De shuttering period relates to the maturity of concrete and depends on the ambient temperature.

Forms shall not struck until the concrete has reached strength at least twice the stress of which the Search
concrete may be subjected at the time of removal of form work.

Form Summers Winters (Temp <18° C)

Walls, columns and vertical faces of structural 24 hrs. 48 hrs.


members

Removal of props under slab Spanning up to 4.5 m 7 days 14 days

Removal of props under beams and arches spanning 14 days 28 days


up to 6 m

So t form work to slabs 3 days (props to be re xed after


removal)

So t to beams props 7 days props to re xed after


removal.

Categories
Test on Cement at construction site | Field Test on…
on…
Building Construction (4)

civil Basic Topic (25)

civil site visit (141)

Interview Questions (12)

Thumb rule (1)


Thumb Rule (1)

Quantity of
steel & Agg
1100 sqft a
RCC Flat Sl

← ROLE OF A SITE ENGINEER IN BUILDING CONSTRUCTION


https://civilsitevisit.com/de-shuttering-time-of-beam-column-slab/#:~:text=De shuttering period relates to,of removal of form work.&text=24 hrs. 2/4

You might also like