8 7 6 5 4 3 2 1

NOTE:

D SECONDARY PACK SUPPORT 1. INSTALL FIRST LAYER OF INSULATION BETWEEN PRIMARY PACK SUPPORTS D

AND IMPALE OVER INTERMEDIATE ROWS OF STUDS.

2. INSTALL SECONDARY PACK SUPPORTS AS DIRECTED ON THE STUD


CASING ASSEMBLY DRAWINGS.

3. INSTALL SECOND LAYER OF INSULATION BETWEEN SECONDARY PACK


SUPPORTS. OFFSET VERTICAL SEAMS IN INSULATION BY AT LEAST ON STUD
SPACE.
PRIMARY PACK SUPPORT
4. INSTALL THIRD LAYER OF INSULATION BETWEEN SECONDARY PACK
SUPPORTS. OFFSET VERTICAL SEAM IN INSULATION BY AT LEAST ON STUD
SPACE.

C
5. ON HORIZONTAL DUCTING WITHOUT PACK SUPPORTS, INSTALL THE C
INSULATION IN A SIMILAR MANNER.

B B
THIRD LAYER OF INSULATION

Released
All information contained within this drawing is the exclusive property of
ATCO Structures & Logistics Ltd.
SECOND LAYER OF INSULATION This design information is CONFIDENTIAL and must not be reproduced or distributed to outside parties without
consent of ATCO Structures & Logistics Ltd.
By using this drawing the user agrees to abide by these foregoing terms and conditions.

Environmental
Systems
FIRST LAYER OF INSULATION
INSULATION INSTALLATION

FOR 6" THICK LINER


A DRAWN Mark T 11/3/2004 DRAWING No. REV A

CHECKED VB 12/6/2004

A ISSUED FOR FABRICATION Mark T 11/3/2004 VB


ENGINEERING VB 12/6/2004
QDD-400-0310-02 A
REV DESCRIPTION BY DATE CHECKED APPROVED VB 12/6/2004 SHEET 1 OF 1
8 7 6 5 4 3 2 1