Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

25 Water

Street
25 Water Street, New York, NY
10004

OWNER:
METROLOFT MANAGEMENT LLC
40 WALL STREET, 17TH FLOOR
NEW YORK, NY 10005
T: 212.706.3030
OWNER:
GFP REAL ESTATE, LLC
515 MADISON AVENUE, SUITE 1500
NEW YORK, NY 10022
T: 212.609.8000
ARCHITECT:
CETRA RUDDY ARCHITECTURE DPC
1 BATTERY PARK PLAZA, SUITE 800
NEW YORK, NY 10004
212.941.9801
STRUCTURAL ENGINEER:
GILSANZ MURRAY STEFICEK LLP
129 WEST 27TH STREET, 5TH FLOOR
NEW YORK, NY 10001
T: 212.254.0030
MEP ENGINEER:
FMC ENGINEERING, P.C.
261 WEST 35TH STREET
NEW YORK, NY 10001
T: 212.643.1720
FACADE CONSULTANT:
AJLP / SURFACE DESIGN GROUP
40 WORTH STREET, #814
NEW YORK, NY 10013

TABLE II - PROGRESS INSPECTIONS FOR ENERGY CODE COMPLIANCE COMMERCIAL BUILDINGS

SUPPORTING DOCUMENTATION INDEX

DESCRIPTION DATE

PROFESSIONAL CERTIFICATION
DRAWING SHEET LIST

DOB NOW#: M08013214-S3

PLUMBING ENERGY CODE


ANALYSIS

EN-200.00

DRAWING NO.

© 2018 CETRARUDDY ARCHITECTURE DPC


PAGE NO.
SCALE

DOB
PROJECT

FILE NO.
DOB
25 Water
Street
EET
WATER STR
25 Water Street, New York, NY
10004

OWNER:
METROLOFT MANAGEMENT LLC
40 WALL STREET, 17TH FLOOR
NEW YORK, NY 10005
T: 212.706.3030
OWNER:
GFP REAL ESTATE, LLC

BROAD STREET
515 MADISON AVENUE, SUITE 1500
NEW YORK, NY 10022
T: 212.609.8000
25 WATER STREET
ARCHITECT:
NEW YORK, NY 10004 CETRA RUDDY ARCHITECTURE DPC
1 BATTERY PARK PLAZA, SUITE 800
NEW YORK, NY 10004
212.941.9801
STRUCTURAL ENGINEER:
GILSANZ MURRAY STEFICEK LLP
129 WEST 27TH STREET, 5TH FLOOR
NEW YORK, NY 10001
T: 212.254.0030
MEP ENGINEER:
FMC ENGINEERING, P.C.
261 WEST 35TH STREET
NEW YORK, NY 10001
T: 212.643.1720
FACADE CONSULTANT:
AJLP / SURFACE DESIGN GROUP
40 WORTH STREET, #814
NEW YORK, NY 10013

FMC to put square around

SITE INFORMATION
PLOT PLAN N
Indicate the
temperature range of
the proposed system.
Specify duct, plenum and piping insulation
and sealing requirements for HVAC and
service water heating systems on drawings.

EN-m.6 Piping Insulation and


Sealing

Specify piping insulation and sealing


requirements for HVAC and service
water heating systems on drawings.

• Penetrations through thermal envelope: must be sealed to minimize air leakage

• Dampers integral to building envelope: outdoor air dampers must close when
system is off

• HVAC & Service Water heating equipment meets sizing and efficiency
requirements

• HVAC & Service Water heating system controls: applicable part-load, reset,
temperature controls

• Piping insulation: minimum thickness of 1” to 4.5”, required on piping carrying


fluids >105F

• Maintenance Information: shall be furnished for installation of new equipment

• Permanent Certificate: shall list type and efficiency of heating, cooling, and/or
service water heating systems

ISSUED FOR PROGRESS 04.07.23


ISSUED FOR DESIGN DEVELOPMENT 02.01.23
ISSUED FOR FILING 11.04.22
DESCRIPTION DATE

PROFESSIONAL CERTIFICATION
DOB NOW#: M08013214-S3
PLUMBING NOTES,
SYMBOL LIST & DRAWING
LIST

P-001.00

DRAWING NO.

© 2018 CETRARUDDY ARCHITECTURE DPC


PAGE NO.
1/8" = 1'0"

SCALE

DOB
PROJECT

FILE NO.
DOB

You might also like