Professional Documents
Culture Documents
10-00 - 302.Kyndryl-IS Raise A Followup WO
10-00 - 302.Kyndryl-IS Raise A Followup WO
This work instruction explain how generate a Work Order from the other work
Application
order. Normally we used when we generate a followup WO to solve a corrective
that we have detected in a Preventive Maintenance.
Associated
Pictures from MAXIMO 7.6 IBM
Document
Change control Issue no. 01 – 10-02-22: Translate from Spanish to English language
Page 1
To raise the followup WO, we should go to the “select action” and select “create a workorder”.
Page 2
Description WO field: To identify the Workorder. If our description is good, it is more easy to
know that we are solving it.
Page 3
In other section of the WO tracking, we can view the original wo and if the original wo has owner, our
followup wo heredit the owner.
If we don’t need to change the Owner (view section in the WI “create a wo….”, to finish the process only
we should change the status to “60 – Work in Progress”.
Page 4
NOTE: if the followup WOs amount is more that clip level include in the Fixed Price, we should complete
this followup wo and indicate in log that the corrective or repair need a Small Job.
a.
Page 5
Page 6