.02 Kadapa slab 50 mm thick and size not less than 0.457 M x 0.457 M 1 Sqm 1450.00
Polished black Kadapa slabs minimum of 15 mm thick
28 BMT-B.06 10 Sqm 1750.00
(0.457x0.457M)
Polished Bethamcherla pure (marble type) white stone minimum
29 BMT-B.07 10 Sqm 4600.00
25 mm thick (0.254Mx0.254M)
Polished Bethamcherla coloured stone minimum 25 mm thick
30 BMT-B.08 10 Sqm 3200.00
(0.254M x0.254M)
Polished black Kadapa slabs of all sizes between 25 - 30 mm
31 BMT-B.17 10 Sqm 1850.00
thickness
Supply of Non-skid red or white full body Ceramic floor tiles of
scratch free-stain free and scratch free-nano finish of size 600 x
43 BMT-C.04 600 mm and thickness between 8-10 mm 1st quality conforming 1 Sqm 520.00
to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and
finish in all shades and designs
Supply of Nano polished /stain free soluble salt porcelain vitrified
tiles screen printed of size 600 x 600 mm and thickness between
46 BMT-C.07 1 Sqm 450.00
8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630
(Parts 1 to 15) of any colour and finish in all shades and designs

1 22.a R.R Masonry Work (other than Granite, Dolomite and Trap) 1 cum 171.45
15 23.b CR Stone for other varieties 1 cum 197.15
18 28.a Bond stones ( 600 x 200 x 200 mm size - 1 No - 47.60 ) 1 Cum 1983.33
12 12 g R.R.Masonry works ( granite, dolamite and trap variety) 1 cum 298.00
14 23.a CR Stone Granite, Dolamite and trap 1 cum 274.30
2 b.i SS Revetment work 225 mm (Other than granite) 1 cum 180.00
8 d iii Granite for SS revetment 225 mm 1 cum 168.55
NOTE:- For items 22(a) to 22© and 22(g) add extra Rs /cum,
13 1 cum 70.00
wherever quarrying is done by blasting
Granite stone slabs for culverts, lintels and copings (3 faces
16 27 1 cum 1810.50
dressed coarsed rubble masonry)
NOTE: - For items 23(a), 23(b) and 27 add extra Rs. Per Cum,
17 1 cum 82.00
wherever quarrying is done by blasting
986 BMS-W.52 Hoisting or lowering of slab 1 cum 130.00
90 34 Gravel 1 Cum 149.00
91 35 a Quarry rubbish 1 Cum 93.00
Stone crusher dust finer than 3 mm with not more than
M-021 MAT-00189 1 cum 395.00
10% passing 0.075 sieve.
92 B HBG Stone Chips 2.36mm and below 1 Cum 435.00
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
173 MAT-00003 Binding wire 1 Kg 70.00
174 MAT-00536 Jute rope 1 Mt 8.35
149 B1 Screening sand and gravel 1 cum 10.50
150 B2 Screening chips and metal 1 cum 17.60
170 n Labour charges for laying filters with coarse aggregate. 1 cum 55.30
171 o Labour charges for laying filter with sand. 1 cum 30.70
23 MAT-00023 Empty cement bag 1 No 7.00
(a) Fine aggregate / sand (un- screened) for Concrete & Filtering
27 93 (36 a) 1 cum 605.00
items)
94 (36 b) (b) Fine aggregate / Sand (unscreened) for filling 1 cum 460.00
Fine aggregate / Sand (Screened) for Mortar, Plastering items
28 95 (36 c) 1 cum 700.00
and Sand blasting items (Including screening Charges)
37/ MAT- Clay for puddle and masonry items 38(a) to 39 (h) as per local
96 1 cum 38.00
00475 prevailing rates based on competitive quotations
Earth cost or compensation for selected earth for shoulders
M-092 MAT-00252 1 cum 130.00
taken from private land
4 MAT-00691 Diesel 1 Lt 99.74
10 MAT-00697 Petrol 1 Lt 112.01
M-189(a) Water charges(Urban) Kilo Litre 125.00
(b) MAT-00333 Water charges(Rural) Kilo Litre 95.00
16 Concrete mixer 300 / 200 ( diesel) (Hire, Fuel and Crew charges) 1 Hour 494.90
52 Shovel 0.85 cum 110 hp / Hydraulic excavator -do- 1 Hour 3483.70
26 Dewatering pump 5 HP (Diesel) -do- 1 Hour 300.30
40 Needle vibrator 40mm (Petrol) -do- 1 Hour 259.10
64 Water tanker 8000 litres -do- 1 Hour 1168.50
165 MAT-05455 Gelatin (For MORTH Data, State and N H Works only) 1 Kg 68.00
166 MAT-00021 Electric Detonators (For MORTH Data, State and N H Works) 12.00 1 No
HARD BROKEN STONE OF GRANITE, TRAP AND DOLERITE FREE FROM DUST OBTAINED BY
QUARRYING, WEDGING, BREAKING, BURNING AND SPLITTING
25 33.a - do - 6mm size (SS 5) 1 cum 636.00
26 b - do - 10mm size (SS 5) 1 cum 800.00
27 c - do - 12mm size (SS 5) 1 cum 952.00
28 d - do - 20mm size (SS 5) 1 cum 1196.00
30 f - do - 40mm size (SS 5) 1 cum 716.00
33 i - do - 65mm size (SS 5) 1 cum 360.95
NOTE:- (1) Add extra Rs. /- per cum for items 33 (a) to 33 (k) if
36 1 cum 70.00
the metal is obtained by blasting
109 1.a Clearing heavy Jungle 1 Sqm 3.20
110 b Clearing light Jungle 1 Sqm 2.80
111 c Clearing Scrub Jungle 1 Sqm 2.80
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
Clearing Juliflora (Prosafis) jungle including up-rooting and
112 d 1 Sqm 4.40
removing of Juliflora stumps.
Removal of natchu, goobi, thooti etc., for every extra lead or lift
136 d 1 Sqm 1.50
over the initial lead or lift.
Laying Sand Bags in the stipulated places including cost of empty 37.00
cement bag, sand, thread, stiching charges and labour charges (Without
with 13.615 % overhead charges and ontractors profits (sand
over head
rate for filling is considered) Note:- During the emergency
2 MAT-00340 1 Bag and
conditions such as floods and other natural calamities, the above
rate is allowed to enhance by 25% for 1st warning level and
Contractor
above, keeping in view of the difficulty in availability of labour profit =
and vehicles. 32.56)
ROLLING SHUTTERS & COLLAPSIBLE STEEL SHUTTERS
Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled
CRCA laths, interlocked together through their entire length and jointed
together at the ends by end-locks, mounted on specially designed pipe
shaft of 50mm dia nominal bore MS B class pipe with brackets, plates,
144 BMT-F.29 guide channels, stoppers, bottom locking plates and arrangements for 1 Sqm 4025.00
inside & outside locking with push-pull operations including cost of
hood cover and springs complete, painted with one coat of approved
steel primer, locks, ball bearings, all accessories etc complete for
finished item of work as per special spn: 1108
Supplying & fixing collapsible steel shutters with vertical, double
channel of 20 x10x2 mm of 100 mm centre, Bracers with flat iron
40x40x6 mm with 38 mm dia steel pulleys, the top, bottom and side
vertical frames of the collapsible gate with 65x65mmx8mm MS Angle
145 BMT-F.30 and middle guide rail at site height with 65mmx8mm MS flat for the 1 Sqm 3508.00
pulleys to guide and fixed with necessary hold fasts, bolts, nuts, rivets,
locking arrangements, stoppers, handles, all accessories all fixtures and
painted with one coat of approved steel primer etc., complete for
finished item of work as per special spn 1105

ROAD ROLLER
Picking old metalled surface to a depth of 40 to 100 mm and spreading metal including watering with
an initial lead of 2 Hectometers and rolling with power rollers watering and spreading gravel for
5.0 blindage and power roller rolling including hire charges of power roller( 8 to 10 T ) barricading and
diversion of traffic and wetting the new consolidation for a fortnight (for compacted thickness of )
HARD METAL
160 5 (a) 40 mm thick ness 10 sqm 185.00
161 (b) 50 mm thick ness 10 sqm 210.00
162 (c ) 75 mm thick ness 10 sqm 231.00
163 (d ) 100 mm thick ness 10 sqm 248.80
164 (e) 150 mm thick excluding hire charges 10 sqm 445.40
CEMENT, STEEL, PIPES, TUBES, GRILLS, AC, GI SHEETS, MESH AND MASTIC PADS
98 42 Cement excluding cost of empty cement bags 43/53 Grade 1 MT 4220.00
Reinforcement steel (HYSD/TMT ) Note: As per Monthly rate
62 MAT-00063 1 MT 62000.00
fixed by Sub-Committee
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
Structural steel angle / channel / beam / bars Note: As per
68 MAT-00069 1 MT 64500.00
Monthly rate fixed by Sub-Committee
Structural steel plate / flats Note: As per Monthly rate fixed by
69 MAT-00070 1 MT 82000.00
Sub-Committee
39 MAT-00040 G.I sheet ( plain ) 1 MT 65275.00
M-126 MAT-00280 Mild Steel bars 1 MT 54500.00
13 MAT-00120 MS pipe 200 / 300 mm dia 1 Kg 188.00
14 MAT-00121 MS pipe 32 mm dia 1 Rmt 198.00
15 MAT-00122 MS pipe 25 mm dia 1 Rmt 165.00
22 MAT-00129 Stainless steel plates / flats 1 Kg 309.00
M-174 MAT-00322 Steel pipe 25 mm external dia as per IS:1239 1 Rmt 318.00
M-175 MAT-00323 Steel pipe 50 mm external dia as per IS:1239 1 Rmt 625.00
Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes
170 BMT-F.06 1 Kg 414.00
& diameters for - 304 Grade
Supplying Galvanized Steel Barbed wire conforming to IS 278 -
159 BMT-F.07 1978 : Type A - IOWA Type Designation as per standard 1 Kg 101.00
specification
Supplying Galvanized Steel Barbed wire conforming to IS 278 -
160 BMT-F.08 1978 : Type B - Glidden Type Designation as per standard 1 Kg 99.00
specification
Plain or Corrugated Galvanized iron sheets as per IS 277
140 BMT-E.20 1 Kg 70.00
(0.1 mm to 0.8 mm thickness)
137 BMT-E.17 A.C sheet Corrugated 6 mm thick 1 sqm 229.00
138 BMT-E.18 A.C sheet plain 4 mm thick 1 sqm 160.00
139 BMT-E.19 A.C sheet plain 6 mm thick 1 sqm 170.00
1000 BMS-W.18 Aluminium sheet 24 Gauge 1 Sqm 282.00
7.5mm thick Aluminium Grill (As approved by the department)
1001 BMS-W.19 1 Sqm 1035.00
3.58 Kg/Sqm.
161 BMT-F.18 Galvanized Iron fly proof wire mesh not less than 20 gauge 1 Sqm 276.00
171 BMT-F.19 Stainless steel fly proof wire mesh of not less than 20 gauge 1 Sqm 564.00
156 BMT-F.28 Rabbit wire mesh (chicken mesh) of not less than 30 gauge 1 Sqm 21.00
1002 BMS-W.20 Mastic pad 2'0 " x 4'0" (0.60M x 1.2M) of 1" (25.4 mm ) thick 1 Sqm 923.00
1003 BMS-W.21 Mastic pad 2'0 " x 4'0" (0.60M x 1.2M) of 1/2" (12.7 mm ) thick 1 Sqm 529.00
GI PIPES
32 MAT-00033 G I Pipe 100 mm dia B Class 1 Rmt 795.00
33 MAT-00034 G I Pipe 15 mm dia A class 1 Rmt 99.00
34 MAT-00035 G I pipe 25 mm dia A class 1 Rmt 167.00
35 MAT-00036 G I pipe 40 mm dia B class 1 Rmt 248.00
36 MAT-00037 G I pipe 50 mm dia A class 1 Rmt 291.00
37 MAT-00038 G I Pipe 80 mm dia B Class 1 Rmt 529.00
11 32mm dia GI "B" Class pipes for Bore Well Hand Pumps only 1 Rmt 400.00
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
S& F 15 mm Nominal Bore GI pipe Light Grade properties &
278 BMW-F.67 weight as per IS 1239 ISI mark with GI fittings including the cost 1 Rmt 180.00
of pipe & its fittings & labour charges complete
279 BMW-F.68 15mm dia GI Pipe labour charges only 1 Rmt 46.00
S& F 20 mm Nominal Bore GI pipe Light Grade properties &
280 BMW-F.69 weight as per IS 1239ISI mark with GI fittings including the cost of 1 Rmt 205.00
pipe & its fittings & labour charges complete
281 BMW-F.70 20mm dia GI Pipe labour charges only 1 Rmt 46.00
S& F 25 mm Nominal Bore GI pipe Light Grade properties &
282 BMW-F.71 weight as per IS 1239ISI mark with GI fittings including the cost of 1 Rmt 268.00
pipe & its fittings & labour charges complete
283 BMW-F.72 25mm dia GI Pipe labour charges only 1 Rmt 46.00
S& F 32 mm Nominal Bore GI pipe Light Grade properties &
284 BMW-F.73 weight as per IS 1239ISI mark with GI fittings including the cost of 1 Rmt 351.00
pipe & its fittings & labour charges complete
285 BMW-F.74 32mm dia GI Pipe labour charges only 1 Rmt 46.00
S& F 40 mm Nominal Bore GI pipe Light Grade properties &
286 BMW-F.75 weight as per IS 1239 ISI mark with GI fittings including the cost 1 Rmt 417.00
of pipe & its fittings & labour charges complete
287 BMW-F.76 40mm dia GI Pipe labour charges only 1 Rmt 50.00
S& F 50 mm Nominal Bore GI pipe Light Grade properties &
288 BMW-F.77 weight as per IS 1239 ISI mark with GI fittings including the cost 1 Rmt 457.00
of pipe & its fittings & labour charges complete
289 BMW-F.78 50mm dia GI Pipe labour charges only 1 Rmt 75.00
S& F 15 mm Nominal Bore GI pipe Medium Grade properties &
290 BMW-F.79 weight as per IS 1239 ISI mark with GI fittings including the cost 1 Rmt 199.00
of pipe & its fittings & labour charges complete
291 BMW-F.80 15mm dia GI Pipe labour charges only 1 Rmt 46.00
S& F 20 mm Nominal Bore GI pipe Medium Grade properties &
292 BMW-F.81 weight as per IS 1239ISI mark with GI fittings including the cost of 1 Rmt 220.00
pipe & its fittings & labour charges complete
293 BMW-F.82 20mm dia GI Pipe labour charges only 1 Rmt 46.00
S& F 25 mm Nominal Bore GI pipe Medium Grade properties &
294 BMW-F.83 weight as per IS 1239ISI mark with GI fittings including the cost of 1 Rmt 286.00
pipe & its fittings & labour charges complete.,
295 BMW-F.84 25mm dia GI Pipe labour charges only 1 Rmt 46.00
S& F 32 mm Nominal Bore GI pipe Medium Grade properties &
296 BMW-F.85 weight as per IS 1239ISI mark with GI fittings including the cost of 1 Rmt 398.00
pipe & its fittings & labour charges complete
297 BMW-F.86 32mm dia GI Pipe labour charges only 1 Rmt 46.00
S& F 40 mm Nominal Bore GI pipe Medium Grade properties &
298 BMW-F.87 weight as per IS 1239 ISI mark with GI fittings including the cost 1 Rmt 444.00
of pipe & its fittings & labour charges complete
299 BMW-F.88 40mm dia GI Pipe labour charges only 1 Rmt 50.00
S& F 50 mm Nominal Bore GI pipe Medium Grade properties &
300 BMW-F.89 weight as per IS 1239 ISI mark with GI fittings including the cost 1 Rmt 457.00
of pipe & its fittings & labour charges complete
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
301 BMW-F.90 50mm dia GI Pipe labour charges only 1 Rmt 76.00
S & F 65 mm Nominal Bore GI pipe Medium Grade properties &
weight as per IS 1239 with GI fittings such as elbows tees
couplings, nipples, plugs including excavation for trenches and
302 BMW-F.91 1 Rmt 837.00
refilling the trenches complete except for GI bends union and GI
connectors with checkout and socket Tata or Zenith make or
equivalent.
671 BMW-I.77 Removing 12.7 mm GIpipe and refixing the same 1 RMt 65.00
672 BMW-I.78 Removing 19.05 mm GIpipe and refixing the same 1 RMt 72.00
673 BMW-I.79 Removing 25.4 mm GIpipe and refixing the same 1 RMt 108.00
674 BMW-I.80 Removing 38.1 mm GIpipe and refixing the same 1 RMt 136.00
675 BMW-I.81 Removing 50.8 mm GIpipe and refixing the same 1 RMt 159.00
LABOUR CHARGES, MUNICIPAL LIMITS AND PIPE LINE TRENCHES (R&B)
LABOUR RATES First class Mason (Mason, Brick layer) 1 day 630.00
LABOUR RATES Bar bender 1 day 750.00
LABOUR RATES First class Fitter 1 day 660.00
LABOUR RATES First class Carpenter 1 day 705.00
LABOUR RATES First class Painter/ Plumber/ Pipe fitter 1 day 705.00
LABOUR RATES Electrician (Licensed) 1 day 700.00
LABOUR RATES Second class (Mason, Brick layer, Carpenter, Fitter, Painter) 1 day 565.00
LABOUR RATES Un skilled Man Mazdoor/ Woman Mazdoor/ Watchman 1 day 525.00
Un skilled work man (R&B) (Helper/ Cleaner/ Sweepers/ Scavangers/
LABOUR RATES
Choukidars/ Security Guards/ Office boys)
1 day 505.00
4.0 (Roads) Skilled labour (30% First class & 70% Second class may be taken)
Up to a belt of 12 KMs from Municipal limits of Muncipal Corporations of Greater Visakhapatnam
MUNICIPAL and Vijayawada is 40% extra, for other Govt notified Municipal Corporations is 25% extra and for
CORPORATION/ remaining all Municipal limits, Industrial area and District Head Quarters is 20% extra from their
MUNICIPALITIES/ limits is allow on basic rate of labour component only. For works located inside TTD Temples of Sri.
DISTRICT HEAD Padmavathi Ammavari Temple, Thiruchanur, Sri Govindaraja Swamy Temple at Thirupathi, Sri
QUARTERS/ TTD Kapileswara Swamy Temple, Kapilatheertham, Thirupathi and Sri Kalyana Venkateswara Swamy
TEMPLES Temple, Srinivasa Mangapuram, 20 % extra over the basic rates of labour component for Thirupathi
Municipal Corporation is allowed.

20% over basic rates on labour component works allowed for works situated within 10Kms belt of
Industrial area of, Ibrahimpatnam, Vuyyuru, Jaggaiahpeta in Krishna District, Macherla, Gurajala,
Challapalli in Guntur District, Garividi in Vijayanagaram District, Renigunta in Chittoor District and
INDUSTRIAL AREA
Yerraguntla & Mangampet in Kadapa District, Hindupur, Tadipatri, Anantapur, Guntakal,
Rayalcheruvu, Yadiki of Anantapur District and Adoni, Dhone,Cement Nagar, Nandyal, Kurnool,
Yemmiganur & Bethamcherla of Kurnool District, Anakapally of Vishakhapatnam District.
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code (a) 25% extra is allowed for the works located within the interior Agency / Tribal limits, i.e. for the
works located within & upto16 KMs from any all weather route inside Agency / Tribal (b) 40% extra
is allowed for the works located within the interior Agency / Tribal limits, i.e. for the works located
beyond 16 KMs from any all weather route inside Agency / Tribal. NOTE:- (1) No extra percentage is
AGENCY/ TRIBAL permissible in respect of Forest produce such as Bamboo, Rellu grass and for all materials obtained
AREA from outside the Agency / Tribal (2) The extra percentage under Agency / Tribal areas allowance
may be allowed on the labour component and on the labour charges in the rates for conveyance of
materials (3) The extra percentage on cost of materials in Agency / Tribal areas can be allowed on
the labour component only, if they are manufactured in the Agency / Tribal areas itself except
Forest produce.
NOTE BELOW AREA ALLOWANCES:-
MORE THAN ONE If more than one area allowance ( such as those ) for (1) Municipalities (2) Agency / Tribal areas (3)
AREA ALLOWANCES Industrial areas are applicable for a particular situation, only the maximum out of the allowable
percentages is to be allowed.
CSOR Pipe lines where depth is less than 1.50 times the width ( Add 75% extra in restricted places)

CSOR Pipe lines where depth is 1.50 times or more than the width ( Add 120% extra in restricted places)

CSOR Silt removal in UT's, Culverts and Syphons in restricted area (Add 120% extra in restricted places)

CSOR Excavation of field channels - 75% extra


For narrow trenches not more than 2 Mts in width and depth not less than twice the width and for
CSOR
excavation of road boundary drains, model sections of canals - 75% extra
High berm cutting of not more than 150mm average thickness and sectioning for roads (Add 50%
CSOR
extra in restricted places)

TIMBER & ROOFING MATERIALS (Landing cost – including cost of conveyance, loading & unloading)

121 BMT-E.01 Medium Teak Wood scantlings: up to 2.0 M 1 cum 81950.00


124 BMT-E.04 Medium Teak Wood Plancks: any thickness 1 cum 160920.00
125 BMT-E.05 Best Teak Wood scantlings: up to 2.0 M 1 cum 134500.00
128 BMT-E.08 Best Teak Wood Plancks: any thickness 1 cum 175490.00
135 BMT-E.15 Sal Wood/ Country Wood scantlings: any length 1 cum 51000.00
136 BMT-E.16 Sal Wood/ Country Wood Plancks: any thickness 1 cum 63950.00
1041 BMS-W.61 75 mm long screws 1 Each 4.00
1042 BMS-W.62 G.I scam bolts & nuts 1 Each 6.00
1043 BMS-W.63 G.I bolts & nuts 1 Each 6.00
1044 BMS-W.64 G.I "J‟ bolts 8 mm dia 1 Each 11.00
1045 BMS-W.65 G.I Washers 1 Each 2.00
1046 BMS-W.66 Limpet washers (for scam & "J‟ bolts) 1 Each 2.00
1047 BMS-W.67 Bitumen washers 1 Each 2.00
SEIGNIORAGE CHARGES
4, 42 Building Stone/Metal/ Rough Boulders 1 cum 90.00
30 G.O.Ms.No: 11 Marble 1 cum 300.00
Dated: 11-02-
32 2020 Muram/Gravel/Earth ( 1 MT - Rs.30.00) 1 cum 45.00
36 Ordinary sand/ Sand manufactured from boulders/ sand others 1 cum 100.00
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
FIXTURES FOR DOORS & WINDOWS
194 BMT-G.14 MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 100 mm Long 1 No 26.50
195 BMT-G.15 MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 150 mm Long 1 No 38.50
196 BMT-G.16 MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 200 mm Long 1 No 56.00
197 BMT-G.17 MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 250 mm Long 1 No 75.00
198 BMT-G.18 MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 300 mm Long 1 No 94.00
207 BMT-G.27 MS-Powder Coated Butt hinges (IS:205)- 75 mm Long 1 No 11.00
208 BMT-G.28 MS-Powder Coated Butt hinges (IS:205)- 100 mm Long 1 No 20.00
209 BMT-G.29 MS-Powder Coated Butt hinges (IS:205)- 125 mm Long 1 No 31.00
210 BMT-G.30 MS-Powder Coated Butt hinges (IS:205)- 150 mm Long 1 No 39.00
221 BMT-G.35 MS-Powder Coated Door Handles (IS:208) 125 mm Long 1 No 35.00
222 BMT-G.36 MS-Powder Coated Door Handles (IS:208) 150 mm Long 1 No 49.00
237 BMT-G.43 MS-Powder Coated Aldrop (IS:2681) 200 mm long 1 No 100.00
238 BMT-G.44 MS-Powder Coated Aldrop (IS:2681) 250 mm long 1 No 129.00
239 BMT-G.45 MS-Powder Coated Aldrop (IS:2681) 300 mm long 1 No 154.00
243 BMT-G.51 MS-Powder Coated Flat Latches: 250 mm long 1 No 61.00
244 BMT-G.52 MS-Powder Coated Flat Latches: 300 mm long 1 No 77.00
259 BMT-G.53 MS-Powder Coated - Door Stoppers 1 No 45.00
1049 BMS-W.69 MS Z Hold fasts - 300 mm long of 40 x 40 x 5 mm ISA 1 No 39.00
GLASS (Landing cost – Including loading, cost of conveyance & unloading)
406 BMT-I.01 Plain Float Glass 4 mm thick 1 sqm 486.00
407 BMT-I.02 Plain Float Glass 5 mm thick 1 sqm 634.00
408 BMT-I.03 Plain Float Glass 6 mm thick 1 Sqm 756.00
414 BMT-I.07 Tinted - Bronze/ Green Glass 4 mm thick 1 sqm 599.00
415 BMT-I.08 Tinted - Bronze/ Green Glass 5 mm thick 1 sqm 749.00
416 BMT-I.09 Tinted - Bronze/ Green Glass 6 mm thick 1 Sqm 900.00
WATER PROOFING COMPOUNDS
80 MAT-00081 Water proofing compound (Acco proof powder) 1 kg 85.00
Two component Water thinnable Food Neutral Epoxy coating
(Complies with ASTM - C- 881 / EN 13813) Coverage : 70 to 80 SFT per
390 BMT-H.113 Ltr / coat Ideal to use as internal coatings for potable water tanks, 1 Kg 459.00
reservoirs, sumps and walls. Part - I 1 Kg : Part -II 1/2 Kg dilute with 1 Ltr
of water
PAINTS & POLISHES (Landing cost – Including loading, cost of conveyance & unloading)
101 E White cement (R&B SSR) 1 Kg 27.95
100 D Shell lime slaked and screened (R&B SSR) 1 Cum 940.00
427 BMT-J.01 Supply of water based Cement Primer of Interior Grade- 1 1 Kg 160.00
428 BMT-J.02 Supply of water based Cement Primer of Exterior Grade- 2 1 Kg 200.00
430 BMT-J.03 Supply of Red Oxide Primer Paint for iron works of Grade -1 1 Litre 145.00
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
431 BMT-J.04 Supply of Zinc Chromate Yellow Oxide Primer paint for iron 1 Litre 200.00
432 BMT-J.05 Supply of Wood Primer 1 Litre 160.00
433 BMT-J.06 Supply of Metal paste (Putty) for steel works 1 Kg 130.00
434 BMT-J.07 Supply of Putty for wood work 1 Kg 130.00
435 BMT-J.08 Supply of White Lead 1 Kg 110.00
436 BMT-J.09 Supply of Synthetic clear Varnish 1 Litre 155.00
437 BMT-J.10 Supply of Spirit 1 Litre 96.00
438 BMT-J.11 Supply of Linseed Oil 1 Litre 60.00
443 BMT-J.19 Supply of wood adhesive compound (Fevicol) 1 Kg 245.00
445 BMT-J.20 Supply of Dry Powder Distemper 1 Kg 45.00
446 BMT-J.21 Supply of acrylic based Oil Bound washable Distemper 1 Kg 81.00
Supply of synthetic polymer luxury plastic emulsion paint of
453 BMT-J.22 superior grade having VOC (Volatile Organic Compound) content 1 Litre 450.00
less than 50 grams/ liter.
448 BMT-J.23 Supply of Water proof Cement paint 1 Kg 49.00
Supply of acrylic interior emulsion paint having VOC (Volatile
450 BMT-J.24 1 Litre 190.00
Organic Compound) content less than 50 grams/ liter
Supply of acrylic exterior emulsion paint having VOC (Volatile
451 BMT-J.34 1 Litre 210.00
Organic Compound) content less than 50 grams/ liter.
449 BMT-J.25 Supply of water proof Cement paint pack 25 Kgs 1009.00
447 BMT-J.26 Supply of paint grade white lime for wash 25 Kgs 490.00
Supply of ready mixed Synthetic Enamel paints in all shades
454 BMT-J.29 Grade - I having VOC (Volatile Organic Compound ) content less 1 Lt 270.00
than 50 grams/ liter.
Supply of wallputty of White Cement or Polymeror Cement
429 BMT-J.31 20 Kgs 600.00
base
456 BMT-J.32 PMCC / Deco orient base or Equivalent exterior Texture 25 Kgs 818.00
457 BMT-J.33 PMCC or Equivalent Gold line Exterior Texture 25 Kgs 1060.00

Supply of acrylic emulsion paint weather proof water-based,


452 BMT-J.35 modified acrylic with silicon additives exterior grade having VOC 1 Lt 220.00
(Volatile Organic Compound ) content less than 50 grams/ liter.

POLYTHYLENE WATER STORAGE TANK WITH DOUBLE LAYER


Providing & Placing on Terrace(at all floor levels) polyethylene
water storage tank of Double layer Roto moulded confirming to
IS:12701 approved brand & manufacture with suitable cover/cap
335 BMW-G.01 1 Litre 8.50
and suitable locking arrangement & making necessary holes for
inlet & outlets and over flow pipes but without fittings & base
support for tanks

336 BMW-G.02 Labour charges (For re-fixing after removed old tanks) 1 Litre 1.00
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
LABOUR CHARGES FOR FABRICATION, WROUGHT AND PUT UP DOORS AND
WINDOWS
Labour charges for fabricating steel works like Window Grills,
947 BMM-V.14 Compound Wall Grills, Iron Doors, Windows including cost of 1 Kg 30.00
welding rods, power charges, excluding cost of fixing in position

Labour charges for fixing Iron Doors, Iron Windows and Window
948 BMM-V.15 1 Kg 6.00
Grills in position
Labour charges for Fabrication of stainless steel railing works
951 BMM-V.18 using stainless steel welding rods including buffing, polishing, 1 Kg 144.00
lacquer finishing, to present seamless finish

Cost of Flush door shutters, solid bond wood block board type
723 BMT-N.12 1 sqm 2000.00
with teak ply on both faces.: 25 mmthick conforming to IS:2202

Labour charges for fixing Flush door shutters of any thickness to


956 BMM-V.23 the existing door frame including fixing the fixtures to the door 1 Sqm 421.00
shutter excluding cost of shutter
Labour charges for fixing glass panes of any thickness to the
957 BMM-V.24 existing door / window panes including fixing the beading 1 Sqm 315.00
excluding cost of beading

Labour charges for wrought and put up including fixing in


position frames of any size, shutters for doors, windows,
958 BMM-V.25 1 sqm 1727.00
ventilators including fixing all necessary fixtures etc. for Teak
wood Fully panelled doors external or internal including frame

Labour charges for wrought and put up including fixing in


position frames of any size, shutters for doors, windows,
959 BMM-V.26 ventilators including fixing all necessary fixtures etc. for Teak 1 sqm 1632.00
wood Glazed and panelled doors including fixing glass including
frame
Labour charges for wrought and put up including fixing in
position frames of any size, shutters for doors, windows,
971 BMM-V.38 ventilators including fixing all necessary fixtures etc. for Other 1 sqm 1701.00
than teakwood Fully panelled doors external or internal including
frame
Labour charges for wrought and put up including fixing in
position frames of any size, shutters for doors, windows,
983 BMM-V.50 ventilators including fixing all necessary fixtures etc. for Other 1 sqm 746.00
than teakwood G.I or AC sheet door & windows including outer
frame and shutter frame
STEEL CENTERING CHARGES (HIRE AND LABOUR) (Un supported height up to 3.66 Mts)
A FOOTINGS 1 Cum 973.00
B BED BLOCKS, BANDS 1 Cum 430.00
C PEDESTALS 1 Cum 1412.00
D PLINTH BEAMS 1 Cum 3073.00
E LINTELS 1 Cum 2953.00
F CHAJJAS - SUNSHADES 1 Sqm 507.00
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
G COLUMNS 1 Cum 2786.00
H BEAMS 1 Cum 4206.00
I SLABS - Up to 150 mm thick 1 Sqm 488.00
J SLABS - Above 150 mm and up to 300 mm 1 Sqm 502.00
K SLABS - Above 300 mm thick 1 Sqm 525.00
L WAFFLE - (GRID) SLABS (Rib Beams with slabs) 1 Sqm 1731.00
M PERGOLA SLABS (Only Rib Beams) 1 Sqm 1214.00
N ARCH BEAMS - up to 1.5 M Span 1 Cum 4781.00
O ARCH BEAMS - above 1.5 M Span 1 Cum 4848.00
P DOME SLABS 1 Cum 7728.00
Q HELICAL STAIRCASES 1 Sqm 589.00
Q Shear Walls, RCC Walls, Water Tank Walls 1 Sqm 982.00
Centering and scaffolding charges for RCC members including all materials and
31
labour charges for forming and dismantling.
a) R C C Elevated Service Reservoir of staging up to 15 Meter below L W L.
1 Slabs thickness (150 mm to 300 mm) 4476.00
2 Slab thickness above 300 mm extra for every 50mm thickness increase 473.00
3 Side walls curved surfaces. (rate is for both sides centering) 3383.00
4 Side wall straight surfaces. (rate is for both sides centering) 1 SqMt 3009.00
Centering
5 Dome area 3667.00
6 Roof Slab 2051.00
7 Column braces and beams 1510.00
8 Circular braces, ring beams & circular column. 1657.00
Note: - For RCC ELSR of staging above 15 m, the % increase in these rates shall be as follows. 15-18 m ---- 9% ,
18-21m --- 15% , 21-24 m --- 21%, 24 -27m --27%, above27m --- 30%
b) For Ground level works :-
1 Slabs 1 SqMt Follow as per
2 Beams and Lintels 1 Cum AP Standard
Sunshades Data
3 1 SqMt
RCC vertical walls of plane surface (rate is for one sides centering) including
4-a) 500.00
open drains of 600mm size and above 1 SqMt
VCC vertical walls of plane surface (rate is for one sides centering) including Centering
4-b) 490.00
open drains area
5) RCC vertical walls of circular faces (rate is for one sides centering) 635.00
32 LIFT OR DELIFT OF MATERIALS
Lifting of cement concrete for RCC elevated reservoir. For every 1m height or
a) 1 Cum 186.00
part thereof over the initial lift of 3 m
Delifting the materials such as stones, concrete etc., for concrete below
ground level for construction of masonry ground level reservoirs, construction
b) of ground level reservoirs, inspection wells, test wells and sump wells etc., for 1 Cum 56.00
every 1 m depth or part there of beyond the initial depth of 3 meters from
ground level.
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
Extra allowance for isolated scattered works viz., valve pits / chambers, public Each 30% extra over the
39 (a)
fountains, meter pits and manholes, delivery cistern etc., complete., cost of chamber.

Repairs to the existing mains, interconnections, replacement of


100% extra over the
(b) valves/specials etc., including the cutting, jointing, bailing out of water, drying,
cost of work
earth work excavation etc., complete.
Rates for OHSRs/ELSRs including fixtures with a staging of 10 m without Seismic
44
analysis.
a Up to 10,000 Liters capacity Liter 66.61
b 15,000 Liters capacity Liter 49.75
c 20,000 Liters capacity Liter 45.00
d 40,000 Liters capacity Liter 38.15
e 60,000 Liters capacity Liter 28.91
f 1,00,000 Liters capacity Liter 26.18
g 2,00,000 Liters capacity Liter 22.88
h 3,00,000 Liters capacity Liter 21.53
i 4,00,000 Liters capacity Liter 18.96
j 4,50,000 Liters capacity Liter 16.39
NOTE: - (I) All concrete members shall be designed with M30 grade design mix.

(2) For intermediate ranges proportional rates may be adopted

3) The above rates are applicable for Elevated Level Services Reservoirs / OHSRs with RAFT
FOUNDATION and a rate of Rs.3680/- per tonne for cement and for steel Rs.68,000/- per tonne (Fe 500)

4) The above rates are applicaable for Elevated Level Services Reservoirs /
OHSRs for SBC of 15 T/ Sqm
(4) (a) For every decrease of 2.50 T/Sqm of SBC, the rate shall be increased by 2.50% on basic rate. (b)
For every increase of 2.5 T/Sqm of SBC, the rate shall be decreased by1.0% on basic rate up to 20
T/Sqm (c) For SBC 10T/Sqm to 7.5 T/Sqm, solid raft shall be provided and for solid raft the rate shall be
increased by 10% on basic rate. (d) For SBC 7.5 T/Sqm to 5 T/Sqm, solid raft shall be provided and for
solid raft the rate shall be increased by 15% on basic rate. (e) For SBC value of less than 5 T/Sqm, soil
improvement shall be adopted, for which additional payment shall be made as per field condition.

(5) For every Meter of staging less than 10 m, the rate shall be reduced by Rs.0.05 paisa per liter per
every Meter of difference in staging
(6) For every Meter of staging above 10 m , the rate shall be increase by Rs.0.10 paisa per liter per every
Meter of additional in staging
(7) The above rates shall be increased / decreased due to increase / decrease in the cost of cement by
Basic Rate x {(Rc-3680)/3680 } x 0.07 ie., Rc = Rate of cement (Rs per Mt) at the time of preparation of
estimate.
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
(8) The above rates shall be increased / decreased due to increase / decrease in the cost of steel by
Basic Rate x { (Rs-68000)/68000 x 0.2 ie., Rs = Rate of steel (Rs per Mt) at the time of preparation of
estimate.
(9) Rate inclusive of three coats of epoxy paint Food Grade of best quality to inner surface of the
Reservoir including roof.
(10) The above rates shall be adopted for estimate purposes for construction of ELSR for a finished
work including 2 coats of whether proof emulsion painting for external surfaces, lettering, all required
fixtures, pipes, bends, valves etc., for pipe connections but excluding cost of pipes, bends and valves as
per departmental designs and drawings.
(11) The above rates are applicable for wind pressures up to 250 kg / Sq m . For decrease in wind
pressure the rate has to be decreased by 5% per every 100kg/Sqm. If the ELSR / OHSR are to be
designed for seismic forces also, cost shall be arrived by working out detailed quantities based on the
designs.
(12) a) For tribal/Agency / Rural area, the above rates as arrived up to shall be increased by 10%.
(b) An additional increase of 7.50% shall be allowed for OHSRs/ELSRs located in agency areas over the
above rates for RWS Department works.
(13) If the ELSR is to be designed for seismic forces also, cost shall be arrived by working out detailed
quantities based on the design & difference to be paid extra.
(14) If the ELSR is to be designed for seismic forces a) The above rates are applied up to Zone-II earth
quake. b) For Zone-III earth quake the above rates are to be increased by 15 %.
15 Fixtures include :

a) RCC or Aluminium ladder inside 0.60 m wide.


b) Spiral staircase on the outside shall be provided up to 200KL. Above 200KL capacity dog legged
staircase shall be provided with staircase flight width of 1.0mts and landing width of 1.20mts with
minimum 32mm dia S.S railing up to 1.2 height.
c) Lightening arrestor, including conductor and earthling etc.
d) RCC ventilators with copper or stainless steel fly proof mesh.
e) D.I Manholes frame and cover 0.60x0.60 m as per IS specifications (light duty) - 2 Nos.
f) Water level indicator of good quality with ebonite/ copper float approved pattern - 1 No.
g) The ladder shall be with M.S ladder and Verticals with HDPE of 10kg/Sqcm shall be provided for single
column OHSRs only.
h) Minimum staging for all ELSR/OHSR shall be 10.0mts.
i) The increase in staging shall be at 1.0mt interval.
j) The railing provided to the gallery and stair case shall be with minimum 32mm dia stainless steel of
grade 304 for a height of 1.20mts. With vertical post of minimum 1 Mt interval.
k). The dog legged staircase shall be enclosed with brick/CRS wall on three sides and front side with M.S
collapsible gate up to 1st brace level from ground level to prevent unauthorized entry.
l). D.I swan neck ventilators shall be provided in top dome and slab.
m). The above rates are exclusive of all inlet, out let connection and valves. All valves near inlet, out let
and for scour of ELSRs shall be D.I valves of heavy duty confirming to the specification of SoR item
No.28
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
DISMANTLING clearing away and carefully stacking materials useful for reuse.
908 BMT-S.01 Stone masonry in cement mortar 1 Cum 498.00
909 BMT-S.02 Terracing work in roofs or floors 10 Sqm 210.00
913 BMT-S.06 Wrought and framed timber in roofs or floors 1 Cum 263.00
914 BMT-S.07 Old lime mortar plaster 10 Sqm 60.00
915 BMT-S.08 Old cement mortar plaster 10 Sqm 75.00
918 BMT-S.11 Kadapa slabs or Shahabad stone slabs flooring on sand bed 10 Sqm 84.00
919 BMT-S.12 Through scraping of old plastered surface 10 Sqm 55.00
Washing of plastered surface with soap, soda and water (or with
920 BMT-S.13 10 Sqm 18.00
soda lime and water)
Dry rough stone revetment for aprons and stacking within 40
137 a.i 1 cum 65.60
metres
CUTTING ROAD SURFACE INCLUDING STACKING OF EXCAVATED MATERIALS FOR PIPE
LINE TRENCH WORK
Cutting open B.T. road surface (as well as asphalt concrete up to 75 mm thick)
25 (A) 10 Sqm 976.00
including water bound macadam
Cutting open C.C. road surface with concrete saw cutter and removal with
25 (B) 1 Cum 3090.00
Breaker
25 ( c ) Cutting open water bound macadam road including soiling 1 Cum 303.00
638 BMW-1.44 Cutting holes in C.C, basement & repairs Labour charges 1 No 121.00
639 BMW-I.45 Cutting holes in stone masonry& basement and repairs 1 No 81.00
640 BMW-I.46 Cutting holes in Brick masonry& repairs Labour charges only 1 No 54.00
641 BMW-I.47 Cutting holes in RCC slab floor & repairs Labour charges only 1 No 81.00

DRILLING HOLES IN HARG GRANITE OR SHEET ROCK


1056 BMS-W.76 Drilling holes in hard rock surfaces up to 18mm dia 1 RMt 220.00
1057 BMS-W.77 Drilling holes in hard rock surfaces above 18mm dia 1 RMt 306.00
Making holes up to 18mm dia in RCC/ any stones up to 50 mm
1058 BMS-W.78 1 No 37.00
thick
Making holes above 18mm dia in RCC/ any stones above 50 mm
1059 BMS-W.79 1 No 52.00
thick
137 7 (a) Manually ( Hand)
138 i) 20 mm dia meter 1 RMt 136.00
139 ii) 25 mm dia meter 1 RMt 144.00
140 iii) 36 mm dia meter 1 RMt 166.00
141 b) Pneumatic Compressor
142 i) 20 mm dia meter 1 RMt 154.00
143 ii) 25 mm dia meter 1 RMt 167.00
144 iii) 36 mm dia meter 1 RMt 182.00
1033 BMS-W.53 Dressing faces of granite stone (double line dressing) 1 Sqm 213.00

1034 BMS-W.54 Dressing faces of other than granite stone (double line dressing) 1 Sqm 133.00
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
BAILING OUT LABOUR CHARGES FOR BUILDINGS
Bailing out water for earth work excavation /concrete for
934 BMM-V.01 foundation below water level. (For building items only) - Other 1 cum 266.00
than sandy soil - 0.0 M to 1.0 M
Bailing out water for earth work excavation /concrete for
935 BMM-V.02 foundation below water level. (For building items only) - Other 1 cum 315.00
than sandy soil - 1.0 M to 2.0 M
Bailing out water for earth work excavation /concrete for
936 BMM-V.03 foundation below water level. (For building items only) - Other 1 cum 367.00
than sandy soil - 2.0 M to 3.0 M
Bailing out water for earth work excavation / for concrete
937 BMM-V.04 foundation below water level. (For building items only) Sandy soil 1 cum 422.00
- 0.0 M to 1.0 M
Bailing out water for earth work excavation /for concrete
938 BMM-V.05 foundation below water level. (For building items only) Sandy soil 1 cum 657.00
- 1.0 M to 2.0 M
Bailing out water for earth work excavation /concrete for
939 BMM-V.06 foundation below water level. (For building items only) Sandy soil 1 cum 793.00
- 2.0 M to 3.0 M
BAILING OUT LABOUR CHARGES FOR PIPE LINE TRENCHES FOR MORE THAN 5 HP
PUMP SETS CAPACITY
A. Water lifting charges using Electrical driven pump
Per HP Hour rate (including contractors profit and overhead charges of
i. HP Hour 11.25
13.615% (Excl 13.615% = 9.90)
Other expenses in terms of Mazdoor, pump operator and pipe laying and
ii. dismantling(including contractors profit and overhead charges of 13.615%) Hour 183.19
per hour (Excl 13.615% = 161.23)
Total hire charges of Electrically driven dewatering pump per hour (11.25 x HP capacity) +
Excl 13.615% = (9.90 x HP capacity) + 161.23 Per hour 183.19 Per hour

B. Water lifting charges using Diesel driven pump


Per HP Hour rate (including contractors profit and overhead charges of
i. HP Hour 28.92
13.615% (Excluding Contractor`s profit 13.615% = 25.45)
Other expenses in terms of Mazdoor, pump operator and pipe laying and
ii. dismantling(including contractors profit and overhead charges of 13.615%) Hour 223.40
per hour (Excl contractor`s profit 13.615% = 196.62)
Total hire charges of Diesel driven dewatering pump per hour Excl CP (28.92 x HP capacity) +
13.615% = (25.45 x HP capacity) + 196.62 Per hour 223.40 Per hour

NOTE:- The rate is payable on the total H.P. hours ignoring fractions less than 0.5 HP hour and
rounding off 0.5 HP hour or more to the next higher integer.
Removal of wet silt and sludge by manual means from sullage drains with aid
40 10 Cum 3158.00
of baskets and vessels.
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
EXCAVATION OF TRENCHES FOR INFILTRATION GALLERIES, SIPHON LINES &
CONNECTING MAINS
Excavation of trenches for infiltration galleries, siphon lines and connecting mains in all soils under
29 water including all leads, lifts, shoring, strutting, bailing out water and removal of shoring and
strutting materials, after completion of pipe line work. (CSOR Page No: 12)
a) 0 to 1 m deep under water. 10 Cum 15389.00
b) 1 to 2 m deep under water. 10 Cum 22044.00
c) 2 to 5 m deep under water. 10 Cum 33086.00

d) Beyond 5 mts deep under water for every additional 1 m depth over item 'c' 10 Cum 6321.00

NOTE:- The above rates do not include rock requiring blasting or chiseling

TUNNELING WORK FOR RAILWAY, ROAD AND CANAL CROSSING

Railway crossing/ Road crossing/ Canal crossing by adopting trenchless technology tunneling work through
specialized pipe jacking method by erecting the equipment to true to the alignment and gradient, by hydraulic
pipe jacking technique complete including tunneling, excavation in all types of soils including hard rock and
construction of RCC chambers suitable to casing pipe pits, and conveyance charges of machinery and other
required materials but excluding cost of encasing pipe, in co-ordination with the concerned authorities as per
approved drawings and directed by the Engineer in-charge

800 mm dia 1 Rmt 27300.00


900 mm dia 1 Rmt 28665.00
1000 mm dia 1 Rmt 30030.00
1100 mm dia 1 Rmt 31395.00
1200 mm dia 1 Rmt 32760.00
1300 mm dia 1 Rmt 34125.00
1400 mm dia 1 Rmt 36855.00
1500 mm dia 1 Rmt 40950.00
ELECTRICAL ITEMS
Supply and Transportation of 2C x1.50 sqmm XLPE/PVC
insulated & PVC sheathed unarmoured control cables of 1.1
ELEC-4.1.5 KV grade with copper conductor as per IS 7098 Part-I -1988 etc
159 1 Rmt 118.00
(a) complete Make: Make: Torrent / Universal / Unicab / Havells /
KEI /Polycab/Gloster /orbit / Paragon/ RR Kabel/
RPG/Pawancab/LS cable.
Supply and Transportation of 2C x1.50 sqmm XLPE/PVC
insulated & PVC sheathed armoured cables of 1.1 KV grade
ELEC-4.1.6
163 with copper conductor as per IS 7098 Part-I -1988 etc complete 1 Rmt 124.00
(a)
Make: Make: Torrent / Universal / Unicab / Havells / KEI
/Polycab/Gloster /orbit / Paragon/ RR
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
Supply of ……...WPSC (Weather Proof Single Core) ISI Alluminium service Wire. Makes:
36 ELEC-1.6.1 Gold Medal / Million / GM / Vimal / Finecab / Nakoda / Plaza/ Payal / Sudhakar/
Rajnigandha/ Airson/Orbit/ollvin/Beljin
a 2.5 Sqmm 1 RMt 9.11
b 6 Sqmm 1 RMt 18.16
c 10 Sqmm 1 RMt 19.80
d 16 Sqmm 1 RMt 33.00
Supply of ……….WPTC (Weather Proof Twin Core) ISI Alluminium Wire. Makes: Gold Medal
37 ELEC-1.6.2 / Million / GM / Vimal / Finecab / Nakoda / Plaza/ Payal / Sudhakar/ Rajnigandha/
Airson/Orbit/ollvin/Beljin
6 Sqmm 36.96
10 Sqmm 44.69
Supply of 3 Core…………. Flat Copper cable of ISI for Submersible Motors confirming to
38 ELEC-1.6.3 IS:694:1990. Makes: Finolex / RR Kabel/ Polycab / Havells / KEI/ Gloster/ Goldmedal / GM/
Finecab/ Million Category-I
a 1.5 Sqmm 1 RMt 72.00
b 2.5 Sqmm 1 RMt 105.00
c 4.0 Sqmm 1 RMt 164.00
d 6.0 Sqmm 1 RMt 236.00
e 10.0 Sqmm 1 RMt 373.00
f 16.0 Sqmm 1 RMt 490.00
Supply of 3 Core…………. Flat Copper cable of ISI for Submersible Motors confirming to
IS:694:1990. Makes: V-Guard / Vihan/Vimal / CRI/ Lubi/Unicab/Hitech/ Spykaar/
39 ELEC-1.6.4
Airson/Ollvin/ Laser/ Beljin/Rhino/Sudhakar/Fortune Arrt/Unistar/DEC//LS cable/ A-Flex/
Fybros - Category-II
a 1.5 Sqmm 1 RMt 66.00
b 2.5 Sqmm 1 RMt 94.00
c 4.0 Sqmm 1 RMt 145.00
d 6.0 Sqmm 1 RMt 209.00
e 10.0 Sqmm 1 RMt 340.00
f 16.0 Sqmm 1 RMt 445.00
5.4 PUMPSETS SINGLE PHASE SUBMERSIBLE MOTOR PUMP SETS
Supply and Transportation of ……….., 5star rated submersible motor pumpset,
confirming to IS 8034 and motor confirming to IS 9283 with water proof winding,Pump
shall be suitable for various delivery head and discharge with stainless steel shaft.Motor
203 ELEC-5.4.1
suitable for working on 240V ± 10% , Single Phase 50 Hz AC supply,etc complete for 4"
Bore well. Makes: Kirloskar / Crompton / Texmo / CRI / KSB/Lubi/
PSG/AryenVarsha/ Falcon Category-I
a 0.75HP 8 Stage 1 No 15565.00
b 1.00HP 10 Stage 1 No 17820.00
c 1.00HP 15 Stage 1 No 18370.00
d 1.50HP 21 Stage 1 No 22275.00
e 2.00HP 25 Stage 1 No 26730.00
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
Supply and Transportation of ……….., 5star rated submersible motor pumpset,
confirming to IS 8034 and motor confirming to IS 9283 with water proof winding, Pump
shall be suitable for various delivery head and discharge with stainless steel shaft. Motor
204 ELEC-5.4.2 suitable for working on 240V ± 10% , SinglePhase 50 Hz AC supply,etc complete for 4"
Bore well. Makes: Pluga / Sterling / Kumar / Unnati
zen/Duke/Lada/Ellen/Suguna/UNItek/KSP(Karunya)/Anco/Sabar/Fitwell/
Deccaan /Karvel / SILVER Category-II
a 0.75HP 8 Stage 1 No 13970.00
b 1.00HP 10 Stage 1 No 15950.00
c 1.00HP 15 Stage 1 No 16500.00
d 1.50HP 21 Stage 1 No 20020.00
e 2.00HP 25 Stage 1 No 24035.00
THREE PHASE SUBMERSIBLE MOTOR PUMP SETS (4" BORE WELL)
Supply and Transportation of ……….., 5star rated submersible motor pumpset, confirming
to IS 8034 and motor confirming to IS 9283 with water proof winding, Pump shall be
suitable for various delivery head and discharge with stainless steel shaft. Motor suitable
205 ELEC-5.4.3
for working on 415V ± 10% , Three Phase 50 Hz AC supply,etc complete for 4" Bore well.
Makes: Kirloskar / Crompton / Texmo / CRI / KSB/Lubi/ PSG/AryenVarsha/Falcon
Category-I
a 3.00HP 15 Stage 1 No 21670.00
b 4.00HP 20 Stage 1 No 25300.00
c 5.00HP 25 Stage 1 No 29920.00

Supply and Transportation of ……….., 5star rated submersible motor pumpset, confirming
to IS 8034 and motor confirming to IS 9283 with water proof winding,Pump shall be
suitable for various delivery head and discharge with stainless steel shaft.Motor suitable
206 ELEC-5.4.4
for working on 415V ± 10% , Three Phase 50 Hz AC supply,etc complete for 4" Bore well.
Makes: Pluga / U-Neel / Sterling / Kumar / Unnati zen/Duke/Lada/Ellen/ Suguna/
UNItek/KSP(Karunya)/ Anco/ Sabar/ Fitwell/Deccan/Karvel/ SILVER Category-II

a 3.00 HP 15 Stage 1 No 20350.00


b 4.00 HP 20 Stage 1 No 23760.00
c 5.00 HP 25 Stage 1 No 28160.00
THREE PHASE SUBMERSIBLE MOTOR PUMP SETS (6" BORE WELL)
Supply and Transportation of ……….., 5star rated submersible motor pumpset, confirming
to IS 8034 and motor confirming to IS 9283 with water proof winding, Pump shall be
suitable for various delivery head and discharge with stainless steel shaft.Motor suitable
207 ELEC-5.4.5
for working on 415V ± 10% , Three Phase 50 Hz AC supply,etc complete for 6" Bore well.
Makes: Kirloskar / Crompton / Texmo / CRI / KSB/Lubi/ PSG/AryenVarsha/Falcon
Category - I
a 3.00HP 5-10 Stage 1 No 33000.00
b 5.00HP, 5-10Stage 1 No 37125.00
c 5.00HP, 12-16 Stage 1 No 42350.00
d 7.50HP, 5-10 Stage 1 No 41690.00
e 7.50HP, 12-16 Stage 1 No 46200.00
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
f 7.50HP, 20-24 Stage 1 No 47300.00
g 10HP, 5-10 Stage 1 No 48950.00
h 10HP, 12-16 Stage 1 No 50600.00
i 10HP, 20-24 Stage 1 No 57200.00
j 12.5HP, 8-12 Stage 1 No 50600.00
k 12.5HP, 16-24 Stage 1 No 59400.00
l 15HP, 8-12 Stage 1 No 63690.00
m 15HP, 16-24 Stage 1 No 65780.00
n 20HP 10-20 Stage 1 No 76450.00
o 20HP 30-40 Stage 1 No 79750.00
p 25HP 20-25 Stage 1 No 86900.00

Supply and Transportation of ……….., 5star rated submersible motor pumpset, confirming
to IS 8034 and motor confirming to IS 9283 with water proof winding,Pump shall be
suitable for various delivery head and discharge with stainless steel shaft. Motor suitable
208 ELEC-5.4.6
for working on 415V ± 10% , Three Phase 50 Hz AC supply,etc complete for 6" Bore well.
Makes: Pluga / U-Neel / Sterling /Kumar / Unnati zen/Duke/Lada/Ellen/ Suguna/UNItek
/KSP (Karunya) /Anco/ Sabar/Fitwell/Polycab/Deccan/Karvel/ SILVER Category - II

a 3.00HP 5-10 Stage 1 No 29700.00


b 5.00HP, 5-10Stage 1 No 33330.00
c 5.00HP, 12-16 Stage 1 No 38115.00
d 7.50HP, 5-10 Stage 1 No 37510.00
e 7.50HP, 12-16 Stage 1 No 41580.00
f 7.50HP, 20-24 Stage 1 No 42570.00
g 10HP, 5-10 Stage 1 No 44000.00
h 10HP, 12-16 Stage 1 No 45650.00
i 10HP, 20-24 Stage 1 No 51480.00
j 12.5HP, 8-12 Stage 1 No 45650.00
k 12.5HP, 16-24 Stage 1 No 53460.00
l 15HP, 8-12 Stage 1 No 57310.00
m 15HP, 16-24 Stage 1 No 59180.00
n 20HP 10-20 Stage 1 No 68750.00
o 20HP 30-40 Stage 1 No 71720.00
SINGLE PHASE OPEN WELL SUBMERSIBLE MOTOR PUMP SETS
Supply and Transportation of ……...Single phase open well submersible motor pumpset
209 ELEC-5.4.7 confirms to IS 14220 : 1994. Makes: Category I of Kirloskar / Crompton / Texmo / CRI /
KSB/Lubi/PSG/ AryenVarsha/Falcon
a 1.00HP 1 No 13552.00
b 1.50HP 1 No 15246.00
c 3.00HP 1 No 20812.00
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
Supply and Transportation of ……...Single phase open well ISI submersible motor pumpset
confirms to IS 14220 : 1994. Makes: Category II of Pluga / U-Neel / Sterling / Kumar /
210 ELEC-5.4.8
Unnati zen/Duke/LDK/Ellen/ Suguna/UNItek /KSP (Karunya) / Anco/
abar/Fitwell/Deccan/Karvel/ SILVER
a 1.00HP 1 No 12705.00
b 1.50HP 1 No 14520.00
c 3.00HP 1 No 19784.00
THREE PHASE OPEN WELL SUBMERSIBLE PUMP SETS
Supply and Transportation of ……... Three phase open well ISI submersible motor
211 ELEC-5.4.9 pumpset confirms to IS 14220 : 1994. Makes: Kirloskar / Crompton / Texmo / CRI /
KSB/Lubi /PSG/ AryenVarsha/Falcon Category I
a 3.00HP(65x50) 1 No 20812.00
b 5.00HP(75x65) 1 No 26015.00
c 7.50HP(100x75) 1 No 30855.00
d 10.00HP(100x75) 1 No 39325.00
Supply and Transportation of ……... Three phase open well ISI submersible motor
pumpset confirms to IS 14220 : 1994. Makes: Pluga / U-Neel / Sterling / Kumar / Unnati
212 ELEC-5.4.10
zen/Duke/LDK/Ellen/ Suguna/UNItek/ KSP(Karunya) /Polycab/ Anco/ Sabar
Fitwell/Deccan/Karvel/ SILVER Category II
a 3.00HP(65x50) 1 No 19965.00
b 5.00HP(75x65) 1 No 24442.00
c 7.50HP(100x75) 1 No 29040.00
d 10.00HP(100x75) 1 No 37510.00
SINGLE PHASE MONO BLOCK MOTOR PUMP SETS.
Supply and Transportation of ……. Single phase Mono block CI body motor pumpset
213 ELEC-5.4.11 confirms to IS 9079:2002 Makes: Kirloskar / Crompton / Texmo / CRI / KSB/Lubi / Havells
Hi-flow V2 / PSG/AryenVarsha/Falcon Category I
a 0.5HP(25x25mm) 1 No 6050.00
b 1.0HP (25x25mm) 1 No 8652.00
c 1.5HP(32x25mm) 1 No 11616.00
Supply and Transportation of ……. Single phase Mono block CI body motor pumpset
confirms to IS 9079:2002 Makes: Pluga / U-Neel / Sterling /Kumar / Unnati
214 ELEC-5.4.12
zen/Ellen/LDK/Suguna/ UNItek/Polycab/Anco/ Sabar/Fitwell/Deccan/Karvel / SILVER
Category II
a 0.5HP(25x25mm) 1 No 5687.00
b 1.0HP (25x25mm) 1 No 8228.00
c 1.5HP(32x25mm) 1 No 11072.00
Supply and Transportation of………. Three phase ISI self priming Mono block IP44 motor
215 ELEC-5.4.13 pumpset. Makes: Category I of Kirloskar / Crompton / Texmo / CRI / KSB /Lubi/
AryenVarsha/Falcon
a 2.00HP(40x40mm) 1 No 17182.00
b 3.0HP (50x50mm) 1 No 23232.00
c 5.00HP(80x80mm) 1 No 28072.00
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
Supply and Transportation of………. Three phase ISI self priming Mono block IP44 motor
216 ELEC-5.4.14 pumpset. Makes: Category II of Pluga / U-Neel / Sterling /Kumar / Unnati
zen/Ellen/LDK/Suguna/ UNItek/Polycab/Anco/ Sabar/Fitwell/Deccan/Karvel/ SILVER

a 2.00HP(40x40mm) 1 No 16335.00
b 3.0HP (50x50mm) 1 No 22143.00
c 5.00HP(80x80mm) 1 No 26862.00
CONTROL PANEL BOARD FOR MOTOR PUMPSETS
Fabrication , transportation and supply of suitable size panel
board for single phase submersible motor up to 1.5 HP
consisting of relay, Contactor, starting and running capacitors,
217 ELEC-5.4.15 1 No 5445.00
Voltmeter, Ammeter, indicator lamps, MCB , on/off switch
including supply and fixing of DOL starter. Make of Category I
C&S/LTLK/ Seimens/ BCH/KSP(Karunya)/ Crompton. complete.,

Fabrication , transportation and supply of suitable size panel


board for single phase submersible motor 2 to 3HP consisting of
relay, Contactor, starting and running capacitors, Voltmeter,
218 ELEC-5.4.16 1 No 7260.00
Ammeter, indicator lamps, MCB , on/off switch including supply
and fixing of DOL starter of make Category - II C&S/LTLK/
Seimens/ BCH/KSP(Karunya)/ Crompton. complete.,

Fabrication , transportation and supply of wall mounted control


panel board of size 600x600x250mm made of 18 SWG CRCA
sheet steel enclosure, 14 SWG mounting plate for cable entry
fabricated , painted with two coats of Red oxide primer and two
coats of Grey paint, lock and key arrangements two side lovures
with weld mesh inside etc., complete consisting of the following
equipment with all internal wiring using L&T / Finolex copper
FRLS cables of suitable size and capacity and cable clamp etc
complete for 3 phase motor pump sets. (1) Voltmeter ; 0-500
219 ELEC-5.4.17 V 96x96mm size - 1No Makes: L&T / C&S / SALZAR / HPL/ AEI /
Meco / Rishab (2) 0 to 20 Amps / 0- 50 Amps Ammeter
(96x96mm size) - 1No. L&T / C&S / SALZAR / HPL/ AEI / Meco /
Rishab (3) Single phase preventor of suitable range - 1No.Makes:
L&T / Minilec / Powertec. 32 A TP, 10KA MCB. Makes: Legrand /
Schneider capacitor Makes: L&T / Siemens / Schneider /
Epcos/Havells. (4) 32 A TP, 10KA MCB. - 1No (5) Indication
lamps (R-Y-B) with switch control - 1set (6) Voltmeter &
Ammeter selector switch - 2 Nos of Supply and fixing of ISI Mark
suitable capacitor

Upto 7.5 HP with DOL Starter Make C&S.Crompton / L&T


220 a 1 No 9680.00
/KSP/ Siemens/BCH.
Above 7.5 HP to 12.5 HP with Star-Delta Starter Make
221 b 1 No 16940.00
C&S/Crompton / L&T / Siemens/BCH.
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
Above 15 HP up to 20 HP with Automatic Star Delta Starter
222 c 1 No 22385.00
Make C&S/Crompton / L&T / Siemens/BCH.
Supply & Fixing of D.O.L Starter 250V, Single phase, 50Hz. With
SS enclouser comprising of contactor with bimetalic relay with
223 ELEC-5.4.18 1 No 1150.00
necessary push buttons, etc., complete suitable for…… Makes:
Siemens / Crompton / L&T (MF1)
Supply & Fixing of D.O.L Starter 415V, 3 phase, 50Hz.. enclosed
with no volt coil and overload protection with necessary
224 ELEC-5.4.19
materials, etc., complete suitable for…… Makes: Siemens /
Crompton / L&T (MK2 DOL)
a Up to 3 HP 1 No 2057.00
b 5 to 7.50 HP 1 No 2299.00
c 10 HP 1 No 2541.00
Supply & Fixing of Star-Delta Starter 415V, 3 phase, 50Hz..
enclosed with no volt coil, overload protection and single phase
225 ELEC-5.4.20
preventor , etc., complete suitable for Makes: Siemens /
Crompton / L&T (MU1 DOL)
a 12.50 to 15HP 8228.00
b 25HP to 30HP 13576.00
LAYING AND JOINTING PVC PIPES (UP TO 50MM DIA)
Laying, jointing of PVC/HDPE pipes as per BIS No.7634 part-III/75 for PVC and BIS No.7634 part-II/75
12-b for HDPE pipes including trench excavation and refilling. (If the depth of trench is more than 0.50 Mts
separate rates to be worked out)
50 mm dia 1 Rmt 43.00
40mm dia 1 Rmt 43.00
32mm dia 1 Rmt 43.00
25mm dia 1 Rmt 39.00
20mm dia 1 Rmt 37.00
LABOUR CHARGES FOR FIXING AIR VALVES KINETIC AIR VALVES
Labour charges for fixing Air valves including boring the mains and threading the bore fixing nipple
17
etc., complete

50mm dia 1 No 217.00


65mm dia 1 No 230.00
80mm dia 1 No 249.00
100mm dia 1 No 295.00
125mm dia 1 No 460.00
150mm dia 1 No 504.00
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
Labour charges for fixing Kinetic Air Valves with isolating Sluice valves, Double Air valves/ Air Cushion
18
valve excluding cost of jointing materials such as bolts, nuts and rubber insertions etc., complete.

25mm dia 1 No 208.00


40mm dia 1 No 235.00
50mm dia (Double Air Valves) 1 No 250.00
65mm dia (Double Air Valves) 1 No 268.00
80mm dia (Double Air Valves) 1 No 293.00
100mm dia (Double Air Valves) 1 No 341.00
125mm dia (Double Air Valves) 1 No 534.00
150mm dia (Double Air Valves) 1 No 584.00
CUTTING AC PIPES
23 Cutting A.C. Pipes without water in mains Dia. of pipes
80mm dia 1 No 42.00
100mm dia 1 No 42.00
125mm dia 1 No 42.00
150mm dia 1 No 42.00
200mm dia 1 No 44.00
250mm dia 1 No 72.00
300mm dia 1 No 72.00
350mm dia 1 No 89.00
400mm dia 1 No 98.00
450mm dia 1 No 121.00
500mm dia 1 No 135.00
600mm dia 1 No 149.00

VITREOUS CHINAWARE - SANITARY APPLIANCES as per IS:2556 – 1974


Supplying & Fixing Indian pattern white glazed W.C 1st quality ISI
133 BMW-D.01 marked conforming to IS:2556-Part-3-1981 with"P" or "S" trap: 1 No 1036.00
580 mm Long
Supplying & Fixing Indian pattern white glazed W.C 1st quality ISI
134 BMW-D.02 marked conforming to IS:2556-Part-3-1981 with"P" or "S" trap: 1 No 1036.00
630 mm Long

Supplying and Fixing European Water Closet of 1st quality


145 BMW-D.13 1 No 1979.00
conforming to IS:2556-Part-2-1973 of white glazed with 'P' trap

Supplying and Fixing European Water Closet of 1st quality


146 BMW-D.14 1 No 1889.00
conforming to IS:2556-Part-2-1973 of white glazed with 'S' trap
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
UPVC PIPES AND FITTINGS
Supply and delivery of ................. for submersible motors with both ends square
threaded, with rubber 'O' rings with smooth inner surface which can take the minimum
226 ELEC-5.4.21
load of 2100 to 4000 Kgs weights. Makes: Ashirvad / Finolex / Waterflo
/Sudhakar/Precision
42 / 32mm dia UPVC raising column pipe, with standing upto 20
A 1 Rmt 157.00
Kgs / CM2 upto 200 Mts
48 / 40mm UPVC pipe with standing upto 20 Kgs / CM2 upto 200
B 1 Rmt 194.00
Mts
60/50 mm UPVC pipe with standing upto 20 Kgs / CM2 upto 200
C 1 Rmt 278.00
Mt
75/65 mm UPVC pipe with standing upto 20 Kgs / CM2 upto 200
D 1 Rmt 375.00
Mts
88/80 mm UPVC pipe with standing upto 20 Kgs / CM2 upto 200
E 1 Rmt 539.00
Mts
Supply and delivery of heavy duty couplings 42/32 mm UPVC
227 ELEC-5.4.22 pipe (27 Kgs / CM 2 ) capable of with standing up to 27 Kgs / CM2 1 No 48.00
above 200 mts and upto 300 mts
Supply and delivery of heavy duty couplings 48/40 mm UPVC
228 ELEC-5.4.23 pipe (27 Kgs / CM 2 ) capable of with standing up to 27 Kgs / CM2 1 No 67.00
above 200 mts and upto 300 mts
Supply and delivery of heavy duty couplings 60/50 mm UPVC
229 ELEC-5.4.24 pipe (27 Kgs / CM 2 ) capable of with standing up to 27 Kgs / CM2 1 No 73.00
above 200 mts and upto 300 mts
Supply and delivery off heavy duty couplings 75/65 mm UPVC
230 ELEC-5.4.25 pipe (27 Kgs / CM 2 ) capable of with standing up to 27 Kgs / CM2 1 No 85.00
above 200 mts and upto 300 mts
Supply and delivery of heavy duty couplings 88/80 mm UPVC
231 ELEC-5.4.26 pipe (27 Kgs / CM 2 ) capable of with standing up to 27 Kgs / CM2 1 No 97.00
above 200 mts and upto 300 mts
RATES FOR CPVC PIPES
Supply and Fixing of Premium make CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and
are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are
made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS
15778:2007)
814 BMW-I-220 15.90mm OD Pipe - SDR 13.5 1 Rmt 59.00
815 BMW-I-221 22.20mm OD Pipe - SDR 13.5 1 Rmt 94.00
816 BMW-I-222 28.60mm OD Pipe - SDR 13.5 1 Rmt 136.00
817 BMW-I-223 34.90mm OD Pipe - SDR 13.5 1 Rmt 214.00
818 BMW-I-224 41.30mm OD Pipe - SDR 13.5 1 Rmt 295.00
819 BMW-I-225 54mm OD Pipe - SDR 13.5 1 Rmt 485.00
820 BMW-I-226 15.90mm OD Pipe - SDR 11 1 Rmt 68.00
821 BMW-I-227 22.20mm OD Pipe - SDR 11 1 Rmt 103.00
822 BMW-I-228 28.60mm OD Pipe - SDR 11 1 Rmt 160.00
823 BMW-I-229 34.90mm OD Pipe - SDR 11 1 Rmt 254.00
824 BMW-I-230 41.30mm OD Pipe - SDR 11 1 Rmt 348.00
825 BMW-I-231 54mm OD Pipe - SDR 11 1 Rmt 535.00
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
CI RATES, RUBBER PACKING, BOLTS AND NUTS
Manufacture, Supply and Delivery of Cast Iron Pipes and Fittings (spls.) Conforming to
IS. No. 7181/1986, 5531/1988, 3950/1979 and C.I.D Joints confirming to is
No.8794/1988 at site of work anywhere in A.P. Including, loading, unloading, 1 Kg 95.77
transportation to site of work stacking at site transit risk and package, excluding taxes
and duties. of I.S. No. 7181/1986 5531/1988 3950/1979 & 8794/1988

Supply and delivery of rubber packing of 3mm or 6mm thick including taxes
1 Kg 93.00
and conveyance etc., complete.,
Supply and delivery of 1/2" to 1" dia bolts and nuts with double washers including taxes
and conveyance etc.,. Complete.,
1 Kg 111.00

GI SPECIALS
212 BMW F 01 Supplying and Fixing of 12.70mm 1st quality GI Union 1 No 42.00
213 BMW F 02 Supplying and Fixing of 19.05mm 1st quality GI Union 1 No 51.00
214 BMW F 03 Supplying and Fixing of 25.40mm 1st quality GI Union 1 No 77.00
215 BMW F 04 Supplying and Fixing of 31.75mm 1st quality GI Union 1 No 95.00
216 BMW F 05 Supplying and Fixing of 38.10mm 1st quality GI Union 1 No 114.00
217 BMW F 06 Supplying and Fixing of 50.80mm 1st quality GI Union 1 No 142.00
218 BMW F 07 Supplying and Fixing of 25.40mm dia GI Connector 1 No 85.00
219 BMW F 08 S & F of 12.70mm GI "T" A Class 1st quality 1 No 52.00
220 BMW F 10 S & F of 31.75mm dia GI "T" 1st quality 1 No 76.00
221 BMW F 09 S & F of 31.75mm dia GI Bend 1st quality 1 No 77.00
222 BMW F 11 S & F 25.40mm Copper ball cock ith PVC ball Indian make ISI mark 1 No 448.00
223 BMW F 12 Labour charges for fixing 25.40mm copper ball cock 1 No 50.00
224 BMW F 13 S & F 19.05mm Copper ball cock ith PVC ball Indian make ISI mark 1 No 367.00
225 BMW F 14 Labour charges for fixing 25.40mm copper ball cock 1 No 45.00
226 BMW F 15 S & F 12.70mm Copper ball cock ith PVC ball Indian make ISI mark 1 No 241.00
227 BMW F 16 Labour charges for fixing 25.40mm copper ball cock 1 No 50.00
S& F of Gun metal Gate (GM Peet) valve as per IS-778 class I, Indian
228 BMW F 17
make heavy type-25mm NB size
1 No 1165.00
229 BMW F 18 Labour charges for fixing 25mm GM Gate valve 1 No 50.00
S& F of Gun metal Gate (GM Peet) valve as per IS-778 class I, Indian
230 BMW F 19
make heavy type-20mm NB size
1 No 812.00
231 BMW F 20 Labour charges for fixing 20mm GM Gate valve 1 No 50.00
S& F of Gun metal Gate (GM Peet) valve as per IS-778 class I, Indian
232 BMW F 21
make heavy type-15mm NB size
1 No 604.00
233 BMW F 22 Labour charges for fixing 15mm GM Gate valve 1 No 50.00
S& F of Gun metal Gate (GM Peet) valve as per IS-778 class I, Indian
234 BMW F 23
make heavy type-32mm NB size
1 No 1768.00
235 BMW F 24 Labour charges for fixing 32mm GM Gate valve 1 No 43.00
S& F of Gun metal Gate (GM Peet) valve as per IS-778 class I, Indian
236 BMW F 25
make heavy type-40mm NB size
1 No 2389.00
237 BMW F 26 Labour charges for fixing 40mm GM Gate valve 1 No 75.00
S& F of Gun metal Gate (GM Peet) valve as per IS-778 class I, Indian
238 BMW F 27
make heavy type-50mm NB size
1 No 3498.00
239 BMW F 28 Labour charges for fixing 50mm GM Gate valve 1 No 101.00
S& F of Gun metal Gate (GM Peet) valve as per IS-778 class I, Indian
240 BMW F 29
make heavy type-65mm NB size
1 No 5398.00
241 BMW F 30 Labour charges for fixing 65mm GM Gate valve 1 No 95.00
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
S& F of Gun metal Gate (GM Peet) valve as per IS-778 class I, Indian
242 BMW F 31
make heavy type-80mm NB size
1 No 7995.00
243 BMW F 32 Labour charges for fixing 80mm GM Gate valve 1 No 149.00
S& F of Gun metal (GM) Horizontal check (Non return) valve as per IS-
244 BMW F 33
778 class I, heavy duty -15mm NB size
1 No 450.00
245 BMW F 34 Labour charges for fixing 15mm GM HC Non return valve 1 No 62.00
S& F of Gun metal (GM) Horizontal check (Non return) valve as per IS-
252 BMW F 41
778 class I, heavy duty -20mm NB size
1 No 653.00
253 BMW F 42 Labour charges for fixing 20mm GM HC Non return valve 1 No 61.00
S& F of Gun metal (GM) Horizontal check (Non return) valve as per IS-
246 BMW F 35
778 class I, heavy duty -25mm NB size
1 No 1019.00
247 BMW F 36 Labour charges for fixing 25mm GM HC Non return valve 1 No 75.00
S& F of Gun metal (GM) Horizontal check (Non return) valve as per IS-
248 BMW F 37
778 class I, heavy duty -40mm NB size
1 No 2069.00
249 BMW F 38 Labour charges for fixing 40mm GM HC Non return valve 1 No 126.00
S& F of Gun metal (GM) Horizontal check (Non return) valve as per IS-
250 BMW F 39
778 class I, heavy duty - 50mm NB size
1 No 2825.00
251 BMW F 40 Labour charges for fixing 50mm GM HC Non return valve 1 No 126.00
S& F of Gun metal (GM) Vertical check (Non return) valve as per IS-778
254 BMW F 43
class I, heavy duty - 15mm NB size
1 No 424.00
255 BMW F 44 Labour charges for fixing 15mm GM VC Non return valve 1 No 61.00
S& F of Gun metal (GM) Vertical check (Non return) valve as per IS-778
256 BMW F 45
class I, heavy duty - 20mm NB size
1 No 550.00
257 BMW F 46 Labour charges for fixing 20mm GM VC Non return valve 1 No 61.00
S& F of Gun metal (GM) Vertical check (Non return) valve as per IS-778
258 BMW F 47
class I, heavy duty - 25mm NB size
1 No 826.00
259 BMW F 48 Labour charges for fixing 25mm GM VC Non return valve 1 No 61.00
S& F of Gun metal (GM) Vertical check (Non return) valve as per IS-778
260 BMW F 49
class I, heavy duty - 32mm NB size
1 No 1135.00
261 BMW F 50 Labour charges for fixing 32mm GM VC Non return valve 1 No 61.00
S& F of Gun metal (GM) Vertical check (Non return) valve as per IS-778
262 BMW F 51
class I, heavy duty - 40mm NB size
1 No 1370.00
263 BMW F 52 Labour charges for fixing 40mm GM VC Non return valve 1 No 61.00
S& F of Gun metal (GM) Vertical check (Non return) valve as per IS-778
264 BMW F 53
class I, heavy duty - 50mm NB size
1 No 2168.00
265 BMW F 54 Labour charges for fixing 50mm GM VC Non return valve 1 No 61.00
S & F Gunmetal (GM) Ball valve with SS Ball and SS spindle as per IS-
266 BMW F 55
Class-I, Indian make heavy type-15mm NB size
1 No 456.00
267 BMW F 56 Labour charges for fixing 15mm GM Ball valve 1 No 61.00
S & F Gunmetal (GM) Ball valve with SS Ball and SS spindle as per IS-
268 BMW F 57
Class-I, Indian make heavy type-20mm NB size
1 No 592.00
269 BMW F 58 Labour charges for fixing 20mm GM Ball valve 1 No 61.00
S & F Gunmetal (GM) Ball valve with SS Ball and SS spindle as per IS-
270 BMW F 59
Class-I, Indian make heavy type-25mm NB size
1 No 864.00
271 BMW F 60 Labour charges for fixing 25mm GM Ball valve 1 No 61.00
S & F Gunmetal (GM) Ball valve with SS Ball and SS spindle as per IS-
272 BMW F 61
Class-I, Indian make heavy type-32mm NB size
1 No 1563.00
273 BMW F 62 Labour charges for fixing 32mm GM Ball valve 1 No 61.00
S & F Gunmetal (GM) Ball valve with SS Ball and SS spindle as per IS-
274 BMW F 63
Class-I, Indian make heavy type-40mm NB size
1 No 2340.00
275 BMW F 64 Labour charges for fixing 40mm GM Ball valve 1 No 61.00
S & F Gunmetal (GM) Ball valve with SS Ball and SS spindle as per IS-
276 BMW F 65
Class-I, Indian make heavy type-50mm NB size
1 No 4073.00
277 BMW F 66 Labour charges for fixing 50mm GM Ball valve 1 No 61.00
Item
Sl. Code/
Description of item Unit Basic Rates
No. CFMS
Code
SOLVENT CEMENT
479 BMW G.145 50ml Solvent cement 1 No 15.00
480 BMW G.146 100ml Solvent cement 1 No 23.00
481 BMW G.147 250ml Solvent cement 1 No 55.00
482 BMW G.148 500ml Solvent cement 1 No 107.00
483 BMW G.149 1000ml Solvent cement 1 No 210.00
STAINLESS STEEL NIPPALS (SSR 2016-17) (For Submersible pump sets errection)
870 ELEC-5.4.69 Supplying & Fixing of 32x25mm dia Stainless steel nipple 1 No 150.00
871 ELEC-5.4.70 Supplying & Fixing of 40x32mm dia Stainless steel nipple 1 No 175.00
872 ELEC-5.4.71 Supplying & Fixing of 50x40mm dia Stainless steel nipple 1 No 375.00
MS CLAMP SET (2 Nos) WITH 8 Nos BOLTS AND NUTS (SSR 2016-17)
Supplying and fixing of MS Clamp set (2 Nos) suitable for 32mm
873 ELEC-5.4.72 1 Set 950.00
dia pipe with 8 Nos bolts and nuts
Supplying and fixing of MS Clamp set (2 Nos) suitable for 40mm
874 ELEC-5.4.73 1 Set 1200.00
dia pipe with 8 Nos bolts and nuts
BRASS NON RETURN VALVE (SSR 2016-17)
Supplying and fixing of 32mm dia Brass Non Return Valve ISI
875 ELEC-5.4.74 1 No 500.00
Make
Supplying and fixing of 40mm dia Brass Non Return Valve ISI
876 ELEC-5.4.75 1 No 750.00
Make
Supply, delivery and staking of Alumino-Ferric(ALUM) as per I.S
299:2012 including cost of material, conveyance , stacking at the Rs. 9.50 8.48
35 1
location specified by the Department and all taxes, duties and with GST without GST
levies etc., complete., (SSR 2018-19)
Supply, delivery and staking of Bleaching powder as per I.S
1065:1989 including cost of material, conveyance , stacking at Rs.26.00 23.21
35 5
the location specified by the Department and all taxes, duties with GST without GST
and levies etc., complete., (SSR 2018-19)
RATES FOR CI D/F NON RETURN VALVE (SSR 2012-13)
Manufacture, supply and delivery of CI D/F Non Return valve Heavy Duty round body conforming to IS 5312
Part 1/1984 excluding transportation, Central Excise duty and sales tax etc., complete.,

Sl. No. Dia in MM Rate per Each P N - 1.0 P N - 1.6

3 50 Rate per Each 2348.00


3 65 Rate per Each 2935.00
3 80 Rate per Each 3523.00
3 100 Rate per Each 4696.00
3 125 Rate per Each 5870.00
3 150 Rate per Each 7043.00 8803.00
3 200 Rate per Each 14049.00 17561.00
RATES OF CID JOINTS FOR THE YEAR 2022-23
Cost of Total rate Grand cost of
Total
Size of Weight rubber of rubber CID Joint set
weight of Bolts and Total cost
CID of CID Total cost rings set rings set including
Rate/Kg Nut and Nuts of Bolts
Joint Joints in of CID Joint (3 Nos (Above rubber rings,
Bolts in cost/ Kg and Nuts
in mm Kgs for AC rate/3) x bolts and
Kgs
cupling) 2 nuts

CLASS - 15
80 3.00 95.77 287.31 0.390 111.00 43.29 89.00 59.33 389.93
100 3.80 95.77 363.93 0.435 111.00 48.29 110.00 73.33 485.54
125 4.80 95.77 459.70 0.580 111.00 64.38 142.00 94.67 618.74
150 6.30 95.77 603.35 0.620 111.00 68.82 180.00 120.00 792.17
200 9.00 95.77 861.93 1.160 111.00 128.76 187.00 124.67 1115.36
250 12.50 95.77 1197.13 1.160 111.00 128.76 217.00 144.67 1470.55
300 15.40 95.77 1474.86 1.450 111.00 160.95 217.00 144.67 1780.47
350 26.50 95.77 2537.91 1.950 111.00 216.45 246.00 164.00 2918.36
400 31.40 95.77 3007.18 1.950 111.00 216.45 301.00 200.67 3424.29
450 38.00 95.77 3639.26 2.275 111.00 252.53 353.00 235.33 4127.12
500 54.10 95.77 5181.16 4.960 111.00 550.56 408.00 272.00 6003.72

CLASS - 20
80 3.10 95.77 296.89 0.390 111.00 43.29 89.00 59.33 399.51
100 3.90 95.77 373.50 0.435 111.00 48.29 110.00 73.33 495.12
125 5.40 95.77 517.16 0.580 111.00 64.38 142.00 94.67 676.20
150 6.40 95.77 612.93 0.620 111.00 68.82 180.00 120.00 801.75
200 9.70 95.77 928.97 1.160 111.00 128.76 187.00 124.67 1182.40
250 13.80 95.77 1321.63 1.160 111.00 128.76 217.00 144.67 1595.05
300 17.50 95.77 1675.98 1.450 111.00 160.95 217.00 144.67 1981.59
350 28.10 95.77 2691.14 1.950 111.00 216.45 246.00 164.00 3071.59
400 33.80 95.77 3237.03 1.950 111.00 216.45 301.00 200.67 3654.14
450 40.60 95.77 3888.26 2.275 111.00 252.53 353.00 235.33 4376.12
500 56.60 95.77 5420.58 4.960 111.00 550.56 408.00 272.00 6243.14

CLASS - 25
80 3.20 95.77 306.46 0.390 111.00 43.29 89.00 59.33 409.09
100 4.00 95.77 383.08 0.435 111.00 48.29 110.00 73.33 504.70
125 5.60 95.77 536.31 0.580 111.00 64.38 142.00 94.67 695.36
150 6.80 95.77 651.24 0.620 111.00 68.82 180.00 120.00 840.06
200 10.10 95.77 967.28 1.160 111.00 128.76 187.00 124.67 1220.70
250 14.30 95.77 1369.51 1.160 111.00 128.76 217.00 144.67 1642.94
300 18.10 95.77 1733.44 1.450 111.00 160.95 217.00 144.67 2039.05
350 29.80 95.77 2853.95 1.950 111.00 216.45 246.00 164.00 3234.40
400 35.80 95.77 3428.57 1.950 111.00 216.45 301.00 200.67 3845.68
450 42.80 95.77 4098.96 2.275 111.00 252.53 353.00 235.33 4586.81
500 60.10 95.77 5755.78 4.960 111.00 550.56 408.00 272.00 6578.34
IMPORTANT DATAS FOR THE YEAR 2022-23
Quantity Description of the work Rate Per Amount

Earth work excavation in all kinds of soils including boulders upto 0.30m dia for foundation
of structures as per drawings and technical specifications clause 305.1 including setting out,
construction of shoring and bracing removal of stumps and other deleterious materials and
1
disposal upto lead of 50mts, dressing of sides and bottom and back filling in trenches with
excavated suitable material including seigniorage charges as per technical specifications 305
MORD/304 MORTH with manual up to 3 Mts depth (IC No: FNDN-1)

0.364 days Man Mazdoor per 1 cum 525.00 1 day 191.10


1 Cum Add 13.615% Contractor`s Profit and OH Charges 1 Cum 26.02
Total : 1 Cum 217.12
Earth work excavation in all kinds of soils/HDR including boulders upto 0.30 mts dia for
foundation of canal cross drainage and other appurtenant structures and placing excavated
2 stuff neatly in specified dump area or disposing off the same as directed etc., complete with
initial lead upto 10mts and initial lift upto 1.50mts including seigniorage charges etc.,
complete., ( Output 2.50 cum per day) with manual upto 3 Mts depth.
0.40 days Man Mazdoor per 1 cum 525.00 1 day 210.00
1 Cum Add 13.615% Contractor`s Profit and OH Charges 1 Cum 28.59
Total: 1 Cum 238.59

Earth work excavation in soft rock (including F&F) without blasting, including boulders upto
0.30m dia for foundations of canal cross drainage and other appurtenant structures and
3 placing excavated stuff neatly in specified dump area or disposing off the same as directed
etc., complete with initial lead upto 10mts and initial lift upto 1.50mts including seigniorage
charges etc., complete., ( Output 1.33 cum per day) with manual upto 3 Mts depth

0.7519 days Man Mazdoor per 1 cum 525.00 1 day 394.75


1 Cum Add 13.615% Contractor`s Profit and OH Charges 1 Cum 53.74
Total: 1 cum 448.49
Earth work excavation in hard rock without blasting, including boulders upto 0.30m dia for
foundations of canal cross drainage and other appurtenant structures and placing excavated
4 stuff neatly in specified dump area or disposing off the same as directed etc., complete with
initial lead upto 10mts and initial lift upto 1.50mts including seigniorage charges etc.,
complete., ( Output 0.67 cum per day) with manual upto 3 Mts depth.
1.4925 days Man Mazdoor per 1 cum 525.00 1 day 783.56
1 Cum Add 13.615% Contractor`s Profit and OH Charges 1 Cum 106.68
Total: 1 cum 890.24
Earth work excavation in all kinds of soils including boulders upto 0.30m dia for foundation
of structures as per drawings and technical specifications clause 305.1 including setting out,
construction of shoring and bracing removal of stumps and other deleterious materials and
5
disposal upto lead of 50mts, dressing of sides and bottom and back filling in trenches with
excavated suitable material including seigniorage charges as per technical specifications 305
MORD/304 MORTH with manual 3 to 6 Mts depth.
0.468 days Man Mazdoor per 1 cum 525.00 1 day 245.70
1 Cum Add 13.615% Contractor`s Profit and OH Charges 1 Cum 33.45
Total: 1 Cum 279.15
Quantity Description of the work Rate Per Amount
Earth work excavation in all kinds of soils including boulders upto 0.30m dia for foundation
of structures as per drawings and technical specifications clause 305.1 including setting out,
construction of shoring and bracing removal of stumps and other deleterious materials and
6 disposal upto lead of 50mts, dressing of sides and bottom and back filling in trenches with
excavated suitable material including seigniorage charges as per technical specifications 305
MORD/304 MORTH with machinery upto 3 Mts depth. (Taking output 240 cum) IC No: FNDN-
1 (B)
8.32 days Man Mazdoor 525.00 1 day 4368.00
6.00 hours Hydraulic excavator 1 cum bucket (Shovel 0.85 cum) 3483.70 1 hour 20902.20
For 240 cum 25270.20
1 Cum Per 1 Cum quantity 105.29
1 Cum Add 13.615% Contractor`s Profit and OH Charges 1 Cum 14.34
Total: 1 Cum 119.63
Removal of silt and silt mixed with sand from canal bed in dry condition including disposing
7 off the same in spoil bank or on the canal embankment in layers as directed etc., complete.,
with initial lead upto 50 mts and all lifts (IRR-PWW-3-20) (1 cum)
0.40 days Mazdoor 525.00 1 day 210.00
Add 13.615% Contractor`s Profit and OH Charges 28.59
Total 1 Cum 238.59
Removal of silt or silt mixed with sand from canal bed in slussy condition including disposing
8 off the same in spoil bank or on the canal embankment in layers as directed etc., complete.,
with initial lead upto 50 mts and all lifts (IRR-PWW-3-21)(1 Cum)
0.50 days Mazdoor 525.00 1 day 262.50
Add 13.615% Contractor`s Profit and OH Charges 35.74
Total: 1 Cum 298.24
Dismentalling of Lime concrete including stacking the material at road side and all labour
9
charges etc., complete., (Unit - 1cum)
1.22 days Mazdoor 525.00 1 day 640.50
Add 13.615% Contractor`s Profit and OH Charges 87.20
Total: 1 Cum 727.70
Dismentalling of cement concrete up to 0.15Mt thickness including stacking the material at
10
road side and all labour charges etc., complete., (Unit - 1cum)
2.44 days Mazdoor 525.00 1 day 1281.00
Add 13.615% Contractor`s Profit and OH Charges 174.41
Total: 1 Cum 1455.41
Dismentalling of cement concrete above 0.15Mts thickness including stacking the material at
11
road side and all labour charges etc., complete., (Unit - 1cum)
4.88 days Mazdoor 525.00 1 day 2562.00
Add 13.615% Contractor`s Profit and OH Charges 348.82
Total: 1 Cum 2910.82
Dismentalling of Reinforced cement concrete (RCC) including stacking the material at road
12
side and all labour charges etc., complete., (Unit - 1cum)
4.32 days Mazdoor 525.00 1 day 2268.00
Add 13.615% Contractor`s Profit and OH Charges 308.79
Total: 1 Cum 2576.79
Quantity Description of the work Rate Per Amount
Removing of kadapa slabs flooring on sand bed including stacking at site for re-use including
13
all labour charges etc., complete.,
10.00 Sqm SSR Sl.No: 873/ BMT-S.11 84.00 10 Sqm 84.00
Add 13.615% Contractor`s Profit and OH Charges 11.44
Total: 1 Cum 95.44
Teak wood wrought and put up of 3 Mts length and below including all labour charges
14
stacking at road side and all labour charges etc., complete., (BLD-CSTN-11-1 to 11-3)
5.31 days First class Mason 630.00 1 day 3345.30
12.39 days Second class Mason 565.00 1 day 7000.35
8.80 days Mazdoor 525.00 1 day 4620.00
14965.65
Add 13.615% Contractor`s Profit and OH Charges 2037.57
Total: 1 Cum 17003.22
Augoring and boring of holes in situ for bored cast-insitu RCC piles for building foundations in
loamy, clayey soil like black cotton soils and ordinary soils without under reams as per IS 2911-
15 1980 as per approved designs including all operations, incidental, labour charges, hire charges
of machinery, augur bore drill and shell equipment etc., complete., for all depths and for
finished item of work upto 300mm dia piles. (Sl.No: 20 A of SSR Data)

0.526 days Mazdoor 525.00 1 day 276.15


Add 13.615% Contractor`s Profit and OH Charges 37.60
Total: 1 Rmt 313.75
Augoring and boring of holes in situ for bored cast-insitu RCC piles for building foundations in
loamy, clayey soil like black cotton soils and ordinary soils without under reams as per IS 2911-
16 1980 as per approved designs including all operations, incidental, labour charges, hire charges
of machinery, augur bore drill and shell equipment etc., complete., for all depths and for
finished item of work for 350mm to 450mm dia piles.(Sl.No: 20 B of SSR Data)

0.631 days Mazdoor 525.00 1 day 331.28


Add 13.615% Contractor`s Profit and OH Charges 45.10
Total: 1 Rmt 376.38
Augoring and boring of holes in situ for bored cast-insitu RCC piles for building foundations in
loamy, clayey soil like black cotton soils and ordinary soils without under reams as per IS 2911-
17 1980 as per approved designs including all operations, incidental, labour charges, hire charges
of machinery, augur bore drill and shell equipment etc., complete., for all depths and for
finished item of work for 500mm to 700mm dia piles.(Sl.No: 20 C of SSR Data)

0.789 days Mazdoor 525.00 1 day 414.23


Add 13.615% Contractor`s Profit and OH Charges 56.40
Total: 1 Rmt 470.62
Under - reaming for bored cast-in-situ RCC piles for building foundations in loamy, clayey
soils like black cotton soils and ordinary soils with Augoring and boring equipment in site as
per IS 2911-1980 as per approved designs including all operations, incidental, labour charges,
18
hire charges of machinery, augur bore drill and shell equipment, etc., complete., for all depths
and for finished item of work for piles upto 300mm dia double under reaming.(Sl.No: 21 A of
SSR Data)
0.560 days Mazdoor 525.00 1 day 294.00
Add 13.615% Contractor`s Profit and OH Charges 40.03
Total: 1 Bulb 334.03
Quantity Description of the work Rate Per Amount
Under - reaming for bored cast-in-situ RCC piles for building foundations in loamy, clayey
soils like black cotton soils and ordinary soils with Augoring and boring equipment in site as
per IS 2911-1980 as per approved designs including all operations, incidental, labour charges,
19
hire charges of machinery, augur bore drill and shell equipment, etc., complete., for all depths
and for finished item of work for piles upto 350mm to 450mm dia double under
reaming.(Sl.No: 21 B of SSR Data)
0.789 days Mazdoor 525.00 1 day 414.23
Add 13.615% Contractor`s Profit and OH Charges 56.40
Total: 1 Bulb 470.62
Under - reaming for bored cast-in-situ RCC piles for building foundations in loamy, clayey
soils like black cotton soils and ordinary soils with Augoring and boring equipment in site as
per IS 2911-1980 as per approved designs including all operations, incidental, labour charges,
20
hire charges of machinery, augur bore drill and shell equipment, etc., complete., for all depths
and for finished item of work for piles upto 500mm to 700mm dia double under
reaming.(Sl.No: 21 C of SSR Data)
0.986 days Mazdoor 525.00 1 day 517.65
Add 13.615% Contractor`s Profit and OH Charges 70.48
Total: 1 Bulb 588.13
Sand for filling in foundation treches/basement as per drawing and technical specification
clause 305.3.9 MORD & 304 MORTH including cost and conveyance of all materials and labour
21 charges etc., complete. (Amendment given to AP Revised Standard Date 2009 in Building SSR
2014-15 of BLD-CSTN-2-8 (16)
1.00 Cum Cost of sand for filling 1 cum
0.31 days Mazdoor 525.00 1 day 162.75
0.10 KL Water 95.00 1 KL 9.50

Add 13.615% Contractor`s Profit and OH Charges


Total : 1 Cum
Earth filling for marshy soils including with a lead of 50 mts in the foundation pits excluding
cost of earth work including labour charges etc., complete., (Amendment given to AP Revised
22
Standard Date 2009 in Building SSR 2014-15 of BLD-CSTN-2-9 (17) and taken labour output
for 6 cum)
3.12 days Mazdoor 525.00 1 day 1638.00
0.72 KL Water 95.00 1 KL 68.40
Total : 6 cum 1706.40
Total: 1 cum 284.40
Add 13.615% Contractor`s Profit and OH Charges 38.72
Total: 1 cum 323.12
Cement Concrete (1:4:8) using 40mm HBT Metal including cost and conveyance of all materials and
23 labour charges including curing etc., complete upto Plinth level with concrete mixer (IC 2-5)
0.90 Cum Cost of 40 mm HBT Metal 1 Cum
0.45 Cum Cost of sand for concrete 1 Cum
162.00 Kgs Cost of cement 1M.T.
1.20 KL Water 95.00 1 KL 114.00
1.00 Hour Concrete Mixer 10/7 Cft capacity 494.90 1 Hour 494.90
0.10 day Mason First Class 630.00 1 day 63.00
1.39 day Mazdoor 525.00 1 day 729.75
Add 13.615% Contractor`s Profit and OH Charges
Total : 1 Cum
Quantity Description of the work Rate Per Amount
Cement Concrete (1:4:8) using 40mm HBT Metal including cost and conveyance of all
24
materials and labour charges etc., complete upto Plinth level with hand mixer (IC 2-4)
0.90 Cum Cost of 40 mm HBT Metal 1 Cum
0.45 Cum Cost of sand for concrete 1 Cum
162.00 Kgs Cost of cement 1M.T.
1.20 KL Water 95.00 1 KL 114.00
0.10 day Mason First Class 630.00 1 day 63.00
2.36 day Mazdoor 525.00 1 day 1239.00

Add 13.615% Contractor`s Profit and OH Charges


Total : 1 Cum
Cement Concrete (1:2:4) using concrete mixer with 20mm HBG M/C Metal including cost and
conveyance of all materials and all labour charges etc., complete for plain works. (With M20
25
nominal mix cement to be taken as 330 kgs for using 40mm HBT metal in PCC and the same
item data) (IC 2-11)
0.90 Cum Cost of 20 mm HBG M/C Metal 1 Cum
0.45 Cum Cost of sand for concrete 1 Cum
324.00 Kgs Cost of cement 1M.T.
1.20 KL Water 95.00 1 KL 114.00
1.00 Hour Concrete Mixer 10/7 Cft (300X200) diesel 494.90 1 Hour 494.90
0.10 day Mason First Class 630.00 1 day 63.00
1.39 day Mazdoor 525.00 1 day 729.75

Add 13.615% Contractor`s Profit and OH Charges


Total : 1 Cum
Cement Concrete (1:2:4) using 20mm HBG M/C Metal including cost and conveyance of all
26 materials, using hand mixing and labour charges etc., complete with hand mixing for plain
works
0.90 Cum Cost of 20 mm HBG M/C Metal 1 Cum
0.45 Cum Cost of sand for concrete 1 Cum
324.00 Kgs Cost of cement 1M.T.
1.20 KL Water 95.00 1 KL 114.00
0.10 day Mason First Class 630.00 1 day 63.00
2.36 days Mazdoor 525.00 1 day 1239.00

Add 13.615% Contractor`s Profit and OH Charges


Total : 1 Cum
Street slab pavement / Flooring with old kadapa slabs pavement without pointing in CM
27 (1:3) including cost and conveyance of all materials and all labour charges etc., complete.,
(Observed Data)
0.90 days First Class mason 630.00 1 day 567.00
2.10-0.50
days Second Class mason 565.00 1 day 904.00
=1.60
2.00-0.74
days Second Class mason 565.00 1 day 711.90
=1.26
2182.90
Add 13.615% Contractor`s Profit and OH Charges 297.20
Total: 10 Sqm 2480.10
Quantity Description of the work Rate Per Amount
Supplying, fitting and placing HYSD bar reinforcement complete as per drawings and
28 technical specifications for bars below 36mm dia including over laps and wastage etc.,
complete.,(IC 2-18)

1.05 MTs Cost of Fe 415 steel 1 MT


6.00 Kgs Binding wire 70.00 1 Kg 420.00
2.00 days Bar bender 750.00 1 day 1500.00
6.40 days Mazdoor 525.00 1 day 3360.00

Add 13.615% Contractor`s Profit and OH Charges


Total : 1 MT
Providing ornamental grill including cost of grill, welding charges, labour charges etc.,
29 complete.,
1.025 Kg Structural steel Angle/ channels (SSR Sl.No:69) 64.50 1 Kg 66.11
1.00 Kg Fabrication and welding charges (BMM-V 14 S.No: 947) 30.00 1 Kg 30.00
1.00 Kg Labour charges (BMM-V 15 of Sl.No: 948) 6.00 1 Kg 6.00
102.11
Add 13.615% Contractor`s Profit and OH Charges 13.90
Total : 1 kg 102.11
RCC (1:2:4) for Plinth beam and Pedastal corresponding to Table 9 of IS 456 using 20mm HBG
M/C Metal from approved quarry including cost and conveyance of all materials and including
operational, incidental, machine mixing, vibrating, curing etc., complete., but excluding cost
30
of centering, shuttering, steel and its fabrication charges for finished item of work. (Cement
to be taken as for CC (1:1 1/2:3) is 432 kgs per 1 cum of CC and for M 20 nominal mix is 400
kgs per 1 cum)(IC 2-13 A)
0.90 Cum Cost of 20 mm HBG M/C Metal 1 Cum
0.45 Cum Cost of sand for concrete 1 Cum
324.00 Kgs Cost of cement 1M.T.
0.133 days First Class Mason 630.00 1 day 83.79
0.267 days Second Class Mason 565.00 1 day 150.86
3.60 days Mazdoor 525.00 1 day 1890.00
1.00 Hour Concrete mixer 10/7 cft 494.90 1 Hour 494.90
0.133 lts Diesel for miller 99.74 1 lt 13.27
0.667 lts Petrol for vibrator 112.01 1 lt 74.71
1.20 KL Water including curing 95.00 1 KL 114.00

Add 13.615% Contractor`s Profit and OH Charges


Total : 1 Cum
Quantity Description of the work Rate Per Amount
RCC (1:2:4) for Columns, Lintels, Water tanks, RCC Walls corresponding to Table 9 of IS 456
using 20mm HBG M/C Metal from approved quarry including cost and conveyance of all
materials and including operational, incidental, machine mixing, vibrating, curing etc.,
31 complete., but excluding cost of centering, shuttering, steel and its fabrication charges for
finished item of work. (Cement to be taken as for CC (1:1 1/2:3) is 432 kgs per 1 cum of CC
and for M 20 nominal mix is 400 kgs per 1 cum)(IC 2-13B)
0.90 Cum Cost of 20 mm HBG M/C Metal 1 Cum
0.45 Cum Cost of sand for concrete 1 Cum
324.00 Kgs Cost of cement 1M.T.
0.167 days First Class Mason 630.00 1 day 105.21
0.167 days Second Class Mason 565.00 1 day 94.36
4.70 days Mazdoor 525.00 1 day 2467.50
1.00 Hour Concrete mixer 10/7 cft (using machinery) 494.90 1 Hour 494.90
1.20 KL Water including curing 95.00 1 KL 114.00

Add 13.615% Contractor`s Profit and OH Charges


Total : 1 Cum
RCC (1:2:4) for slabs and beams corresponding to Table 9 of IS 456 using 20mm HBG M/C
Metal from approved quarry including cost and conveyance of all materials and including
operational, incidental, machine mixing, vibrating, curing etc., complete., but excluding cost
32 of centering, shuttering, steel and its fabrication charges for finished item of work. (Cement
to be taken as for CC (1:1 1/2:3) is 432 kgs per 1 cum of CC and for M 20 nominal mix is 400
kgs per 1 cum)(IC 2-13C)
0.90 Cum Cost of 20 mm HBG M/C Metal 1 Cum
0.45 Cum Cost of sand for concrete 1 Cum
324.00 Kgs Cost of cement 1M.T.
0.067 days First Class Mason 630.00 1 day 42.21
0.133 days Second Class Mason 565.00 1 day 75.15
2.50 days Mazdoor 525.00 1 day 1312.50
0.267 Hour Concrete mixer 10/7 cft (using machinery) 494.90 1 Hour 132.14
1.20 KL Water including curing 95.00 1 KL 114.00

Add 13.615% Contractor`s Profit and OH Charges


Total : 1 Cum
Cement Concrete (1:2:4) mix using concrete mixer with 1/3 quantity of 20mm HBG M/C
33 Metal and 2/3 quantity of 40mm HBT Metal including cost and conveyance of all materials
and all labour charges etc., complete for SIDE DRAINS
0.30 Cum Cost of 20 mm HBG M/C Metal 1 Cum
0.60 Cum Cost of 40 mm HBT Metal 1 Cum
0.45 Cum Cost of sand for concrete 1 Cum
324.00 Kgs Cost of cement 1M.T.
1.20 KL Water 95.00 1 KL 114.00
1.00 Hour Concrete Mixer 10/7 Cft capacity 494.90 1 Hour 494.90
0.10 day Mason First Class 630.00 1 day 63.00
1.39 day Mazdoor 525.00 1 day 729.75
Quantity Description of the work Rate Per Amount
Centering charges (Bed blocks or Bands) (For higher size vertical plain
1.00 Cum surface drain = 1 sqmt centering area for RCC is Rs.1000/- and for VCC is 430.00 1 Cum 430.00
Rs.980/-). The rates are including both side centering charges)

Add 13.615% Contractor`s Profit and OH Charges


Total : 1 Cum
RCC (1:2:4) for footings corresponding to Table 9 of IS 456 using 20mm HBG M/C Metal from
approved quarry including cost and conveyance of all materials and including operational,
34 incidental, machine mixing, vibrating, centering, scaffolding charges, curing etc., complete.,
but excluding cost of steel and its fabrication charges for finished item of work.

0.90 Cum Cost of 20 mm HBG M/C Metal 1 Cum


0.45 Cum Cost of sand for concrete 1 Cum
324.00 Kgs Cost of cement 1M.T.
1.20 KL Water 95.00 1 KL 114.00
1.00 Hour Concrete Mixer 10/7 Cft capacity 494.90 1 Hour 494.90
0.10 day Mason First Class 630.00 1 day 63.00
1.39 day Mazdoor 525.00 1 day 729.75
1.00 Cum Centering charges for footings 973.00 1 Cum 973.00

Add 13.615% Contractor`s Profit and OH Charges


Total : 1 Cum
RCC (1:2:4) for Pedestals corresponding to Table 9 of IS 456 using 20mm HBG M/C Metal
from approved quarry including cost and conveyance of all materials and including
35 operational, incidental, machine mixing, vibrating, centering, scaffolding charges, curing etc.,
complete., but excluding cost of steel and its fabrication charges for finished item of work.

1.00 Cum Cost of CC (1:2:4) for Pedestal 1 Cum


1.00 Cum Centering charges 1412.00 1 Cum 1412.00
Add 13.615% Contractor`s Profit and OH Charges 192.24
Total : 1 Cum
RCC (1:2:4) for Plinth beam corresponding to Table 9 of IS 456 using 20mm HBG M/C Metal
from approved quarry including cost and conveyance of all materials and including
36 operational, incidental, machine mixing, vibrating, centering, scaffolding charges, curing etc.,
complete., but excluding cost of steel and its fabrication charges for finished item of work.

1.00 Cum Cost of CC (1:2:4) for Plinth beam 1 Cum


1.00 Cum Centering charges 3073.00 1 Cum 3073.00
Add 13.615% Contractor`s Profit and OH Charges 418.39
Total : 1 Cum
RCC (1:2:4) for Lintels corresponding to Table 9 of IS 456 using 20mm HBG M/C Metal from
approved quarry including cost and conveyance of all materials and including operational,
37 incidental, machine mixing, vibrating, centering, scaffolding charges, curing etc., complete.,
but excluding cost of steel and its fabrication charges for finished item of work.

1.00 Cum Cost of CC (1:2:4) for Lintel 1 Cum


1.00 Cum Centering charges 2953.00 1 Cum 2953.00
Add 13.615% Contractor`s Profit and OH Charges 402.05
Total : 1 Cum
Quantity Description of the work Rate Per Amount
RCC (1:2:4) for Chejjas / Sunshades of 75mm thick at fixed end and 50mm thick at free end
corresponding to Table 9 of IS 456 using 20mm HBG M/C Metal from approved quarry
38 including cost and conveyance of all materials and including operational, incidental, machine
mixing, centering, scaffolding charges, curing etc., complete., but excluding cost of steel and
its fabrication charges for finished item of work.
0.0625 Cum Cost of CC (1:2:4) for Lintel 1 Cum
1.00 Sqmt Centering charges 507.00 1 Sqm 507.00
Add 13.615% Contractor`s Profit and OH Charges 69.03
Total : 1 Sqm
RCC (1:2:4) for Columns corresponding to Table 9 of IS 456 using 20mm HBG M/C Metal from
approved quarry including cost and conveyance of all materials and including operational,
39 incidental, machine mixing, vibrating, centering, scaffolding charges, curing etc., complete.,
but excluding cost of steel and its fabrication charges for finished item of work.

1.00 Cum Cost of CC (1:2:4) for Columns 1 Cum


1.00 Cum Centering charges 2786.00 1 Cum 2786.00
Add 13.615% Contractor`s Profit and OH Charges 379.31
Total : 1 Cum
RCC (1:2:4) for L- Beams or T- Beams corresponding to Table 9 of IS 456 using 20mm HBG
M/C Metal from approved quarry including cost and conveyance of all materials and including
40 operational, incidental, machine mixing, vibrating, centering, scaffolding charges, curing etc.,
complete., but excluding cost of steel and its fabrication charges for finished item of work.

1.00 Cum Cost of CC (1:2:4) for beams 1 Cum


1.00 Cum Centering charges 4206.00 1 Cum 4206.00
Add 13.615% Contractor`s Profit and OH Charges 572.65
Total : 1 Cum
RCC (1:2:4) for 100mm thick roof slab corresponding to Table 9 of IS 456 using 20mm HBG
M/C Metal from approved quarry including cost and conveyance of all materials and including
41 operational, incidental, machine mixing, vibrating, centering, scaffolding charges, curing etc.,
complete., but excluding cost of steel and its fabrication charges for finished item of work.

1.00 Cum Cost of CC (1:2:4) for slab 1 Cum


10.00 Sqmts Centering charges 488.00 1 Sqm 4880.00
Add 13.615% Contractor`s Profit and OH Charges 664.41
Total : 10 Sqm
RCC (1:2:4) for 125mm thick roof slab corresponding to Table 9 of IS 456 using 20mm HBG
M/C Metal from approved quarry including cost and conveyance of all materials and including
42
operational, incidental, machine mixing, vibrating, curing etc., complete., but excluding cost
of steel and its fabrication charges for finished item of work.
1.25 Cum Cost of CC (1:2:4) for slab 1 Cum
10.00 Sqmts Centering charges 488.00 1 Sqm 4880.00
Add 13.615% Contractor`s Profit and OH Charges 664.41

Total : 10 Sqm
Quantity Description of the work Rate Per Amount
Dry Stone masonry for well steining including cost of all materials and all labour charges
43
etc., complete., (IC No: BLD-CSTN-4-11)
1.04 Cum Cost of Rough stone 1 Cum
0.16 Cum Cost of Bond stone 1 Cum
0.45 days First Class Mason 630.00 1 day 283.50
1.05 days Second Class Mason 565.00 1 day 593.25
1.10 days Mazdoor 525.00 1 day 577.50

Add 13.615% Contractor`s Profit and OH Charges


Total: 1 Cum
RR Masonry in CM (1:8) including cost and conveyance of all materials and labour charges
44 including scaffolding, curing charges etc., complete for foundation and basement. (IC 4-9)

59.40 Kgs Cost of cement 1 Kg


0.44 Cum C R Stone 1 Cum
0.50 Cum Rough Stone 1 Cum
0.16 Cum Bond Stone 1 Cum
0.33 Cum Cost of Sand for Mortor 1 Cum
1.20 days First Class Mason 630.00 1 day 756.00
2.00 days Mazdoor 525.00 1 day 1050.00
Add 1% for water on materials and labour for mixing and curing

Add 13.615% Contractor`s Profit and OH Charges


Total : 1 Cum
Brick Masonry in CM (1:6) with second class non modular or traditional size 23x11x7 cms
45 including cost and conveyance of all materials and labour charges etc., complete for
Superstructure.(IC 3-1-IV)
48.00 Kgs Cost of cement 1 Kg
512.00 Nos Cost of Non Modular/traditional size bricks 1000 Nos
0.20 Cum Cost of Sand for Mortor 1 Cum
0.24 days First Class Mason 630.00 1 day 151.20
0.56 days Second Class Mason 565.00 1 day 316.40
1.89 days Mazdoor 525.00 1 day 992.25
Add 1% for water on materials and labour for mixing and curing

Add 13.615% Contractor`s Profit and OH Charges


Total : 1 Cum
Fly Ash Cement solid blocks of size 290 x 225 x 140 mm for masonry work in CM (1:6) prop
with for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum
of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges,
46
seiniorage charges, scaffolding and curing etc., cpomplete with a compresive streangth not
lessthan 50 kg/sqcm for walls for Superstructure Walls. (Data as per BLD-CSTN-6-18) (Unit - 1
Cum)
110 Nos No of blocks required for one cum of Masonry 30.00 1 No 3300.00
0.10 cum Cost of Cement Mortar (1:6) 1 Cum
Quantity Description of the work Rate Per Amount
0.42 day Mason 1st class 630.00 1 day 264.60
0.92 day Mason 2nd class 565.00 1 day 519.80
0.70 day Man Mazdoor 525.00 1 day 367.50
2.10 day Woman Mazdoor 525.00 1 day 1102.50
Add 1% for water on materials and labour for mixing and curing

Add 13.615% Contractor`s Profit and OH Charges


Total: 1 Cum
Cement Mortor in CM (1:5) including cost and conveyance of all materials and all labour
47
charges etc., complete., for to use in plastering (IC No: CSTN-1-4)
288 Kgs Cost of cement 1 Kg
1.05 Cum Sand for Mortor 1 Cum
0.20 days Man Mazdoor for mixing cement mortor 525.00 1 day 105.00
Add 1% for water on materials and labour for mixing and curing

Add 13.615% Contractor`s Profit and OH Charges


Total: 1 Cum
Plastering with C.M. (1:3) 12mm thick including cost and conveyance of all materials.
48 scaffolding charges, curing and all labour charges etc., complete., IC 6-1) (Amendment for
labour content given in SOR 2016-17 vide BLD-CSTN 6-1 to 6-8)
0.15 Cum Cost of CM (1:3) 1 Cum
0.45 days First Class Mason 630.00 1 day 283.50
1.05 days Second Class Mason 565.00 1 day 593.25
2.80 days Mazdoor 525.00 1 day 1470.00
Add 1% for water on materials and labour for mixing and curing

Add 13.615% Contractor`s Profit and OH Charges


Total : 10 Sqm
Plastering with C.M. (1:3) 12mm thick using 2 % of Acco proof powder including cost and
49 conveyance of all materials, curing and all labour charges etc., complete., (Amendment for
labour content given in SOR 2016-17 vide BLD-CSTN 6-1 to 6-8)
0.15 Cum Cost of CM (1:3) 1 Cum
1.44 Kgs Cost of Water proofing compound (MAT-00081) 85.00 1 Kg 122.40
0.45 days First Class Mason 630.00 1 day 283.50
1.05 days Second Class Mason 565.00 1 day 593.25
2.80 days Mazdoor 525.00 1 day 1470.00
Add 1% for water on materials and labour for mixing and curing

Add 13.615% Contractor`s Profit and OH Charges


Total : 10 Sqm
Quantity Description of the work Rate Per Amount
Providing impervious coat to exposed RCC roof slab surface with CM (1:3) 20mm thick with
1 kg of water proof compound per bag of cement laid including laying, thread lining, curing,
50
rounding of junctions of wall and slab ete., complete for finished item of work(Amendment
for labour content given in SOR 2016-17 vide BLD-CSTN 6-1 to 6-8)
0.21 Cum Cost of CM (1:3) 1 Cum
2.00 Kgs Cost of Water proofing compound (Sl. No: 80 of BID) 85.00 1 Kg 170.00
0.45 days First class mason 630.00 1 day 283.50
1.05 days Second class mason 565.00 1 day 593.25
2.80 days Mazdoor 525.00 1 day 1470.00
Add 1% for water on materials and labour for mixing and curing

Add 13.615% Contractor`s Profit and OH Charges


Total : 10 Sqm
Plastering with C.M. (1:5) 12mm thick including cost and conveyance of all materials,
51 scaffolding charges, curing and all labour charges etc., complete., (IC 6-3) (Amendment for
labour content given in SOR 2016-17 vide BLD-CSTN 6-1 to 6-8)
0.15 Cum Cost of CM (1:5) 1 Cum
0.45 days First Class Mason 630.00 1 day 283.50
1.05 days Second Class Mason 565.00 1 day 593.25
2.80 days Mazdoor 525.00 1 day 1470.00
Add 1% for water on materials and labour for mixing and curing

Add 13.615% Contractor`s Profit and OH Charges


Total : 10 Sqm
Plastering with C.M. (1:5) 20mm thick including cost and conveyance of all materials,
52 scaffolding charges, curing and all labour charges etc., complete., (IC 6-7) (Amendment for
labour content given in SOR 2016-17 vide BLD-CSTN 6-1 to 6-8)
0.21 Cum Cost of CM (1:5) 1 Cum
0.45 days First Class Mason 630.00 1 day 283.50
1.05 days Second Class Mason 565.00 1 day 593.25
2.80 days Mazdoor 525.00 1 day 1470.00
Add 1% for water on materials and labour for mixing and curing

Add 13.615% Contractor`s Profit and OH Charges


Total : 10 Sqm
Plastering in CM two coats 12 mm thick with CM (1:5) 8mm thick base coat and CM (1:3)
53 4mm thick sponze finish including cost and conveyance of all materials and all labour charges
etc., complete., ( I Code BLD-CSTN-6-10)
31.70 Kgs Cost of cement for base coat (0.11x1440/5) 1 Kg
19.20 Kgs Cost of cement for top coat (0.04x1440/3) 1 Kg
0.15 Cum Fine sand (0.11 + 0.04) 1 cum
0.63 days First class mason 630.00 1 day 396.90
1.47 days Second class mason 565.00 1 day 830.55
3.90 days Mazdoor 525.00 1 day 2047.50
Add 1% for water on materials and labour for mixing and curing

Add 13.615% Contractor`s Profit and OH Charges


Total: 10 Sqm
Quantity Description of the work Rate Per Amount
Plastering in CM two coats 20 mm thick with CM (1:6) 16mm thick base coat and CM (1:4)
54 4mm thick with Dubara sponze finish in 2 coats including cost and conveyance of all materials
and all labour charges etc., complete., ( I Code BLD-CSTN-6-9)
43.00 Kgs Cost of cement for base coat (0.18x1440/6) 1 Kg
14.50 Kgs Cost of cement for top coat (0.04x1440/4) 1 Kg
0.22 Cum Fine sand (0.18 + 0.04) 1 cum
0.63 days First class mason 630.00 1 day 396.90
1.47 days Second class mason 565.00 1 day 830.55
3.90 days Mazdoor 525.00 1 day 2047.50
Add 1% for water on materials and labour for mixing and curing

Add 13.615% Contractor`s Profit and OH Charges


Total: 10 Sqm
RCM facia 5cms thick in CM (1:3) for drop walls, fins with rabbit wire mesh and nominal
reinforcement as directed by Eingineer-in-charge with dubara sponge finishing, including cost
and conveyance of all materials to site, operation and incidental charges, cost and conveyance
55
of all materials excluding cost of steel and its fitting charges including centering, curing,
scaffolding and form work, lift charges etc., complete for finished item of work (As per I Code
BLD-CSTN-6-11)
13.30 Sqm Rabbit wire/ chicken mesh (BMT-F-28) Building SSR 21.00 1 Sqm 279.30
0.25 cum Cement Mortor (1:3) for 25mm thick 1 Cum
50.00 Kgs Dry cement for making lumps 1 Kg
12mm Plastering 2 coats in CM (1:5) & CM (1:3) both
21.80 Sqm sides excluding cost of steel and its fabrication charges (I 10 Sqm
C 6-10)
8.00 days First class mason 630.00 1 day 5040.00
1.00 day Miller operator 565.00 1 day 565.00
10.00 days Mazdoor 525.00 1 day 5250.00
2 hours Machine mixing mortar with miller hire charges 494.90 1 Hour 989.80
Add 1% for water on materials and labour for mixing and curing

Add 13.615% Contractor`s Profit and OH Charges


Total: 10 Sqm
Flush pointing with CM (1:3) to RR Masonry/Brick Masonry/CR Masonry including cost and
56
conveyance of all materials and all labour charges etc., complete., (IC 5-2)
14.40 Kgs Cost of Cement 1 Kg
0.03 Cum Plastering sand for mortor 1 Cum
0.50 days Second class mason 565.00 1 day 282.50
0.74 days Mazdoor 525.00 1 day 388.50
Add 1% for water on materials and labour for mixing and curing

Add 13.615% Contractor`s Profit and OH Charges


Total 10 Sqm
Quantity Description of the work Rate Per Amount
Raised pointing with CM (1:3) to RR Masonry including cost and conveyance of all materials
57
and all labour charges etc., complete., (IC 5-3)
28.80 Kgs Cost of Cement 1 Kg
0.06 Cum Plastering sand for mortor 1 Cum
0.50 days Second class mason 565.00 1 day 282.50
0.74 days Mazdoor 525.00 1 day 388.50
Add 1% for water on materials and labour for mixing and curing

Add 13.615% Contractor`s Profit and OH Charges


Total 10 Sqm
Flooring with kadapa slabs 40 mm thick laid on already laid cement concrete bed set over
base coat of CM (1:8) 12mm thick including pointing with CM (1:3) to full depth of kadapa
58
slabs including cost and conveyance of all materials and labour charges, filling joints neatly,
dressing of flooring stones, etc., complete., (IC 7-2)
10.50 Sqm Cost of 40mm thick kadapa slabs 10 Sqm
21.60 Kgs Cost of cement for base coat 1 Kg
9.60 Kgs Cost of cement for pointing 1 Kg
0.12 Cum Cost of sand for base coat 1 Cum
0.02 Cum Cost of sand for pointing 1 Cum
0.96 days Mason first class 630.00 1 day 604.80
2.24 days Mason second class 565.00 1 day 1265.60
3.30 days Mazdoor 525.00 1 day 1732.50
Add 1% for water on materials and labour for mixing and curing

Add 13.615% Contractor`s Profit and OH Charges


Total : 10 Sqm
Flooring with 25 mm thick colour polished Bethamcherlla slabs laid on already laid cement
concrete bed set over base coat of CM (1:8) 12mm thick including neat cement slurry spread
59 at 3.30 kgs per sqm and jointing to full depth of polished slabs including cost and conveyance
of all materials and labour charges, filling joints neatly, dressing of flooring stones, etc.,
complete., (O.D)
10.50 Sqm Colour polished bethamcherlla 25mm thick slabs 10 Sqm
21.60 Kgs Cost of cement for base coat 1 Kg
33.00 Kgs Cost of cement for slurry 1 Kg
20.00 Kgs Cost of cement for pointing 1 Kg
0.12 Cum Cost of sand for base coat 1 Cum
3.10 days Mason first class 630.00 1 day 1953.00
1.10 days Mason second class 565.00 1 day 621.50
0.86 days Mazdoor 525.00 1 day 451.50
Add 1% for water on materials and labour for mixing and curing

Add 13.615% Contractor`s Profit and OH Charges


Total : 10 Sqm
Quantity Description of the work Rate Per Amount
Flooring with vitrified polished tiles 8 to 10mm thick Nano polished/stain free soluble salt porcelain
screen printed of 600x600mm size 1st quality set over a base coat of CM (1:8) 12mm thick over already
laid cement concrete bed including neat cement slurry at 3.30 kgs per sqm and jointing neatly with
white cement paste to full depth of slabs laid on already laid cement concrete bed set over base coat of
60
CM (1:8) 12mm thick including neat cement slurry spread at 3.30 kgs per sqm and jointing to full depth
of vitrified tiles including cost and conveyance of all materials and labour charges, filling joints neatly,
dressing of flooring stones, etc., complete., (IC 7-5)

10.10 Sqm Vitrified tiles screen printed (BMT-C-06 Sl. No: 45) 425.00 10 Sqm 4292.50
21.60 Kgs Cost of cement for base coat 1 Kg
33.00 Kgs Cost of cement for slurry 1 Kg
6.00 Kgs Cost of cement for pointing 1 Kg
0.12 Cum Cost of sand for base coat 1 Cum
0.02 Cum Cost of sand for pointing 1 Cum
0.96 days Mason first class 630.00 1 day 604.80
2.24 days Mason second class 565.00 1 day 1265.60
3.30 days Mazdoor 525.00 1 day 1732.50
Add 1% for water on materials and labour for mixing and curing

Add 13.615% Contractor`s Profit and OH Charges


Total : 10 Sqm
Flooring with ceramic tiles 8 to 10mm thick 1st quality non skid floor tiles of scratch free of nano
finish of size 600x600mm of IS: 13711,13712,13630 of any colour set over a base coat of CM (1:8)
12mm thick over already laid cement concrete bed including neat cement slurry at 3.30 kgs per sqm
61 and jointing neatly with white cement paste to full depth of slabs laid on already laid cement concrete
bed set over base coat of CM (1:8) 12mm thick including neat cement slurry spread at 3.30 kgs per sqm
and jointing to full depth of ceramic tiles including cost and conveyance of all materials and labour
charges, filling joints neatly, dressing of flooring stones, etc., (IC 7-6)

10.10 Sqm Non skid ceramic tiles (BMT-C-04 Sl. No: 43) 520.00 1 Sqm 5252.00
21.60 Kgs Cost of cement for base coat 1 Kg
33.00 Kgs Cost of cement for slurry 1 Kg
2.00 Kgs Cost of white cement (Roads SSR 101.E) 27.95 1 Kg 55.90
0.12 Cum Cost of sand for base coat 1 Cum
0.96 days Mason first class 630.00 1 day 604.80
2.24 days Mason second class 565.00 1 day 1265.60
3.30 days Mazdoor 525.00 1 day 1732.50
Add 1% for water on materials and labour for mixing and curing

Add 13.615% Contractor`s Profit and OH Charges


Total : 10 Sqm
Quantity Description of the work Rate Per Amount
Flooring with high polished granite 16 to 18mm thick slabs other than black set over a base
coat of CM (1:8) 20mm thick over already laid cement concrete bed including neat cement
slurry at 3.30 kgs per sqm and jointing neatly with white cement paste to full depth of slabs
62 laid on already laid cement concrete bed set over base coat of CM (1:8) 12mm thick including
neat cement slurry spread at 3.30 kgs per sqm and jointing to full depth of polished granite
slabs including cost and conveyance of all materials and labour charges, filling joints neatly,
dressing of flooring stones, etc., complete., (IC 7-7)
10.10 Sqm High polished 16 to 18mm thick granite slabs 10 Sqm
36.00 Kgs Cost of cement for Base coat 1 Kg
33.00 Kgs Cost of cement for slurry 1 Kg
6.00 Kgs Cost of white cement (BMS-W.68) 27.95 1 Kg 167.70
0.20 Cum Cost of sand for base coat 1 Cum
3.00 days Mason first class 630.00 1 day 1890.00
1.00 day Mason second class 565.00 1 day 565.00
8.00 days Mazdoor 525.00 1 day 4200.00
Add 1% for water on materials and labour for mixing and curing

Add 13.615% Contractor`s Profit and OH Charges


Total : 10 Sqm
Providing skirting / dadoing to internal walls to 15cms height/risers of steps with 25mm
thick polished kadapa slabs set over base coat of CM (1:3) 12mm thick with cement slurry
63 spread at the rate of 3.30 kgs per sqm and jointing with white cement paste to full depth of
polished slaabs including cost and conveyance of all materials and all labour charges, filling
joints neatly, dressing etc., complete.,(IC 7-22)
10.10 Sqm 25mm thick polished kadapa slabs 10 Sqm
57.60 Kgs Cost of cement for base coat 1 Kg
33.00 Kgs Cost of cement for slurry 1 Kg
0.12 Cum Cost of sand for base coat 1 Cum
0.96 days Mason first class 630.00 1 day 604.80
2.24 day Mason second class 565.00 1 day 1265.60
3.10 days Mazdoor 525.00 1 day 1627.50
Add 1% for water on materials and labour for mixing and curing

Add 13.615% Contractor`s Profit and OH Charges


Total : 10 Sqm
Providing and fixing Corrugated AC sheet ceiling of approved qualilty with necessary nails etc.,
64 complete., excluding cost of frame work for base and cost of conveyance of all materials etc.,
complete.,(IC 8-29)
11.00 Sqm AC sheet 6mm thick corrugated (Sl No: 137/ BMT-E-17) 229.00 1 Sqm 2519.00
2.50 days Carpenter Ist class 705.00 1 day 1762.50
2.00 days Man Mazdoor 525.00 1 day 1050.00
5331.50
Add 13.615% Contractor`s Profit and OH Charges 725.88
Total: 10 Sqm 6057.38
Quantity Description of the work Rate Per Amount
Roofing with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins
with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping
65
/ drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided
with anti capillary grove.
Rate as per SSR BMS-W.45 (CFMS CODE MAT-01615)
1.00 Sqm 836.00 1 Sqm 836.00
and Sl. No: 980.
Add 13.615% Contractor`s Profit and OH Charges 113.82
Total: 1 Sqm 949.82

Providing and applying wall putty of white cement or equivalent putty such as birla wall care
putty or texture paint or equivalent such as NCL / Saicoat texture paint of average 2 to 3
mm thickness over plastered surface to prepare the surface even and smooth after
thoroughly brushing the surface to remove all dirt and remains of loose powdered materials,
66 applying emery paper, sand the surface, clean and wipe off loose dust, applying putty /
texture paint filler by putty knife / muslin pad, air dry for 2-3 hours for the surface
preparation including cost and conveyance of all materials to work site and all operational,
incidental, labour charges etc., complete., for finished item of work for external walls
excluding cost of access scaffolding.(Sl.No: 19 of SSR Data)

Wall putty or cement based (Rs.550.00 per 20Kgs


34.50 Kgs 30.00 1 Kg 1035.00
BMT-J-31)/ Plaster of paris putty/ Exterior texture
0.546 days Painter Ist class 705.00 1 day 384.93
1.274 days Painter IInd class 565.00 1 day 719.81
1.820 days Mazdoor 525.00 1 day 955.50
Labour for access scaffolding (Cumulative rates of higher
10.00 Sqm 10 Sqm 0.20
floors)
3095.44
Add 13.615% Contractor`s Profit and OH Charges 421.44
Total: 10 Sqm 3516.88

Providing and applying wall putty of white cement or cement based or paris putty or lime
punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even
and smooth after thoroughly brushing the surface to remove all dirt and remains of loose
powdered materials, applying emery paper, sand the surface, clean and wipe off loose dust,
67
applying knifing paste filler by putty knife/muslin pad, air dry for 2-3 hours, sand with 180 and
320 Nos emery paper for the surface preparation including cost and conveyance of all
materials to work site and all operational, incidental, labour charges etc., complete., for
finished item of work for internal walls.(Sl.No: 18 of SSR Data)

Wall putty or cement based (Rs.550.00 per 20Kgs


23.00 Kgs 30.00 1 Kg 690.00
BMT-J-31)/ Plaster of paris putty/ Exterior texture
0.273 days Painter Ist class 705.00 1 day 192.47
0.637 days Painter IInd class 565.00 1 day 359.91
0.910 days Mazdoor 525.00 1 day 477.75
LS provision for Emery papers, fillers, knife etc., 0.61
1720.73
Add 13.615% Contractor`s Profit and OH Charges 234.28
Total: 10 Sqm 1955.01
Quantity Description of the work Rate Per Amount
Roofing with corrugated GI sheets of 0.80mm/1.00mm/1.25mm thick fixed with GI "J" bolts
and nuts 8mm dia with bitumen and GI limpet washers filled with white lead and including a
coat of approved steel primer and two coats of approved paint on over lapping of sheets
68
complete up to a pitch of 60 degrees but excluding cost of purlins, rafters, trusses including all
labour charges etc., complete., (As per standard data BLD-CSTN-8-1,2 and 3) Unit = 184.518
Sqm
GI Plain/Corrugated 0.80mm thick sheets IS-277 (103.09kgs/
103.09 Kgs 0.80mm thick, 126.07 kgs/1.0mm thick and 154.80kgs/ 1.25mm 70.00 1 Kg 7216.30
thick) (Rate Sl.No: 123 BMT/E/20)
GI Scam bolts & nuts 2x27 lapsx17=884 (Rate Sl.No:
47.91 Nos 6.00 1 No 287.46
996/BMS-W.62)
GI "J" bolts 8mm dia 2x5x27 sheets x 3 nos=810 nos with
43.90 Nos washers or screws, if wooden battens used) (Rate BMS-W- 11.00 1 No 482.90
64 Sl.No: 998)
Limpet washers for scam and "J" bolts 884 +810=1694
91.82 Nos 2.00 1 No 183.64
(Rate BMS-W-66 Sl.No: 1000)
91.82 Nos Bitumen washers (Rate BMS-W-67 Sl.No: 1001) 2.00 1 No 183.64
0.14 lts Zinc cromate yellow paint (BMT-J-04 Sl No: 431) 200.00 1 lt 28.00
0.20 lts Ready mixed Synthetic enamyl paint Gr.1 (BMT-J-29) 270.00 1 lt 54.00
0.84 days Carpenter second class 565.00 1 day 474.60
0.91 days Mazdoor 525.00 1 day 477.75
0.06 days Painter for premier painting one coat 705.00 1 day 42.30
0.06 days Mazdoor for premier painting one coat 525.00 1 day 31.50
0.14 days Painter for two coats of painting to over laps 705.00 1 day 98.70
0.14 days Mazdoor for two coats of painting to over laps 525.00 1 day 73.50
Sundries including 50x6mm iron wind ties white lead 9.51
Add for standard specification 1mm thick ridging and 1.25mm thick sheet vallyes when
0.95
such are required for a particular work. Average allowance for 10 sqm roofing

Total 100 Sqm 9644.75


964.48
Add 13.615% Contractor`s Profit and OH Charges 131.31
Total 10 Sqm 1095.79
Roofing with 6mm thick corrugated asbestos cement sheets, fixing withGI "J" bolts and nuts
8mm dia GI plain washers complete up to a pitch of 60 degrees but excluding cost of purlins,
69
rafters, trusses including all labour charges etc., complete., (As per standard data BLD-CSTN-8-
4) Unit = 216.14 Sqm
0.15 Ton 6mm thick Corrugated AC sheets (1 Sqm = 133 Kgs) 1 Ton
22.03 Nos GI "J" bolts 8mm dia 11.00 1 No 242.33
22.03 Nos GI washers 2.00 1 No 44.06
22.03 Nos Bitumen washers 2.00 1 No 44.06
0.43 days Carpenter second class 565.00 1 day 242.95
0.54 days Man Mazdoor 525.00 1 day 283.50
Sundries including 50x6mm iron wind ties white lead
Add for standard specification 1mm thick ridging and 1.25mm thick sheet vallyes when
such are required for a particular work. Average allowance for 10 sqm roofing

Total 100 Sqm


Add 13.615% Contractor`s Profit and OH Charges
Total 10 Sqm
Quantity Description of the work Rate Per Amount
White washing one coat with lime of approved quality to give an even shade after throughly
brushing the surface to remove all dirt and remains of loose powdered materials including
70
cost and conveyance of all materials and all labour charges etc., complete., (IC 9-1)

0.005 Cum Fine screeened shell lime (Roads SSR Sl.No: 100 D) 940.00 1cum 4.70
0.033 days First class mason 630.00 1 day 20.79
0.077 days Second class mason 565.00 1 day 43.51
0.22 days Mazdoor 525.00 1 day 115.50
LS Gum, Conjee water, brushes and ladder etc., 0.46
184.96
Add 13.615% Contractor`s Profit and OH Charges 25.18
Total : 10 Sqm 210.14
White washing two coats with lime of approved quality to give an even shade after
throughly brushing the surface to remove all dirt and remains of loose powdered materials
71
including cost and conveyance of all materials and all labour charges etc., complete., (IC 9-2)

0.007 Cum Fine screeened shell lime (Roads SSR Sl.No: 100 D) 940.00 1cum 6.58
0.048 days First class mason 630.00 1 day 30.24
0.112 days Second class mason 565.00 1 day 63.28
0.32 days Mazdoor 525.00 1 day 168.00
LS Gum, Conjee water, brushes and ladder hire charges 0.85
268.95
Add 13.615% Contractor`s Profit and OH Charges 36.62
Total : 10 Sqm 305.57
White washing three coats with lime of approved quality to give an even shade after
throughly brushing the surface to remove all dirt and remains of loose powdered materials
72 including cost and conveyance of all materials and all labour charges etc., complete., (IC 9-3)

0.009 Cum Fine screeened shell lime (Roads SSR Sl.No: 100 D) 940.00 1cum 8.46
0.066 days First class mason 630.00 1 day 41.58
0.154 days Second class mason 565.00 1 day 87.01
0.43 days Mazdoor 525.00 1 day 225.75
LS Gum, Conjee water, brushes and ladder hire charges 0.44
363.24
Add 13.615% Contractor`s Profit and OH Charges 49.46
Sundries 0.00
Total : 10 Sqm 412.70
White washing one coat with white cement to give an even shade after throughly brushing
the surface to remove all dirt and remains of loose powdered materials including cost and
73
conveyance of all materials and all labour charges etc., complete., (IC 9-4)

1.20 Kgs Cost of white cement (Roads 101-E) 27.95 1 Kg 33.54


0.033 days First class mason 630.00 1 day 20.79
0.077 days Second class mason 565.00 1 day 43.51
Quantity Description of the work Rate Per Amount

0.22 days Mazdoor 525.00 1 day 115.50


LS Gum, Conjee water, brushes and ladder hire charges etc., at 0.50% 1.07
0.65
215.05
Add 13.615% Contractor`s Profit and OH Charges 29.28
Sundries 0.07
Total : 10 Sqm 244.40
White washing two coats with white cement to give an even shade after throughly brushing
the surface to remove all dirt and remains of loose powdered materials including cost and
74
conveyance of all materials and all labour charges etc., complete., (IC 9-5)

2.00 Kgs Cost of white cement (Roads 101-E) 27.95 1 Kg 55.90


0.063 days First class mason 630.00 1 day 39.69
0.147 days Second class mason 565.00 1 day 83.06
0.32 days Mazdoor 525.00 1 day 168.00
LS Gum, Conjee water, brushes and ladder hire charges etc., at 1% 3.47
Lumpsum 0.64
350.75
Add 13.615% Contractor`s Profit and OH Charges 47.75
Sundries 0.00
Total : 10 Sqm 398.50
White washing three coats with white cement to give an even shade after throughly brushing
the surface to remove all dirt and remains of loose powdered materials including cost and
75
conveyance of all materials and all labour charges etc., complete., (IC 9-6)

2.80 Kgs Cost of white cement (Roads 101-E) 27.95 1 Kg 78.26


0.09 days First class mason 630.00 1 day 56.70
0.21 days Second class mason 565.00 1 day 118.65
0.43 days Mazdoor 525.00 1 day 225.75
Lumpsum 0.44
479.80
Add 13.615% Contractor`s Profit and OH Charges 65.32
Sundries 0.08
Total : 10 Sqm 545.20
Distemper two coats with water bound distemper to give an even shade after throughly
brushing the surface to remove all dirt and remains of loose powdered materials including
76
cost and conveyance of all materials and all labour charges etc., complete., (IC 9-9)

1.34 Kgs Dry powder Distemper (Sl.No: 445 BMT-J-20) 45.00 1 Kg 60.30
0.15 days First class Painter 705.00 1 day 105.75
0.35 days Second class Painter 565.00 1 day 197.75
1.30 days Mazdoor 525.00 1 day 682.50
Sundries including brushes and ladder at 1% 10.46
Quantity Description of the work Rate Per Amount
Lumpsum 0.96
1057.72
Add 13.615% Contractor`s Profit and OH Charges 144.01
Sundries 0.07
Total : 10 Sqm 1201.80
Distemper two coats with Oil bound distemper to give an even shade after throughly
brushing the surface to remove all dirt and remains of loose powdered materials including
77
cost and conveyance of all materials and all labour charges etc., complete., (IC 9-10)

1.70 Kgs Oil bound Distemper (Sl.No: 446 BMT-J-21) 81.00 1 Kg 137.70
0.36 days First class Painter 705.00 1 day 253.80
0.84 days Second class Painter 565.00 1 day 474.60
Sundries including brushes and ladder at 1% 8.66
Lumpsum 0.11
874.87
Add 13.615% Contractor`s Profit and OH Charges 119.11
Sundries 0.02
Total : 10 Sqm 994.00
Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of
approved brand and shade over a base coat of appropriate primer of approved brand, making
3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt
78
and remains of loose powdered materials, including cost and conveyance of all materials to
work site and all operational, incidental, labour charges etc. complete for finished item of
work as per SS 911 for internal walls (BLD-CSTN-10-1)
0.50 lts Cost of Primer (Sl. No: 427 BMT-J.01) 160.00 1 lt 80.00
0.08 Nos Painter I st class 705.00 1 day 56.40
0.19 Nos Pianter Iind class 565.00 1 day 107.35
1.70 lts Cost of washable Oil Bound Distemper (BMT-J.21) 81.00 1 lt 137.70
0.36 Nos 1st class painter 705.00 1 day 253.80
0.84 Nos II class painter 565.00 1 day 474.60
1109.85
Add 13.615% Contractor`s Profit and OH Charges 151.11
Sundries 0.04
Total : 10 Sqm 1261.00
Painting with snowcem or other equal approved water proof cement paint one coat over
79 priming coat including cost and conveyance of all materials and all labour charges etc.,
complete., (IC 10-3)
2.00 Kgs Water proof cement paint (Sl.No: 426 BMT-J-23) 49.00 1 Kg 98.00
0.09 days First class painter 705.00 1 day 63.45
0.21 days Second class painter 565.00 1 day 118.65
1.50 days Mazdoor 525.00 1 day 787.50
Sundries including brushes and ladder at 1% 10.68
Lumpsum 0.17
1078.45
Add 13.615% Contractor`s Profit and OH Charges 146.83
Sundries 0.07
Total : 10 Sqm 1225.35
Quantity Description of the work Rate Per Amount
Painting with snowcem or other equal approved water proof cement paint two coats over
80 priming coat including cost and conveyance of all materials and all labour charges etc.,
complete., (IC 10-4)
3.50 Kgs Water proof cement paint 49.00 1 Kg 171.50
0.15 days First class painter 705.00 1 day 105.75
0.35 days Second class painter 565.00 1 day 197.75
1.50 days Mazdoor 525.00 1 day 787.50
Sundries including brushes and ladder at 1% 12.63
Lumpsum 0.95
1276.08
Add 13.615% Contractor`s Profit and OH Charges 173.74
Total : 10 Sqm 1449.81
Painting with synthetic enamel paint one coat for new iron work, new wood work and old
81 wood work including cost and conveyance of all materials and all labour charges etc.,
complete., (Item code BLD-CSTN-10-12 -I)
0.70 lts Synthetic enamel paint (Sl.No: 432 BMT-J.29) 270.00 1 lt 189.00
0.21 days First class painter 705.00 1 day 148.05
0.49 days Second class painter 565.00 1 day 276.85
Sundries including brushes, soap, putty etc., 0.28
614.18
Add 13.615% Contractor`s Profit and OH Charges 83.62
Total : 10 Sqm 697.79
Painting with synthetic enamel paint one coat for old iron work including cost and
82
conveyance of all materials and all labour charges etc., complete.,(IC 10-12-2)
0.50 lts Synthetic enamel paint 270.00 1 lt 135.00
0.21 days First class painter 705.00 1 day 148.05
0.49 days Second class painter 565.00 1 day 276.85
Sundries including brushes, soap, putty etc., 0.85
560.75
Add 13.615% Contractor`s Profit and OH Charges 76.35
Total : 10 Sqm 637.10
Painting with synthetic enamel paint two coats for new wood work including cost and
83
conveyance of all materials and all labour charges etc., complete., (IC 10-12-3)
1.20 lts Synthetic enamel paint 270.00 1 lt 324.00
0.36 days First class painter 705.00 1 day 253.80
0.84 days Second class painter 565.00 1 day 474.60
Sundries including brushes, soap, putty etc., 1.18
1053.58
Add 13.615% Contractor`s Profit and OH Charges 143.44
Total : 10 Sqm 1197.02
Painting with synthetic enamel paint two coats for old wood work including cost and
84
conveyance of all materials and all labour charges etc., complete.,(IC 10-12-4)
1.10 lts Synthetic enamel paint 270.00 1 lt 297.00
0.36 days First class painter 705.00 1 day 253.80
0.84 days Second class painter 565.00 1 day 474.60
Sundries including brushes, soap, putty etc., 0.72
1026.12
Add 13.615% Contractor`s Profit and OH Charges 139.71
Total : 10 Sqm 1165.82
Quantity Description of the work Rate Per Amount
Painting with synthetic enamel paint two coats for new iron work including cost and
85
conveyance of all materials and all labour charges etc., complete.,(IC 10-12-5)
1.10 lts Synthetic enamel paint 270.00 1 lt 297.00
0.33 days First class painter 705.00 1 day 232.65
0.77 days Second class painter 565.00 1 day 435.05
Sundries including brushes, soap, putty etc., 0.26
964.96
Add 13.615% Contractor`s Profit and OH Charges 131.38
Total : 10 Sqm 1096.34
Painting with synthetic enamel paint two coats for old iron work including cost and
86 conveyance of all materials and all labour charges etc., complete.,(IC 10-12-6)
0.90 lts Synthetic enamel paint 270.00 1 lt 243.00
0.33 days First class painter 705.00 1 day 232.65
0.77 days Second class painter 565.00 1 day 435.05
Sundries including brushes, soap, putty etc., 0.83
911.53
Add 13.615% Contractor`s Profit and OH Charges 124.10
Total : 10 Sqm 1035.63
Painting with Epoxy paint two coats over primary coat on new plastered surface including
87 cost and conveyance of all materials and all labour charges etc., complete., (OD as per Index
code BLD-CSTN-10-4)
3.50 Kgs Epoxy coating ASTM-C 881 (BMT-H-113 Sl.No: 390) 459.00 1 Kg 1606.50
0.15 days First class painter 705.00 1 day 105.75
0.35 days Second class painter 565.00 1 day 197.75
1.50 days Mazdoor 525.00 1 day 787.50
Sundries including brushes, soap etc., at 1% 26.98
Lumpsum 0.85
2725.32
Add 13.615% Contractor`s Profit and OH Charges 371.05
Total : 10 Sqm 3096.37
Painting to new walls with two coats of acrylic interior emulsion paint having VOC (Volatile
Organic Compound) content less than 50 grams/ litre of approved brand and shade over a
base coat of appropriate primer of approved brand, making three coats in all to give an even
88 shade after throughly brushing the surface to remove all dirt and remains of loose powdered
materials including cost and conveyance of all materials to work site and all operational,
incidental, labour charges etc., complete., for finished item of work as per SS 911 for Internal
walls (APSS No: 912)
1.20 Kgs Cement Primer Interior Grade - I (BMT-J-01) 160.00 1 Kg 192.00
0.21 days First class painter for primer 705.00 1 day 148.05
0.49 days Second class painter for primer 565.00 1 day 276.85
0.80 lts Acrylic interior emulsion paint (BMT-J.24) 190.00 1 lt 152.00
0.36 days First class painter 705.00 1 day 253.80
0.84 days Second class painter 565.00 1 day 474.60
Sundries 0.85
1498.15
Add 13.615% Contractor`s Profit and OH Charges 203.97
Total : 10 Sqm 1702.12
Quantity Description of the work Rate Per Amount
Painting to new walls with two coats of acrylic Exterior emulsion paint having VOC (Volatile
Organic Compound) content less than 50 grams/ litre of approved brand and shade over a
base coat of appropriate primer of approved brand, making three coats in all to give an even
89 shade after throughly brushing the surface to remove all dirt and remains of loose powdered
materials including cost and conveyance of all materials to work site and all operational,
incidental, labour charges etc., complete., for finished item of work as per SS 911 for External
walls (APSS No: 912)
1.20 Kgs Cement Primer Exterior Grade - II (BMT-J-02) 200.00 1 Kg 240.00
0.21 days First class painter for primer 705.00 1 day 148.05
0.49 days Second class painter for primer 565.00 1 day 276.85
0.80 lts Acrylic exterior emulsion paint (BMT-J.34) 210.00 1 lt 168.00
0.36 days First class painter 705.00 1 day 253.80
0.84 days Second class painter 565.00 1 day 474.60
Sundries 0.11
1561.41
Add 13.615% Contractor`s Profit and OH Charges 212.59
Total : 10 Sqm 1774.00
Labour charges for erection of 0.50 HP Single phase Centrifugal Mono block pumpsets
90 including pipe connection for suction and delivery and all labour charges etc., complete.,
(Specification No: 11.1.1)
0.50 days Skilled fitter 660.00 1 day 330.00
1 day Helper 565.00 1 day 565.00
0.50 day Plumber 565.00 1 day 282.50
Total: 2 Jobs 1177.50
1 No 588.75
Add 13.615% Contractor`s Profit and OH Charges 80.16
Total 1 No 668.91
Labour charges for erection of 1 HP to 2 HP Single phase Centrifugal Mono block pumpsets
91 including pipe connection for suction and delivery and all labour charges etc., complete.,
(Specification No: 11.1.2 to 4)
0.50 days Skilled fitter 660.00 1 day 330.00
1 day Helper 565.00 1 day 565.00
0.50 day Plumber 565.00 1 day 282.50
1 No 1177.50
Add 13.615% Contractor`s Profit and OH Charges 160.32
Total: 1 No 1337.82
Labour charges for erection of 3 HP to 10 HP three phase centrifugal pumpsets including pipe
92 connection for suction and delivery and all labour charges etc., complete., (Specification No:
11.1.5 to 8)
1 day Skilled fitter 660.00 1 day 660.00
1 day Helper 565.00 1 day 565.00
1 day Plumber 565.00 1 day 565.00
1 No 1790.00
Add 13.615% Contractor`s Profit and OH Charges 243.71
Total: 1 No 2033.71
Quantity Description of the work Rate Per Amount
Labour charges for erection of 15 HP three phase centrifugal pumpsets including pipe
93 connection for suction and delivery and all labour charges etc., complete., (Specification No:
11.1. 9)
1 day Skilled fitter 660.00 1 day 660.00
3 days Helper 565.00 1 day 1695.00
1 day Plumber 565.00 1 day 565.00
2920.00
Add 13.615% Contractor`s Profit and OH Charges 397.56
Total: 1 No 3317.56

Labour charges for erection of Ejecto type water pump single phase 0.50 HP to 3 HP single
94 stage pumpsets and three phase 3 HP single stage pumpsets including pipe connection for
suction and delivery and all labour charges etc., complete., (Specification No: 11.2.1 to 6)

0.50 day Skilled Electrician 700.00 1 day 350.00


1.00 day Helper 565.00 1 day 565.00
0.50 day Fitter 565.00 1 day 282.50
Total: 2 Jobs 1197.50
1 No 598.75
Add 13.615% Contractor`s Profit and OH Charges 81.52
Total: 1 No 680.27
Labour charges for erection of Ejecto type water pump three phase 5 HP single stage
95 pumpset including pipe connection for suction and delivery and all labour charges etc.,
complete., (Specification No: 11.2.7)
0.50 day Skiller fitter 660.00 1 day 330.00
1.50 days Helper 565.00 1 day 847.50
0.50 day Plumber 565.00 1 day 282.50
Total: 2 Jobs 1460.00
1 No 730.00
Add 13.615% Contractor`s Profit and OH Charges 99.39
Total: 1 No 829.39
Labour charges for erection of single phase submersible pumpsets (Bore well type) 1 HP to 2
96 HP pumpsets including pipe connection for suction and delivery and all labour charges etc.,
complete., (Specification No: 11.3.1 a to c)
0.50 day Skiller fitter 660.00 1 day 330.00
1.00 day Helper 565.00 1 day 565.00
0.50 day Plumber 565.00 1 day 282.50
Total: 2 Jobs 1177.50
1 No 588.75
Add 13.615% Contractor`s Profit and OH Charges 80.16
Total: 1 No 668.91
Labour charges for erection of three phase submersible pumpsets (Bore well type) 2 HP to 4
97 HP pumpsets including pipe connection for suction and delivery and all labour charges etc.,
complete., (S.No: 11.3.2 to 8)
1.00 day Skiller fitter 660.00 1 day 660.00
2.00 days Helper 565.00 1 day 1130.00
Quantity Description of the work Rate Per Amount
1.00 day Plumber 565.00 1 day 565.00
Hire charges of tripod with winch 50% of labour charges 1177.50
1 No 3532.50
Add 13.615% Contractor`s Profit and OH Charges 480.95
Total: 1 No 4013.45
Labour charges for erection of three phase submersible pumpsets (Bore well type) 5 HP to
98 10 HP pumpsets including pipe connection for suction and delivery and all labour charges etc.,
complete., (S.No:11.3.10 to 16)
2.00 days Skiller fitter 660.00 1 day 1320.00
3.00 days Helper 565.00 1 day 1695.00
1.00 day Plumber 565.00 1 day 565.00
Hire charges of tripod with winch 50% of labour charges 1790.00
5370.00
Add 13.615% Contractor`s Profit and OH Charges 731.13
Total: 1 No 6101.13
Labour charges for erection of three phase submersible pumpsets (Bore well type) 15 HP
99 pumpsets including pipe connection for suction and delivery and all labour charges etc.,
complete., (S.No: 11.3.17)
2.00 days Skiller fitter 660.00 1 day 1320.00
4.00 days Helper 565.00 1 day 2260.00
1.00 day Plumber 565.00 1 day 565.00
Hire charges of tripod with winch 50% of labour charges 2072.50
6217.50
Add 13.615% Contractor`s Profit and OH Charges 846.51
Total: 1 No 7064.01
Labour charges for erection of three phase submersible pumpsets (Open well) 3 HP to 7.50
100 HP pumpsets including pipe connection for suction and delivery and all labour charges etc.,
complete., (S.No: 11.4.1 to 3)
1.00 day Skiller fitter 660.00 1 day 660.00
2.00 days Helper 565.00 1 day 1130.00
1.00 day Plumber 565.00 1 day 565.00
Hire charges of tripod with winch 50% of labour charges 1177.50
3532.50
Add 13.615% Contractor`s Profit and OH Charges 480.95
Total: 1 No 4013.45
Labour charges for erection of three phase submersible pumpsets (Open well) 10 HP
101 pumpset including pipe connection for suction and delivery and all labour charges etc.,
complete., ( S.No: 11.4.4)
1.00 day Skiller fitter 660.00 1 day 660.00
3.00 days Helper 565.00 1 day 1695.00
Quantity Description of the work Rate Per Amount

1.00 day Plumber 565.00 1 day 565.00


Hire charges of tripod winch 50% of labour charges 1460.00
4380.00
Add 13.615% Contractor`s Profit and OH Charges 596.34
Total: 1 No 4976.34
102. REWINDING OF MOTORS
Rewinding of single phase motor of 1400 RPM including all necessary material and of the
ELEC-
298 same characteristics as original with required size of super enamelled wire 'E' class insulation
5.9.13
material and testing etc. as required.
a 0.5 H.P. To 1 H.P. 1 No 1050.00
Add 13.615% Contractor`s Profit and OH Charges 142.96
0.5 H.P. To 1 H.P. With 13.615% CP& OH Charges 1 No 1192.96

b 2.0 H.P 1 No 1725.00


Add 13.615% Contractor`s Profit and OH Charges 234.86
2.0 H.P With 13.615% CP& OH Charges 1 No 1959.86
Rewinding of three phase motor of 1400 to 2800 RPM including all necessary material and of
ELEC-
299 the same characteristics as original with required size of super enamelled wire 'E' class
5.9.14
insulation material and testing etc. as required.
a 3.0 H.P. 1 No 2550.00
Add 13.615% Contractor`s Profit and OH Charges 347.18
3.0 H.P. With 13.615% CP& OH Charges 1 No 2897.18

b 5.0 H.P. 1 No 3600.00


Add 13.615% Contractor`s Profit and OH Charges 490.14
5.0 H.P. With 13.615% CP& OH Charges 1 No 4090.14

c 7.5 H.P 1 No 3900.00


Add 13.615% Contractor`s Profit and OH Charges 530.99
7.5 H.P With 13.615% CP& OH Charges 1 No 4430.99

d 10.0 H.P 1 No 5250.00


Add 13.615% Contractor`s Profit and OH Charges 714.79
10.0 H.P With 13.615% CP& OH Charges 1 No 5964.79

e 12.5 H.P 1 No 5550.00


Add 13.615% Contractor`s Profit and OH Charges 755.63
12.5 H.P With 13.615% CP& OH Charges 1 No 6305.63

f 15.0 H.P 1 No 6750.00


Add 13.615% Contractor`s Profit and OH Charges 919.01
15.0 H.P With 13.615% CP& OH Charges 1 No 7669.01
Quantity Description of the work Rate Per Amount

PVC PIPE LINE DATA (Distribution = 4 Kgs/sqcms & Pumping main = 6 Kgs/sqcms)

Earth work excavation in BC soils, red earth and ordinary gravelly soils for pipe line trench of
size 0.50 x 0.75 Mts using 2/3 quanity with machinery and 1/3 quantity with manual
including laying and jointing of 63 / 75mm dia PVC Kgs/Sqcms true to alignment and
103
testing the pipe line with hydralic field test pressure with water minimum lead of 500mts
including refilling the trench with excavated earth including cost of pipes and all labour
charges etc., complete., but excluding taxes on PVC pipes etc., complete.,

Cost of 63 / 75mm dia PVC Kgs/Sqcms Pipe (Excluding


1 Rmt 1 Rmt
taxes)

1 Rmt Laying and jointing of PVC pipe 9.58/ 11.41 1 Rmt

0.25 Cum Earth work with machinery 2/3 quantity 105.29 1 Cum 26.32

0.125 Cum Earthw work with manual 1/3 quantity 191.10 1 Cum 23.89

1.20 Cum Add 120% for narrow trenches on manual only 23.89 1 Cum 28.67

0.375 Cum Seigniorage charges for earth work excavation 0.00 1 Cum 0.00

1 Rmt

Add 13.615% Contractor`s Profit and OH Charges


Total: 1 Rmt

Earth work excavation in BC soils, red earth and ordinary gravelly soils for pipe line trench of
size 0.70 x 1.00 Mt using 2/3 quanity with machinery and 1/3 quantity with manual including
laying and jointing of 90 / 110mm dia PVC Kgs/Sqcms true to alignment and testing the
104
pipe line with hydralic field test pressure with water minimum lead of 500mts including
refilling the trench with excavated earth including cost of pipes and all labour charges etc.,
complete., but excluding taxes on PVC pipes etc., complete.,

Cost of 90 / 110mm dia PVC Kgs/Sqcms Pipe


1 Rmt 1 Rmt
(Excluding taxes)

1 Rmt Laying and jointing of PVC pipe 13.69/16.73 1 Rmt

0.467 Cum Earth work with machinery 2/3 quantity 105.29 1 Cum 49.14

0.233 Cum Earthw work with manual 1/3 quantity 191.10 1 Cum 44.59

0.75 Cum Add 75% for narrow trenches on manual only 44.59 1 Cum 33.44

0.70 Cum Seigniorage charges for earth work excavation 0.00 1 Cum 0.00

1 Rmt

Add 13.615% Contractor`s Profit and OH Charges

Total: 1 Rmt
Quantity Description of the work Rate Per Amount

HDPE PIPE LINE DATA (Distribution = 4 Kgs/sqcms PE 80 Grade and


Pumping main = 6 Kgs/sqcms PE 100 Grade)
Earth work excavation in BC soils, red earth and ordinary gravelly soils for pipe line trench of
size 0.50 x 0.75 Mts using 2/3 quanity with machinery and 1/3 quantity with manual
including laying and jointing of 63 / 75mm dia HDPE Kgs/Sqcms pipe line true to alignment
with butt fusion welding as per IS 7634- Part II/1975 as amended from time to time to the
105
alignment and gradient and testing the pipe line with hydralic field test pressure with water
minimum lead of 500mts including refilling the trench with excavated earth including cost of
pipes and all labour charges etc., complete., but excluding taxes on HDPE pipes etc.,
complete.,

Cost of 63 / 75mm dia HDPE PE Grade


1 Rmt 1 Rmt
Kgs/Sqcms Pipe (Excluding taxes)
1 Rmt Laying and jointing of HDPE pipe 38.98/41.03 1 Rmt

0.25 Cum Earth work with machinery 2/3 quantity 105.29 1 Cum 26.32

0.125 Cum Earthw work with manual 1/3 quantity 191.10 1 Cum 23.89

1.20 Cum Add 120% for narrow trenches on manual only 23.89 1 Cum 28.67

0.375 Cum Seigniorage charges for earth work excavation 0.00 1 Cum 0.00

1 Rmt

Add 13.615% Contractor`s Profit and OH Charges

Total: 1 Rmt
Earth work excavation in BC soils, red earth and ordinary gravelly soils for pipe line trench of
size 0.70 x 1.00 Mts using 2/3 quanity with machinery and 1/3 quantity with manual
including laying and jointing of 90 / 110mm dia HDPE Kgs/Sqcms pipe line true to
alignment with butt fusion welding as per IS 7634- Part II/1975 as amended from time to time
106
to the alignment and gradient and testing the pipe line with hydralic field test pressure with
water minimum lead of 500mts including refilling the trench with excavated earth including
cost of pipes and all labour charges etc., complete., but excluding taxes on HDPE pipes etc.,
complete.,
Cost of 90 / 110mm dia HDPE PE Grade
1 Rmt 1 Rmt
Kgs/Sqcms Pipe (Excluding taxes)
1 Rmt Laying and jointing of HDPE pipe 44.65/51.72 1 Rmt
0.467 Cum Earth work with machinery 2/3 quantity 105.29 1 Cum 49.14
0.233 Cum Earthw work with manual 1/3 quantity 191.10 1 Cum 44.59
0.75 Cum Add 75% for narrow trenches on manual only 44.59 1 Cum 33.44
0.70 Cum Seigniorage charges for earth work excavation 0.00 1 Cum 0.00
Total: 1 Rmt
Add 13.615% Contractor`s Profit and OH Charges
Total: 1 Rmt
Quantity Description of the work Rate Per Amount

LAYING & JOINTING 65MM GI PIPE WITH SPECIALS & WITH OUT EARTH WORK
Laying and jointing of 65mm dia GI "B" Class pipe as per IS 1239 specifications excluding earth
work excavation including cost of pipe and its specials and all labour charges etc., complete.,
107
except GI bends, unions, GI connectors with checkout and socket TATA or ZENITH make or
equivalent.
Cost of GI "B" Class pipe as per IS 1239 specifications
1.00 Rmt 837.00 1 Rmt 837.00
including Earth work (Sl.No:302, BMW-F.91)
0.25 Cum Deduct Earth work of trench size 0.50x0.50Mts 191.10 1 Cum 47.78
0.1875 Cum Deduct 75% for narrow trenches 191.10 1 Cum 35.83
Total: 1 Rmt 753.39
Add 13.615% Contractor`s Profit and OH Charges 102.57
Sundries 0.03
Total: 1 Rmt 856.00

FILTER BED FILTER MEDIA AND OTHER DATAS


Collection and supply of fine sand including laying, screening, washing, filling of the sand in
filter bed with an effective size of 0.20 to 0.30mm with uniformity coefficient of 2 to 3 for a
108
depth of 1 Mt including cost and conveyance of all materials and all labour charges etc.,
complete.,
Cost of sand including washing and screening (Roads SSR
1 Cum 700.00 1 Cum 700.00
SSI No: 95 C)
Sand conveyance charges from __________________
1 Cum 1 Cum
with a lead of ______ KMs
Labour charges for laying filters with sand (Roads SSR
1 Cum 30.70 1 Cum 30.70
Sl.No: 171, SS Item No: 5 (o))
1 Cum
Add 13.615% Contractor`s Profit and OH Charges
Total: 1 Cum
Collection and supply of 16 to 23.60mm HBG M/C metal chips including laying, screening,
109 washing, filling of the metal in filter bed with uniformity including cost and conveyance of
all materials and all labour charges etc., complete.,
Cost of 20mm HBG M/C chips including cost, machine
1.00 Cum 1079.00 1 Cum 1079.00
crushing charges at 25% and blasting charges
Meta/Chips conveyance charges from _______________
1.00 Cum 1 Cum
with a lead of ______ KMs
Screening charges for Chips/Metal (Roads SSR Sl.No: 150,
1.00 Cum 17.60 1 Cum 17.60
SS Item No: B 2)
Labour for laying filters with Coarse agregate/ chips
1.00 Cum 55.30 1 Cum 55.30
(Roads SSR Sl.No: 170, SS Item No: 5 (n))
1 Cum
Add 13.615% Contractor`s Profit and OH Charges
Total : 1 Cum
Quantity Description of the work Rate Per Amount

110 Removing of sand in filter beds including all labour charges etc., complete.,
Labour charges for laying filters with sand (Roads SSR
1.00 Cum 30.70 1 Cum 30.70
Sl.No: 171, SS Item No: 5 (o))
Add 13.615% Contractor`s Profit and OH Charges 4.18
Total : 1 Cum 34.88
Removing of Coarse agregate in filter beds including all labour charges etc.,
111
complete.,
Labour for laying filters with Coarse agregate/ chips
1.00 Cum 55.30 1 Cum 55.30
(Roads SSR Sl.No: 170, SS Item No: 5 (n))
Add 13.615% Contractor`s Profit and OH Charges 7.53
Total : 1 Cum 62.83
Printing new letters of any shade for name board with synthetic enamyl paint two coats
(ఆంధ్ర ధ్రదేశ్ ధ్రభుత్వ ము, ధ్ామీణ నీటి సరఫరా మరియు పారిశురయ ము శాఖ,
112 సామర ్య ము: ____ 000 లీటర్లు ఉరరి త్ల జలాశయము, __________________ ధ్ామము,
______________ మండలము, కర్నూ లు జిలాు) including cost and conveyance of all
materials and all labour charges etc., complete.,
Printing 10 cms height new letter and figures of any
1 Cm
shade (Item 8.30 in SSR in Part I - Materials not covered
94 Nos 2.00 height 1880.00
under WR Work items basic data – Common SoR 2022-
per 1 No
23)
Add 13.615% Contractor`s Profit and OH Charges 255.96
Sundries 0.04
Total : 1 No 2136.00
Supply, delivery and staking of Alumino-
Ferric(ALUM) as per I.S 299:2012 including cost of 8.48
Rs. 9.50
35 1 material, conveyance , stacking at the location 1 Kg with GST
without
specified by the Department and all taxes, duties
GST
and levies etc., complete., (SSR 2018-19)
Add 13.615% Contractor`s Profit and OH Charges 1.15
1 Kg 9.63
Supply, delivery and staking of Bleaching powder as
per I.S 1065:1989 including cost of material, 23.21
Rs.26.00
35 5 conveyance , stacking at the location specified by the 1 Kg with GST
without
Department and all taxes, duties and levies etc.,
GST
complete., (SSR 2018-19)
Add 13.615% Contractor`s Profit and OH Charges 3.16
1 Kg 26.37
Quantity Description of the work Rate Per Amount

DATA FOR TAP CONNECTIONS WITH UPVC CONNECTIONS ON UPVC/ HDPE


PIPE LINES AND GI CONNECTIONS ON GI PIPE LINES
Providing individual house hold tap connection using 1 Rmt 20mm dia UPVC Pipe with
113 required specials on PVC/ HDPE pipe line including cost and conveyence of all materials and
all labour and fitting charges etc., complete.,
1 Rmt 20mm dia (3/4") size UPVC pipe 10kgf/sqcms 22.00 1 Rmt 22.00
1 No 20mm dia (3/4'') UPVC On/ Off control 100.00 1 No 100.00
1 No Service Saddle for 63/75 mm dia PVC pipe 150.00 1 No 150.00
3 Nos 20mm dia (3/4") size UPVC connector 40.00 1 No 120.00
1 No 15mm dia Regulating brass ferrule 182.00 1 No 182.00
3 Nos 20mm dia 3/4" size UPVC Elbow 25.00 1 No 75.00
1 No 50ml Solvent cement Adhesive (50ml) 14.00 50ml 14.00

Labour charges for laying, fixing and commissioning the


PVC pipes including couplers/ bends/ tees etc any
1 Rmt diameter including fixing necessary fittings like bends, 74.00 1 Rmt 74.00
plugs, couplers, junctions, tees, etc with solvent jointing
as per standard practice (As per SSR BMW-G.152)

1 No 737.00
Add 13.615% Contractor`s Profit and OH Charges 100.34
Sundries 0.66
Total: 1 No 838.00
Providing individual house hold tap connection using 2 Rmt 20mm dia UPVC Pipe with
114 required specials on PVC/ HDPE pipe line including cost and conveyence of all materials and
all labour and fitting charges etc., complete.,

2 Rmt 20mm dia (3/4") size UPVC pipe 10kgf/sqcms 22.00 1 Rmt 44.00
1 No 20mm dia (3/4'') UPVC On/ Off control 100.00 1 No 100.00
1 No Service Saddle for 63/75 mm dia PVC pipe 150.00 1 No 150.00
3 Nos 20mm dia (3/4") size UPVC connector 40.00 1 No 120.00
1 No 15mm dia Regulating brass ferrule 182.00 1 No 182.00
3 Nos 20mm dia 3/4" size UPVC Elbow 25.00 1 No 75.00
1 No 50ml Solvent cement Adhesive (50ml) 14.00 50ml 14.00

Labour charges for laying, fixing and commissioning the


PVC pipes including couplers/ bends/ tees etc any
2 Rmt diameter including fixing necessary fittings like bends, 74.00 1 Rmt 148.00
plugs, couplers, junctions, tees, etc with solvent jointing
as per standard practice (As per SSR BMW-G.152)

1 No 833.00
Add 13.615% Contractor`s Profit and OH Charges 113.41
Sundries 0.59
Total: 1 No 947.00
Quantity Description of the work Rate Per Amount

Providing individual house hold tap connection using 3 Rmt 20mm dia UPVC Pipe with
115 required specials on PVC/ HDPE pipe line including cost and conveyence of all materials and
all labour and fitting charges etc., complete.,

3 Rmt 20mm dia (3/4") size UPVC pipe 10kgf/sqcms 22.00 1 Rmt 66.00
1 No 20mm dia (3/4'') UPVC On/ Off control 100.00 1 No 100.00
1 No Service Saddle for 63/75 mm dia PVC pipe 150.00 1 No 150.00
3 Nos 20mm dia (3/4") size UPVC connector 40.00 1 No 120.00
1 No 15mm dia Regulating brass ferrule 182.00 1 No 182.00
3 Nos 20mm dia 3/4" size UPVC Elbow 25.00 1 No 75.00
1 No 50ml Solvent cement Adhesive (50ml) 14.00 50ml 14.00

Labour charges for laying, fixing and commissioning the


PVC pipes including couplers/ bends/ tees etc any
3 Rmt diameter including fixing necessary fittings like bends, 74.00 1 Rmt 222.00
plugs, couplers, junctions, tees, etc with solvent jointing
as per standard practice (As per SSR BMW-G.152)

1 No 929.00
Add 13.615% Contractor`s Profit and OH Charges 126.48
Sundries 0.52
Total: 1 No 1056.00
Making connection of G.I. distribution branch with G.I. main by providing and fixing tee,
including cutting and threading the pipes and fixing tee etc., complete. Reference to
116
specifications. BIS No.783/85 for 25mm branch from 40mm nominal dia main (Data as per
PH SSR vide PHE-GIDM-8)
2.50 Rmt 15mm dia GI "B" Class pipe (188.00-43.00) 145.00 1 Rmt 362.50

1 No 25mm dia GI Tee 58.00 1 No 58.00

1 No 25mm dia GI Jam Nut 10.00 1 No 10.00

1 No 15mm dia GI Coupling 35.00 1 No 35.00

3 Nos 15mm dia GI Elbows 35.00 1 No 105.00

1 No 15mm dia GI/ PVC Tap 75.00 1 No 75.00

0.33 days Plumber 2nd class 565.00 1 Day 186.45

0.33 days Man mazdoor 525.00 1 Day 173.25

Water charges @ 1% on Labour & Testing Charges 3.60

1 No 646.30

Add 13.615% Contractor`s Profit and OH Charges 87.99

Sundries 0.11

Total: 1 No 734.40
Quantity Description of the work Rate Per Amount

O & M OF CPWS SCHEMES DATA


Operation and Maintenance of CPWS Scheme to ________________ and other ____
habitations in Kurnool District including all charges for filling of SS tank upto MWL
maintenance of crew and all labour charges (Pump Operator/Electrician semi skilled,
fitter/helper, watchman) involved for operation and maintenance of pumpsets, treatment
plants, pipe lines, head works, including transmission lines, distribution lines, service
resorvoirs and other like sluice valves, including cost of materials, pipes, CID Joints, valves,
117
repairs to pumpsets including rewinding of electrical motors and chlorinators and mixing of
required quantity of bleaching powder daily and release of water through taps at the rate of
40 LPCD at prescribed time but excluding power consumption charges as envisaged in special
conditions which will be paid of the department excluding GST etc., complete as per
specifications and direction of the department. Systerm staff (From 01-01-2021 to 31-03-
2021 ie., 90 days)
Nos Helper ( x 90 days= Nos) 565.00 1 day
Nos Watchman ( x 90 days= Nos) 525.00 1 day
Bleaching powder excluding 12% GST
Populationx 40 x 4.40/1000000 = x
23.21 1 Kg
90 days = Kgs
Repairs and Renewals
Original Estimate cost x 0.50% x (1.06) x 90 days / 365
days
1 lt
Add 13.615% Contractor`s Profit and OH Charges
Total Amount in Rs. Per 1 liter
DATA FOR 40, 60, 90 KL CAPACITY 12.90 Mts STAGING VRCC OHSR
WITH M 30 GRADE DESIGN MIX (SSR 2022-23)
40 KL 60 KL 90 KL
Description of Work
RATE RATE RATE
Construction of 40,000/ 60,000/ 90,000 liters capacity Circular Over Head Service
Reservoir (OHSR) with 12.90 Mts staging with raft foundation for a wind pressure of
185.21 Kg/sqm using Vibrated Reinforced Cement Concrete M 30 Grade design mix and
using 20 mm HBG machine crushed metal in the site selected by the department as
shown in the drawings and specification as per the departmental procedure, including
earth work excavation in all kinds of soils in wet or dry conditions except in rock for
foundations fitted with (A) RCC or Aluminium ladder inside 0.60 Mts wide (B) Spiral
staircase on the out side shall be provided up to 200 KL. Above 200 KL capacity dog
legged staircase shall be provided with staircase flight width of 1.0 mts and landing width
of 1.20 mts with 32mm dia SS 304 railing up to 1.20 Mts height in two rows with vertical
posts should not be more than 1.00 Mt (C) Lightening arrestor including conductor and
earthing as per IS 3070 earthing extended below the foundation (D) RCC finial ventilators
with copper or stainless steel fly proof mesh, earthing (E) DI Man holes of 2 Nos frame
and cover of 0.60x0.60 Mts size (light duty) as per IS specifications (F) Water level
indicator of good quality with ebonite/ copper float of approved pattern - 1 No
(G) The ladder shall be with MS ladder and verticals with HDPE of 10 Kgs/Sqcms shall be
provided for single column OHSR only. (h) Minimum staging for all ELSR/OHSR shall be
10.0 Mts (i) The increase in staging shall be at 1.0 Mt interval. (j) The railing provided to
the gallery and staircase shall be with 32mm dia stainless steel of grade 304 for a height
of 1.20 Mts in two rows with vertical posts should not be more than 1.00 Mt (k) The dog
legged staircase shall be enclosed with brick/CRS wall on three sides and front side with
MS collapsible gate up to 1st brace level from ground level to prevent unauthorized entry
(l) DI swan neck ventilators shall be provided in top dome and slab. (m) The above rates
are exclusive of all inlet, outlet connections and valves. All valves near inlet, out let and
for scour of ELSRs shall be DI Valves of heavy duty confirming to the specification of SOR
item No: 28. (n) Rate inclusive of three coats of epoxy paint Food Grade of best quality to
inner surface of the reservoir including roof dome (o) Two coats of whether proof
emulsion painting for external surfaces, lettering, all required fixtures, pipes, bends,
valves etc., for pipe connections but excluding cost of pipes, bends and valves as per
departmental designs and drawings, cost and conveyance of all materials, centering,
curing, seigniorage, all labour charges and testing the reservoir for water tightness
etc.,complete., for finished item of the work.
Rate for OHSR of 10 Mts staging as per SSR Item No: 44 (90 KL Rate
1 Liter 38.150 28.910 26.863
taken as per interpolation formula)
Add for every meter of staging above 10 Mts, the rate shall be
( 2.90 x 0.10 =
increase by 0.10 paise per litre per every meter of additional in 0.290 0.290 0.290
staging 0.29)
Litre rate for 12.90 Mts staging VRCC OHSR for SBC of 15 T/ Sqmt. 38.440 29.200 27.153
The above rate shall be increased/ decreased due to increase/ 38.44 x ((4220-
decrease in the cost of cement by Basic rate x ((Rc-3680) /3680)x 3680)/3680) x 0.395 0.300 0.279
0.07 (Rc = Present cement rate) 0.07
The above rate shall be increased/ decreased due to increase/ 38.44 x ((72000-
decrease in the cost of steel by Basic rate x ((Rs-68000)/68000) x 68000)/68000) 0.452 0.344 0.319
0.20 (Rs = Present steel rate Fe 500) x 0.20
The above rates are applicable for wind pressures up to 250
kg/Sqmts. For decrease in wind pressure the rate has to be
(185.21-250.00)
decreased by 5 % per every 100 kg/sqmt. If the ELSR/ OHSR are to
be designed for seismic forces also cost shall be arrived by working
x 0.05 x -1.245 -0.946 -0.880
out detailed quantities based on the designs. Wind pressure for 38.44/100
Kurnool District is taken 185.21 Kgs/Sqmts
Total cost in Rs. 1 Liter 38.042 28.898 26.871
Add 10 % for Tribal/ Agency/ Rural area 1 Liter 3.804 2.890 2.687
TOTAL in Rs. 1 Liter 41.846 31.788 29.558
Add 13.615% Contractor`s Profit 1 Liter 5.697 4.328 4.024
GRAND TOTAL in Rs. 1 Liter 47.543 36.116 33.582
STATEMENT SHOWING COMPARATIVE DATA FOR THE YEAR 2022-23
Drinking Water Supply Schemes (Public Health)
S No Description Unit Quantity Rate Rs. Amt Rs.
1 2 3 4 5 6
2A Sub Analysis : (Basic Data)
OBSERVED DATA FOR TESTING OF 450 MM
DIA PSC MAIN : Pumping main to Hydralic field
test pressure including transportation of Water
with minimum lead of 500 M

(Length = 500 Mts) taking out put / 500


Mts. Unit = 1 Rmt.
Labour
Fitters (2 x 3 days)
Fitters I Class day 3.000 660.00 1980.00
Fitters II Class day 3.000 565.00 1695.00
Machinery
Hire chargers for Hydralic field test pressure days 3.000 1200.00 3600.00
testing including transportation of water @ Rs.
1200/- (1000+200) / day

Materials
Pressure guage Nos 0.050
3/4" G.I. Pipe (20 mm) RM 3.000 220.00 660.00
Specials Ls
Dummies No. 0.100 50.00 5.00
Diesel (2 Lts. / Hr) 30 Hrs. Lts. 60.000 99.74 5984.40
(T) Total Rate per 500 Mts. 13924.40
(r) Rate per 1 Rmt for 450 mm dia 27.85
(R) Rate per 1 Rmt for 10 mm dia = (10/450) 0.6189
xr
Note : Proportionate Testing Charges may
be arrived, keeping the diametre of pipe
based on this analysis, for an varities of
pipes for various Dia Pipes.

11 Lowering, laying, jointing and testing to


hydralic test pressure including cost of water
with minimum water lead of 500m for UPVC
pressure pipes in ready made trenches true
to alignment and gradient including all
sundries but excluding cost & conveyance of
pipes from source of supply and jointing
materials as per BIS No. 7634 - Part III - 1975

Sub Analysis for 160 mm Dia :


Taking output : Length - 500 m ; Joints -
83 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor day 7.000 525.000 3675.00
Jointing
Fitter day 2.000 660.000 1320.00
Mazdoor day 4.000 525.000 2100.00
Testing
Testing of Pipelines with required pressure rm 500.000 9.90 4950.90
as per relevant IS Specification including
filling with water with a water lead upto 500
M, including hire charges of testing
equipment and labour, Materials needed for
testing (as per Sub Analysis 2 A)

Total 12045.90
(b) Material
Add for Water charges at 1% on Labour & Lt 120.46
Testing
(c) Overheads & Contractors Profit
(d) Total (a+b+c) 12166.36
Rate per RM =d/500 Rm 24.33
Rate per 10 mm / 1rm 1.52
A All Classes pipes :
i 63 mm dia pipe
Weight of 1m length = (0.468+0.666+1.01)/3
=0.715 kgs
(a) Labour charges for laying, jointing & rm 6.300 1.52 9.58
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
ii 75 mm dia pipe
Weight of 1m length =
(0.655+0.923+1.439)/3 =1.005 kgs
(a) Labour charges for laying, jointing & rm 7.500 1.52 11.41
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
iii 90 mm dia pipe
Weight of 1m length =
(0.924+1.321+2.032)/3 =1.426 kgs
(a) Labour charges for laying, jointing & rm 9.000 1.52 13.69
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
iv 110 mm dia pipe
Weight of 1m length =
(1.323+1.902+3.062)/3 =2.096 kgs
(a) Labour charges for laying, jointing & rm 11.000 1.52 16.73
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
v 125 mm dia pipe
Weight of 1m length =
(1.722+2.511+3.929)/3 =2.72 kgs
(a) Labour charges for laying, jointing & rm 12.500 1.52 19.01
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
vi 140 mm dia pipe
Weight of 1m length =
(2.144+3.116+4.905)/3 =3.388 kgs
(a) Labour charges for laying, jointing & rm 14.000 1.52 21.29
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
vii 160 mm dia pipe
Weight of 1m length =
(2.799+4.012+6.414)/3 =4.408 kgs
(a) Labour charges for laying, jointing & rm 16.000 1.52 24.33
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
viii 180 mm dia pipe
Weight of 1m length =
(3.581+5.134+8.092)/3 =5.602 kgs
(a) Labour charges for laying, jointing & rm 18.000 1.52 27.37
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
ix 200 mm dia pipe
Weight of 1m length =
(4.331+6.351+10.001)/3 =6.894 kgs
(a) Labour charges for laying, jointing & rm 20.000 1.52 30.42
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
x 225 mm dia pipe
Weight of 1m length =
(5.511+7.975+12.675)/3 =8.72 kgs
(a) Labour charges for laying, jointing & rm 22.500 1.52 34.22
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
xi 250 mm dia pipe
Weight of 1m length =
(6.674+9.886+15.666)/3 =10.742 kgs
(a) Labour charges for laying, jointing & rm 25.000 1.52 38.02
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
xii 280 mm dia pipe
Weight of 1m length =
(8.453+12.404+19.616)/3 =13.491 kgs
(a) Labour charges for laying, jointing & rm 28.000 1.52 42.58
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
xiii 315 mm dia pipe
Weight of 1m length =
(10.682+15.723+24.732)/3 =17.046 kgs
(a) Labour charges for laying, jointing & rm 31.500 1.52 47.91
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
PHE

STATEMENT SHOWING COMPARATIVE DATA AS PER SSR 2022-23


Drinking Water Supply Schemes (Public Health)
LAYING AND JOINTING OF HDPE PIPE LINE
S No
Index-code Description Unit Quantity Rate Rs. Amt Rs.

12 Laying and jointing of HDPE pipes by butt fusion welding as per


IS:7634 – part-II/1975 as amended from time to time to the
PHE-LJHE-12 alignment and gradient and testing the pipeline to the required
pressure.
Note : Specialized labour is needed for execution of laying &
jointing for HDPE Pipes with buttfusion welding technique as
per IS Specification.
i 63 mm Dia
Taking output : Length - 480 m ; Joints - 40 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor day 4.000 525.00 2100.00
Jointing
Fitter First class day 0.300 660.00 198.00
Fitter Second class day 0.700 565.00 395.50
Mazdoor day 2.000 525.00 1050.00
Testing
Fitter First class day 0.300 660.00 198.00
Fitter Second class day 0.700 565.00 395.50
Mazdoor day 2.000 525.00 1050.00
Supervisor day 1.000 975.00 975.00
Total 6362.00
(b) Machinery
Hirecharges of Generator Set & Hydraulic Testing Equipment day 1.000 10152.00 10152.00
(c) Material
Kerosene Lt 4.000 50.00 200.00
Diesel Lt 8.000 99.74 797.92
Water for Testing Lt
Transport day 1.000 1200.00 1200.00
Overheads & Contractors Profit 18711.92
(d) Total (a+b+c)
Rate per RM =d/480 1 Rmt 38.98
ii 75 mm Dia
Taking output : Length - 456 m ; Joints - 38 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor day 4.000 525.00 2100.00
Jointing
Fitter First class day 0.300 660.00 198.00
Fitter Second class day 0.700 565.00 395.50
Mazdoor day 2.000 525.00 1050.00
Testing
Fitter First class day 0.300 660.00 198.00
Fitter Second class day 0.700 565.00 395.50
Mazdoor day 2.000 525.00 1050.00
Supervisor day 1.000 975.00 975.00
Total
(b) Machinery
Hire charges of Generator Set & Hydraulic testing equipment day 1.000 10152.00 10152.00
(c) Material
Kerosene Lt 4.000 50.00 200.00
Diesel Lt 8.000 99.74 797.92
Water for Testing Lt 0.00
Transport day 1.000 1200.00 1200.00
Overheads & Contractors Profit
(d) Total (a+b+c) 18711.92
Rate per RM =d/456 1 Rmt 41.03
PHE

iii 90 mm Dia
Taking output : Length - 432 m ; Joints - 36 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor day 5.000 525.00 2625.00
Jointing
Fitter First class day 0.300 660.00 198.00
Fitter Second class day 0.700 565.00 395.50
Mazdoor day 2.000 525.00 1050.00
Testing
Fitter First class day 0.300 660.00 198.00
Fitter Second class day 0.700 565.00 395.50
Mazdoor day 2.000 525.00 1050.00
Supervisor day 1.000 975.00 975.00
Total
(b) Machinery
Hire charges of Generator Set & Hydraulic testing equipment day 1.000 10152.00 10152.00
(c) Material
Kerosene Lt 5.000 50.00 250.00
Diesel Lt 8.000 99.74 797.92
Water for Testing Lt
Transport day 1.000 1200.00 1200.00
Overheads & Contractors Profit
(d) Total (a+b+c) 19286.92
Rate per RM =d/432 1 Rmt 44.65
iv 110 mm Dia
Taking output : Length - 384 m ; Joints - 32 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor day 6.000 525.00 3150.00
Jointing
Fitter First class day 0.300 660.00 198.00
Fitter Second class day 0.700 565.00 395.50
Mazdoor day 2.000 525.00 1050.00
Testing
Fitter First class day 0.300 660.00 198.00
Fitter Second class day 0.700 565.00 395.50
Mazdoor day 2.000 525.00 1050.00
Supervisor day 1.000 975.00 975.00
Total
(b) Machinery
Hirecharges of Generator Set & Hydraulic Testing Equipment day 1.000 10152.00 10152.00
(c) Material
Kerosene Lt 6.000 50.00 300.00
Diesel Lt 8.000 99.74 797.92
Water for Testing Lt
Transport day 1.000 1200.00 1200.00
Overheads & Contractors Profit
(d) Total (a+b+c) 19861.92
Rate per RM =d/384 1 Rmt 51.72
v 125 mm Dia
Taking output : Length - 348 m ; Joints - 29 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor day 7.000 525.00 3675.00
Jointing
Fitter First class day 0.600 660.00 396.00
Fitter second class day 1.400 565.00 791.00
Mazdoor day 3.000 525.00 1575.00
Testing
Fitter First class day 0.300 660.00 198.00
Fitter second class day 0.700 565.00 395.50
Mazdoor day 2.000 525.00 1050.00
Supervisor day 1.000 975.00 975.00
PHE

Total
(b) Machinery
Hire charges of Generator Set & Hydraulic testing equipment day 1.000 10152.00 10152.00

(c) Material
Kerosene Lt 7.000 50.00 350.00
Diesel Lt 8.000 99.74 797.92
Water for Testing Lt 0.00
Transport day 1.000 1200.00 1200.00
Overheads & Contractors Profit
(d) Total (a+b+c) 21555.42
Rate per RM =d/348 1 Rmt 61.94
vi 140 mm Dia
Taking output : Length - 300 m ; Joints - 25 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor day 7.000 525.00 3675.00
Jointing
Fitter First class day 0.600 660.00 396.00
Fitter second class 1.400 565.00 791.00
Mazdoor day 3.000 525.00 1575.00
Testing
Fitter First class day 0.300 660.00 198.00
Fitter second class 0.700 565.00 395.50
Mazdoor day 2.000 525.00 1050.00
Supervisor day 1.000 975.00 975.00
Total
(b) Machinery
Hire charges of Generator Set & Hydraulic testing equipment day 1.000 10152.00 10152.00

(c) Material
Kerosene Lt 8.000 50.00 400.00
Diesel Lt 8.000 99.74 797.92
Water for Testing Lt
Transport day 1.000 1200.00 1200.00
Overheads & Contractors Profit
(d) Total (a+b+c) 21605.42
Rate per RM =d/300 1 Rmt 72.02
vii 160 mm Dia
Taking output : Length - 303 m ; Joints - 25 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor day 7.000 525.00 3675.00
Jointing
Fitter First class day 0.600 660.00 396.00
Fitter second class 1.400 565.00 791.00
Mazdoor day 4.000 525.00 2100.00
Testing
Fitter First class day 0.300 660.00 198.00
Fitter second class 0.700 565.00 395.50
Mazdoor day 2.000 525.00 1050.00
Supervisor day 1.000 975.00 975.00
Total
(b) Machinery
Hire charges of Generator Set & Hydraulic testing equipment day 1.000 10152.00 10152.00

(c) Material
Kerosene Lt 9.000 50.00 450.00
Diesel Lt 8.000 99.74 797.92
Water for Testing Lt
Transport day 1.000 1200.00 1200.00
PHE

Overheads & Contractors Profit


(d) Total (a+b+c) 22180.42
Rate per RM =d/303 1 Rmt 73.20
viii 180 mm Dia
Taking output : Length - 240 m ; Joints - 20 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor day 8.000 525.00 4200.00
Jointing
Fitter First class day 0.600 660.00 396.00
Fitter second class 1.400 565.00 791.00
Mazdoor day 4.000 525.00 2100.00
Testing
Fitter First class day 0.300 660.00 198.00
Fitter second class 0.700 565.00 395.50
Mazdoor day 2.000 525.00 1050.00
Supervisor day 1.000 975.00 975.00
Total Labour
(b) Machinery
Hire charges of Generator Set & Hydraulic testing equipment day 1.000 10152.00 10152.00

(c) Material
Kerosene Lt 10.000 50.00 500.00
Diesel Lt 8.000 99.74 797.92
Water for Testing Lt
Transport day 1.000 1200.00 1200.00
Overheads & Contractors Profit
(d) Total (a+b+c) 22755.42
Rate per RM =d/240 1 Rmt 94.81
ix 200 mm Dia
Taking output : Length - 240 m ; Joints - 20 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor day 10.000 525.00 5250.00
Jointing
Fitter First class day 0.600 660.00 396.00
Fitter second class 1.400 565.00 791.00
Mazdoor day 6.000 525.00 3150.00
Testing
Fitter First class day 0.300 660.00 198.00
Fitter second class 0.700 565.00 395.50
Mazdoor day 2.000 525.00 1050.00
Supervisor day 1.000 975.00 975.00
Total
(b) Machinery
Hire charges of Generator Set & Hydraulic testing equipment day 1.000 10152.00 10152.00

(c) Material
Kerosene Lt 11.000 50.00 550.00
Diesel Lt 8.000 99.74 797.92
Water for Testing Lt
Transport day 1.000 1200.00 1200.00
Overheads & Contractors Profit
(d) Total (a+b+c) 24905.42
Rate per RM =d/240 1 Rmt 103.77
x 225 mm Dia
Taking output : Length - 216 m ; Joints -18 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor day 10.000 525.00 5250.00
Jointing
PHE

Fitter First class day 0.600 660.00 396.00


Fitter second class 1.400 565.00 791.00
Mazdoor day 6.000 525.00 3150.00
Testing
Fitter First class day 0.300 660.00 198.00
Fitter second class 0.700 565.00 395.50
Mazdoor day 2.000 525.00 1050.00
Supervisor day 1.000 975.00 975.00
Total
(b) Machinery
Hire charges of Generator Set & Hydraulic testing equipment day 1.000 10152.00 10152.00

(c) Material
Kerosene Lt 12.000 50.00 600.00
Diesel Lt 8.000 99.74 797.92
Water for Testing Lt
Transport day 1.000 1200.00 1200.00
Overheads & Contractors Profit
(d) Total (a+b+c) 24955.42
Rate per RM =d/216 1 Rmt 115.53
xi 250 mm Dia
Taking output : Length - 216 m ; Joints - 18 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor day 11.000 525.00 5775.00
Jointing
Fitter First class day 0.600 660.00 396.00
Fitter second class 1.400 565.00 791.00
Mazdoor day 6.000 525.00 3150.00
Testing
Fitter First class day 0.300 660.00 198.00
Fitter second class 0.700 565.00 395.50
Mazdoor day 2.000 525.00 1050.00
Supervisor day 1.000 975.00 975.00
Total
(b) Machinery
Hire charges of Generator Set & Hydraulic testing equipment day 1.000 10152.00 10152.00

(c) Material
Kerosene Lt 13.000 50.00 650.00
Diesel Lt 8.000 99.74 797.92
Water for Testing Lt
Transport day 1.000 1200.00 1200.00
Overheads & Contractors Profit
(d) Total (a+b+c) 25530.42
Rate per RM =d/216 1 Rmt 118.20
xii 280 mm Dia
Taking output : Length - 192 m ; Joints - 16 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor day 12.000 525.00 6300.00
Jointing
Fitter First class day 2.000 660.00 1320.00
Fitter second class 565.00
Mazdoor day 6.000 525.00 3150.00
Testing
Fitter First class day 1.000 660.00 660.00
Fitter second class 565.00
Mazdoor day 2.000 525.00 1050.00
Supervisor day 1.000 975.00 975.00
Total
PHE

(b) Machinery
Hire charges of Generator Set & Hydraulic testing equipment day 1.000 10152.00 10152.00

(c) Material
Kerosene Lt 14.000 50.00 700.00
Diesel Lt 8.000 99.74 797.92
Water for Testing Lt
Transport day 1.000 1200.00 1200.00
Overheads & Contractors Profit
(d) Total (a+b+c) 26304.92
Rate per RM =d/192 1 Rmt 137.00
xiii 315 mm Dia
Taking output : Length - 180 m ; Joints - 15 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor day 12.000 525.00 6300.00
Jointing
Fitter First class day 2.000 660.00 1320.00
Fitter second class 565.00
Mazdoor day 6.000 525.00 3150.00
Testing
Fitter First class day 1.000 660.00 660.00
Fitter second class 565.00
Mazdoor day 2.000 525.00 1050.00
Supervisor day 1.000 975.00 975.00
Total
(b) Machinery
Hire charges of Generator Set & Hydraulic testing equipment day 1.000 10152.00 10152.00

(c) Material
Kerosene Lt 15.000 50.00 750.00
Diesel Lt 8.000 99.74 797.92
Water for Testing Lt
Transport day 1.000 1200.00 1200.00
Overheads & Contractors Profit
(d) Total (a+b+c) 26354.92
Rate per RM =d/180 1 Rmt 146.42
SEIGNIORAGE CHARGES CALCULATION SCHEET
Name
Sl. Total quantity in Amount
Name of the item of sub Rate in Rs. Unit
No. Cum/Sqm in Rs.
item
1 Earth work excavation Earth x1.00 45.00 1 cum

2 Sand filling in Basement Sand x1.00 100.00 1 cum

CC (1:6:10) using 40mm HBT Metal x0.90 90.00 1 cum


3
Metal Sand x0.54 100.00 1 cum

CC (1:5:10) using 40mm HBT Metal x0.90 90.00 1 cum


4
Metal Sand x0.45 100.00 1 cum

CC (1:4:8) using 40mm HBT Metal x0.90 90.00 1 cum


5
Metal Sand x0.45 100.00 1 cum

CC (1:3:6) using 40mm HBT Metal x0.90 90.00 1 cum


6
Metal Sand x0.45 100.00 1 cum

CC M 10 using 40mm HBT Metal x0.90 90.00 1 cum


7
Metal (Nominal mix) Sand x0.45 100.00 1 cum

CC M 15 using 40mm HBT Metal x0.90 90.00 1 cum


8
Metal (Nominal mix) Sand x0.48 100.00 1 cum
CC M 20 using 20mm HBG/ Metal x0.90 90.00 1 cum
9 40mm HBT Metal (Nominal
mix) Sand x0.45 100.00 1 cum
CC M 20, M25, M30, M35 and Metal x0.80 90.00 1 cum
10 M40 using 20mm HBG Metal
(Design mix) Sand x0.40 100.00 1 cum

Stone x1.10 90.00 1 cum


11 RR Masonry in CM (1:8)
Sand x0.33 100.00 1 cum

12 Brick Masonry in CM (1:6) Sand x0.20 100.00 1 cum

13 Fly ash Cement Bricks Sand x0.10 100.00 1 cum


CC (1:1 1/2:3) / (1:2:4) using Metal x0.90 90.00 1 cum
20mm HBG M/C for footings,
14
columns, lintels, sun shades, Sand x0.45 100.00 1 cum
beams and slabs
Plastering with CM (1:3)/(1:5)
15 12mm thick to CC items and Sand X0.15/10 100.00 1 Sqm
brick workwith CM (1:5)
Plastering
16 20mm thick to RR Masonry or Sand X0.21/10 100.00 1 Sqm
Flooring bed
Pointing with CM (1:3) to
17 Sand X0.01/10 100.00 1 Sqm
kadapa slabs
Pointing with CM (1:3) to
18 Sand X0.09/10 100.00 1 Sqm
Rough stone

UN AUTHENTICATED
CEMENT CALCULATIONS
Sl.
Name of the item Quantity Unit Cement in Kgs
No.

1 C C (1:5:10) mix using 40mm HBT Metal 0.90x1440/10 1 Cum 129.60 Kgs

2 C C (1:6:10) mix using 40mm HBT Metal 0.90x1440/10 1 Cum 129.60 Kgs

3 C C (1:4:8) mix using 40mm HBT Metal 0.90x1440/8 1 Cum 162 Kgs

4 C C (1:3:6) mix using 40mm HBT Metal 0.90x1440/6 1 Cum 216 Kgs
40mm Metal=
Cement concrete M 10 Nominal mix
5 0.90 cum and 1 Cum 220 Kgs
using 40mm HBT Metal
Sand=0.45 cum
40mm Metal=
Cement concrete M 15 Nominal mix
0.54 cum, 20mm
using 40mm HBT Metal (40mm Metal=
Metal=0.27 cum,
6 0.54 cum, 20mm Metal=0.27 cum, 1 Cum 275 Kgs
10mm Metal=0.09
10mm Metal=0.09 cum and Sand=0.48
cum and
cum)
Sand=0.48 cum
Metal= 0.90 cum
Cement concrete M 20 Nominal mix
7 and Sand=0.45 1 Cum 330 Kgs
using 40mm HBT Metal
cum
Metal= 0.90 cum
Cement concrete M 20 Nominal mix
8 and Sand=0.45 1 Cum 400 Kgs
using 20mm HBG Metal
cum
20mm Metal=
Cement concrete M 20 design mix for
9 0.80 cum and 1 Cum 350 Kgs
estimate purpose
Sand=0.40 cum
20mm Metal=
Cement concrete M 25 design mix for
10 0.80 cum and 1 Cum 380 Kgs
estimate purpose
Sand=0.40 cum
20mm Metal=
Cement concrete M 30 design mix for
11 0.80 cum and 1 Cum 400 Kgs
estimate purpose
Sand=0.40 cum
20mm Metal=
Cement concrete M 35 design mix for
12 0.80 cum and 1 Cum 420 Kgs
estimate purpose
Sand=0.40 cum
20mm Metal=
Cement concrete M 40 design mix for
13 0.80 cum and 1 Cum 430 Kgs
estimate purpose
Sand=0.40 cum

14 RR Masonry in CM (1:8) 0.33x1440/8 1 Cum 59.40 Kgs

15 Brick Masonry in CM (1:6) 0.20x1440/6 1 Cum 48 Kgs

Cement concrete (1:2:4) mix using


16 0.90x1440/4 1 Cum 324 Kgs
20mm HBG Metal
C C (1: 1 1/2:3) mix using 20mm HBG
17 0.90x1440/3 1 Cum 432 Kgs
Metal

UN AUTHENTICATED
18 Plastering with CM (1:3) 12mm thick 0.15x1440/(3x10) 1 Sqm 7.20 Kgs

19 Plastering with CM (1:5) 12mm thick 0.15x1440/(5x10) 1 Sqm 4.32 Kgs

20 Plastering with CM (1:3) 20mm thick 0.21x1440/(3x10) 1 Sqm 10.08 Kgs

21 Plastering with CM (1:5) 20mm thick 0.21x1440/(5x10) 1 Sqm 6.048 Kgs


Flooring with cement concrete (1:5:10)
22 0.90x1440/10 1 Cum 129.60 Kgs
levelling course

23 Pointing in CM (1:3) to kadapa slabs 0.01x1440/(3x10) 1 Sqm 0.48 Kgs

24 Pointing in CM (1:3) to RR Masonry 0.09x1440/(3x10) 1 Sqm 4.32 Kgs

WEIGHT OF STEEL
1 Rmt Weight of Steel (Diameter of steel x Diameter of steel) / 162 Kgs

6mm dia Weight per 1 Rmt (6X6) / 162 0.222 Kgs


8mm dia Weight per 1 Rmt (8X8) / 162 0.395 Kgs
10mm dia Weight per 1 Rmt (10X10) / 162 0.617 Kgs
12mm dia Weight per 1 Rmt (12X12) / 162 0.888 Kgs
16mm dia Weight per 1 Rmt (16X16) / 162 1.580 Kgs
20mm dia Weight per 1 Rmt (20x20) / 162 2.469 Kgs
25mm dia Weight per 1 Rmt (25x25) / 162 3.858 Kgs

APPROXIMATE STEEL REQUIREMENT FOR BUILDING WORKS


Apx steel for
Sl.
Name of the item Unit Approximate requirement Estimate
No.
purposes

1 Footings 1 Cum 80 Kgs 80 Kgs

2 Columns 1 Cum 120 Kgs 120 Kgs

3 Lintels 1 Cum 128 to 160 Kgs 140 Kgs

4 Sun Shades 1 Rmt 6 to 10 Kgs 8 Kgs

5 L - Beams 1 Cum 160 to 240 Kgs 200 Kgs

6 T - Beams 1 Cum 160 to 240 Kgs 200 Kgs

7 Roof Slabs 1 Cum 64 to 96 Kgs 80 Kgs

UN AUTHENTICATED
SCHEDULE - A
NAME OF THE WORK:- Manufacture, supply, delivery, transportation, erection and commission of 500 LPH UV & RO Plant in Kurnool
District.
The quantities given here on those upon which the lumpsum tender cost of the work is based but they are subject to alterations, ommissions, deductions or
1 additions as provided for in the conditions of the contract and do not necessarily to show the actual quantities of work to be done. Payments of extras or
deductions for omissions according to the conditions of the contract or as set forth in the preliminary specifications.

It is to be expressly understood that the measured work is to be taken nett (not with standing any custom or practice to be contrary) according to the drawings or as
2 may be ordered from time to time by the Executive Engineer and cost calculated by the measurement or weight at the respective prices without any additional
charges for any necessary or contingent works connected there with. The rates quoted are for works in site and completed in every respect.

Unit Rate quoted by the tenderer/


Probable quantity Total
Sl. calculation firm/ authorised Dealer
Description of work APDSS amount in
No. (In Figs &
Rs.
In figures In words Words) In Figures In words

Manufacture, supply, delivery, installation and commissioning of 500 liters per hour water treatment plant (De-flouride plant) with Reverse Osmosis
Technology including packing, transportation, installation, testing as per DIS standards and all other incidental charges, as per ISI standard
specifications for obtaining quality of treated water as per BIS standards for drinking water in all aspects including cost and conveyance to site of RO
& UV Plant, raw water tank, product water tank (steel tank), pump sets and its accessories, inlet and out let connections where ever necessary,
1
plumbing, electrical connections, attending repairs and defects during warranty period of one year, inclussive of all taxes and VAT etc., complete., for
finished item of work but excluding construction of shelter. The plant should be maintained for one month and to be handed over to Gram Panchayat.
(The rate is approved vide Rc. No: D 10/237/2011 Dated: 07-06-2013 of the Joint Collector, District Purchase Committee, Kurnool subject to conditions
enclosed in the agreement).

Rupees One lakh


One Unit 1 Unit (One
1 Unit Rate with 5% VAT 165000.00 sixty five 165000.00
only unit) only
thousands only
Rupees One lakh
fifty seven
One Unit 1 Unit (One
1 Unit Rate without GST and other taxes 157143.00 thousand one 157143.00
only unit) only
hundred and forty
three only
SCHEDULE - A
NAME OF THE WORK:- Manufacture, supply, delivery, transportation, erection and commission of 1000 LPH UV & RO Plant in Kurnool
District.
The quantities given here on those upon which the lumpsum tender cost of the work is based but they are subject to alterations, ommissions, deductions or additions as
1 provided for in the conditions of the contract and do not necessarily to show the actual quantities of work to be done. Payments of extras or deductions for omissions
according to the conditions of the contract or as set forth in the preliminary specifications.
It is to be expressly understood that the measured work is to be taken nett (not with standing any custom or practice to be contrary) according to the drawings or as may be
2 ordered from time to time by the Executive Engineer and cost calculated by the measurement or weight at the respective prices without any additional charges for any
necessary or contingent works connected there with. The rates quoted are for works in site and completed in every respect.

Unit Rate quoted by the tenderer/


Probable quantity Total
Sl. calculation firm/ authorised Dealer
Description of work APDSS amount in
No. (In Figs &
Rs.
In figures In words Words) In Figures In words

Manufacture, supply, delivery, installation and commissioning of 1000 liters per hour water treatment plant (De-flouride plant) with Reverse Osmosis
Technology including packing, transportation, installation, testing as per DIS standards and all other incidental charges, as per ISI standard specifications for
obtaining quality of treated water as per BIS standards for drinking water in all aspects including cost and conveyance to site of RO & UV Plant, raw water
1 tank, product water tank (steel tank), pump sets and its accessories, inlet and out let connections where ever necessary, plumbing, electrical connections,
attending repairs and defects during warranty period of one year, inclussive of all taxes and VAT etc., complete., for finished item of work but excluding
construction of shelter. The plant should be maintained for one month and to be handed over to Gram Panchayat (The rate is approved vide Rc. No: D
10/237/2011 Dated: 07-06-2013 of the Joint Collector, District Purchase Committee, Kurnool subject to conditions enclosed in the agreement).

Rupees Two lakhs


One Unit 1 Unit (One
1 Unit Rate with 5% VAT 203000.00 and three 203000.00
only unit) only thousands only

Rupees One lakh


ninety three
One Unit 1 Unit (One
1 Unit Rate without GST and other taxes 193333.00 thousand three 193333.00
only unit) only hundred and
thirty three only
INTERPOLATION FORMULA FOR UN KNOWN RATE IN BETWEEN TWO KNOWN
RATES (OHSR RATES TAKEN FOR THE YEAR 2020-21)

60 KL OHSR RATE : Y1 28.91 Per 1 Lt

100 KL OHSR RATE : Y2 26.18 Per 1 Lt

90 KL OHSR RATE : Y Required

Here, X1 : 60 KL

X : 90 KL

X2 : 100 KL

Y1 : 28.91

Y : Required

Y2 : 26.18

Formula (Y-Y1) / (X-X1) : (Y2-Y1) / (X2-X1)

Y : ((Y2-Y1)*(X-X1) / (X2-X1)) + Y1

: 26.8625

Therefore, 90 KL OHSR RATE : 26.8625

TRAPEZOIDAL FORMULA (USEFUL FOR CEMENT CONCRETE QUANTITY IN


FOOTINGS)

Area of Trapezoidal section : D/6 (A1 +A2 + 4 Am)


Where, A1 : Top area of Trapezoidal section
A2 : Bottom area of Trapezoidal section
Am : Mean Area = (A1 + A2)/2
D : Depth of Trapezoidal section
GOVERNMENT OF ANDHRA PRADESH
RURAL WATER SUPPLY AND SANITATION DEPARTMENT
OFFICE OF THE SUPERINTENDING ENGINEER, RWS & SANITATION CIRLE, KURNOOL
***
CIRCULAR MEMO
Circular Memo No: TO/ Bills/ 2015-16 Dated: 21-07-2015
Sub:- RWS&Sanitation Circle, Kurnool - Bills - Reiteration of guide lines on
submission of final bills - Regarding.
Ref:- Arising.
***
All the Deputy Executive Engineers/ Assistant Executive Engineers/ Assistant
Engineers in this RWS&S Circle are requested to look in to the above circular memos and
to following the guide line issued on submission of the work bills. The guide lines for
submission of final bill are once again reiterated here under. The Deputy Executive
Engineers are requested to verify that all the applicable certificates are appended and all
required copies of certificates are produced while submitting the final bill.

1 SOURCE CERTIFICATES:-
(a) Yield Test Certificate:
Certified that the source (Bore well/ Open well) is tested and the Yield is observed ______
LPM against requirement of __________ LPM.
(b) Source Quality Certificate:
Certified that the source (Bore well/ Open well) is tested and water quality is found
potable as per the test report of Lab Reference No: _______________________ Dated:
_____________.
2 PIPE LINE TEST CERTIFICATE:-

Certified that the Pumping main/ Distribution line with DI/ HDPE/ PVC Class ___________
of _____ dia to a length of _____________ Rmt is tested hydraulically to the required test
pressure of ___________ Kgs/Sqcms and found satisfactory without any leakages.

3 OHSR/ GLSR/ SUMP TESTING CERTIFICATE:-


Certified that the OHSR/ GLSR/ SUMP of __________ KL is tested hydraulically and found
satisfactory without any leakages.
4 PUMP SET TESTING CERTIFICATE:-

Certified that the Pump set of _________ HP bearing No: _______________ of


(a) ______________ make ___________ Model is tested and observed the duty is
___________ LPM against the design duty of _____________ LPM.

Trail run certificate (If applicable as per agreement): Certified that the Pump set is
(b)
commissioned and trail run period of ___________ days is completed satisfactory.
5 FINAL BILL CERTIFICATES OF DEPARTMENT (As applicable):-

The work has been completed by _____________ (date) in all respects in accordance with
(a)
the specifications, drawings and terms and conditions of the Agreement and A.P.S.S.
The Contractor/ Agency has engaged Technical personnel/ Key personnel, Viz., Sri.
_________________________ (Technical qualifications to be indicated at the each name)
(b) as technical agents (as in the agreement) throughout the period of execution of the work
and that they were available at the site of work during the course of execution of the
work.
No recoveries are due for recovery from the Contractor/ Agency, other than those
( c)
proposed in the bill.
(d) There are no further dues to be recovered from the Contractor/ Agency.
The revised estimate/ completion report is approved by the competent authority duly
( e)
covering all the deviations.
The extension of time is granted up to _____________ (date) with necessary liquidated
damages/ fine of Rs. ________ ae imposed as per procgs No: ______________ Dated:
(f)
_________ of the CE/ SE/ EE out of which Rs. _______ is now proposed for recovery in
the bill.

The system has been tested/ subjected to full function/ working condition and no
(g)
leakages are found (to be furnished for pipe lines/ reservoirs etc.,)

6 RELEASE AND DISCHARGE CERTIFICATE OF CONTRACTOR:-


I do here by release and discharge from any and all claims from any/ all claims and
demands whatsoever for all matters arising out of or/ and in connection with the contract
under this agreement, Agreement No: ______________ Dated: ________ of the SE/ EE/
DEE ______________.
7 ACCEPTED MEASUREMENT SIGNATURE OF THE CONTRACTOR:-
Accepted measurement signature of the Contractor at all recording by the AEE/ AE.

8 7 - F ACCOUNT:-
7 - F Account of materials (If applicable) if any excess materials received and paid to be
proposed for recovery.
9 SEIGNIORAGE CHARGES:-
Over all seigniorage charges to be worked out on right hand side of M Book and signed by
the AEE/ AE/ DEE.
10 TAXES:-
For payment of taxes proof of payment for taxes to be produced.
11 TEST CERTIFICATE OF MATERIALS:-
All test certificate such as M-30 design mix, lab tests for cement, steel, cube tests, pipe QC
certificate and source water quality lab certificates to be enclosed, if not previously
submitted.
Sd/- P. Bhanu Veera Prasad,
Superintending Engineer,
RWS&S Circle, Kurnool.
To
All the Executive Engineers, RWS&S Divisions in the Kurnool District,
All the Deputy Executive Engineers, RWS&S Sub Divisions in the Kurnool District,
Copy to AEE 1, AEE2, AEE3, AEE4, AEE5 of this office,
Copy to stock file.
GOVERNMENT OF ANDHRA PRADESH
RURAL WATER SUPPLY AND SANITATION DEPARTMENT
OFFICE OF THE SUPERINTENDING ENGINEER, RWS & SANITATION CIRLE, KURNOOL
***
CIRCULAR MEMO
Circular Memo No: TO/ GUIDE LINES/ 2015-16 Dated: 21-07-2015
Sub:- RWS&Sanitation Circle, Kurnool - Preparation of estimates, recording, work bills -
Work bills being presented in complete shape with several omissions - Certain guide
lines - Regarding.
Ref:- Arising.
***
The general instructions in preparation of estimates, recording of works, submitting of bills etc., is
here with communicated and the Deputy Executive Engineers/ Assistant Executive Engineers/ Assistant
Engineers are instructed to follow the guide lines as follows.
PREPARATION OF ESTIMATES:-
The date of inspection should be noted in the estimate by the authority according Technical
1
sanction as per G.O.Ms. No: 402 PWD (Y) Department Dated: 14-05-1973.
2 The estimate should contain the following documents invariably,
Design calculations has to be worked out based on population and the design parameters of
2.1
different components.
The details of population General, SC, ST and prospective, ultimate demands to be worked out at
2.2
1% growth rate.
For Augmentation or improvements of the SVS Scheme all the existing components to be
2.3
indicated and additional requirements to be worked out.
All estimates should have flow diagrams, distribution net work plan, and drawing of each
2.4
component where ever necessary.
Hydraulic statement/ Eponet/ Economies size of pumping main is be enclosed for pipe lines
2.5
where ever necessary.
3 "Unforseen" items, provision do not exceed 2% of estimated cost.

Loading, unloading and stacking charges have to be deducted from the rate for conveyance of
4 earth in the data as per Govt. Memo. 34975/ Irrgn. III/ 94-2 I&CAD Dept., Dated: 06-07-1994
and Govt. Memo No: 34975/ Irrgn. III/ 99-4, Dated: 27-12-1995.

The "Head of Account" with full details of Major Head, Minor Head, Sub-head, Sub detailed head
5 etc., to which the expenditure on account of the estimate is to be charged is to be indicated in
the technical sanction of the estimate.

In respect of items for which the rates are not covered in the SSRs, or for the materials, they are
to be adopted based on the rates approved by the competent authority for such items or as per
6 the Rate Contracts concluded by the authorities concerned (for materials) or as per the rates
approved by the District Administration (for drilling of bores/ for cost of pipes etc.,) but the basis
for such provisions as mentioned above is to be mentioned in data of estimates.
Adopt machinery excavation rate for excavation the pipe line trenches in all Project and Scheme
works. Where ever machinery can`t work a certificate must be furnished indicating the length
7 and reaches and their additional payments for manual work can be given. Necessary LS
provision for difference can be made in the estimate as per Circular Memo No: AEE12/ RWS (P)-
III/ GNT/ Gen/ 02 Dated: 18-11-2002 of the Chief Engineer, RWS (PR), Hyderabad.

While preparing the estimates to allow 2/3 rd depth to be excavated by the machinery and
balance 1/3 rd depth to be excavated by manual even though the quantity is more than 1000
8
cum as per Circular Memo No: RWS (Plg)/ T-sec/ Rates/ 2005 Dated: 18-08-2006 of the Engineer-
in-Chief, PR, Hyderabad.
A Revised Estimate/ Work shop is necessary where there is variation compared to the original
estimate, even if it be by way or reduction in the quantities/ by way of substantial variations or
in the value of the estimate, etc., because the said +/- variation have to be explained in the
9
revised estimate/ completion report as the case may be, by the competent authority as per
paras 214 and 215 of A.P.P.W, approval for the deviations met with may be obtained from the
competent authority.

Specification report should be clearly indicate the necesity of the provisions made in the
10
estimate and reasons for any deviations proposed.

RECORDING AND BILLING:-


Date of recording of measurements is not being in some cases by the recording officer (AE/ AEE),
11
below his signature, signature without date is not valid.
Cancellation of measurements or corrections or over-writings in the measurements is not being
attested by the Check-measuring officer concerned who conducts check-measurement of such
12 set of maeasurements. Usase of erasing liquids/ solutions for corrections in the measurements
is barred. Over writings are not allowed. The item has to be stricked out and re recorded, and
to be attested by check measured officer.
Only Metric systems of measurements shall be recorded (Since usage of FPS was dispensed with
13
long back). Mentioning in feet, gallons etc., is dispensed.

All the lines (normally 16/ 17 lines) in a page in M Book shall be used or filled in with the
measurements (on Left Hand Side of page only) and if any lines have to be necessarily left
14
unfilled, then a diagonal line shall be drawn below the signature of the Recording Officer, so as
to ensure check isertion of any measurements below the signature of the Recording Officer.

Where measurements are to be recorded based on levels (e.g., Earth work), the measurements
in such cases shall be recorded in M Books with reference to the levls recorded in L.F. Books
15 through Cross Section sheets and after computation in the calculation statements. Where the
measurements are based on level, L.F. Books, C.S. Book and calculation statements shall
invariably be sent to PAO`s office along with M Book and Bill.

Where measurements are based on trip sheets for transportation of hours of usage for pumping
16 with diesel pump etc., based on DLR sheets. Such trip sheets/ DLR sheets to be signed by
competent authorities to be enclosed with M Book.

In the case of clearence of light jungle (Where pre-measurements are recorded), a certificate to
the effect that `the light jungle has been cleared, removed, burnt and thrown out side the site of
17
work` shuld be recorded on the right page of the pre-measurements after its removal and duly
verified by the Deputy Executive Engineer under his signature.
In the case of scrub jungle (Where pre-measurements are recorded), a certificate to the effect
that `the scrub jungle has been cleared, removed, burnt and thrown out side the site of work
18
and it has no saleable value` shuld be recorded on the right page of the pre-measurements after
its removal and duly verified by the Deputy Executive Engineer under his signature.

In the case of clearence of heavy jungle (Where pre-measurements are recorded), after carrying
out its clearence, a certificate to the effect that `the wood/ other materials have been taken to 7
19 F accounts for the month of _________________ (with details of quantity so taken) shuld be
recorded on the right page of the pre-measurements and duly verified by the DyEE/ EE and
auction to be conducted for such items subsequently.
In case of Bore well, the yield should be recorded by AE/ AEE and certified by the Deputy
20
Executive Engineer.
In case of pump sets, the make, model, Sl. No., Head and duty of Pump as per the Label to be
21 recorded in the M Book. The test certificate should be given as per the Yield on ducted and yield
observed, and to be verified by the Deputy Executive Engineer.
All the item recorded should be visible as on the date of recording and should be Measurable.
22 The items to be dispersed/ refilled/ laid with concrete only after check measurement by the
competent authority.
The items recorded should be as per the measurement done in the field and as in the serial of
23 measurement done. No bulk quantities to be recorded with intermittent calculation on separate
paper.

All the items visible at one particular site can be measured at one page and only after closing the
24
recordings at particular work spot, measurement at second or other site to be recorded.

Pre-measurements for Hard rock should be recorded and after their removal, the quantities of
the removed HR should be recorded by stacks duly deducting voids as prescribed allowances
25
towards compaction, swell factor, etc., with due comparision for allowing payment for the
correct (net) quantity. The rock should be taken in to account for re-use.

If the rock is not use full for any construction purpose and if not stocked, Necessary certificate to
that effect has to be made in right side of the M Book as the rock blasted and removed is found
25.1.1
not use full for reuse for any construction purpose and hence not stacked and the certificte has
to be verified and signed by the Deputy Executive Engineer.
Where variation in classification of soils exceeds +/- 10% the instructions issued in Govt. Memo.
26 No: 1970-K2/72-11, PWD (PW) Dept., 04-07-1974 should be followed and they are briefly
indicated below.
(i) Classification should be check measured by the Executive Engineer in all cases,
(ii) Executive Engineer can approve classification up to +/- 10% in a bay,
(iii) If the variation exceeds +/- 10% in a bay, the classification should be verified by the
Superintending Engineer.
As the rate in the agreement is normally for finished item of the work, care should be taken that
the measurements are recorded only after that item of work is completed for the finished item
27 of work, e.g., in the case of cement involved item of work like concrete laying, it should be
ensured that the requisite curing period is over by the date of recording measurements for that
finished item of the work.
Quantities of trial pits are to be deducted from Earth work quantity, where necessary, and M
28
Books concerned should be made available for checking the same.
Where supply of metal/ gravel and spreading of metal/ gravel are provided distinctly as two
separate items in Schedule `A` of the Agreement, the supplied quantities and spread quantities
29
shall be duly compared (with deduction of due allowances) and it should be ensured that the
payment for the spread quatity, in no case, is in excess of the supplied quantity.

If over all measurements are recorded, deductions towards previously executed/ paid quantities
30 should be shown in detail, to ensure that there is no overlapping of the measurements in excess
payments.
Contra nothing indicating Page No. and M Book No. in which all previous part bills are recorded
shall be indicated in red ink on top of Abstract of Bill of the current bill. Similarly, reference to
31
Page No. and M Book No. in which the current bill is recorded should be noted in red ink on top
of all previous part bills.
Theoretical requirement of materials like cement, steel, shall be furnished for every bill in the M
32 Book, whereever necessary along with details of recovery from the bill. A copy of the same shall
also be enclosed to the bill form for different rates of materials.
32.1 Over - lapping and chairs in steel measurements shall not be allowed for payment.

Overall statement showing details of theoretical consumption of seigniorage materials along


with the seigniorage charges involved at the rates prescribed shall be worked out and recorded
33
in every bill in the M Book for effecting recovery from the bill. A copy of the same shall also be
enclosed to the bill form, duly signed by the Deputy Executive Engineer.

Overall statement showing details of recoveries towards hire charges for any departmental
machinery lent as per the rates concluded in the machinery supplemental agreement/ Main
34 Agreement, for the number of hours/ days/ months use duly recording log extract (relevant part
only) etc., shall be recorded for every bill in the M Book and a copy of the same shall also be
enclosed to the bill form, duly signed by the Deputy Executive Engineer.

The abstract bill should contain all the items in the same serial order in which they appear in the
35
agreement, irrespective of whether the items is covered for payment in the current bill or not.

Break-up of original estimate/ agreement quantities and of excess/ supplemental quantities shall
36
be exhibited separately.
The bill to be inevitably contain with value of total work done previous bill made and since last
37
measurement value.

The part bill submitted should contain quantities for all the componenets completed to the stage
38 of work by the date of presenting the bill. Next bill can contain the items recorded beyond the
date of previous bill submitting date. No back date recordings are allowed.

As set registers to be maintained at Sub Division/ Mandal level for each Mandal. While
39 submitting the final bill of any work details of the Assets created should be noted in the "Assets
Register" and to be uploaded in Water Soft.
Maintenance Registers to be maintained at Mandal/ Sub Division level for each mandal and
40 while submitting final bills of any maintenance work, the details of work to be noted in
corresponding PWS Scheme/ MPWS Scheme/ HP/ Direct Pump.
CHECK MEASUREMENT:-
41 Deputy Executive Engineer shall check measure every item costing more than Rs. 500/-
Executive Engineer shall invariably check measure all works costing Rs. 5.00 lakhs and above
42
covering all the major items not less than 30% of total expenditure incurred.
The Superintendng Engineer shall invariably check measure all works costing Rs. 50.00 lakhs and
43
above at 1/3rd, 2/3rd stage of the work and before final measurements.
Road works costing more than Rs. 10.00 lakhs in all the departments, the Superintending
44 Engineer shall accord metal spreading permission and for works costing up to Rs. 10.00 lakhs,
the Executive Engineer shall accord metal spreading permission.
The check measuring officer shall put his initials on the left side of the `particulars` column in
45
token of his having check measured that line.

It is observed that items like `Test checked`, `verified` are being used by the check measuring
officers to denote check measurement. But these terms are not identified in the APPW `A` code
46
and therefore they shall not be used. Only the corrct term `check measuring` may be used while
recording the check measurements by the Check measuring Officer.

Where date of measurement and check-measurement is same, check-measurement are not


47 done simultaneously shuld be recorded by the Check-measuring Officer at relevant page in M
Book.
INSURANCE:-
Works are not being insured, in spite of specific instructions issued by the Government. That all
works shall be got insured soon after conclusion of agreement to safeguard the interest of the
Government. In the event of occurrence of damages to the work and copy of Insurance Policy
48
(attested) shall be enclosed to the bill (first bill). Dispensing with insurance cover for all works
of Engineering department with effect from 05-03-2014 vide G.O.Ms.No: 5 Dated: 05-03-2014
of Finance (Works&Projects-F7) Department.
The start date up to the end of date of completion plus defect liability period and two years for
original works or as specified in the agreement extension of time is granted by competent
48.1
authority, the insurance should cover such extended period as well as the defect liability period
beyond the extended period.
48.2.1 The Agreement condition celarly stipulates payment for the same under Part-II,
Original stamped receipt towards payments of premier is enclosed (along with a Xerox copy of
48.2.2
Insurance policy duly attested) to the bill duly.
The bill is preferred under Part-II, along with the regular bill for work done and included in the
48.2.3
memo of payments for work done bill.
48.2.4 The amount payable is not more than that provided in the Agreement/ Estimate.

Quality Control check has become mandatory now and the quality control certificate issued by
49 the Quality Control authority concerned shall be enclosed to bills (both part bills and final bills)
and the fact having enclosed the same shall be certified in the M Book and bill form.

For Intermediate bills (Part bills) (Only appropriate and applicable certificates are to be
50
furnished):
50.1 The work is in progress,
The work has been carried out satisfactorily as per the drawings, designs and terms and
50.2
conditions of the agreement,
50.3 All recoveries have been made in this bill,

The Contractor/ agency has engaged technical personnel/ key personnel, viz., Sri. _______
50.4 (Technical qualifications to be indicated at the end of each name) as Technical Agents (as in the
agreement) throughout the period of execution of the course of execution of the work.
The extension of time is granted up to ________ (date) with necessary liquidated damages/ fine
of Rs. ________ are imposed as per Proceedings No: _________ Dated:___ (ie., of CE/ SE/ EE),
50.5
out of which Rs. ________ was recovered up to previous bill and the balance of Rs. _________ is
now proposed up to recovery in this bill,

51 For final bills: (Only appropriate and applicable certificates are to be furnished)

The work has been completed by ________ (date) in all respects in accordance with the
51.1
specifications, drawings and terms and conditions of the agreement and A.P.S.S.,
The Contractor/ agency hs engaged technical personnel/ key personnel, viz., Sri. _______
(Technical qualifications to be indicated at the end of each name) as Technical Agents (as in the
51.2
agreement) throughout the period of execution of the work and that they were available at the
site of work during the course of execution of the work,
No recoveries are due for recovery from the Contractor/ agency, other than those proposed in
51.3
the bill,
51.4 There are no further dues to be recovered from the Contractor/ agency,
The Revised Estimate/ Completion report is approved by the competent authority duly covering
51.5
all the deviations,
The extension of time is granted up to ________ (date) with necessary liquidated damages/ fine
51.6 of Rs. ________ are imposed as per Proceedings No: _________ Dated:___ (ie., of CE/ SE/ EE),
out of which Rs. ________ is now proposed for recovery in the bill.
The system has been tested/ subjected to full function/ working condition and leakages are
51.7
found (to be furnished for pipe lines/ reservoirs, etc.,)
52 CERTIFICATES/ SIGNATURES OF THE CONTRACTOR:
For Final Bills:- The Contractor shall furnish `Release and Discharge` Certificate as under (under
52.1
the signature of the contractor/ agency),

Release and Discharge Certificate:- "I do here by release and discharge from any and all claims
from any/ all claims and demands whatsoever for all matters arising out of or/ and in Connection
with the contract under this Agreement, Agreement No: __________ Dated: ________ of the
SE/ EE ________.

The Signature of the Contractor/ Agency or authorized agent/ power of Attorney - Holder shall
be affixed in the M Books for each set of measurement (With the seal of the Company/ Firm)
52.2 with the endorsements `I accept the Measurements` / `Accepted the measurements` similarly,
signatures shall also be obtained in LF Books, CS Booklets, Calculation statements, which are
treated as adjuncts to M Books.

The powers of according Technical Sanction to estimates (Same as issued earlier vide
G.O.Ms.No: 94 PR&RD (Estt.III) Dept., Dated: 08-03-1999) and also Electrical works as per
53
G.O.Rt. No: 939 Dated: 29-06-2010 of Panchayat Raj & Rural Development (PROGS.II)
Department are:
Assistant Engineer/ Assistant Executive Engineer: Up to Rs. 25,000/-
Deputy Executive Engineer: Up to Rs. 2,00,000/-
Executive Engineer: Above Rs. 2,00,000/- and up to Rs. 10,00,000/-
Superintending Engineer: Above Rs. 10,00,000/- and up to Rs. 50,00,000/-
Chief Engineer: Above Rs. 50,00,000/-
54 The Tender will be finalised by the Officers as indicated below:
Estimate value of work put to Tender up to Rs. 2.00 lakhs : By Deputy Executive Engineer
Estimate value of work put to Tender above Rs. 2.00 lakhs and up to Rs. 10.00 lakhs: By
Executive Engineer
Estimate value of work put to Tender above Rs. 10.00 lakhs and up to Rs. 50.00 lakhs: By
Superintending Engineer
Estimate value of work put to Tender above Rs. 50.00 lakhs and up to Rs. 100.00 lakhs: By Chief
Engineer
Estimate value of work put to Tender above Rs. 100.00 lakhs: By Tender committee.
The acceptance of tenders is as follows vide G.O.Ms.No: 133 Dated: 20-11-2004 of the
55
Irrigation and CAD (PW REFORMS) Department.
By the Deputy Executive Engineer: At Estimated rates/ Below Estimated rates.
By the Executive Engineer: Up to 5% Excess over the Estimated rates.
By the Superintending Engineer: Up to 5% Excess over the Estimated rates.
By the Chief Engineer/ Engineer-in-Chief: Up to 5% Excess over the Estimated rates.
56 Date of commencement/ start date of work is the date of signing the agreement
If Technical agents as prescribed are not employed the recoverey towards non-employment of
57 Technical Agents shall be recovered from the Contractors bills at the rate prescribed/ as given in
the agreement.

58 The Technical Agents target to be employed by the Contractor are as follow for estimate cost of

Rs. 0.50 lakhs to Rs. 1.00 lakh : One ITI Certificate Holder (Civil)
Rs. 1.00 lakhs to Rs. 5.00 lakh : One Diploma Holder (Civil)
Rs. 5.00 lakhs to Rs. 15.00 lakh : One Graduate Engineer or Two Diploma Holders (Civil)
Rs. 15.00 lakh to Rs. 50.00 lakh : One Graduate Engineer and One Diploma Holder (Civil)
Above Rs. 50.00 lakh : Two Graduate Engineers or as specified in the Agreement.
The over leaf page of M Book/ Right Hand Side of 1st Page of M Book should be noted with all
59 the details of work such as Administration sanction, Agreement Number and Date, Agreement
target date, Contractor name, Contract value EMD, FSD paid etc.,

Sd/- P. Bhanu Veera Prasad,


Superintending Engineer,
RWS&S Circle, Kurnool.
To
All the Executive Engineers, RWS&S Divisions in the Kurnool District,
All the Deputy Executive Engineers, RWS&S Sub Divisions in the Kurnool District,
Copy to AEE 1, AEE2, AEE3, AEE4, AEE5 of this office,
Copy to stock file.
CENTERING CHARGES FOR OHSR AND OTHER ITEMS
Description of item Diagram of item
1. RAFT SLAB
CC Quantity : 22/7 x Diameter x Bredth x Depth or
: 1 /4 x 22/7 (D - d ) x H
: 22/7 x 5.00 x 2.40 x 0.22 = 8.29 Cum
Centering Area : II d x t = II x 2.60 x 0.22 = 1.79 Sqm
: II D x t = II x 7.40 x 0.22 = 5.11 Sqm
Total = 6.90 Sqm
8.29 Cum = 6.90 Sqm
1 Cum = 6.90/8.29 = 0.83 Sqm
Centering Area required
2. RAFT RING BEAM
CC Quantity : lxbxd = 1x0.40x0.53 = 0.212 Cum
Centering Area : lxb = 1x(0.53+0.53) = 1.06 Sqm
: 0.212 Cum = 1.06 Sqm
1 Cum = 1.06/ 0.212 = 5.00 Sqm
:
Centering Area required
3. COLUMN
CC Quantity : lxbxd = 1x0.30x0.30 = 0.09 Cum
Centering Area : 4 x 0.30 = 1.20 Sqm
0.09 Cum = 1.20 Sqm
1 Cum = 1.20/0.09 = 13.33 Sqm
Centering Area required
4. BRACE
CC Quantity : lxbxd = 1x0.45x0.25 = 0.1125 Cum
Centering Area : 1 X( 0.45+0.45+0.25) = 1.15 Sqm
0.1125 Cum = 1.15 Sqm
1 Cum = 1.15/0.1125 = 10.222 Sqm
Centering Area required
5. BOTTOM RING GIRDER
CC Quantity : lxbxd = 1x0.325x0.30 = 0.0975 Cum
Centering Area : 1 X( 0.325+0.325+0.30) = 0.95 Sqm
0.0975 Cum = 0.95 Sqm
1 Cum = 0.95/0.0975 = 9.743 Sqm
Centering Area required
6. PLAIN BOTTOM SLAB
CC Quantity : lxbxd = 1x1X0.275 = 0.275 Cum
Centering Area : 1 X 1 = 1 Sqm
0.275 Cum = 1 Sqm
1 Cum = 1/0.275 = 3.636 Sqm
Centering Area required
Description of item Diagram of item
7. SIDE WALLS
CC Quantity : lxbxd = 1x1X0.10 = 0.10 Cum
Centering Area : 2 X 1 X 1 = 2 Sqm (Two sides)
0.10 Cum = 2 Sqm
1 Cum = 2/0.10 = 20 Sqm Centering
Area required
8. TOP SLAB (100MM THICK)
CC Quantity : lxbxd = 1x1X0.10 = 0.10 Cum
Centering Area : 1 X 1 = 1 Sqm
0.10 Cum = 1 Sqm
1 Cum = 1/0.10 = 10 Sqm Centering
Area required
9. DAMAGED COLUMN WIDENING
CC Quantity : lxbxd = 0.45X0.45X1.00 = 0.2025 Cum
Damaged : 0.30x0.30x1.00 = 0.09 Cum
Net Quantity : 0.1125 Cum
Centering Area : 4 Sides x 0.45 = 1.80 Sqm
0.1125 Cum = 1.80 Sqm
1 Cum = 1.80/0.1125 = 16 Sqm
Centering Area required
10. DAMAGED BRACE WIDENING
CC Quantity : lxbxd = 1X0.60X0.40 = 0.24 Cum
Damaged : 1X0.40X0.20 = 0.08 Cum
Net Quantity : 0.16 Cum
Centering Area : 1X (0.60+0.40+0.60) = 1.60 Sqm
0.16 Cum = 1.60 Sqm
1 Cum = 1.60/0.16 = 10 Sqm
Centering Area required
11. EXTRA FOOTING BELOW GL BRACE
CC Quantity : 0.90X0.90X0.30 = 0.243 Cum
Existing : 0.30x0.30x0.30 = 0.027 Cum
Net Quantity : 0.216 Cum
Centering Area : (4 Sides x 0.90) x 0.30 = 1.08 Sqm
0.216 Cum = 1.08 Sqm
1 Cum = 1.08/0.216 = 5 Sqm
Centering Area required
IMPORTANT
ITEMS IN
THE SSR
2022-23
DATAS
WEIGHTS OF CI,
DI, MS, HDPE, GI,
AND SS PIPES
SEIGNIORAGE CHARGES,
CEMENT CALCULATIONS,
WEIGHT OF STEEL,
CENTERING CHARGES FOR
RCC ITEMS, CIRCULAR
MEMOS ON PIPE LINES, GAS
CHLORINATION RATES, RO
PLANTS SPECIALS APPROVED
QUOTATIONS, RATES OF
HAND PUMP SPARES,
APPROVED RO PLANT RATES
AND GUIDE LINES ON BILLS
SUBMISSION

You might also like