SYARIKAT HAMKA CONSTRUCTION LOKASI: BAWAH KONKRIT SLAP

TARIKH DISEDIAKN 6-Dec-21 PROSES: 3

DISEDIAKAN OEH DISEMAK OLEH: DILULUSKAN OLEH:___________________________

1. Pengenalpastian Hazard 2. Analisis Risiko 3. Kawalan Risiko

YANG BOLEH KAWALAN RISIKO KEMUNGKI KETERUK


BIL AKTIVITI KERJA HAZARD MENGAKIBATKAN (JIKA ADA) NAN AN RISIKO LANGKAH KAWALAN YANG DISARANKAN PEGAWAI BERTUGAS

0
Engineering Control
1. To set up a designed place for formwork fabrication
2. To install proper cover to machinery part that
potentially cause injury in example: heat and
shaperness of cutting machine.
Administrative Control
1. To carry out routine maintainance for machinery.
PPE - 2. implement safety work procedure.
Melakukan kerja- Boleh mengakibatkan 1.Topi Keselamatan 3. work must be carry out by trained worker.
kerja memasang Manual Handling Muscular Skeletal Disorder 2.Kasut PPE CONTROL Concreting
1 perancak A Frame 1 secara berterusan Syndrome (MSDS) - sakit Keselamatan 3 1 3( )
1. Wearing of safety helmet, safety shoes/ boots, works supervisor
bay 1 leaf pergelangan tangan dan sakit 3.sarung tangan working gloves, safety vest and safety glasses should be
bahu keselamatan 4. made mandatory.
Jaket Keselamatan

Engineering Control
To maximize usage of machinery aid to minimize
manual handling. such as transfer and loading of
formwork by lorry crane instead of carry by workers.
Administrative Control
1. To organise work rotation.
2. Work must be carried out by trained personnel.
3. Conduct Tool Box Talk on manual handling hazard
and control prior to formwork fabrication.
Excessive manual Potential to sustain body
injury and Musculoskeletal
No existing risk
control 5 2 10 PPE CONTROL Concreting
handling Disorder Syndrome (MSDs) measure 1. Wearing of safety helmet, safety shoes/ boots, works supervisor
working gloves, safety vest and safety glasses should be
made mandatory.
1. Pengenalpastian Hazard 2. Analisis Risiko 3. Kawalan Risiko

BIL AKTIVITI KERJA HAZARD YANG BOLEH KAWALAN RISIKO KEMUNGKI KETERUK RISIKO LANGKAH KAWALAN YANG DISARANKAN PEGAWAI BERTUGAS
MENGAKIBATKAN (JIKA ADA) NAN AN
0
Engineering Control
1. To set up a designed place for rebar fabrication
2. To install proper cover to machinery part that
potentially cause injury
Administrative Control
1. To carry out routine maintainance for machinery.
2. implement safety work procedure.
Potential to be caught in 3. work must be carry out by trained worker.
Expose to moving No existing risk PPE CONTROL
2 Rebar fabrication and dangerous between moving part of control 4 3 12 Concreting
work machinery and cause serious 1. Wearing of safety helmet, safety shoes/ boots, works supervisor
part of machinery injury measure working gloves, safety vest and safety glasses should be
made mandatory.

Engineering Control
To maximize usage of machinery aid to minimize
manual handling. such as transfer and loading of rebar
by lorry crane instead of carry by workers.
Administrative Control
1. To organise work rotation.
2. Work must be carried out by trained personnel.
3. Conduct Tool Box Talk on manual handling hazard
Excessive manual Potential to sustain body
injury and Musculoskeletal
No existing risk
control 5 2 10
and control prior to formwork fabrication. Concreting
handling PPE CONTROL works supervisor
Disorder Syndrome (MSDs) measure 1. Wearing of safety helmet, safety shoes/ boots,
working gloves, safety vest and safety glasses should be
made mandatory.

Engineering Control
To maximize usage of machinery aid to minimize
manual handling.
Administrative Control
1. To organise work rotation.
2. Work must be carried out by trained personnel.
3. Conduct Tool Box Talk on manual handling hazard
and control prior to formwork fabrication.
Formwork, Excessive manual Potential to sustain body No existing risk 4. Work must be carry out under supervision of Concreting
3 Falsework and rebar handling injury and Musculoskeletal control 5 2 10 designated person. works supervisor
installation Disorder Syndrome (MSDs) measure PPE CONTROL
1. Wearing of safety helmet, safety shoes/ boots,
working gloves, safety vest and safety glasses should be
made mandatory.
1. Pengenalpastian Hazard 2. Analisis Risiko 3. Kawalan Risiko

BIL AKTIVITI KERJA HAZARD YANG BOLEH KAWALAN RISIKO KEMUNGKI KETERUK RISIKO LANGKAH KAWALAN YANG DISARANKAN PEGAWAI BERTUGAS
MENGAKIBATKAN (JIKA ADA) NAN AN
0
Engineering Control
1. To provide safe access and egress.
2. To install warning barrier tape at work place.
Administrative Control
1. Work must be carried out by trained personnel.
2. To install capping to protruding rebar.
3. Conduct Tool Box Talk on protruding object hazards
Expose to sharp Potential to puncture and No existing risk prior to re-bar installation work. Concreting
object cause bodily injury control 5 2 10 PPE CONTROL works supervisor
measure 1. Wearing of safety helmet, safety shoes/ boots,
working gloves, safety vest and safety glasses should be
made mandatory.

Engineering Control
1. To use Tag Line to control pile movement.
2. Wisel to be used by signalman as warning during
hoisting.
Administrative Control
1. To provide standing supervision by designated
person.
2. To provide train signalman.
3. Work must be carried out by trained personnel.
4. Set up barrier to the work area to prevent
Potential to be hit or crush No existing risk unauthorised entry.
Exposure to and cause body injury or control 4 5 20 5. Conduct Tool Box Talk prior on moving load safety. Concreting
moving load Death. measure PPE CONTROL works supervisor
1. Wearing of safety helmet, safety shoes/ boots,
working gloves, safety vest and safety glasses should be
made mandatory.
1. Pengenalpastian Hazard 2. Analisis Risiko 3. Kawalan Risiko

BIL AKTIVITI KERJA HAZARD YANG BOLEH KAWALAN RISIKO KEMUNGKI KETERUK RISIKO LANGKAH KAWALAN YANG DISARANKAN PEGAWAI BERTUGAS
MENGAKIBATKAN (JIKA ADA) NAN AN
0
Engineering Control
1. To provide safe access and egress.
2. To provide safe working platform with perimeter
guard rail.
3. To install guard rail on opening edges.
4. Hard barricade/cover to floor opening.
Administrative Control
1. Conduct training to workers regarding working at
height safety.
2. To provide standing supervision by designated
No existing risk person.
Expose to work at Potential to fall from height 3. Conduct Tool Box Talk on working at height safety Concreting
height and fatal or Death control 4 5 20 works supervisor
measure prior to working at height.
PPE CONTROL
1. Wearing of Safety Harness, safety helmet, safety
shoes/ boots, working gloves, safety vest and safety
glasses should be made mandatory.

Engineering Control
To use concrete pump for concrete casting work.
Administrative Control
1. To organise work rotation.
2. Work must be carried out by trained personnel.
3. Conduct Tool Box Talk on manual handling hazard
and control to concreting safety prior to concrete work.
4. Work must be carry out under supervision of
designated person.
4 Manual concrete Expose to contact
with wet cement Potential to sustain No existing risk
control 5 2 10 PPE CONTROL Concreting
casting mixture Dermatitis. measure 1. Wearing of safety helmet, safety shoes/ boots, works supervisor
working gloves, safety vest and safety glasses should be
made mandatory.
1. Pengenalpastian Hazard 2. Analisis Risiko 3. Kawalan Risiko

BIL AKTIVITI KERJA HAZARD YANG BOLEH KAWALAN RISIKO KEMUNGKI KETERUK RISIKO LANGKAH KAWALAN YANG DISARANKAN PEGAWAI BERTUGAS
MENGAKIBATKAN (JIKA ADA) NAN AN
0
Engineering Control
To maximize usage of machinery aid to minimize
manual handling.
Administrative Control
1. To organise work rotation.
2. Work must be carried out by trained personnel.
3. Conduct Tool Box Talk on manual handling hazard
and control concreting safety prior to concrete work.
Potential to sustain body No existing risk PPE CONTROL
Excessive manual injury and Musculoskeletal control 5 2 10 Concreting
handling 1. Wearing of safety helmet, safety shoes/ boots, works supervisor
Disorder Syndrome (MSDs) measure working gloves, safety vest and safety glasses should be
made mandatory.
1. Pengenalpastian Hazard 2. Analisis Risiko 3. Kawalan Risiko

BIL AKTIVITI KERJA HAZARD YANG BOLEH KAWALAN RISIKO KEMUNGKI KETERUK RISIKO LANGKAH KAWALAN YANG DISARANKAN PEGAWAI BERTUGAS
MENGAKIBATKAN (JIKA ADA) NAN AN
0
Engineering Control
All falsework must be endorsed by Practising
Professional Engineer (PE).
Administrative Control
1. Work to be performed by trained personnel.
2. To provide full time supervision by Designated
person.
3. Dismantling work must be carried out as per the
approved and appropriate dismantling sequence.
4. Formwork/Falsework must be inspected by
Designated person prior to dismantling.
Dismantling Unsafe Collapse of formwork/ No existing risk 5. Conduct Tool Box Talk on safety dismantling of Concreting
5 Formwork and construction of falsework may cause serious control 4 5 20 falsework/formwork. works supervisor
Falsework manually falsework injury or death. measure PPE CONTROL
1. Wearing of safety helmet, safety shoes/ boots,
working gloves, safety vest and safety glasses should be
made mandatory.

Engineering Control
Set up barrier the area of dismantling formwork/
falsework.
Administrative Control
1. To provide right dismantling sequence drawing and
instruction to Designated person.
2. To provide standing supervision.
3. To install safety warning signage at strategic location.
4. Conduct Tool Box Talk on dismantling sequence work
Wrong dismantling Hit by formwork or falsework
components – serious injury
No existing risk
control 4 4 16
safety. Concreting
sequence PPE CONTROL works supervisor
or death. measure 1. Wearing of safety helmet, safety shoes/ boots,
working gloves, safety vest and safety glasses should be
made mandatory.
1. Pengenalpastian Hazard 2. Analisis Risiko 3. Kawalan Risiko

BIL AKTIVITI KERJA HAZARD YANG BOLEH KAWALAN RISIKO KEMUNGKI KETERUK RISIKO LANGKAH KAWALAN YANG DISARANKAN PEGAWAI BERTUGAS
MENGAKIBATKAN (JIKA ADA) NAN AN
0
Engineering Control
1. All formwork must be organised and tie well before
transfer out.
2. Protruding nails need to be bend over or removed.
Administrative Control
1. Collecting point for dismantle formwork must be
provided. and must removed from site and disposed at
approved disposal area.
2. To organise work rotation.
3. Handling and Disposing of dismantle formworks
must be schedule
Fire Hazards, 4. Conduct Tool Box Talk on safety Disposing of
Falling Hazards Potential to cause fire No existing risk
incidents, hit or crush and falsework/formwork. Concreting
6 Housekeeping and Infestation of cause body injury and control 5 2 10 5. Burning is not allow for dismantle formworks works supervisor
rodents and desease of health. measure PPE CONTROL
vermin 1. Wearing of safety helmet, safety shoes/ boots,
working gloves, safety vest and safety glasses should be