PVsyst - Simulation report


Grid-Connected System

Project: Faber Castell 150 kWp


Variant: New simulation variant
No 3D scene defined, no shadings
System power: 148 kWp
Kawasan Industri MM2100 - Indonesia

Author
Project: Faber Castell 150 kWp
Variant: New simulation variant

PVsyst V7.2.11
VC0, Simulation date:
23/09/22 14:26
with v7.2.11

Project summary
Geographical Site Situation Project settings
Kawasan Industri MM2100 Latitude -6.33 °S Albedo 0.20
Indonesia Longitude 107.10 °E
Altitude 42 m
Time zone UTC+7

Meteo data
Kawasan Industri MM2100
Meteonorm 8.0 (2010-2014), Sat=100% - Synthetic

System summary
Grid-Connected System No 3D scene defined, no shadings

PV Field Orientation Near Shadings User's needs


Fixed plane No Shadings Unlimited load (grid)
Tilt/Azimuth 10 / 90 °

System information
PV Array Inverters
Nb. of modules 272 units Nb. of units 3 units
Pnom total 148 kWp Pnom total 120 kWac
Pnom ratio 1.235

Results summary
Produced Energy 212.5 MWh/year Specific production 1434 kWh/kWp/year Perf. Ratio PR 82.39 %

Table of contents
Project and results summary 2
General parameters, PV Array Characteristics, System losses 3
Main results 4
Loss diagram 5
Special graphs 6

23/09/22 PVsyst Licensed to Page 2/6


Project: Faber Castell 150 kWp
Variant: New simulation variant

PVsyst V7.2.11
VC0, Simulation date:
23/09/22 14:26
with v7.2.11

General parameters
Grid-Connected System No 3D scene defined, no shadings

PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane No 3D scene defined Transposition Perez
Tilt/Azimuth 10 / 90 ° Diffuse Perez, Meteonorm
Circumsolar separate

Horizon Near Shadings User's needs


Free Horizon No Shadings Unlimited load (grid)

PV Array Characteristics
PV module Inverter
Manufacturer Jinkosolar Manufacturer Huawei Technologies
Model JKM-545M-72HL4-BDVP Model SUN2000-40KTL-M3-380V
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 545 Wp Unit Nom. Power 40.0 kWac
Number of PV modules 272 units Number of inverters 12 * MPPT 25% 3 units
Nominal (STC) 148 kWp Total power 120 kWac
Modules 16 Strings x 17 In series Operating voltage 200-1000 V
At operating cond. (50°C) Max. power (=>40°C) 44.0 kWac
Pmpp 135 kWp Pnom ratio (DC:AC) 1.24
U mpp 637 V
I mpp 212 A

Total PV power Total inverter power


Nominal (STC) 148 kWp Total power 120 kWac
Total 272 modules Number of inverters 3 units
Module area 701 m² Pnom ratio 1.24

Array losses
Thermal Loss factor DC wiring losses Module Quality Loss
Module temperature according to irradiance Global array res. 50 mΩ Loss Fraction -0.8 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s

Module mismatch losses Strings Mismatch loss


Loss Fraction 2.0 % at MPP Loss Fraction 0.1 %

IAM loss factor


Incidence effect (IAM): Fresnel AR coating, n(glass)=1.526, n(AR)=1.290

0° 30° 50° 60° 70° 75° 80° 85° 90°


1.000 0.999 0.987 0.962 0.892 0.816 0.681 0.440 0.000

23/09/22 PVsyst Licensed to Page 3/6


Project: Faber Castell 150 kWp
Variant: New simulation variant

PVsyst V7.2.11
VC0, Simulation date:
23/09/22 14:26
with v7.2.11

Main results
System Production
Produced Energy 212.5 MWh/year Specific production 1434 kWh/kWp/year
Performance Ratio PR 82.39 %

Normalized productions (per installed kWp) Performance Ratio PR

Balances and main results

GlobHor DiffHor T_Amb GlobInc GlobEff EArray E_Grid PR


kWh/m² kWh/m² °C kWh/m² kWh/m² MWh MWh ratio
January 122.7 79.64 25.02 120.8 117.3 15.20 14.91 0.833
February 139.7 83.48 24.88 137.8 134.4 17.20 16.87 0.826
March 142.6 85.47 25.35 140.6 137.1 17.59 17.25 0.828
April 144.7 77.41 25.50 143.7 140.5 17.79 17.45 0.819
May 144.5 69.11 26.09 143.6 140.1 17.96 17.62 0.828
June 139.5 64.06 25.36 140.4 137.0 17.77 17.43 0.838
July 151.8 67.75 25.20 150.3 146.5 18.91 18.55 0.833
August 160.1 82.22 25.56 159.7 156.2 19.97 19.59 0.828
September 162.3 81.00 25.55 160.1 156.8 19.65 19.27 0.812
October 171.1 93.97 26.18 170.0 166.4 20.85 20.46 0.812
November 141.0 79.40 25.42 139.0 135.7 17.14 16.81 0.816
December 135.8 78.99 25.33 134.4 130.9 16.63 16.32 0.819
Year 1755.7 942.50 25.46 1740.2 1698.8 216.66 212.54 0.824

Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings

23/09/22 PVsyst Licensed to Page 4/6


Project: Faber Castell 150 kWp
Variant: New simulation variant

PVsyst V7.2.11
VC0, Simulation date:
23/09/22 14:26
with v7.2.11

Loss diagram
1756 kWh/m² Global horizontal irradiation

-0.88% Global incident in coll. plane


-2.38% IAM factor on global

1699 kWh/m² * 701 m² coll. Effective irradiation on collectors

efficiency at STC = 21.13% PV conversion

251.8 MWh Array nominal energy (at STC effic.)


-0.69% PV loss due to irradiance level

-8.89% PV loss due to temperature

+0.75% Module quality loss

-2.10% Mismatch loss, modules and strings

-0.99% Ohmic wiring loss


222.5 MWh Array virtual energy at MPP
-1.82% Inverter Loss during operation (efficiency)

-2.67% Inverter Loss over nominal inv. power


0.00% Inverter Loss due to max. input current
0.00% Inverter Loss over nominal inv. voltage
0.00% Inverter Loss due to power threshold
0.00% Inverter Loss due to voltage threshold
-0.03% Night consumption
212.5 MWh Available Energy at Inverter Output
212.5 MWh Energy injected into grid

23/09/22 PVsyst Licensed to Page 5/6


Project: Faber Castell 150 kWp
Variant: New simulation variant

PVsyst V7.2.11
VC0, Simulation date:
23/09/22 14:26
with v7.2.11

Special graphs
Daily Input/Output diagram

System Output Power Distribution

23/09/22 PVsyst Licensed to Page 6/6