1 GENERAL :
construction of switching station buildings and associated electrical works.
2 EARTH WORK:
(a) we will required leveled formation for construction of switching station
buildings following procedure to be adapt as per the condition .
(c) Excavation:
All cuttings shall be taken down carefully to the precise level and section
as shown in the drawings . In case, the bottom of the cutting is taken down
deeper than is necessary by oversight, the hollow must be filled up to true
depth with selected material .
4 SUPER STRUCTURES :
(a) Brick work: Besides following relevant specification, well burnt bricks shall
only be used. The brick work shall be laid in ENGLISH BOND. The brick
work below plinth shall be done in Cement mortar of ratio 1:4 (1 cement, 4
sand). The brick work above plinth shall be done in cement mortar of ratio
1:6. Curing of the brick work shall be done for a minimum period of
fourteen days.
(b) Plastering on inside and outside surface shall be done in Cement mortar
of ratio 1:3 and shall have a thickness of 10 mm.
(c) All external surface shall be treated with snowcem over two coats of
cement primer of approved quality and all internal surfaces of wall and
ceiling shall be white washed with three coats.
5 FLOORING :
(a) Following pattern of the flooring shall be adopted :
(i) Base concrete - 100 mm thick cement concrete of ratio 1:4:8
with under layer of 100 mm thick sand filling over well compacted
earth.
(b) Suitable anti termite treatment, pre and post treatment as approved by the
purchaser, shall be provided.
6 ROOFING :
R.C.C. roof, complete in all respects in accordance with RDSO drawing
No.ETI/C/0067 (Mod.A) shall be provided. Water proofing of roof shall be
responsibility of the contractor. Type of water proofing treatment if required, will
be got approved from the purchaser. The contractor shall ensure at the time of
handing over of the building that roofs are leak proof and water tight. The
contractor shall also provide C.I. rain water pipes of specified size.
7 DOORS, WINDOWS, VENTILATORS :
Pressed steel doors, windows, ventilators and grills etc. shall be provided in
accordance with the drawing No.RE/Civil/S-115/95. All steel work shall be
painted with two coats of ready mixed paint of approved quality and shade with
Red Oxide primer coat.
8 WIRING :
(a) The contractor shall follow recessed conduit wiring system for internal
wiring of the switching station buildings. Stove enameled, jet black, steel
seamless conduit pipes of standard diameter, conforming to IS:9537(Part-
2)/1983 with latest amendments shall be used. No conduit pipes having a
diameter of less than 19 mm shall be used. All conduit accessories like
bends, inspection boxes, elbows, draw boxes, junction boxes shall be of
threaded type and shall conform to IS:3837 with latest amendments. The
conduits shall be recessed in the wall/ceiling.
(b) The wiring shall include circuit wiring and point wiring. The circuit wiring
shall include wiring from distribution board upto first switch board along
the run of wiring. The point wiring shall include complete wiring of a switch
circuit from tapping point on the distribution circuit to the following via the
switch.
(c) PVC insulated, single core, multi stranded Aluminium conductor, 660/1100
Volt grade cables conforming to IS:694/1990 shall be used for the wiring.
The standard sizes shall be as follows.
(d) Electrical fittings, plug points and appliances as indicated in following table
shall be provided in a switching station. The contractor shall get the
locations of the electrical fittings/ appliances approved from purchaser.
TABLE
(a) Main board consisting of main switch and distribution board shall be
situated as near as practicable to the termination of service line and shall
be easily accessiable without use of external aid. Switch boards of
adequate sizes as approved by the purchaser shall be made of mild steel
and recessed in the wall. Front of the boards shall be fitted with 3 mm
thick phenolic-laminated sheet similar to Hylem one. All the metal
switchgears and switch boards shall be painted, prior to erection with two
coates of approved enamel paint, as required on all sides accessible.
(d) Switches shall be 230 V, 5/15 Amp, one way flush type, piano type
switches, conforming to IS:3854/1988 with latest amendments and shall
be ISI marked.
Three pin socket outlets shall be 230 Volt, 5/15 Amp, flush type,
comforting to IS:1293/1988 with latest amendments and shall be ISI
marked.
The luminaire fitting shall be suitable for a 150 watt HPSV lamp and
shall be complete with control gear box with ballast, PF
improving capacitor, connector block, fuse cutout, earthing terminal
and a 150 watt HPSV lamp.
(ii) INSTALLATION
The control gear box, mounted on a teakwood board of appropriate
size and shall be installed on wall inside the building at an
accessible height and connected to the switch board through a
ceiling rose.
The pipe shall be grouted on the outside wall of the building with the help
of M.S. clamps such that height of G.I. pipe above the roof of the buildings
is not less than 2.5 meters. The fitting shall be mounted with the help of a
25mm dia G.I. pipe, given a bend of 120 deg. from horizontal plane and
MS clamps. Flexible copper wire of suitable size shall be provided to
connect the control gear & the fitting. The control gear box and the fitting
shall be properly earthed.