A. Back Pressure line was not tightened. B. Leakage between filter and heater C. Heater terminal was damaged D. Filter was missassmbled (opposite).
Defective Cause
The back pressure pipe must be tighten Make sure that the contact between In case of putting the counterweight, There is one sense to mount the filter, the
to avoid accumulation of water in the heater and filter is good (test without pay much attention not to give any damage to flange shown must be fitted on the heater
pipe. gasket), If the heater flange is bent, mount heater terminal. side.
If you find longer, after cutting the 2 filters temporally to avoid any leakage.
pipe must be used.
Countermeasure
Before assembling, make sure that the new Before covering CPU part, make sure that Some operators never re-generate By using adjustable clamps, the harness
sensing pipe is not clogged. the connecting of heater terminal is OK. because of this. must be located as far as possible from
We found that this is one of the cause 5- heat influence.
1(Over collecting) error.
So, cut the cover in order that the operator is
easy to open as shown below.
Countermeasure
M. AC200V supply was below. N. DPF valve maintenance was bad. O. Air flow sensor was clogged. P. The operator didn't know how to use DPF.
During re-generation AC200 supply must This is one of cause 4-2 error. As a result of bad DPF valve maintenance, 1. Never interrupt the DPF regeneration
be over 210V. Otherwise, the filter does DPF valve must be inspected and cleaned the airflow sensor is sometimes contaminated process incorrectly.
not get enough heat. every 12 months or 2000hrs (please refer to as shown above. It is important to tell to the customer that
Listen to the operator where is usual supply the P&S news EN-3001). In that case, it must be changed. each time the regeneration is interrupted,
for re-generation. Near the supply, there is the DPF system is damaged (error code 7-2
a big equipment as shown above. Pay is shown).
much attention. In order to interrupt correctly, please refer
Check the voltage during re-generation and to the operator manual.
also the equipment turning on. <From operator manual>
If the regeneration interruption is
unavoidable, press the maintenance switch
until the buzzer sounds, Then the left green
Countermeasure