ODISHA UNIVERSITY OF TECHNOLOGY AND RESEARCH

(Formerly College of Engineering & Technology, Bhubaneswar)

Registration No:
                   

Total Number of Pages: PLANNING


Time: 2 Hours Max marks: 20 PPCPL 103
Mid-Term Examination : 2022-23
SUBJECT: INFRASTRUCTURE PLANNING
BRANCH: Section-
Answer Question No.1 which is compulsory and any Three from the rest.
The figures in the right hand margin indicate marks.

Q1 Answer the following questions: (0.5 x 10)


a) As per CPHEEO, what is the recommended per capita water supply levels for
different towns and cities?
b) Calculate the total quantity of water for a town with population of 35,46,253?
c) Define the term “Compensatory Loss Demand” ?
d) What are the chemical indicators on which the quality of water depends?
e) Explain the objectives of water treatment process?
f) Per capita consumption for industrial demand for a city is ----------.
g) Discuss the main objectives of rain water harvesting technique?
h) What are the types of Industrial Waste?
i) Explain the Dead end or Tree water distribution system?
j) Why Infrastructure development is important in Urban Planning?

Q2 a) Elaborate the Grid iron system of water distribution layout with its advantages and (2.5)
disadvantages.
b) What does UFW mean in context to the quantity of water? (2.5)

Q3 (a) Detail out the different sources of water with examples? (2.5)
b) What is meant by sewage system? Describe the various types of sewage system (2.5)
with relevant sketches?

Q4 a) Discuss the different stages of waste water treatment process ? (2.5)


b) Explain the term “Zero Liquid Discharge System”? (2.5)

Q5 a) A real estate project on a 15 hectare site contains: (2.5)


12 High -rise apartment buildings each with ground coverage of 5% of the site area
and houses a residential population of 20,000. 40% of the site area is for
landscaped gardens, and parks. The rest of the area is for roads and open parking.
The site experiences rainfall of 1660 mm annually.
Making necessary assumptions determine the surface runoff from the site after a
heavy rainfall of 120 mm in two hours.
b) Elaborate the various types of water demand? (2.5)