Professional Documents
Culture Documents
QDD 400 0310 02
QDD 400 0310 02
NOTE:
D SECONDARY PACK SUPPORT 1. INSTALL FIRST LAYER OF INSULATION BETWEEN PRIMARY PACK SUPPORTS D
C
5. ON HORIZONTAL DUCTING WITHOUT PACK SUPPORTS, INSTALL THE C
INSULATION IN A SIMILAR MANNER.
B B
THIRD LAYER OF INSULATION
Released
All information contained within this drawing is the exclusive property of
ATCO Structures & Logistics Ltd.
SECOND LAYER OF INSULATION This design information is CONFIDENTIAL and must not be reproduced or distributed to outside parties without
consent of ATCO Structures & Logistics Ltd.
By using this drawing the user agrees to abide by these foregoing terms and conditions.
Environmental
Systems
FIRST LAYER OF INSULATION
INSULATION INSTALLATION
CHECKED VB 12/6/2004