Professional Documents
Culture Documents
SMOC Wiring Diagram
SMOC Wiring Diagram
F26_001
SYNGENTA PAKISTAN
Company / customer
Project description SMOC Unloading and Transfering to 8KL Vessel
Job number IEC_bas001
Commission EPLAN
Created on 05/05/2023
Edit date 05/05/2023 by (short name) EASTERN Number of pages 38
2
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN Title page = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 1
Modification Date Name Original Replacement of Replaced by Page 1 / 38
0 1 2 3 4 5 6 7 8 9
LOTO-L1
LOTO-L2
LOTO-L3
MAIN-L1
MAIN-L2
MAIN-L3
LOTO-N
MAIN-N
KE-L1
KE-L2
KE-L3
KE-N
19.2 19.2 19.2 19.2 2.3 2.3 2.4 2.4
1 3 5 N 1 3 5 N 1 3 5 N
-Q1 -LOTO -Q2
2 4 6 N. 2 4 6 N. 2 4 6 N.
100 A 63 A
19.2 19.2 19.2 19.2 2.6 2.6 2.6 2.6 4.0 4.0 4.0 4.0
Q1-L1
Q1-L2
Q1-L3
Q2-L1
Q2-L2
Q2-L3
Q1-N
Q2-N
LOTO-L1
LOTO-L2
LOTO-L3
LOTO-N
LOTO SWITCH
K-ELECTRIC
1
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN BREAKERS
MAIN = CA1
4
Q2-L1 / 2.6
Q2-L2 / 2.6
Q2-L3 / 2.6
Q2-N / 2.6
1 N 1 3 5 1 3 5
-Q3 F7 F8
2 N.
2 4 6 2 4 6
F7L1
F7L2
F7L3
F8L1
F8L2
F8L3
UPS-INPUT-L
VFD-1
VFD-2
UPS
2 5
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN BREAKERS = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 4
Modification Date Name Original Replacement of Replaced by Page 3 / 38
0 1 2 3 4 5 6 7 8 9
UPS-OUTPUT-L / 19.4
UPS-OUTPUT-N / 19.4
1 N 1 N 1 N 1 N 1 N 1 N
-F1 -F2 -F3 -F4 -F5 -F6
2 N. 2 N. 2 N. 2 N. 2 N. 2 N.
5A.1 5A.1 5A.4 5A.4 14.0 14.0 31.3 31.5 14A.5 14A.5 14B.0 14B.0
F1-N
F2-N
F3-N
F4-N
F5-N
F6-N
F1-L
F2-L
F3-L
F4-L
F5-L
F6-L
MASS FLOW METER
POWER SUPPLY-1
POWER SUPPLY-2
EOCR-1 , EOCR-2
220V BANK
AC OUTLET
FAN
4 5A
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN BREAKERS = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 5
Modification Date Name Original Replacement of Replaced by Page 4 / 38
0 1 2 3 4 5 6 7 8 9
1L- / 6.4
V+ V+ V- V- V+ V+ V- V-
FUSE
NDR-240-24 NDR-240-24
⏚ N L ⏚ N L
POWER SUPPLY-01
HMI, PLC, Etherner Moudule
Ethernet Switch, Analog Input
POWER SUPPLY-02
F1-N / 5.2 F2-N / 5.3
Digital Input Modules
Digital Output Module
Relays Common, Termination
Panel and Penumetic Panel.
5 6
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN POWER SUPPLY = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 5A
Modification Date Name Original Replacement of Replaced by Page 5 / 38
0 1 2 3 4 5 6 7 8 9
-K1
Rack X
Slot Y
MAIN PANEL RACK-02
SIE.6ES7314-1AG14-0AB0
S7-300 SIEMENS
CPU 314
-X1:X1
MPI
L+ 1L+ / 5A.8
M 1L- / 5A.9
PE
6ES7314-1AG14-0AB0
Siemens\Automation_Systems\S7-300\6ES7314-1AG14-0AB0.ema
Übersicht
Variante A
2015-10 / P8 2.4
CPU 314
5A 7
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN CPU = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 6
Modification Date Name Original Replacement of Replaced by Page 6 / 38
0 1 2 3 4 5 6 7 8 9
ETHERNET MODULE
-K1 CP 343-1 Lean
SF
BF
DC5V
RX/TX
RUN
STOP
X1P1
X1P2
MAINT
X1
ETHERNET
FOR LAN ONLY
P1
P2
DC 24V
L+
M
-X80 1 2
L+ M
8.7 8.7
1L+
1L-
6 8
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN ETHERNET MODULE = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 7
Modification Date Name Original Replacement of Replaced by Page 7 / 38
0 1 2 3 4 5 6 7 8 9
S7-300 SIEMENS
SM 331 AI 8 x 12 BIT
1 1L+ / 7 .4
IWX 2 7 .4 / 1L-
V
IWX 3 AI 0+ / 22.0
+
IWX+2 4 8.7 / 1L-
2
DMU
-
IWX+2 5 AI 1+ / 22.1
+
L+ IWX+4 6 8.7 / 1L-
4
DMU
-
M IWX+4 7 AI 2+ / 22.1
IWX+6 9 AI 3+ / 22.1
10
COMP
11
IWX+8 13 AI 4+ / 22.1
IWX+10 15 AI 5+ / 22.1
IWX+12 17 AI 6+ / 22.2
IWX+14 19 AI 7+ / 14A.4
20 1L- / 8.7
6ES7331-7KF02-0AB0
7 9
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN ANALOG INPUT = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 8
Modification Date Name Original Replacement of Replaced by Page 8 / 38
0 1 2 3 4 5 6 7 8 9
S7-300
SM 332 AO 4 x 12 BIT
SIEMENS ANALOG OUTPUT MODULE
X1/1/L+ 1L+ / 14.6
X1/2
QWX
X1/3/QWX/QI0_QV0
X1/6/Mana0
QWX+2
X1/7/QWX+2/QI1_QV1
X1/10/Mana1
QWX+4
X1/11/QWX+4/QI2_QV2
QWX+4 AO-2+ /
X1/12/QWX+4/n.c._S2+
QWX+4 AO-2- /
X1/13/QWX+4/n.c._S2-
X1/14/Mana2
QWX+6
X1/15/QWX+6/QI3_QV3
QWX+6 AO-3+ /
X1/16/QWX+6/n.c._S3+
QWX+6 AO-3- /
X1/17/QWX+6/n.c._S3-
X1/18/Mana3
X1/19
6ES7332-5HD01-0AB0
Siemens\Automation_Systems\S7-300\6ES7332-5HD01-0AB0.ema
Übersicht
Variante A
2012-06 / 2.1.4
8 SM 332 AO 4 x 12 BIT 10a
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN ANALOG OUTPUT = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 9
Modification Date Name Original Replacement of Replaced by Page 9 / 38
0 1 2 3 4 5 6 7 8 9
S7-300 SIEMENS
DIGITAL INPUT MODULE-01
SM 321 DI 32 x DC24V
1M 1M
6ES7321-1BL00-0AA0
2L-
9 10b
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN DIGITAL INPUT = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 10a
Modification Date Name Original Replacement of Replaced by Page 10 / 38
0 1 2 3 4 5 6 7 8 9
S7-300
SM 321 DI 32 x DC24V
SIEMENS DIGITAL INPUT MODULE-02
1M 1M
6ES7 321-1BL00-0AA0
2L-
10a 11
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN DIGITAL INPUT = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 10b
Modification Date Name Original Replacement of Replaced by Page 11 / 38
0 1 2 3 4 5 6 7 8 9
DO-04
Rack X
Slot Y
SIE.6ES7 322-1BL00-0AA0
SM 322 DO 32 x DC24V/0,5A
S7-300
SM 322 DO 32 x DC24V/0,5A
SIEMENS
DIGITAL OUTPUT MODULE
1L 1L
1M 1M
6ES7322-1BL00-0AA0
2L-
10b 13A
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN DIGITAL OUTPUT = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 11
Modification Date Name Original Replacement of Replaced by Page 12 / 38
11
Modification
2L-
2L+
0
Date
R1
11.1
A2
A1
Q0.0
1NO
R1-1NO R1-1C
22.0
1NC 1C
2NO
R1-2NO R1-2C
15.1
2NC 2C
Name
3NO
4NO
4NC 4C
1
Ed.
Date
Appr.
Original
R2
11.1
A2
A1
Q0.1
1NO
EASTERN
R2-1NO R2-1C
22.0
05/05/2023
1NC 1C
2NO
R2-2NO R2-2C
16.1
2NC 2C
3NO
4NO
2
EPLAN
4NC 4C
Replacement of
R3
11.1
A2
A1
Q0.2
1NO
R3-1NO R3-1C
22.0
1NC 1C
2NO
R3-2NO R3-2C
15.3
14.3
2NC 2C
R3-2C
3NO
3
K3-PUMP-1 3NC 3C
4NO
Replaced by
4NC 4C
A2
A1
Q0.3
1NO
R4-1NO 22.1 R4-1C
1NC 1C
2NO
R4-2NO R4-2C
16.3
14.4
4
2NC 2C
R4-2C
3NO
K4-PUMP-2 3NC 3C
4NO
4NC 4C
RELAYS
SYNGENTA PAKISTAN
R5
11.1
A2
A1
Q0.4
1NO
R5-1NO R5-1C
22.1
5
1NC 1C
2NO
MAIN PANEL RACK-03
R5-2NO R5-2C
15.7
15.7
2NC 2C
R5-2C
RELAYS
3NO
VFD-1 PUMP-1 RUN CMD
3NC 3C
4NO
4NC 4C
R6
6
11.1
A2
A1
Q0.5
1NO
R6-1NO R6-1C
22.1
1NC 1C
2NO
R6-2NO R6-2C
16.7
16.7
2NC 2C
R6-2C
3NO
4NO
4NC 4C
7
R7
11.1
A2
A1
Q0.6
1NO
R7-1NO
22.1
1NC 1C
2NO
2NC 2C
IEC_bas001
BUZZER-ALARM 3NO
3NC 3C
4NO
8
4NC 4C
R8
11.1
A2
A1
Q0.7
= CA1
+ EAA
1NO
R8-1NO
22.1
1NC 1C
2NO
2NC 2C
3NO
SPARE
9
3NC 3C
4NO
Page
Page
4NC 4C
13 / 38
13A
13B
13A
2L-
2L+
Modification
0
Date
R9
11.1
A2
A1
Q1.0
1NO
R9-1NO
22.1
1NC 1C
2NO
2NC 2C
Name
PNEUMATIC VALVE
3NO
PV-01
3NC 3C
4NO
4NC 4C
1
Ed.
Date
Appr.
Original
R10
11.1
A2
A1
Q1.1
EASTERN
05/05/2023
1NO
R10-1NO
22.1
1NC 1C
2NO
2NC 2C
3NO
PV-02 4NO
EPLAN
4NC 4C
Replacement of
R11
11.1
A2
A1
Q1.2
1NO
R11-1NO
22.1
1NC 1C
2NO
3
2NC 2C
Replaced by
PV-03 3NC 3C
4NO
4NC 4C
A2
A1
Q1.3
1NO
R12-1NO
22.1
1NC 1C
4
2NO
2NC 2C
3NO
PNEUMATIC VALVE
3NC 3C
PV-04 4NO
4NC 4C
RELAYS
SYNGENTA PAKISTAN
R13
11.1
A2
A1
Q1.4
1NO
5
R13-1NO
22.1
1NC 1C
MAIN PANEL RACK-03
2NO
RELAYS
2NC 2C
3NO
PNEUMATIC VALVE
3NC 3C
PV-05 4NO
4NC 4C
R14
6
11.1
A2
A1
Q1.5
1NO
R14-1NO
22.2
1NC 1C
2NO
2NC 2C
PNEUMATIC VALVE
3NO
PV-06 3NC 3C
4NO
4NC 4C
7
R15
11.1
A2
A1
Q1.6
1NO
R15-1NO
22.2
1NC 1C
2NO
2NC 2C
IEC_bas001
3NO
PNEUMATIC VALVE
3NC 3C
PV-07 4NO
8
4NC 4C
R16
11.1
A2
A1
Q1.7
1NO
= CA1
+ EAA
R16-1NO
22.2
1NC 1C
2NO
3NO
PV-08
3NC 3C
9
4NO
Page
Page
4NC 4C
14 / 38
13B
13C
13B
Modification
2L-
2L+
0
R17
Date
11.8
A2
A1
Q2.0
1NO
R17-1NO
22.2
1NC 1C
2NO
2NC 2C
Name
3NO
PNEUMATIC VALVE
3NC 3C
PV-09 4NO
4NC 4C
1
Ed.
Date
Appr.
Original
R18
11.8
A2
A1
1NO Q2.1
R18-1NO
22.2
EASTERN
1NC 1C
05/05/2023
2NO
2NC 2C
3NO
PNEUMATIC VALVE
3NC 3C
PV-10 4NO
2
4NC 4C
EPLAN
Replacement of
R19
11.8
A2
A1
Q2.2
1NO
R19-1NO
22.2
1NC 1C
2NO
2NC 2C
3NC 3C
PV-11
4NO
Replaced by
4NC 4C
A2
A1
Q2.3
1NO
R20-1NO
22.2
1NC 1C
2NO
4
2NC 2C
PNEUMATIC VALVE 3NO
PV-12 3NC 3C
4NO
4NC 4C
SYNGENTA PAKISTAN
RELAYS
R21
11.8
A2
A1
Q2.4
1NO
5
R21-1NO
22.2
1NC 1C
2NO
RELAYS
2NC 2C
3NO
MAIN PANEL RACK-03
PV-13 4NO
4NC 4C
R22
11.8
6
A2
A1
Q2.5
1NO
R22-1NO
22.2
1NC 1C
2NO
2NC 2C
3NC 3C
PV-14
4NO
4NC 4C
7
R23
11.8
A2
A1
Q2.6
1NO
R23-1NO
22.2
1NC 1C
2NO
2NC 2C
PV-15 3NC 3C
4NO
4NC 4C
8
R24
11.8
A2
A1
Q2.7
1NO
R24-1NO
22.2
= CA1
+ EAA
1NC 1C
2NO
PNEUMATIC VALVE
2NC 2C
PV-16 3NO
4NO
9
4NC 4C
Page
Page
15 / 38
13C
13D
13C
Modification
2L-
0
2L+
Date
R25
11.8
A2
A1
Q3.0
1NO
R25-1NO
22.3
1NC 1C
Name
2NO
2NC 2C
PNEUMATIC VALVE 3NO
PV-17 3NC 3C
1
Ed.
4NO
Date
Appr.
Not Present
Original
4NC 4C
EASTERN
R26
05/05/2023
11.8
A2
A1
Q3.1
1NO
R26-1NO
22.3
1NC 1C
2NO
2NC 2C
2
EPLAN
PV-18 3NC 3C
4NO
Replacement of
Not Present
4NC 4C
R27
11.8
A2
A1
Q3.2
1NO
R27-1NO
22.3
1NC 1C
2NO
3
2NC 2C
Replaced by
PV-19 3NC 3C
4NO
Not Present
A2
A1
Q3.3
1NO
R28-1NO
22.3
4
1NC 1C
2NO
2NC 2C
PV-120 3NC 3C
4NO
Not Present
4NC 4C
SYNGENTA PAKISTAN
RELAYS
R29
11.8
A2
A1
Q3.4
5
1NO
R29-1NO
22.3
1NC 1C
RELAYS
2NO
MAIN PANEL RACK-03
2NC 2C
3NO
3NC 3C
4NO
DIAPHRAGM PUMP-01
4NC 4C
6
R30
11.8
A2
A1
Q3.5
1NO
R30-1NO
22.3
1NC 1C
2NO
2NC 2C
3NO
3NC 3C
4NC 4C
7
R31
11.8
A2
A1
Q3.6
1NO
R31-1NO
22.3
1NC 1C
2NO
IEC_bas001
2NC 2C
3NO
3NC 3C
8
4NO
SPARE OUTPUT-02
4NC 4C
R32
= CA1
+ EAA
11.8
A2
A1
Q3.7
1NO
R32-1NO
22.3
1NC 1C
2NO
2NC 2C
3NO
9
3NC 3C
Page
Page
4NO
SPARE OUTPUT-03
4NC 4C
16 / 38
13D
13E
0 1 2 3 4 5 6 7 8 9
RELAYS
Q2-L1
2L+
14.0
2L+
R33-A1 R34-A1
A1 A1 A1 A1 A1 A1
1C
2C
3C
4C
1C
2C
3C
4C
1C
2C
3C
4C
1C
2C
3C
4C
1C
2C
3C
4C
1C
2C
3C
4C
1NO
2NO
3NO
4NO
1NO
2NO
3NO
4NO
1NO
2NO
3NO
4NO
1NO
2NO
3NO
4NO
1NO
2NO
3NO
4NO
1NO
2NO
3NO
4NO
1NC
2NC
3NC
4NC
1NC
2NC
3NC
4NC
1NC
2NC
3NC
4NC
1NC
2NC
3NC
4NC
1NC
2NC
3NC
4NC
1NC
2NC
3NC
4NC
A2 A2 A2 A2 A2 A2
K-ELECTRIC STATUS
VFD-01 MOTOR-01
VFD-02 MOTOR-02
OVER LOAD
OVER LOAD
SPARE RELAY
SPARE RELAY
SPARE RELAY
10b.7 10b.7
I7.0
I7.1
I7.6
10b.7
2L-
Q2-N
13D 14
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN RELAYS = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 13E
Modification Date Name Original Replacement of Replaced by Page 17 / 38
0 1 2 3 4 5 6 7 8 9
F3-L / 5.4
F3-N / 5.4
2L+ / 13E.6
1L+ 14.6
1L- 14.7
EOCR-SS EOCR-SS
1 1
T R T R
TIMER TIMER TIMER TIMER
A1 A2 95 96 98 A1 A2 95 96 98
1L+ 1L+ 1L+ 1L+ 1L+ 1L- 1L- 1L- 1L- 1L-
9.6 14.6 14.6 14.6 14A.4 9.6 14.7 14.7 14.7 29.3
BANK-01
HMI, PLC, Etherner Moudule
Ethernet Switch, Analog Input
32.4 13A.3 32.5 13A.4
TRIP-1
TRIP-2
R3-2C
R4-2C
13E 14A
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN EOCR and Bank 1 = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 14
Modification Date Name Original Replacement of Replaced by Page 18 / 38
0 1 2 3 4 5 6 7 8 9
MAIN PANEL
SCREEN
A B - + A A- A+ B B- C C- D D- N(L-) L(L+)
AI 7+
MFM (A)
MFM (B)
MFM (-)
14 14B
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN MASS FLOW METER INTERFACE = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 14A
Modification Date Name Original Replacement of Replaced by Page 19 / 38
0 1 2 3 4 5 6 7 8 9
MAIN PANEL
FANS
F6-L / 5.7
F6-N / 5.8
14A 15
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN FANS = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 14B
Modification Date Name Original Replacement of Replaced by Page 20 / 38
0 1 2 3 4 5 6 7 8 9
MAIN PANEL
RACK-04 RACK-05
F7L1 / 4.6
F7L2 / 4.6
'EM-2L- / 16.0
F7L3 / 4.6
EM-2L- / 32.0
R5-2NO
AO-0+
R5-2C
AO-0-
R1-2NO
R3-2NO
13A.5 13A.5 9.5 9.5
13A.1
RUN-1 I7.2
32.2 10b.7 13A.3
K1L1
K1L2
K1L3
-L1 -L2 -L3 -P1 -CM1 -AV1 -ACM1
1 3 5 1 3 5
A1 13 A1
11
A2 2 4 6 2 4 6
VFD-01
14 12 A2
K1L1
K1L2
K1L3
K3L1
K3L2
K3L3
K1 K3
15.3 15.2
-U1 -V1 -W1 -E1 -RA1 -RC1 -E1
2L+ 2L+
W1 19.5
U1 19.4
V1 19.5
I7.0 2L+
16.2
14B 16
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN VFD-1 = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 15
Modification Date Name Original Replacement of Replaced by Page 21 / 38
0 1 2 3 4 5 6 7 8 9
MAIN PANEL
RACK-04 RACK-05
F8L1 / 4.7
F8L2 / 4.7
F8L3 / 4.7
R6-2NO
AO-1+
R2-2NO
R6-2C
AO-1-
'EM-2L- / 15.9
R4-2NO
13A.6 13A.6 9.5 9.5
13A.2
32.3 10b.7
13A.4
RUN-2 I7.3
F8L1 F8L2 F8L3
K2L1
K2L2
K2L3
-L4 -L5 -L6 -P2 -CM2 -AV2 -ACM2
1 3 5 1 3 5
A1 13 11 A1
A2 2 4 6 14 12 A2 2 4 6
VFD-02
K2L1
K2L2
K2L3
K4L1
K4L2
K2 K4 K4L3
15.8 16.7
2L+ 2L+
U2 V2 W2
19.5 19.6 19.6
I7.1 2L+
16.2
15 19
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN VFD-2 = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 16
Modification Date Name Original Replacement of Replaced by Page 22 / 38
0 1 2 3 4 5 6 7 8 9
UPS-OUTPUT - ⏚
UPS-OUTPUT-N
UPS-OUTPUT-L
UPS-INPUT - ⏚
UPS-INPUT-N
UPS-INPUT-L
2.3
2.3
2.4
2.4
W1 15.6
W2 16.6
U1 15.5
U2 16.5
MAIN-L1
MAIN-L2
MAIN-L3
V1 15.6
V2 16.5
MAIN-N
⏚ 19.5
⏚ 19.6
15.3 K3L2 K3L3 ⏚ K4L1 K4L2 K4L3 ⏚
4.3 4.3 19.3 5.1 5.1 19.4 K3L1 15.3 15.4 19.8 16.3 16.3 16.3 19.7
1 1 1 1 1 1 1
Q1-L2
Q1-L3
UPS-OUTPUT - ⏚
Q1-N
UPS-OUTPUT-N'
UPS-OUTPUT-L'
UPS-INPUT - ⏚
UPS-INPUT-N'
UPS-INPUT-L'
'W1
'W2
'U1
'U2
'V1
'V2
⏚
⏚
2.1
2.1
2.1
2.1
CONTACTOR-03
CONTACTOR-04
UPS-OUTPUT
PUMP-02
PUMP-01
MAIN
UPS-INPUT
16 22
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN POWER TERMINAL BLOCKS = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 19
Modification Date Name Original Replacement of Replaced by Page 23 / 38
19
Modification
0
Date
1
1
R1-1NO R1-1NO 13A.0
24.2
R2-1NO R2-1NO 13A.1 AI 0+ AI 0+ 8.7
22.0
R3-1NO R3-1NO 13A.3 AI 0- AI 0- 22.0
24.2
R4-1NO R4-1NO 13A.4 AI 1+ AI 1+ 8.7
Name
22.1
R5-1NO R5-1NO 13A.5 AI 1- AI 1- 22.1
24.3
R6-1NO R6-1NO 13A.6 AI 2+ AI 2+ 8.7
22.1
32.7 R7-1NO R7-1NO 13A.7 AI 2- AI 2- 22.1
24.3
R8-1NO R8-1NO 13A.9 AI 3+ AI 3+ 8.7
1
Ed.
22.1
25.0 R9-1NO R9-1NO 13B.0 AI 3- AI 3- 22.1
Date
Appr.
24.3
Original
25.0 R10-1NO R10-1NO13B.2 AI 4+ AI 4+ 8.7
22.1
25.1 R11-1NO R11-1NO13B.3 AI 4- AI 4- 22.1
24.3
25.1 R12-1NO R12-1NO13B.4 AI 5+ AI 5+ 8.7
22.1
25.1 R13-1NO R13-1NO13B.5 AI 5- AI 5- 22.1
EASTERN
ANALOG INPUT
24.3
05/05/2023
25.1 R14-1NO R14-1NO13B.6 AI 6+ AI 6+ 8.7
22.2
25.1 R15-1NO R15-1NO13B.7 AI 6- AI 6- 22.2
22.2
25.1 R16-1NO R16-1NO13B.9 AI 7+ AI 7+ 22.2
22.2
25.1 R17-1NO R17-1NO13C.0 AI 7- AI 7- 22.2
1
AO 0+ AO 0+
EPLAN
AO 0- AO 0-
DIGITAL OUTPUT
25.2 R21-1NO R21-1NO13C.5 22.2 AO 1+ AO 1+
Replacement of
25.2 R22-1NO R22-1NO13C.6 22.2 AO 1- AO 1-
25.3
ANALOG OUTPUT
R27-1NO R27-1NO13D.3
1
Replaced by
'I0.1 I0.1 10a.2
25.8 R32-1NO R32-1NO13D.9
'I0.2 I0.2 10a.2
24.3
1
'I0.3 I0.3 10a.2
24.3
1
'I0.6 I0.6 10a.2
24.3
2L+ 24.2
2L- 5A.9
10a.8
SYNGENTA PAKISTAN
'I2.0 I2.0
24.4
24.4
1
MAIN PANEL RACK-06
F3-L
'I3.3 I3.3 10a.8
24.4
F3-N
'I4.1 I4.1 10b.1
24.5
IEC_bas001
= CA1
+ EAA
9
Page
Page
24 / 38
22
24
22
Modification
0
Date
Name
1
Ed.
Date
Appr.
Original
EASTERN
05/05/2023
Rack - 02
Rack - 01
Rack - 03
24.5 /
2
2L-
EPLAN
2L+ / 22.4
1
1
Replacement of
1
AI 0+ AI 0+ 22.0
24.2
24.2 PV-01 CLOSE 'I0.0 22.3
AI 0- AI 0- 24.2
24.2
PV-01 OPEN 'I0.1 22.3
AI 1+ AI 1+ 22.1
24.3
24.3 PV-02 CLOSE 'I0.2 22.3
AI 1- AI 1- 24.3
1
3
24.3
ANALOG INPUT
AI 4-
24.3
Replaced by
PV-06 OPEN 'I1.3 22.4
AI 5+ 22.1
24.3
PNEUMATIC ACTUATOR FEEDBACK
1
24.4
22.5
24V DC POWER BANK
SYNGENTA PAKISTAN
START PB_HOIST-FIELD 'I3.6 22.6
24.2
2L-
22.6
TERMINATION PANEL
TERMINATION PANEL
SPARE-1 'I5.5 22.7
22.8
6
SPARE-4 'I6.0
25.3
IEC_bas001
8
= CA1
+ EAA
9
Page
Page
25 / 38
24
25
24
Modification
0
Date
R9-1NO R9-1NO 22.1
PV-01
Name
PV-04 R12-1NO R12-1NO 22.1
Ed.
PV-06
Date
Appr.
Original
PV-07 R15-1NO R15-1NO 22.2
EASTERN
R17-1NO R17-1NO 22.2
05/05/2023
PV-09
EPLAN
DIGITAL OUTPUT
Replacement of
PV-14 R22-1NO R22-1NO 22.2
Replaced by
PV-20 R28-1NO R28-1NO 22.3
⏚
2L- / 25.4
24.7
⏚
29.3
4
25.3
2L-
25.4
2L-
25.4
2L-
25.5
2L-
SYNGENTA PAKISTAN
25.4
2L-
25.5
2L-
25.5
2L-
5
25.5
2L-
PNEUMATIC PANEL
25.5
2L-
25.6
2L-
PNEUMATIC PANEL
25.5
2L-
25.6
2L-
25.6
2L-
6
25.6
2L-
25.6
2L-
25.7
2L-
26.4
2L-
1
IEC_bas001
= CA1
+ EAA
1
9
Page
Page
26 / 38
25
26
0 1 2 3 4 5 6 7 8 9
PRESSURE SWITCH - 01
PRESSURE SWITCH - 02
SOLENOID VALVE - 01
SOLENOID VALVE - 02
R29-1NO
R30-1NO
LOW_AIR_PS-01
2L-
2L-
25.8
25.7
25.8
26.4
2L+ 2L+ I4.1
26.4 26.5 26.5
1 1 1
R29-1NO
R30-1NO
2L-
2L-
26.4
32.0
25 29
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN DIAPHRAGM PUMP PANEL = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 26
Modification Date Name Original Replacement of Replaced by Page 27 / 38
0 1 2 3 4 5 6 7 8 9
MAIN PANEL
FRONT DOOR
TP-1200 HMI
26 30
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN HMI = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 29
Modification Date Name Original Replacement of Replaced by Page 28 / 38
0 1 2 3 4 5 6 7 8 9
ETHERNET SWITCH
S7-300 /
S7-1200 /
TP-1200-HMI /
DESKTOP /
29 31
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN ETHERNET SWITCH = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 30
Modification Date Name Original Replacement of Replaced by Page 29 / 38
0 1 2 3 4 5 6 7 8 9
AC OUTLET
5.5 5.5
F4-L ⏚ F4-N
30 32
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN AC OUTLET = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 31
Modification Date Name Original Replacement of Replaced by Page 30 / 38
0 1 2 3 4 5 6 7 8 9
11 11 13
x1 x2 x1 x2 x1 x2 x1 x2 x1 x2
x2 x1
12 12 14
29.2 15.2 32.3 16.2 32.3 14.3 32.5 14.4 32.4 10b.7 22.1
EM-2L-
I6.0 1L+ 1L- RUN-1 2L- RUN-2 2L- TRIP-1 2L- TRIP-2 2L- I7.4 R7-1NO 2L-
15.0
8KL-EMERGENCY
PUMP-01 TRIP
PUMP-02 TRIP
PUMP-01 RUN
PUMP-02 RUN
PLC POWER
RESET PB
BUZZER
31 33A
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN MAIN PANEL DOOR = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 32
Modification Date Name Original Replacement of Replaced by Page 31 / 38
0 1 2 3 4 5 6 7 8 9
-V+3 -V-3
POWER SUPPLY - 03
1 N 1 N 1 N NDR-240-24
-F12 -F13 -F14
2 N. 2 N. 2 N.
C 16A C 6A C 6A
F14-L F14-N
33AB.0 33AB.0
MAIN BREAKER
-⏚1 -N1 -L7
32 33AB
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN BREAKERS OF 8KL VESSEL = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 33A
Modification Date Name Original Replacement of Replaced by Page 32 / 38
0 1 2 3 4 5 6 7 8 9
LOAD _CELL-S1
LOAD _CELL-S2
LOAD _CELL-S3
LOAD _CELL-S4
35.1
35.2
35.2
35.2
S1 S2 S3 S4
35.835.835.835.8
S1 S2 S3 S4
33A 34A
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN POWER SUPPLY FOR 8KL = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 33AB
Modification Date Name Original Replacement of Replaced by Page 33 / 38
0 1 2 3 4 5 6 7 8 9
8KL-EMERGENCY
8KL-HIGH-HIGH
8KL-HIGH
I-0.0
I-0.1
I-0.2
33A.9 33A.9
37.4
37.5
37.3
3L+ 3L-
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
-K4
SIE.6ES7214-1AG40-0XB0
L+ M FE L+ M 1M DI a.0 DI a.1 DI a.2 DI a.3 DI a.4 DI a.5 DI a.6 DI a.7 DI b.0 DI b.1 DI b.2 DI b.3 DI b.4 DI b.5 2M AI 0 AI 1
-X10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 -X11 1 2 3
PIW12
PIW14
I0.0
I0.1
I0.2
I0.3
I0.4
I0.5
I0.6
I0.7
I1.0
I1.1
I1.2
I1.3
I1.4
I1.5
+
-
-
+
- -
+
6ES7214-1AG40-0XB0 CPU 1214C DC/DC/DC S7-1200 SIEMENS
-
+
Q0.0
Q0.1
Q0.2
Q0.3
Q0.4
Q0.5
Q0.6
Q0.7
Q1.0
Q1.1
-X12 1 2 3 4 5 6 7 8 9 10 11 12
3L+ 3M DQ a.0 DQ a.1 DQ a.2 DQ a.3 DQ a.4 DQ a.5 DQ a.6 DQ a.7 DQ b.0 DQ b.1
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
RESERVE
34B.4 34B.4
3L+ 3L-
33AB 34B
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN PLC S7-1200 = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 34A
Modification Date Name Original Replacement of Replaced by Page 34 / 38
0 1 2 3 4 5 6 7 8 9
35.6
34A.2 34A.3
3L+ 3L-
RESERVE
RESERVE
RESERVE
RESERVE
-K3
SIE.6ES7231-4HD32-0XB0
L+ M FE AI 0+ AI 0- AI 1+ AI 1- AI 2+ AI 2- AI 3+ AI 3-
-X10 1 2 3 4 5 6 7 4 5 6 7
PIW10
PIW4
PIW6
PIW8
+
I
L+
I I
-
A
-
V
4-Draht
+
2-Draht Messumformer
+
Messumformer -
M L+
34A 35
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN ANALOG INPUT = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 34B
Modification Date Name Original Replacement of Replaced by Page 35 / 38
0 1 2 3 4 5 6 7 8 9
S1 S3
S2 S4
OP-07
LOAD _CELL-S2
LOAD _CELL-S3
LOAD _CELL-S4
34B.5 34B.6
33AB.633AB.6
34B 36
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN WEIGHT INDICATOR = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 35
Modification Date Name Original Replacement of Replaced by Page 36 / 38
0 1 2 3 4 5 6 7 8 9
FRONT DOOR
TP-700 HMI
37.3
3L+ 3L-
35 37
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN HMI = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 36
Modification Date Name Original Replacement of Replaced by Page 37 / 38
0 1 2 3 4 5 6 7 8 9
Pepperl+Fuchs Pepperl+Fuchs
8KL-EMERGENCY 8KL-HIGH 8KL-HIGH HIGH
11 11 11 11
12 12 12 12
F14-L /
F14-N /
36
Date 05/05/2023 EPLAN SYNGENTA PAKISTAN EMERGENCY AND LIMIT SENSOR. = CA1
Ed. EASTERN + EAA
Appr. SMOC Unloading and Transfering to 8KL Vessel IEC_bas001 Page 37
Modification Date Name Original Replacement of Replaced by Page 38 / 38