BID FORM - Lump Sum Without Optional Work

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 8

BID FORM

RFX Number Project Title


1 RFX 4000074045 CONSTRUCTION OF CONSTRUCTION OF ALJANADRIYAH
132/13.8kV SUBSTATION # 8259 IN RIYADH CITY (PTS –
22CN1087) , ADDITION OF 3RD 132/13.8kV POWER
TRANSFORMER AT EAST GATE SUBSTATION # 8380 – RIYADH
CITY ( PTS – 22CR1210)
2 RFX 4000074061 CONNECTION OF AL JINADRIYAH S/S 8259, WITH 132KV
NETWORK, IN RIYADH CITY.

1. BASIC INFORMATION

Name of Company (Bidder) :      


Mailing Address :      
Commercial Registration No.       VAT Registration No.      
Telephone Number (s) :      
Fax Number (s) :      
E-Mail :      
Web Site Address :      
Name of Contact Individual :      

2. PRICES
2.1 Having examined in their entireties the Bid Documents and determined all factors
that may affect the cost, duration and/or performance of the WORK, the
undersigned bidder hereby submits the total lump sum prices to perform and
complete the WORK, in the amount of :
2.1.1 MAIN BID COMBINED TWO PROJECTS (Saudi Riyals)
TOTAL COMBINED LUMPSUM PRICE FOR THE TWO (2) PROJECTS
Saudi Riyals : (In Words)
      SAR (In Figures)
THE ABOVE PRICE IS BROKEN DOWN AS FOLLOWS:
S. No. RFX No. Price (SAR in Figures)
1 RFX 4000074045
2 RFX 4000074061

Discount (If Any): %


DISCOUNTED COMBINED BID (Exclusive of VAT) (Saudi Riyals)
Saudi Riyals : (In Words)
      SR (In Figures)

The Above DISCOUNTED Combined BID Price is broken-down as follows:

S. No. RFX No. Price (SAR in Figures)


1 RFX 4000074045

Name in Print & Signature of Bidder


1
Bid Form - (Lump Sum Without Optional Work)
April 2021
2 RFX 4000074061

2.1.2 A. MAIN BID INDIVIDUAL PROJECT RFX 4000074045(Saudi Riyals)


Saudi Riyals : (In Words)
SAR (In Figures)
B. MAIN BID INDIVIDUAL PROJECT RFX 4000074061 (Saudi Riyals)
Saudi Riyals : (In Words)
SAR (In Figures)

DISCOUNTED ((If Any):Exclusive of VAT) (Saudi Riyals)


Saudi Riyals : (In Words)
      SR (In Figures)
S. No. RFX No. Price (SAR in Figures)
1 RFX 4000074045

Saudi Riyals : (In Words)


      SR (In Figures)
S. No. RFX No. Price (SAR in Figures)
2 RFX 4000074061

2.2 The lump sum prices indicated above include, but are not limited to, compensation
for all applicable taxes (other than VAT), fees of any kind, customs duties,
insurances including Saudi Arab social insurance, fees, mobilization and
demobilization, catering and accommodations, transportations to and from the
WORK SITE, all overheads and profits, and all other direct and indirect costs
incurred or to be incurred by the undersigned bidder.

2.3 For purposes of invoicing, the lump sum prices indicated in Paragraph 2.1 of this
Bid are broken down as per the Pricing Attachment hereto, which reflect the actual
cost of all items listed in these Pricing Attachments.

2.4 COMPANY reserves the right to verify the value of Engineering and Design
WORK to be within reasonable percentage and may, if necessary, request
CONTRACTOR to redistribute the percentages. CONTRACTOR shall abide by
such request.

2.5 The lump sum prices indicated in Paragraph 2.1 of this Bid and broken down as per
the Pricing Attachment are not subject to escalation for any reason whatsoever.

2.6 Price Adjustment Related to Copper Price for Power Cable


(Note: If the Contract shall provide for supply of more than one size or voltage level
of power cable, the provisions of this Paragraph 2.6 as well as Paragraph 2.7 below
shall be applied similarly to each of power cable and accordingly to the total quoted
Contract Price.)

Name in Print & Signature of Bidder


2
Bid Form - (Lump Sum Without Optional Work)
April 2021
2.6.1 The undersigned bidder hereby confirms that the lump sum prices
indicated in Paragraph 2.1 of this Bid are based on the Copper Price in
U.S. Dollars per Metric Ton specified by COMPANY (IPCa in the
formula in Paragraph 2.6.2 below).

2.6.2 The undersigned bidder hereby agrees that, if on the day (LME working
day) immediately following the date of the Notice of Award by
COMPANY, the “Official International Price of Copper for Cash
Buyer as published in London Metal Exchange (LME)” differs (plus or
minus) from the “Copper Price specified by COMPANY as per
Paragraph 2.6.1 above”, the undersigned bidder’s “Unit Price” and
“Total Material Price” for Power Cable indicated in Materials/
Equipment Price Component in Pricing Attachment to this Bid, and
accordingly the “lump sum price indicated in Paragraph 2.1 of this
Bid” shall be adjusted (plus or minus) by the following amounts:

Amount of Adjustment to
a. the Unit Price of Power = 3.75 (IPC1 - IPCa) x (K1)
Cable (SR/LM)

3.75 (IPC1 - IPCa) x (K1) x


(Total Length of Power
Amount of Adjustment to Cable in Linear Meters
b. the Total Material Price = indicated in Materials/
for Power Cable (SR) Equipment Price
Component in Pricing
Attachment to this Bid)

Where:

IPCa = US 8998.76 (January 2023)


(This price shall be the “Monthly Average LME Price
of Copper for Cash Buyer” for the month preceding the
month for issuing the Bid Package in U.S. Dollars per
Metric Ton.)

IPC1 = International Price of Copper in U.S. Dollars per Metric


Ton for Cash Buyer as published in London Metal
Exchange (LME) on the day (LME working day)
immediately following the date of the Notice of Award or
Letter of Intent by COMPANY.

Name in Print & Signature of Bidder


3
Bid Form - (Lump Sum Without Optional Work)
April 2021
K1 = 0.000008633 x (Power Cable Core Cross Sectional Area +
Metallic Shield Cross Sectional Area, in mm2)

Where:
630 mm2, or 800 mm2, or 1200
Power Cable Core mm2, etc. as indicated in the
=
Cross Sectional Area Scope of Work and Technical
Specifications

229 mm2 for 31.5kA Short Circuit


Current Rating, or 279 mm2 for
Power Cable Metallic
40kA Short Circuit Current
Shield Cross Sectional =
Rating, etc. as indicated in the
Area
Scope of Work and Technical
Specifications

2.7 Final “Unit Price” and “Total Material Price” for Power Cable and final
“CONTRACT Price”

As a result of the Cable Price Adjustment indicated in Paragraph 2.6 of this Bid,
the final “Unit Price” and “Total Material Price” for Power Cable indicated in
Materials/Equipment Price Component in Pricing Attachment to this Bid, and the
final “CONTRACT Price” to be indicated in Paragraph 1.1 of Schedule “C” of
the final CONTRACT to be entered into between COMPANY and the
undersigned bidder, in the event it becomes the successful bidder, shall be as
follows:

a. Final Unit Price of Power Original Bid Price (SR/LM) ± Price


Cable (SR/LM) = Adjustment (SR/LM) as per Paragraph 2.6.2.a
above

b. Final Total Material Price for = Original Bid Price (SR) ± Price
Power Cable (SR) Adjustment (SR) as per Paragraph
2.6.2.b above

c. Final CONTRACT Price = A–B+C

where:

A = Original Total Lump Sum Bid Price (Indicated in Paragraph 2.1 of this Bid)

B = Original Total Material Bid Price for Power Cable (Indicated in Materials /
Equipment Price Component in Pricing Attachment to this Bid)

C = Final Total Material Price for Power Cable as per Paragraph 2.7.b above

2.8 Price Adjustment Related to Copper Price for PowerTransformers

Name in Print & Signature of Bidder


4
Bid Form - (Lump Sum Without Optional Work)
April 2021
(Note: If the Contract shall provide for supply of more than one size or voltage
level of Transformer, the provisions of this Paragraph 2.8 as well as Paragraph 2.9
below shall be applied similarly to each of EHV/HV Power Transformer and
accordingly to the total quoted Contract Price.)

2.8.1 The undersigned bidder hereby confirms that the lump sum prices
indicated in Paragraph 2.1 of this Bid are based on the Copper Price in
U.S. Dollars per Metric Ton specified by COMPANY (𝐿𝑀𝐸t in the
formula in Paragraph 2.8.2 below).

2.8.2 The undersigned bidder hereby agrees that, if on the day (LME
working day) immediately following the date of the Notice of Award
by COMPANY, the “Official International Price of Copper for
Cash Buyer as published in London Metal Exchange (LME)”
differs (plus or minus) from the “Copper Price specified by
COMPANY as per Paragraph 2.8.1 above”, the undersigned
bidder’s “Unit Price” and “Total Material Price” for Power
Transformers indicated in Materials/ Equipment Price Component in
Pricing Attachment to this Bid, and accordingly the “lump sum price
indicated in Paragraph 2.1 of this Bid” shall be adjusted (plus or
minus) by the following amounts:

Amount of Adjustment to
a. a. the Unit Price of Power = PT * 𝐶𝐹 *( ▲𝐿𝑀𝐸)
Trnsformer (SR/EA)

PT * 𝐶𝐹 *( ▲𝐿𝑀𝐸) x
Amount of Adjustment to (Total Number of Power
the Total Material Price Transformers indicated in
b. =
for Power Transformer Materials/ Equipment Price
(SR) Component in Pricing
Attachment to this Bid)

Where:

PT = Power Trnsformer Tender unit price

LMEt = US 8998.76

LMEt = “Copper Price specified by COMPANY according


to Monthly Average LME Price of Copper for Cash
Buyer” for the month preceding the month for
issuing the Bid Package in U.S. Dollars per Metric
Ton.

Name in Print & Signature of Bidder


5
Bid Form - (Lump Sum Without Optional Work)
April 2021
LMEf = International Price of Copper in U.S. Dollars per
Metric Ton for Cash Buyer as published in London
Metal Exchange (LME) on the day (LME working
day) immediately following the date of the Notice of
Award or Letter of Intent by COMPANY.

CF = Copper Factor
=3.75* ( LMEt) ∗( Copper Weight in KG ) / ( PT
∗(1000 𝐾𝐺.))

* Copper Weight in KG to be supplied by Bidder as per ITB-Annexture XXI

▲𝐿𝑀𝐸 = ( (LMEf / LMEt) - 1 )

2.9 Final “Unit Price” and “Total Material Price” for PowerTransformers and
final “CONTRACT Price”

As a result of the Power Trnsformer Price Adjustment indicated in Paragraph 2.8 of


this Bid, the final “Unit Price” and “Total Material Price” for
PowerTransformers indicated in Materials/Equipment Price Component in Pricing
Attachment to this Bid, and the final “CONTRACT Price” to be indicated in
Paragraph 1.1 of Schedule “C” of the final CONTRACT to be entered into between
COMPANY and the undersigned bidder, in the event it becomes the successful
bidder, shall be as follows:

a. Final Unit Price of Original Bid Price (SR/EA) ±


PowerTransformer(SR/EA) = Price Adjustment (SR/EA) as
per Paragraph 2.8.2.a above

b. Final Total Material Price = Original Bid Price (SR) ± Price


for Power Transformer Adjustment (SR) as per
(SR) Paragraph 2.6.2.b above

c. Final CONTRACT Price = A–B+C

where:

A = Original Total Lump Sum Bid Price (Indicated in Paragraph 2.1


of this Bid)

B = Original Total Material Bid Price for


PowerTransformer(Indicated in Materials / Equipment Price
Component in Pricing Attachment to this Bid)

C = Final Total Material Price for PowerTransformeras per


Paragraph 2.7.b above

Name in Print & Signature of Bidder


6
Bid Form - (Lump Sum Without Optional Work)
April 2021
3. TRANSFORMER LOSSES TABLE

Pursuant to Paragraph 17.3 of the Instructions to Bidders for Commercial Proposal,


the undersigned bidder hereby submits as attachment to this bid an EXACT COPY
of Bidder’s Annexure-IX of Instructions to Bidders for Technical Proposal
(TRANSFORMER LOSSES TABLE) duly signed and stamped by both Bidder and
Manufacturer(s) stating the Guaranteed No Load (Core) Loss and Full Load
(Copper) Loss for each proposed transformer.

4. VALIDITY

This bid shall remain valid for a period of one hundred twenty (120) calendar
days following the bid closing date.

5. ADDENDA

The following addenda to the bid documents were received by the


undersigned, and were considered in the preparation of this bid:

Date Received .Addenda No


           

6. CONFLICT OF INTEREST

The undersigned Bidder acknowledges having read paragraph 2.10 "Conflict of


Interest" of the General Terms and Conditions (Schedule "A") and paragraph 9.3
"Conflict of Interest" of the Instructions to Bidders, and that no conflict of interest
exists with the National Grid SAas per the above paragraphs, and shall avoid those
situations where the bidder's interests conflict with those of the National Grid SA, and
shall notify the Saudi Electricity Company in writing immediately upon the
occurrence of any conflict of interest, and that the undersigned bidder shall bear all
consequences arising from a breach of the terms of the contract and shall compensate
Company for damages, losses and additional costs incurred as a result of that breach.

7. SCOPE AND COMPLIANCE

This bid includes all the work and services required to perform the WORK. Having
been properly represented during the Job Explanation Meeting and having
investigated the WORK SITE, and examined in their entirety the Scope of Work, the
Proforma Contract and all the documents referred to therein, and the Instructions to
Bidders, the undersigned offers to:

RFX 40000xxxxx
CONTRACTOR shall design and engineer; procure, supply and deliver to the
WORK SITE and COMPANY-designated warehouse(s) all equipment and materials
(except for the items that COMPANY shall provide pursuant to Paragraph 3.1 of

Name in Print & Signature of Bidder


7
Bid Form - (Lump Sum Without Optional Work)
April 2021
Schedule “B”, if any), start-up; perform quality management, factory
inspection/testing, and all associated work and services; construct, install, test and
commission; and put into service until final handing over to COMPANY, in a
satisfactorily working and operating condition, the new substation and associated
modifications to the existing remote substations as described below in accordance
with the Scope of Work and Technical Specifications (PTS # 22CN1136 & PTS-
22CR1210):

RFX 40000xxxxx

CONTRACTOR shall design and engineer; procure, supply and deliver to the
WORK SITE all equipment and materials and start-up; perform quality management,
factory inspection/testing, and all associated work and services; construct, install, test
and commission; and put into service until final handing over to COMPANY, in a
satisfactorily working and operating condition, the CONNECTION OF AL
JANADRIYAH S/S 8259, IN RIYADH CITY as described below in accordance
with the Scope of Work and Technical Specifications, PTS # 22CC1088

strictly in accordance with said Bid Documents, all for the Unit Prices indicated in the
Pricing Attachment. The undersigned confirms having read both the above affidavits,
and that there are no conditional terms or exceptions contained elsewhere in this bid.

Contractor Name :       CONTRACTOR SEAL

Authorized Signature :
Name :      
Position :      
Date :      

Name in Print & Signature of Bidder


8
Bid Form - (Lump Sum Without Optional Work)