This document sets up a network simulation with 4 nodes connected by links with varying bandwidths and delays. It creates TCP and UDP connections between nodes to transmit FTP and CBR traffic. The simulation is run for 5 seconds, with events scheduled for the applications to start and stop transmitting. Network Animator (NAM) traces are generated to visualize the simulation results.
This document sets up a network simulation with 4 nodes connected by links with varying bandwidths and delays. It creates TCP and UDP connections between nodes to transmit FTP and CBR traffic. The simulation is run for 5 seconds, with events scheduled for the applications to start and stop transmitting. Network Animator (NAM) traces are generated to visualize the simulation results.
This document sets up a network simulation with 4 nodes connected by links with varying bandwidths and delays. It creates TCP and UDP connections between nodes to transmit FTP and CBR traffic. The simulation is run for 5 seconds, with events scheduled for the applications to start and stop transmitting. Network Animator (NAM) traces are generated to visualize the simulation results.
This document sets up a network simulation with 4 nodes connected by links with varying bandwidths and delays. It creates TCP and UDP connections between nodes to transmit FTP and CBR traffic. The simulation is run for 5 seconds, with events scheduled for the applications to start and stop transmitting. Network Animator (NAM) traces are generated to visualize the simulation results.