File No.SPCORP-OPNICIVL/OCOR/0015/2023-SD2-CVL1
SOUTHERN POWER DISTRIBUTION COMPANY OF A.P. LIMITED
CORPORATE OFFICE::TIRUPA1
U.O.Note to Chief General Manager/Projects/APSPDCL/Tirupati:
Sir,
Sub: CIVIL - APSPDCL ~ TPT ~ Excavation of pole pit in hard rock by blasting for
the work of system strengthening works for electrification of YSR Jagananna
Housing Colonies in all circles of APSPDCL — Rate Approval - Accorded -
Reg.
34713/2023
Ref: 1) U.O.Note No.CGM/Proj/EE/Proj/DEE-P4/F Civil Rates/D.No.900/23,
Dt:01-05-2023
2) Memo No.CGM/P&MM&IT,SAP&CIVIL/TPT/F/I.No.28688/2022,
Dt:27-09-2022
3) U.O.Note No.SPCORP/CGM/P&MM&CIVIL/TPT/D.No.29965/22,
Dt:28-12-2022
4) Note orders Dt:26-12-2022 of Chairman & Managing
Director/APSPDCL/Tirupati
5) Note orders Dt:01-05-2023 of the Chairman & Managing
Director/APSPDCL/Tirupati
se
With reference to the above and after careful examination of the proposal
received from the Chief General Manager/Projects/APSPDCL/Tirupati in the reference
(1) cited, the Chairman & Managing Director of APSPDCL accords rate approval in
the above reference 4" & 5" note orders for “Excavation of pole pit in hard rock by
blasting for the work of system strengthening works for electrification of YSR Jagananna
Housing Colonies in all circles of APSPDCL” as detailed below.
co Description of item Hatey |
per pit
| Excavation of pole pits of standard size for all types/sizes of
Gn long poles in hard rocks by blasting including drilling of holes,
cost of required blasting material, removing of excavated
3h material, hire charges of machinery and T&P, all labour
e | charges, all operational and incidental charges ete complete of
| |-2) Controlling blasting 3,800.00
b) Open blasting
(Note:
i) Necessary protection measures to be taken before
commencement as per the guidelines and rules in vogue.
| ii) Necessary permissions to be taken from the competent
Z | authority prior to the commencement of work.)
Hence, it is requested to adopt standard planting depths in Pole pit excavation
luly following the departmental procedures in vogue.
3,420.00
Signed by D. Venkata
Chalapathy
CR ieee Neeyaesioe
APSPDC!
To,
eee General Manager/Projects/APSPDCL/Tirupati