Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

Project: PROPOSED_SEMI_DET_BUILDING - CADVIEW M.

S LTD (*1KE-QB46-HVAE-G8DF)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-1

SLAB ANALYSIS AND DESIGN REPORT

NOTATION:
d/h = Effective/Total Depth of Slab (d=h-conc.cover)
g/q = Dead/Live Load (not factored)
L1 = Width of the Slab Along the Strip Direction
L2 = Width of the Slab Perpendicular to the Strip Direction
C = Moment Coefficient M=C p / L^2
M-spn = Ultimate Design Span Moment
M-sup = Ultimate Design Support Moment
Mc = Balanced Support Moment
As = Steel Area (Required/Supplied)

Material: C20/25 / Grade 410 (Type 2)

Slab Strip: X1 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.5Support As = 323.14/646.27 Top:Y12-175(T1)

1S1 1 5.800 3825.00 0.0320 0.0240 254.4/646.27


107/150 1.200 3725.00 4.5 3.3 Bottom: Y12-175(B2)

Support Mc = 4.5Support As = 323.14/646.27 Top:Y12-175(T1)

1S4 1 5.800 2500.00 0.0630 0.0630 254.4/646.27


119/150 1.200 5050.00 4.0 4.0 Bottom: Y12-175(B1)
Deflection Check: L/d = 21.01 < 52.0 *** Sufficient ***

Support Mc = 4.0Support As = 323.14/646.27 Top:Y12-175(T1)

1S7 1 5.800 2500.00 0.0630 0.0630 254.4/646.27


119/150 1.200 5050.00 4.0 4.0 Bottom: Y12-175(B1)
Deflection Check: L/d = 21.01 < 52.0 *** Sufficient ***

Support Mc = 4.1Support As = 323.14/646.27 Top:Y12-175(T1)

1S8 1 5.800 3900.00 0.0320 0.0240 254.4/646.27


107/150 1.200 3575.00 4.1 3.1 Bottom: Y12-175(B2)

Support Mc = 4.1Support As = 323.14/646.27 Top:Y12-175(T1)

1S11 1 5.800 2925.00 0.0429 0.0327 254.4/646.27


119/150 1.200 3575.00 3.7 2.8 Bottom: Y12-175(B1)
Deflection Check: L/d = 24.58 < 52.0 *** Sufficient ***

Support Mc = 3.9Support As = 323.14/646.27 Top:Y12-175(T1)

1S12 1 5.800 3225.00 0.0374 0.0283 254.4/646.27


119/150 1.200 3575.00 3.9 3.0 Bottom: Y12-175(B1)
Deflection Check: L/d = 27.1 < 52.0 *** Sufficient ***

Support Mc = 3.9Support As = 323.14/646.27 Top:Y12-175(T1)

1S13 1 5.800 5725.00 0.0320 0.0240 254.4/646.27


107/150 1.200 3225.00 3.3 2.5 Bottom: Y12-175(B2)

Support Mc = 0.4Support As = 323.14/646.27 Top:Y12-175(T1)

Slab Strip: X2 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 2.0Support As = 323.14/646.27 Top:Y12-175(T1)

1S18 1 5.800 3225.00 0.0000 0.1250 323.85/646.27


119/150 1.200 7350.00 2.0 13.1 Bottom: Y12-175(B1)
Deflection Check: L/d = 27.1 < 40.0 *** Sufficient ***

Project: PROPOSED_SEMI_DET_BUILDING
Project: PROPOSED_SEMI_DET_BUILDING - CADVIEW M.S LTD (*1KE-QB46-HVAE-G8DF)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-2

Support Mc = 2.0Support As = 323.14/646.27 Top:Y12-175(T1)

Slab Strip: X3 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.7Support As = 323.14/646.27 Top:Y12-175(T1)

1S16 1 5.800 3550.00 0.0522 0.0392 254.4/646.27


119/150 1.200 5225.00 6.6 5.0 Bottom: Y12-175(B1)
Deflection Check: L/d = 29.83 < 52.0 *** Sufficient ***

Support Mc = 6.6Support As = 323.14/646.27 Top:Y12-175(T1)

1S15 1 5.800 3550.00 0.0522 0.0392 254.4/646.27


119/150 1.200 5225.00 6.6 5.0 Bottom: Y12-175(B1)
Deflection Check: L/d = 29.83 < 52.0 *** Sufficient ***

Support Mc = 0.7Support As = 323.14/646.27 Top:Y12-175(T1)

Slab Strip: X4 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.6Support As = 323.14/646.27 Top:Y12-175(T1)

1S5 1 5.800 5000.00 0.0320 0.0240 254.4/646.27


107/150 1.200 4125.00 5.5 4.1 Bottom: Y12-175(B2)

Support Mc = 5.5Support As = 323.14/646.27 Top:Y12-175(T1)

1S3 1 5.800 3825.00 0.0320 0.0240 254.4/646.27


107/150 1.200 3750.00 4.5 3.4 Bottom: Y12-175(B2)

Support Mc = 0.5Support As = 323.14/646.27 Top:Y12-175(T1)

Slab Strip: X5 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.2Support As = 323.14/646.27 Top:Y12-175(T1)

1S9 1 5.800 1750.00 0.0000 0.0341 254.4/646.27


119/150 1.200 2225.00 0.2 1.0 Bottom: Y12-175(B1)
Deflection Check: L/d = 14.71 < 40.0 *** Sufficient ***

Support Mc = 0.2Support As = 323.14/646.27 Top:Y12-175(T1)

Slab Strip: X6 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 1.3Support As = 323.14/646.27 Top:Y12-175(T1)

1S18 1 5.800 3225.00 0.0860 0.0860 254.4/646.27


119/150 1.200 7350.00 9.0 9.0 Bottom: Y12-175(B1)
Deflection Check: L/d = 27.1 < 52.0 *** Sufficient ***

Support Mc = 6.8Support As = 323.14/646.27 Top:Y12-175(T1)

1S9 1 5.800 2225.00 0.0320 0.0240 254.4/646.27


107/150 1.200 1750.00 1.0 0.7 Bottom: Y12-175(B2)

Support Mc = 1.0Support As = 323.14/646.27 Top:Y12-175(T1)

Project: PROPOSED_SEMI_DET_BUILDING
Project: PROPOSED_SEMI_DET_BUILDING - CADVIEW M.S LTD (*1KE-QB46-HVAE-G8DF)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-3

1S6 1 5.800 5000.00 0.0000 0.0000 254.4/646.27


107/150 1.200 1750.00 0.0 0.0 Bottom: Y12-175(B2)

Support Mc = 4.5Support As = 323.14/646.27 Top:Y12-175(T1)

1S3 1 5.800 3825.00 0.0320 0.0240 254.4/646.27


107/150 1.200 3750.00 4.5 3.4 Bottom: Y12-175(B2)

Support Mc = 0.5Support As = 323.14/646.27 Top:Y12-175(T1)

Slab Strip: X7 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.4Support As = 323.14/646.27 Top:Y12-175(T1)

1S2 1 5.800 3825.00 0.0320 0.0240 254.4/646.27


107/150 1.200 3450.00 3.8 2.9 Bottom: Y12-175(B2)

Support Mc = 4.0Support As = 323.14/646.27 Top:Y12-175(T1)

1S4 1 5.800 2500.00 0.0630 0.0630 254.4/646.27


119/150 1.200 5050.00 4.0 4.0 Bottom: Y12-175(B1)
Deflection Check: L/d = 21.01 < 52.0 *** Sufficient ***

Support Mc = 4.0Support As = 323.14/646.27 Top:Y12-175(T1)

1S7 1 5.800 2500.00 0.0630 0.0630 254.4/646.27


119/150 1.200 5050.00 4.0 4.0 Bottom: Y12-175(B1)
Deflection Check: L/d = 21.01 < 52.0 *** Sufficient ***

Support Mc = 2.9Support As = 323.14/646.27 Top:Y12-175(T1)

1S17 1 5.800 2225.00 0.0320 0.0240 254.4/646.27


107/150 1.200 1475.00 0.7 0.5 Bottom: Y12-175(B2)

Support Mc = 5.0Support As = 323.14/646.27 Top:Y12-175(T1)

1S18 1 5.800 3225.00 0.0630 0.0630 254.4/646.27


119/150 1.200 7350.00 6.6 6.6 Bottom: Y12-175(B1)
Deflection Check: L/d = 27.1 < 52.0 *** Sufficient ***

Support Mc = 6.6Support As = 323.14/646.27 Top:Y12-175(T1)

1S19 1 5.800 4600.00 0.0000 0.0000 254.4/646.27


107/150 1.200 2125.00 0.0 0.0 Bottom: Y12-175(B2)

Support Mc = 0.0Support As = 323.14/646.27 Top:Y12-175(T1)

1S14 1 5.800 5725.00 0.0000 0.0000 254.4/646.27


107/150 1.200 2475.00 0.0 0.0 Bottom: Y12-175(B2)

Support Mc = 0.0Support As = 323.14/646.27 Top:Y12-175(T1)

Slab Strip: X8 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.1Support As = 323.14/646.27 Top:Y12-175(T1)

1S17 1 5.800 1475.00 0.0532 0.0401 254.4/646.27


119/150 1.200 2225.00 1.2 0.9 Bottom: Y12-175(B1)
Deflection Check: L/d = 12.39 < 52.0 *** Sufficient ***

Support Mc = 4.0Support As = 323.14/646.27 Top:Y12-175(T1)

1S8 1 5.800 3575.00 0.0365 0.0276 254.4/646.27


119/150 1.200 3900.00 4.7 3.5 Bottom: Y12-175(B1)
Deflection Check: L/d = 30.04 < 52.0 *** Sufficient ***

Support Mc = 0.5Support As = 323.14/646.27 Top:Y12-175(T1)

Project: PROPOSED_SEMI_DET_BUILDING
Project: PROPOSED_SEMI_DET_BUILDING - CADVIEW M.S LTD (*1KE-QB46-HVAE-G8DF)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-4

Slab Strip: X9 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.0Support As = 323.14/646.27 Top:Y12-175(T1)

1S18 1 5.800 7350.00 0.0000 0.0000 254.4/646.27


107/150 1.200 3225.00 0.0 0.0 Bottom: Y12-175(B2)

Support Mc = 2.7Support As = 323.14/646.27 Top:Y12-175(T1)

1S11 1 5.800 3575.00 0.0320 0.0240 254.4/646.27


107/150 1.200 2925.00 2.7 2.1 Bottom: Y12-175(B2)

Support Mc = 0.3Support As = 323.14/646.27 Top:Y12-175(T1)

Slab Strip: X10 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.6Support As = 323.14/646.27 Top:Y12-175(T1)

1S19 1 5.800 2125.00 0.1000 0.0860 254.4/646.27


119/150 1.200 4600.00 4.5 3.9 Bottom: Y12-175(B1)
Deflection Check: L/d = 17.86 < 52.0 *** Sufficient ***

Support Mc = 4.0Support As = 323.14/646.27 Top:Y12-175(T1)

1S12 1 5.800 3575.00 0.0320 0.0240 254.4/646.27


107/150 1.200 3225.00 3.3 2.5 Bottom: Y12-175(B2)

Support Mc = 0.4Support As = 323.14/646.27 Top:Y12-175(T1)

Slab Strip: X11 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.5Support As = 323.14/646.27 Top:Y12-175(T1)

1S16 1 5.800 5225.00 0.0320 0.0240 254.4/646.27


107/150 1.200 3550.00 4.0 3.0 Bottom: Y12-175(B2)

Support Mc = 4.0Support As = 323.14/646.27 Top:Y12-175(T1)

1S14 1 5.800 2475.00 0.0630 0.0630 254.4/646.27


119/150 1.200 5725.00 3.9 3.9 Bottom: Y12-175(B1)
Deflection Check: L/d = 20.8 < 52.0 *** Sufficient ***

Support Mc = 5.5Support As = 323.14/646.27 Top:Y12-175(T1)

1S13 1 5.800 3225.00 0.0594 0.0444 254.4/646.27


119/150 1.200 5725.00 6.2 4.6 Bottom: Y12-175(B1)
Deflection Check: L/d = 27.1 < 52.0 *** Sufficient ***

Support Mc = 0.7Support As = 323.14/646.27 Top:Y12-175(T1)

Slab Strip: X12 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.5Support As = 323.14/646.27 Top:Y12-175(T1)

1S15 1 5.800 5225.00 0.0320 0.0240 254.4/646.27

Project: PROPOSED_SEMI_DET_BUILDING
Project: PROPOSED_SEMI_DET_BUILDING - CADVIEW M.S LTD (*1KE-QB46-HVAE-G8DF)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-5

107/150 1.200 3550.00 4.0 3.0 Bottom: Y12-175(B2)

Support Mc = 4.0Support As = 323.14/646.27 Top:Y12-175(T1)

1S14 1 5.800 2475.00 0.0630 0.0630 254.4/646.27


119/150 1.200 5725.00 3.9 3.9 Bottom: Y12-175(B1)
Deflection Check: L/d = 20.8 < 52.0 *** Sufficient ***

Support Mc = 5.5Support As = 323.14/646.27 Top:Y12-175(T1)

1S13 1 5.800 3225.00 0.0594 0.0444 254.4/646.27


119/150 1.200 5725.00 6.2 4.6 Bottom: Y12-175(B1)
Deflection Check: L/d = 27.1 < 52.0 *** Sufficient ***

Support Mc = 0.7Support As = 323.14/646.27 Top:Y12-175(T1)

Slab Strip: X13 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.4Support As = 323.14/646.27 Top:Y12-175(T1)

1S6 1 5.800 1750.00 0.0860 0.0860 254.4/646.27


119/150 1.200 5000.00 2.6 2.6 Bottom: Y12-175(B1)
Deflection Check: L/d = 14.71 < 52.0 *** Sufficient ***

Support Mc = 6.4Support As = 323.14/646.27 Top:Y12-175(T1)

1S5 1 5.800 4125.00 0.0425 0.0324 254.4/646.27


119/150 1.200 5000.00 7.3 5.5 Bottom: Y12-175(B1)
Deflection Check: L/d = 34.66 < 52.0 *** Sufficient ***

Support Mc = 7.3Support As = 323.14/646.27 Top:Y12-175(T1)

1S7 1 5.800 5050.00 0.0000 0.0000 254.4/646.27


107/150 1.200 2500.00 0.0 0.0 Bottom: Y12-175(B2)

Support Mc = 0.0Support As = 323.14/646.27 Top:Y12-175(T1)

Slab Strip: X14 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.4Support As = 323.14/646.27 Top:Y12-175(T1)

1S6 1 5.800 1750.00 0.0860 0.0860 254.4/646.27


119/150 1.200 5000.00 2.6 2.6 Bottom: Y12-175(B1)
Deflection Check: L/d = 14.71 < 52.0 *** Sufficient ***

Support Mc = 6.4Support As = 323.14/646.27 Top:Y12-175(T1)

1S5 1 5.800 4125.00 0.0425 0.0324 254.4/646.27


119/150 1.200 5000.00 7.3 5.5 Bottom: Y12-175(B1)
Deflection Check: L/d = 34.66 < 52.0 *** Sufficient ***

Support Mc = 7.3Support As = 323.14/646.27 Top:Y12-175(T1)

1S4 1 5.800 5050.00 0.0000 0.0000 254.4/646.27


107/150 1.200 2500.00 0.0 0.0 Bottom: Y12-175(B2)

Support Mc = 0.0Support As = 323.14/646.27 Top:Y12-175(T1)

Slab Strip: X15 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.5Support As = 323.14/646.27 Top:Y12-175(T1)

Project: PROPOSED_SEMI_DET_BUILDING
Project: PROPOSED_SEMI_DET_BUILDING - CADVIEW M.S LTD (*1KE-QB46-HVAE-G8DF)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-6

1S3 1 5.800 3750.00 0.0322 0.0248 254.4/646.27


119/150 1.200 3825.00 4.5 3.5 Bottom: Y12-175(B1)
Deflection Check: L/d = 31.51 < 52.0 *** Sufficient ***

Support Mc = 4.5Support As = 323.14/646.27 Top:Y12-175(T1)

1S2 1 5.800 3450.00 0.0374 0.0283 254.4/646.27


119/150 1.200 3825.00 4.5 3.4 Bottom: Y12-175(B1)
Deflection Check: L/d = 28.99 < 52.0 *** Sufficient ***

Support Mc = 4.5Support As = 323.14/646.27 Top:Y12-175(T1)

1S1 1 5.800 3725.00 0.0326 0.0251 254.4/646.27


119/150 1.200 3825.00 4.5 3.5 Bottom: Y12-175(B1)
Deflection Check: L/d = 31.3 < 52.0 *** Sufficient ***

Support Mc = 0.5Support As = 323.14/646.27 Top:Y12-175(T1)

Project: PROPOSED_SEMI_DET_BUILDING

You might also like