Download as pdf
Download as pdf
You are on page 1of 1
BILL OF QUANTITIES ST MM ‘SENEVIRATNE, KALUWELLA GALLE. prem tess DESCRIPTION unit) qty. | RATE AMOUNT No | NO o (cement concrete 1:1 1/2:3 (3/4") in column shafts in {ground floor, using mixer and vibrator. ( Reinforcement, s shuttering and finishes paid for separately). ( GRADE 25 ). O50] 44,500.00 22,250.00) 2 ‘cement concrete 1: 1 1/2: 3( 3/4" ) in beams in ground floor, using mixer and vibrator. Inc. curing ( Reinforcement, : shuttering and finishes paid separately .{ GRADE 25 ) POO ee eno eet ter0o) 3 16mm,12mm, dia.tor steel reinforcement in colournns. 120.00] 724.00 86,880.00 4 16mm,20mm, dia.tor steel reinforcement in beam. 220.00] 724.00| 159,280.00 8 10mm dia.tor steel reinforcement in staircase and slab. kg | 300.00 724.00| 217,200.00 6 {6mm, 10mm dia.mild steel reinforcement in column and beer kg | 125.00 751.00 93,875.00 7 ‘Shuttering for column shaft 9" x9" including Class () timber joists and necessary props etc. (Rate to include ismantling same when required) -Ground floor 10.00 3171.00 31,710.00 8 ‘Shuttering for beam sides & soffit in 15 mm thk plywood sheets ,Class (I) timber, joists and necessary props et : (Rate to include dismantling same when required) ground 1690] 4,332.00 69,312.00] {oor to Ast floor 9 ‘shuttering for floor slab concrete including 15 mm plywood sheets, 4" x2" Class (ll) timber joists and necessary props. lup to 12'-00" height. (Rate to include dismantling same 30.00, 2,098.00 62,940.00 \when required). Ground floor 10 {Allow for chemical anchoring reinforcements ITEM) _ALLOw| __ 50,000.00 50,000.00 ‘TOTAL 1,106,214.00 prepaired by: Paget

You might also like